Generation Interconnection Number | IFS Queue Number | Current Cluster | Cluster Group | Nearest Town or County | State | TO at POI | In-Service Date (proposed) |
Commercial Operation Date | Cessation Date | Replacement Generator Commercial Op. Date | Capacity (MW) | MAX Summer MW | MAX Winter MW | Service Type | Generation Type | Fuel Type |
Substation or Line | Request Received | Date Withdrawn | Status | Cause of Delay | Associated Studies | Facility Report | Executed GIA |
GEN-2024-SR9 | | Surplus | 05 SOUTHWEST | Beaver County | OK | OG&E | | 1/1/2027 | | | 150 | 150 | 150 | ER | Battery/Storage | | Beaver County Substation 345 kV | 1/26/2024 | | None | | | | |
GEN-2024-SR8 | | Surplus | 02 NEBRASKA | Greely County | NE | NPPD | | 12/31/2026 | | | 70 | 70 | 70 | ER | Battery/Storage | | Spalding to North Loup 115kV | 4/3/2024 | | FACILITY STUDY STAGE | | | | |
GEN-2024-SR7 | | Surplus | 05 SOUTHWEST | Beaver County | OK | OG&E | | 6/1/2027 | | | 200 | 200 | 200 | ER | Solar | | Beaver County Substation 345 kV | 1/26/2024 | | None | | | | |
GEN-2024-SR6 | | Surplus | 04 SOUTHEAST | Johnston County | OK | OG&E | | | | | 200 | 200 | 200 | ER | Battery/Storage | | Interconnecting at Hugo - Sunnyside 345 kV transmission line | 2/20/2024 | | None | | | | |
GEN-2024-SR5 | | Surplus | 04 SOUTHEAST | Drumright | OK | OG&E | | 6/1/2025 | | | 176.9 | 176.9 | 176.9 | ER | Battery/Storage | | 138 kV Greenwood Station | 2/7/2024 | | IA PENDING | | | | |
GEN-2024-SR3 | | Surplus | 04 SOUTHEAST | Lincoln County | OK | OG&E | | 5/1/2026 | | | 72.5 | 72.5 | 72.5 | ER/NR | Battery/Storage | | 138 kV TRYON 3 (Bus # 515675 | 2/1/2024 | | IA PENDING | | | | |
GEN-2024-SR2 | | Surplus | 04 SOUTHEAST | Franklin County | AR | OG&E | | 6/1/2026 | | | 72.5 | 72.5 | 72.5 | ER/NR | Battery/Storage | | 161 kV BRANCH 5 (Bus # 515316) | 2/6/2024 | | IA PENDING | | | | |
GEN-2024-SR15 | | Surplus | 05 SOUTHWEST | Yoakum | TX | SPS | | 5/1/2026 | | | 300 | 300 | 300 | ER | Battery/Storage | | Mahoney 230kV Substation | 10/24/2024 | | None | | | | |
GEN-2024-SR14 | | Surplus | 05 SOUTHWEST | Lea County | NM | Xcel/SPS | | 4/1/2026 | | | 36 | 36 | 36 | ER | Battery/Storage | | Cunningham 115kV | 7/8/2024 | | None | | | | |
GEN-2024-SR13 | | Surplus | 04 SOUTHEAST | Bryan County | OK | OG&E | | 6/1/2026 | | | 52.2 | 52.2 | 52.2 | ER/NR | Battery/Storage | | Brown 138kV Substation | 5/1/2024 | | None | | | | |
GEN-2024-SR12 | | Surplus | 01 NORTH | La Moure County | ND | WAPA | | 10/1/2026 | | | 20 | 20 | 20 | ER | Battery/Storage | | Edgeley 115 kV Substation | 5/21/2024 | | None | | | | |
GEN-2024-SR11 | | Surplus | 04 SOUTHEAST | Garfield | OK | OGE | | 12/31/2025 | | | 200 | 200 | 200 | ER/NR | Battery/Storage | | Woodring 345kV Substation | 5/7/2024 | | IA PENDING | | | | |
GEN-2024-SR10 | | Surplus | 02 NEBRASKA | Lancaster | NE | NPPD | | 12/31/2026 | | | 80 | 80 | 80 | ER/NR | Battery/Storage | | Monolith 115kV | 4/22/2024 | | FACILITY STUDY STAGE | | | | |
GEN-2024-SR1 | | Surplus | 04 SOUTHEAST | Chouteau | OK | GRDA | | 12/31/2025 | | | 84 | 84 | 84 | ER | Solar | | 345 kV bus of GRDA GREC 1 & 2 Substation | 11/29/2023 | | None | | | | |
GEN-2024-GR4 | | Replacement | 03 CENTRAL | Riverton | KS | EDE | | | 3/15/2026 | 6/30/2026 | 31 | 31 | 31 | ER | Thermal | | Riverton 452 | 7/25/2024 | | None | | | | |
GEN-2024-GR3 | | Replacement | 05 SOUTHWEST | Lea County | NM | Xcel/SPS | | | 4/1/2027 | 4/1/2027 | 196 | 196 | 196 | ER | Solar | | 230kV Cunningham Substation | 6/7/2024 | | None | | | | |
GEN-2024-GR1 | | Replacement | 04 SOUTHEAST | Harrah | OK | OG&E | | 12/31/2026 | 12/31/2026 | | 492 | 492 | 492 | ER | Thermal | CTG | Horseshoe Lake 138kV | 1/8/2024 | | None | | | | |
GEN-2024-013 | | DISIS-2024-001 | 04 SOUTHEAST | McClain | OK | OG&E | 4/1/2029 | 1/1/2030 | | | 495.6 | 474.4 | 495.6 | ER/NR | Thermal | CT | Norman Hills 345 kV | 8/2/2024 | | DISIS STAGE | | | | |
GEN-2024-012 | | DISIS-2024-001 | 04 SOUTHEAST | Oklahoma | OK | OG&E | 4/1/2028 | 1/1/2029 | | | 495.6 | 474.4 | 495.6 | ER/NR | Thermal | Gas | Horseshoe Lake 138 kV | 8/2/2024 | | DISIS STAGE | | | | |
GEN-2024-011 | | DISIS-2024-001 | 05 SOUTHWEST | Lea | NM | WFEC | 2/1/2026 | 12/29/2026 | | | 150 | 150 | 150 | ER/NR | Solar | | Lea County 115 kV Substation | 12/29/2023 | | DISIS STAGE | | | | |
GEN-2024-010 | | DISIS-2024-001 | 05 SOUTHWEST | Lea | NM | SPS | 2/1/2026 | 12/28/2026 | | | 150 | 150 | 150 | ER/NR | Solar | | Cunningham 230 kV Substation | 12/29/2023 | | DISIS STAGE | | | | |
GEN-2024-009 | | DISIS-2024-001 | 05 SOUTHWEST | Lea | NM | SPS | 2/26/2026 | 12/30/2026 | | | 150 | 150 | 150 | ER/NR | Solar | | Hobbs 230 kV Substation | 1/2/2024 | | DISIS STAGE | | | | |
GEN-2024-008 | | DISIS-2024-001 | 05 SOUTHWEST | Lea | NM | SPS | 2/1/2026 | 12/28/2026 | | | 150 | 150 | 150 | ER/NR | Solar | | Ward 115 kV Substation | 12/29/2023 | | DISIS STAGE | | | | |
GEN-2024-007 | | DISIS-2024-001 | 03 CENTRAL | Stafford | KS | Evergy | 1/30/2028 | 12/31/2028 | | | 80 | 80 | 80 | ER/NR | Hybrid | Solar/Storage | Seward 115 kV Substation | 4/30/2024 | | DISIS STAGE | | | | |
GEN-2024-006 | | DISIS-2024-001 | 04 SOUTHEAST | Lawrence | AR | SWPA | 10/1/2026 | 2/1/2028 | | | 100 | 100 | 100 | ER/NR | Solar | | Jonesboro - Water Valley 161 kV | 4/25/2024 | | DISIS STAGE | | | | |
GEN-2024-005 | | DISIS-2024-001 | 03 CENTRAL | Andrew and Nodaway | MO | Evergy | 11/1/2026 | 3/1/2028 | | | 150 | 150 | 150 | ER/NR | Solar | | Midway - Avenue City 161 kV | 4/25/2024 | | DISIS STAGE | | | | |
GEN-2024-004 | | DISIS-2024-001 | 03 CENTRAL | Cooper | MO | Evergy | 8/1/2026 | 10/1/2026 | | | 20 | 20 | 20 | ER/NR | Solar | | Overton - Sedalia East 161 kV Substation | 4/25/2024 | | DISIS STAGE | | | | |
GEN-2024-003 | | DISIS-2024-001 | 04 SOUTHEAST | Franklin | AR | AECC | 9/12/2025 | 11/7/2025 | | | 102.2 | 102.2 | 102.2 | ER | Thermal | CT | Fitzhugh 161kV | 4/25/2024 | | DISIS STAGE | | | | |
GEN-2024-002 | | DISIS-2024-001 | 05 SOUTHWEST | Roosevelt | NM | SPS | 5/27/2029 | 9/30/2029 | | | 90 | 90 | 90 | ER/NR | Solar | | Roosevelt - Portales 115 kV Line | 2/2/2024 | | DISIS STAGE | | | | |
GEN-2024-001 | | DISIS-2024-001 | 05 SOUTHWEST | Curry | NM | SPS | 5/27/2029 | 9/30/2029 | | | 100 | 100 | 100 | ER/NR | Solar | | Curry County 115 kV Substation | 2/2/2024 | | DISIS STAGE | | | | |
GEN-2023-SR9 | | Surplus | 05 SOUTHWEST | Lorenzo | TX | Xcel | | 6/1/2026 | | | 50 | 50 | 50 | ER | Battery/Storage | | Tap Floyd County Interchange and Crosby County Interchange 115kV Line | 2/13/2023 | | IA FULLY EXECUTED/ON SCHEDULE | | | | |
GEN-2023-SR8 | | Surplus | 05 SOUTHWEST | Gruver | TX | Xcel | | 6/1/2026 | | | 200 | 200 | 200 | ER | Battery/Storage | | Hitchland 345 kV Substation | 2/13/2023 | | IA FULLY EXECUTED/ON SCHEDULE | | | | |
GEN-2023-SR7 | | Surplus | 02 NEBRASKA | Wayne Co | NE | NPPD | | 12/31/2024 | | | 135 | 135 | 135 | ER | Battery/Storage | | Hoskins 345 kV Substation | 12/16/2022 | | FACILITY STUDY STAGE | | | | |
GEN-2023-SR5 | | Surplus | 04 SOUTHEAST | Seiling | OK | OGE | | 6/1/2026 | | | 85 | 85 | 85 | ER | Battery/Storage | | Tatonga 345 kV Substation | 12/15/2022 | | IA FULLY EXECUTED/ON SCHEDULE | | | | |
GEN-2023-SR4 | | Surplus | 01 NORTH | Burke | ND | BEPC | | 6/1/2026 | | | 170 | 170 | 170 | ER | Battery/Storage | | Tande 345 kV Substation | 12/15/2022 | | IA FULLY EXECUTED/ON SCHEDULE | | | | |
GEN-2023-SR28 | | Surplus | 03 CENTRAL | Ford | KS | SUNC | | 9/15/2025 | | | 150 | 150 | 150 | ER | Solar | | 115 kV Fort Dodge Substation | 10/6/2023 | | IA PENDING | | | | |
GEN-2023-SR27 | | Surplus | 04 SOUTHEAST | Mayes County | OK | GRDA | 12/1/2021 | 8/1/2024 | | | 101.5 | 101.5 | 101.5 | ER | Battery/Storage | | GRDA1 to CLARMR 5 161kV line | 7/12/2023 | | IA PENDING | | | | |
GEN-2023-SR26 | | Surplus | 04 SOUTHEAST | Mayes County | OK | AEP | 12/1/2021 | 12/9/2024 | | | 72.5 | 72.5 | 72.5 | ER | Battery/Storage | | Pryor Junction 138kV sub | 7/12/2023 | | IA PENDING | | | | |
GEN-2023-SR25 | | Surplus | 04 SOUTHEAST | Mayes County | OK | GRDA | 12/1/2021 | 8/1/2024 | | | 72.5 | 72.5 | 72.5 | ER | Battery/Storage | | Dry Gulch 161kV sub | 7/12/2023 | | IA PENDING | | | | |
GEN-2023-SR23 | | Surplus | 04 SOUTHEAST | Caddo Parrish | LA | AEP | | 12/1/2025 | | | 73.5 | 73.5 | 73.5 | ER/NR | Battery/Storage | | 138 kV G16-167-TAP Station (Bus# 588404); Tapping North Benton (Bus# 508811) to Lieberman (bus# 508806) Transmission Line | 6/20/2023 | | IA PENDING | | | | |
GEN-2023-SR22 | | Surplus | 04 SOUTHEAST | Mayes County | OK | AEP | | 12/6/2024 | | | 124.7 | 124.7 | 124.7 | ER | Battery/Storage | | 138 kV Exclart Bus (Bus# 510401) | 6/20/2023 | | IA PENDING | | | | |
GEN-2023-SR20 | | Surplus | 04 SOUTHEAST | Custer/Wasita | OK | AEP | | 6/1/2025 | | | 120 | 120 | 120 | ER | Battery/Storage | | Weatherford 138 kV Substation | 6/21/2023 | | IA PENDING | | | | |
GEN-2023-SR19 | | Surplus | 02 NEBRASKA | Jefferson County | NE | NPPD | | 6/1/2025 | | | 60 | 60 | 60 | ER | Battery/Storage | | Steele City 115 kV | 6/21/2023 | | FACILITY STUDY STAGE | | | | |
GEN-2023-SR18 | | Surplus | 04 SOUTHEAST | Grady County | OK | OGE | | 5/15/2025 | | | 80 | 80 | 80 | ER | Battery/Storage | | Minco 345 kV | 6/20/2023 | | IA FULLY EXECUTED/ON SCHEDULE | | | | |
GEN-2023-SR16 | | Surplus | 04 SOUTHEAST | Woodward and Harper Counties | OK | OG&E | | 6/1/2025 | | | 70 | 70 | 70 | ER | Battery/Storage | | Tap Mooreland to Woodward 138 kV Line (FPLSwitch 138 kV Substation) | 4/26/2023 | | IA FULLY EXECUTED/ON SCHEDULE | | | | |
GEN-2023-SR15 | | Surplus | 04 SOUTHEAST | Choctaw County | OK | WFEC | | 6/1/2026 | | | 50 | 50 | 50 | ER/NR | Battery/Storage | | Hugo Power Plant 138 kV Substation | 3/27/2023 | | IA FULLY EXECUTED/ON SCHEDULE | | | | |
GEN-2023-SR13 | | Surplus | 04 SOUTHEAST | Garfield County | OK | OG&E | | 6/1/2025 | | | 70 | 70 | 70 | ER | Battery/Storage | | Breckinridge 138 kV Substation | 1/26/2023 | | IA FULLY EXECUTED/ON SCHEDULE | | | | |
GEN-2023-SR12 | | Surplus | 05 SOUTHWEST | Whiteface | TX | Xcel | | 9/30/2025 | | | 120 | 120 | 120 | ER | Battery/Storage | | Tap Cochran to Lehman 115 kV Line | 2/13/2023 | | IA FULLY EXECUTED/ON SCHEDULE | | | | |
GEN-2023-SR1 | | Surplus | 02 NEBRASKA | Brown | NE | NPPD | 10/1/2005 | 6/21/2024 | | | 21.9 | 21.9 | 21.9 | ER/NR | Thermal | | Ainsworth Wind 115 kV | 12/5/2022 | | IA FULLY EXECUTED/ON SCHEDULE | | | | |
GEN-2023-GR5 | | Replacement | 05 SOUTHWEST | Lamb County | TX | Xcel/SPS | | | 8/11/2022 | 4/1/2026 | 150 | 150 | 150 | ER | Solar | | Plant X 115 kV Substation | 7/18/2023 | | IA FULLY EXECUTED/ON SCHEDULE | | | | |
GEN-2023-GR4 | | Replacement | 05 SOUTHWEST | Lea County | NM | Xcel/SPS | | | 7/13/2022 | 5/1/2026 | 72 | 72 | 72 | ER | Solar | | Cunningham 115kV | 7/5/2023 | | IA FULLY EXECUTED/ON SCHEDULE | | | | |
GEN-2023-GR3 | | Replacement | 05 SOUTHWEST | Quay County | NM | Xcel/SPS | 12/1/2004 | 12/31/2004 | 9/16/2024 | 12/31/2024 | 80 | 80 | 80 | ER/NR | Wind | | Norton 115 kV | 6/30/2023 | | IA FULLY EXECUTED/ON SCHEDULE | | | | |
GEN-2023-GR2 | | Replacement | 04 SOUTHEAST | Oklahoma City | OK | OG&E | | | 4/1/2026 | 5/1/2026 | 94.242 | 84.926 | 94.242 | ER | Thermal | Gas | Tinker Air Force Base 138kV | 2/17/2023 | | IA FULLY EXECUTED/ON SCHEDULE | | | | |
GEN-2023-GR1 | | Replacement | 04 SOUTHEAST | Anadarko | OK | WFEC | | | 11/30/2025 | 12/1/2025 | 97.488 | 97.488 | 95.64 | ER | Thermal | Gas | Anadarko Power Plant 69 kV | 1/9/2023 | | IA FULLY EXECUTED/ON SCHEDULE | | | | |
GEN-2023-241 | | DISIS-2023-001 | 04 SOUTHEAST | Franklin & Wood | TX | AEP | 8/28/2027 | 1/5/2028 | | | 93 | 93 | 93 | ER | Solar | | Winnsboro 138 kV Substation | 10/2/2023 | | DISIS STAGE | | | | |
GEN-2023-237 | | DISIS-2023-001 | 05 SOUTHWEST | Hale | TX | SPS | 1/15/2030 | 12/31/2030 | | | 500 | 500 | 500 | ER/NR | Wind | | Crawfish Draw 345 kV Substation | 10/2/2023 | | DISIS STAGE | | | | |
GEN-2023-236 | | DISIS-2023-001 | 05 SOUTHWEST | Lea | NM | SPS | 1/15/2030 | 12/31/2030 | | | 400 | 400 | 400 | ER/NR | Solar | | Hobbs - Yoakum 345 kV | 10/2/2023 | | DISIS STAGE | | | | |
GEN-2023-231 | | DISIS-2023-001 | 03 CENTRAL | Crawford | KS | Evergy | 5/1/2028 | 12/1/2028 | | | 310 | 310 | 310 | ER | Hybrid | Wind/Storage | Neosho - LaCynge 345 kV Line | 10/2/2023 | | DISIS STAGE | | | | |
GEN-2023-230 | | DISIS-2023-001 | 04 SOUTHEAST | Bossier | LA | AEP | 2/4/2028 | 11/19/2028 | | | 150 | 150 | 150 | ER/NR | Hybrid | Solar/Storage | Red Pointe 138 kV Substation | 10/2/2023 | | DISIS STAGE | | | | |
GEN-2023-229 | | DISIS-2023-001 | 04 SOUTHEAST | Caddo | OK | AEP | 4/1/2028 | 10/31/2028 | | | 230 | 230 | 230 | ER/NR | Wind | | Southwestern Power Station 138 kV Substation (SWS4) | 10/2/2023 | | DISIS STAGE | | | | |
GEN-2023-228 | | DISIS-2023-001 | 05 SOUTHWEST | Cottle | TX | SPS | 8/15/2026 | 12/1/2026 | | | 250 | 250 | 250 | ER/NR | Battery/Storage | | Tuco-Okalunion 345 kV line | 10/2/2023 | | DISIS STAGE | | | | |
GEN-2023-227 | | DISIS-2023-001 | 04 SOUTHEAST | Titus | TX | AEP | 5/1/2026 | 9/1/2026 | | | 200 | 200 | 200 | ER/NR | Battery/Storage | | Petty to Chapel 138 kV Line | 10/2/2023 | | DISIS STAGE | | | | |
GEN-2023-225 | | DISIS-2023-001 | 02 NEBRASKA | Lancaster | NE | NPPD | 3/1/2027 | 6/1/2027 | | | 217 | 217 | 217 | ER | Thermal | RICE | Olive Creek 345 kV Substation | 10/2/2023 | | DISIS STAGE | | | | |
GEN-2023-224 | | DISIS-2023-001 | 02 NEBRASKA | Lancaster | NE | NPPD | 3/1/2027 | 6/1/2027 | | | 478 | 478 | 478 | ER | Thermal | CTG | Olive Creek 345 kV Substation | 10/2/2023 | | DISIS STAGE | | | | |
GEN-2023-223 | | DISIS-2023-001 | 02 NEBRASKA | Gage | NE | NPPD | 3/1/2027 | 6/1/2027 | | | 239 | 239 | 239 | ER/NR | Thermal | CTG | New Beatrice Power Station 345 kV | 10/2/2023 | | DISIS STAGE | | | | |
GEN-2023-222 | | DISIS-2023-001 | 02 NEBRASKA | Gage | NE | NPPD | 3/1/2027 | 6/1/2027 | | | 478 | 478 | 478 | ER/NR | Thermal | CTG | New Beatrice Power Station 345 kV | 10/2/2023 | | DISIS STAGE | | | | |
GEN-2023-221 | | DISIS-2023-001 | 03 CENTRAL | Osage | KS | Evergy | 9/1/2029 | 12/1/2029 | | | 250 | 250 | 250 | ER/NR | Solar | | Emporia Energy Center - Swissvale 345 kV Line | 10/2/2023 | | DISIS STAGE | | | | |
GEN-2023-220 | | DISIS-2023-001 | 03 CENTRAL | Osage | KS | Evergy | 8/1/2029 | 12/1/2029 | | | 250 | 250 | 250 | ER/NR | Solar | | Emporia Energy Center - Swissvale 345 kV Line | 10/2/2023 | | DISIS STAGE | | | | |
GEN-2023-219 | | DISIS-2023-001 | 03 CENTRAL | Osage | KS | Evergy | 8/1/2029 | 12/1/2029 | | | 125 | 125 | 125 | ER/NR | Solar | | Reading - Osage Jct 115 kV Line | 10/2/2023 | | DISIS STAGE | | | | |
GEN-2023-218 | | DISIS-2023-001 | 02 NEBRASKA | Knox and Cedar | NE | NPPD | 9/30/2026 | 12/31/2026 | | | 200 | 200 | 200 | ER/NR | Wind | | Turtle Creek 345 kV Substation | 10/2/2023 | | DISIS STAGE | | | | |
GEN-2023-217 | | DISIS-2023-001 | 02 NEBRASKA | Knox and Cedar | NE | NPPD | 9/30/2026 | 12/31/2026 | | | 200 | 200 | 200 | ER/NR | Wind | | Turtle Creek 345 kV Substation | 10/2/2023 | | DISIS STAGE | | | | |
GEN-2023-216 | | DISIS-2023-001 | 02 NEBRASKA | Knox and Cedar | NE | NPPD | 9/30/2026 | 12/31/2026 | | | 200 | 200 | 200 | ER/NR | Wind | | Turtle Creek 345 kV Substation | 10/2/2023 | | DISIS STAGE | | | | |
GEN-2023-213 | | DISIS-2023-001 | 04 SOUTHEAST | Benton | AR | AEP | 4/15/2028 | 9/1/2028 | | | 100 | 100 | 100 | ER/NR | Battery/Storage | | Chamber Springs 161 kV Substation | 10/2/2023 | | DISIS STAGE | | | | |
GEN-2023-212 | | DISIS-2023-001 | 04 SOUTHEAST | Bowie | TX/OK | AEP | 3/1/2027 | 12/1/2027 | | | 400 | 400 | 400 | ER/NR | Hybrid | Solar/Storage | Northwest Texarkana - Valliant 345 kV Line | 10/2/2023 | | DISIS STAGE | | | | |
GEN-2023-211 | | DISIS-2023-001 | 04 SOUTHEAST | Kay | OK | OGE | 3/1/2028 | 11/1/2028 | | | 250 | 250 | 250 | ER/NR | Hybrid | Solar/Battery/Wind | Ranch Road 345 kV Substation | 10/2/2023 | | DISIS STAGE | | | | |
GEN-2023-210 | | DISIS-2023-001 | 04 SOUTHEAST | Lincoln | OK | WFEC | 5/4/2026 | 9/1/2026 | | | 191 | 191 | 191 | ER/NR | Solar | | Prague - Chernicky 138 kV Line | 10/2/2023 | | DISIS STAGE | | | | |
GEN-2023-209 | | DISIS-2023-001 | 05 SOUTHWEST | Randall | TX | SPS | 4/1/2027 | 6/1/2027 | | | 125 | 125 | 125 | ER/NR | Battery/Storage | | Amarillo South 115 kV | 10/2/2023 | | DISIS STAGE | | | | |
GEN-2023-208 | | DISIS-2023-001 | 05 SOUTHWEST | Potter | TX | SPS | | 12/31/2029 | | | 200 | 200 | 200 | ER | Battery/Storage | | Rolling Hills 115 kV | 10/2/2023 | | DISIS STAGE | | | | |
GEN-2023-206 | | DISIS-2023-001 | 04 SOUTHEAST | Sebastian | AR | OGE | 1/1/2029 | 12/31/2029 | | | 50 | 50 | 50 | ER/NR | Battery/Storage | | Battlefield BESS 161 kV Substation | 10/2/2023 | | DISIS STAGE | | | | |
GEN-2023-205 | | DISIS-2023-001 | 04 SOUTHEAST | Hughes | OK | AEP | 7/1/2026 | 12/31/2026 | | | 180 | 180 | 180 | ER/NR | Solar | | McAlester City - Weleetka 138 kV line | 10/2/2023 | | DISIS STAGE | | | | |
GEN-2023-204 | | DISIS-2023-001 | 04 SOUTHEAST | Morris | TX | AEP | 4/1/2028 | 12/1/2028 | | | 953 | 953 | 953 | ER | Thermal | CTG | Welsh-Lydia 345kV Line | 10/2/2023 | | DISIS STAGE | | | | |
GEN-2023-203 | | DISIS-2023-001 | 05 SOUTHWEST | Lea | NM | SPS | 7/31/2028 | 12/31/2028 | | | 300 | 300 | 300 | ER/NR | Hybrid | Solar/Storage | Hobbs - Ink Basin 230 kV Transmission Line | 10/2/2023 | | DISIS STAGE | | | | |
GEN-2023-201 | | DISIS-2023-001 | 05 SOUTHWEST | Lea | NM | NEET | 7/31/2028 | 12/31/2028 | | | 300 | 300 | 300 | ER/NR | Hybrid | Solar/Storage | Crossroads - Hobbs 345 kV Line | 10/2/2023 | | DISIS STAGE | | | | |
GEN-2023-199 | | DISIS-2023-001 | 02 NEBRASKA | Dakota | NE | NPPD | 3/1/2030 | 3/28/2027 | | | 250 | 250 | 250 | ER/NR | Hybrid | Solar/Storage | Twin Church 230 kV Substation | 10/2/2023 | | DISIS STAGE | | | | |
GEN-2023-195 | | DISIS-2023-001 | 05 SOUTHWEST | Bailey | TX | SPS | 2/1/2028 | 6/1/2028 | | | 250 | 250 | 250 | ER/NR | Solar | | Roosevelt - Tolk 230 kV line tap | 10/2/2023 | | DISIS STAGE | | | | |
GEN-2023-194 | | DISIS-2023-001 | 03 CENTRAL | Cherokee | KS | EDE | 6/1/2028 | 12/31/2028 | | | 225 | 225 | 225 | ER/NR | Solar | | Riverton - Neosho 161 kV Line Tap | 10/2/2023 | | DISIS STAGE | | | | |
GEN-2023-193 | | DISIS-2023-001 | 04 SOUTHEAST | Harrison | TX | AEP | 1/15/2028 | 3/31/2028 | | | 175 | 175 | 175 | ER/NR | Hybrid | Solar/Storage | Pirkey - Whitney 138 kV Line | 10/2/2023 | | DISIS STAGE | | | | |
GEN-2023-189 | | DISIS-2023-001 | 02 NEBRASKA | Lancaster | NE | LES | 8/30/2030 | 12/31/2030 | | | 200 | 200 | 200 | ER | Battery/Storage | | NW 68th - Holdrege 345 kV Substation | 10/2/2023 | | DISIS STAGE | | | | |
GEN-2023-188 | | DISIS-2023-001 | 05 SOUTHWEST | Cotton | OK | AEP | 2/15/2027 | 9/1/2027 | | | 160 | 160 | 160 | ER/NR | Hybrid | Solar/Storage | Oklaunion - Lawton 345 kV Line | 10/2/2023 | | DISIS STAGE | | | | |
GEN-2023-184 | | DISIS-2023-001 | 05 SOUTHWEST | Eddy | NM | SPS | 8/30/2030 | 12/31/2030 | | | 200 | 200 | 200 | ER | Solar | | Phantom 115 kV Substation | 10/2/2023 | | DISIS STAGE | | | | |
GEN-2023-183 | | DISIS-2023-001 | 05 SOUTHWEST | Hale | TX | SPS | 3/31/2027 | 2/28/2027 | | | 217 | 217 | 217 | ER | Thermal | CTG | Tuco 345kV | 10/2/2023 | | DISIS STAGE | | | | |
GEN-2023-182 | | DISIS-2023-001 | 01 NORTH | Logan & McIntosh | ND | BEPC | 8/15/2026 | 12/1/2026 | | | 300 | 300 | 300 | ER | Wind | | Groton - Leland Olds 345 kV Line | 10/2/2023 | | DISIS STAGE | | | | |
GEN-2023-180 | | DISIS-2023-001 | 04 SOUTHEAST | Sebastian | AR | AEP | 2/1/2028 | 6/1/2028 | | | 150 | 150 | 150 | ER/NR | Solar | | Hackett - N Huntington 161 kV Line Tap | 10/2/2023 | | DISIS STAGE | | | | |
GEN-2023-178 | | DISIS-2023-001 | 05 SOUTHWEST | Roosevelt | NM | SPS | 8/15/2026 | 12/1/2026 | | | 200 | 200 | 200 | ER/NR | Solar | | Roosevelt 230kV Substation | 10/2/2023 | | DISIS STAGE | | | | |
GEN-2023-177 | | DISIS-2023-001 | 04 SOUTHEAST | Garvin | OK | OGE | 2/1/2028 | 6/1/2028 | | | 200 | 200 | 200 | ER/NR | Solar | | Paoli - Seminole 138 kV line tap | 10/2/2023 | | DISIS STAGE | | | | |
GEN-2023-176 | | DISIS-2023-001 | 05 SOUTHWEST | Lamb | TX | SPS | 8/30/2030 | 12/31/2030 | | | 300 | 300 | 300 | ER | Wind | | Plant X 230 kV Substation | 10/2/2023 | | DISIS STAGE | | | | |
GEN-2023-174 | | DISIS-2023-001 | 04 SOUTHEAST | Garvin | OK | WFEC | 2/1/2028 | 6/1/2028 | | | 150 | 150 | 150 | ER | Battery/Storage | | Paoli West 138 kV Substation | 10/2/2023 | | DISIS STAGE | | | | |
GEN-2023-173 | | DISIS-2023-001 | 03 CENTRAL | Kearny | KS | SUNC | 9/1/2027 | 12/31/2027 | | | 100 | 100 | 100 | ER/NR | Wind | | Holcomb 345 kV | 10/2/2023 | | DISIS STAGE | | | | |
GEN-2023-172 | | DISIS-2023-001 | 03 CENTRAL | Kearny | KS | SUNC | 9/1/2027 | 12/31/2027 | | | 200 | 200 | 200 | ER/NR | Wind | | Holcomb 345 kV | 10/2/2023 | | DISIS STAGE | | | | |
GEN-2023-171 | | DISIS-2023-001 | 03 CENTRAL | Jackson | MO | INDN | 2/1/2028 | 6/1/2028 | | | 150 | 150 | 150 | ER/NR | Battery/Storage | | Sub M 161 kV Substation | 10/2/2023 | | DISIS STAGE | | | | |
GEN-2023-170 | | DISIS-2023-001 | 03 CENTRAL | Chariton | MO | Evergy | 2/1/2028 | 6/1/2028 | | | 150 | 150 | 150 | ER | Battery/Storage | | Salisbury 161 kV Substation | 10/2/2023 | | DISIS STAGE | | | | |
GEN-2023-169 | | DISIS-2023-001 | 03 CENTRAL | Clay | MO | Evergy | 2/1/2028 | 6/1/2028 | | | 125 | 125 | 125 | ER/NR | Battery/Storage | | Missouri City - Liberty South 161 kV Line | 10/2/2023 | | DISIS STAGE | | | | |
GEN-2023-168 | | DISIS-2023-001 | 04 SOUTHEAST | Oklahoma | OK | OGE | 2/1/2028 | 6/1/2028 | | | 175 | 175 | 175 | ER/NR | Battery/Storage | | Classen 138 kV Substation | 10/2/2023 | | DISIS STAGE | | | | |
GEN-2023-167 | | DISIS-2023-001 | 04 SOUTHEAST | Oklahoma | OK | OGE | 2/1/2028 | 6/1/2028 | | | 250 | 250 | 250 | ER/NR | Battery/Storage | | Washington Park 138 kV Substation | 10/2/2023 | | DISIS STAGE | | | | |
GEN-2023-166 | | DISIS-2023-001 | 04 SOUTHEAST | Oklahoma | OK | OGE | 2/1/2028 | 6/1/2028 | | | 150 | 150 | 150 | ER | Battery/Storage | | 84th Street - Tennessee Tap 138 kV Line | 10/2/2023 | | DISIS STAGE | | | | |
GEN-2023-165 | | DISIS-2023-001 | 04 SOUTHEAST | Caddo | OK | OGE | 3/1/2028 | 5/1/2028 | | | 210 | 210 | 210 | ER/NR | Battery/Storage | | Gracemont 345 kV Substation | 10/2/2023 | | DISIS STAGE | | | | |
GEN-2023-164 | | DISIS-2023-001 | 04 SOUTHEAST | Caddo | OK | OGE | 3/1/2028 | 5/1/2028 | | | 210 | 210 | 210 | ER/NR | Battery/Storage | | Gracemont 345 kV Substation | 10/2/2023 | | DISIS STAGE | | | | |
GEN-2023-161 | | DISIS-2023-001 | 04 SOUTHEAST | Blaine | OK | OGE | 9/3/2026 | 11/4/2026 | | | 74.9 | 74.9 | 74.9 | ER/NR | Battery/Storage | | Roman Nose 138 kV Substation | 10/2/2023 | | DISIS STAGE | | | | |
GEN-2023-159 | | DISIS-2023-001 | 05 SOUTHWEST | Bailey and Lamb | TX | SPS | 3/1/2029 | 9/15/2029 | | | 170 | 170 | 170 | ER/NR | Battery/Storage | | Needmore - Yoakum 230 kV Line | 10/2/2023 | | DISIS STAGE | | | | |
GEN-2023-158 | | DISIS-2023-001 | 05 SOUTHWEST | Bailey and Lamb | TX | SPS | 3/1/2029 | 9/15/2029 | | | 335 | 335 | 335 | ER/NR | Solar | | Needmore - Yoakum 230 kV Line | 10/2/2023 | | DISIS STAGE | | | | |
GEN-2023-154 | | DISIS-2023-001 | 01 NORTH | Hand | SD | WAPA | 3/1/2029 | 9/30/2029 | | | 175 | 175 | 175 | ER | Solar | | Fort Thompson - Huron 230 kV Tap | 10/2/2023 | | DISIS STAGE | | | | |
GEN-2023-153 | | DISIS-2023-001 | 02 NEBRASKA | Perkins | NE | Tri-State | 6/30/2028 | 8/31/2028 | | | 120 | 120 | 120 | ER/NR | Hybrid | Solar/Storage | Grant 115 kV Substation | 10/2/2023 | | DISIS STAGE | | | | |
GEN-2023-151 | | DISIS-2023-001 | 04 SOUTHEAST | Hempstead | AR | AEP | 4/1/2028 | 8/1/2028 | | | 100 | 100 | 100 | ER/NR | Hybrid | Solar/Storage | South Nashville - South Murfreesboro 138kV | 10/2/2023 | | DISIS STAGE | | | | |
GEN-2023-150 | | DISIS-2023-001 | 04 SOUTHEAST | Caddo | OK | OGE | 9/1/2027 | 12/31/2027 | | | 150 | 150 | 150 | ER/NR | Solar | | Gracemont 138 kV Substation | 10/2/2023 | | DISIS STAGE | | | | |
GEN-2023-149 | | DISIS-2023-001 | 03 CENTRAL | Lin | KS | Evergy | 2/15/2029 | 7/1/2029 | | | 300 | 300 | 300 | ER/NR | Battery/Storage | | LaCygne - Stilwell 345 kV Line | 10/2/2023 | | DISIS STAGE | | | | |
GEN-2023-143 | | DISIS-2023-001 | 05 SOUTHWEST | Lamb | TX | SPS | 3/1/2029 | 9/15/2029 | | | 200 | 200 | 200 | ER/NR | Battery/Storage | | Plant X 230 kV Substation | 10/2/2023 | | DISIS STAGE | | | | |
GEN-2023-142 | | DISIS-2023-001 | 05 SOUTHWEST | Lamb | TX | SPS | 3/1/2029 | 9/15/2029 | | | 275 | 275 | 275 | ER | Solar | | Plant X 230 kV Substation | 10/2/2023 | | DISIS STAGE | | | | |
GEN-2023-138 | | DISIS-2023-001 | 04 SOUTHEAST | Deleware | OK | GRDA | 7/15/2028 | 11/30/2028 | | | 250 | 250 | 250 | ER | Wind | | GRDA1 - Tonece7 345 kV Line | 10/2/2023 | | DISIS STAGE | | | | |
GEN-2023-135 | | DISIS-2023-001 | 04 SOUTHEAST | Bowie | TX | AEP | 9/15/2026 | 12/31/2026 | | | 52 | 52 | 52 | ER/NR | Solar | | Lydia 345kV substation | 10/2/2023 | | DISIS STAGE | | | | |
GEN-2023-134 | | DISIS-2023-001 | 04 SOUTHEAST | Hughes/Okfuskee | OK | AEP | 9/15/2026 | 12/31/2026 | | | 252 | 252 | 252 | ER/NR | Wind | | Fixico Tap to Weleetka 138 kV Line | 10/2/2023 | | DISIS STAGE | | | | |
GEN-2023-133 | | DISIS-2023-001 | 02 NEBRASKA | Custer | NE | NPPD | 5/1/2030 | 12/30/2030 | | | 250 | 250 | 250 | ER | Wind | | Sweetwater 345 kV Substation | 10/2/2023 | | DISIS STAGE | | | | |
GEN-2023-132 | | DISIS-2023-001 | 04 SOUTHEAST | Craighead | AR | SWPA | 6/30/2026 | 12/31/2026 | | | 150 | 150 | 150 | ER/NR | Solar | | Jonesboro - Independence 161 kV | 10/2/2023 | | DISIS STAGE | | | | |
GEN-2023-123 | | DISIS-2023-001 | 05 SOUTHWEST | Ochiltree/Handsford | TX | SPS | 8/30/2030 | 12/31/2030 | | | 285 | 285 | 285 | ER | Wind | | Pringle Interchange 230 kV Substation | 10/2/2023 | | DISIS STAGE | | | | |
GEN-2023-120 | | DISIS-2023-001 | 05 SOUTHWEST | Swisher | TX | SPS | 8/30/2030 | 12/31/2030 | | | 130 | 130 | 130 | ER | Solar | | Kress 115 kV Substation | 10/2/2023 | | DISIS STAGE | | | | |
GEN-2023-117 | | DISIS-2023-001 | 02 NEBRASKA | Keith, Deuel, Garden | NE | NPPD | 8/30/2030 | 12/30/2030 | | | 300 | 300 | 300 | ER | Wind | | Keystone 345 kV Substation | 10/2/2023 | | DISIS STAGE | | | | |
GEN-2023-116 | | DISIS-2023-001 | 02 NEBRASKA | Keith, Deuel, Garden | NE | NPPD | 8/30/2030 | 12/30/2030 | | | 500 | 500 | 500 | ER | Wind | | Keystone 345 kV Substation | 10/2/2023 | | DISIS STAGE | | | | |
GEN-2023-110 | | DISIS-2023-001 | 05 SOUTHWEST | Hall | TX | SPS | 8/30/2030 | 12/31/2030 | | | 250 | 250 | 250 | ER | Solar | | Tap Border to Tuco 345 kV Line | 10/2/2023 | | DISIS STAGE | | | | |
GEN-2023-107 | | DISIS-2023-001 | 03 CENTRAL | Finney/Kearny | KS | SUNC | 5/1/2030 | 12/31/2030 | | | 300 | 300 | 300 | ER | Wind | | Setab 345 kV | 10/2/2023 | | DISIS STAGE | | | | |
GEN-2023-105 | | DISIS-2023-001 | 01 NORTH | Hyde | SD | BEPC | 9/1/2028 | 12/1/2028 | | | 249 | 249 | 249 | ER/NR | Wind | | Chappelle Creek 345 kV | 10/2/2023 | | DISIS STAGE | | | | |
GEN-2023-104 | | DISIS-2023-001 | 04 SOUTHEAST | Woods | OK | WFEC | 8/30/2027 | 12/17/2027 | | | 100 | 100 | 100 | ER/NR | Hybrid | Solar/Storage | Mooreland - Noel 138 kV Line | 10/2/2023 | | DISIS STAGE | | | | |
GEN-2023-102 | | DISIS-2023-001 | 04 SOUTHEAST | Woods | OK | OGE | 8/30/2027 | 12/17/2027 | | | 475 | 475 | 475 | ER/NR | Hybrid | Solar/Storage | Degrasse 345 kV Substation | 10/2/2023 | | DISIS STAGE | | | | |
GEN-2023-101 | | DISIS-2023-001 | 04 SOUTHEAST | Wheeler | TX | SPS | 10/1/2027 | 12/31/2027 | | | 150 | 150 | 150 | ER/NR | Hybrid | Solar/Storage | Tap Stateline Demarc - Wheeler 230 kV Line | 10/2/2023 | | DISIS STAGE | | | | |
GEN-2023-100 | | DISIS-2023-001 | 04 SOUTHEAST | Woods | OK | OGE | 8/30/2027 | 12/17/2027 | | | 300 | 300 | 300 | ER/NR | Hybrid | Solar/Storage | Degrasse 345 kV Substation | 10/2/2023 | | DISIS STAGE | | | | |
GEN-2023-099 | | DISIS-2023-001 | 03 CENTRAL | Jackson | KS | Evergy | 8/30/2030 | 12/31/2030 | | | 300 | 300 | 300 | ER | Solar | | Jeffery Energy Center 345 kV Substation | 10/2/2023 | | DISIS STAGE | | | | |
GEN-2023-097 | | DISIS-2023-001 | 01 NORTH | Williams | ND | BEPC | 2/15/2029 | 7/1/2029 | | | 250 | 250 | 250 | ER/NR | Battery/Storage | | Judson 345 kV Substation | 10/2/2023 | | DISIS STAGE | | | | |
GEN-2023-092 | | DISIS-2023-001 | 04 SOUTHEAST | Choctaw | OK | WFEC | 8/30/2027 | 12/17/2027 | | | 125 | 125 | 125 | ER/NR | Hybrid | Solar/Storage | Unger - Frogville 138 kV line | 10/2/2023 | | DISIS STAGE | | | | |
GEN-2023-088 | | DISIS-2023-001 | 04 SOUTHEAST | Okfuskee/Okmulgee | OK | WFEC | 9/15/2028 | 12/31/2028 | | | 117 | 117 | 117 | ER/NR | Wind | | Pharaoh 138 kV Substation | 10/2/2023 | | DISIS STAGE | | | | |
GEN-2023-087 | | DISIS-2023-001 | 03 CENTRAL | Cass | MO | Evergy | 8/30/2030 | 12/31/2030 | | | 200 | 200 | 200 | ER | Solar | | Archie 161 kV Substation | 10/2/2023 | | DISIS STAGE | | | | |
GEN-2023-086 | | DISIS-2023-001 | 05 SOUTHWEST | Randall | TX | SPS | 10/1/2028 | 5/1/2029 | | | 300 | 300 | 300 | ER/NR | Hybrid | Solar/Storage | Potter - Newhart 230 kV line | 10/2/2023 | | DISIS STAGE | | | | |
GEN-2023-085 | | DISIS-2023-001 | 03 CENTRAL | Douglas/Wright | MO | SWPA | 9/15/2026 | 12/31/2026 | | | 150 | 150 | 150 | ER/NR | Wind | | Mansfield - Logan 161 kV Line | 10/2/2023 | | DISIS STAGE | | | | |
GEN-2023-082 | | DISIS-2023-001 | 01 NORTH | Brookings | SD | WAPA | 2/15/2029 | 7/1/2029 | | | 175 | 175 | 175 | ER/NR | Battery/Storage | | White 115 kV Substation | 10/2/2023 | | DISIS STAGE | | | | |
GEN-2023-081 | | DISIS-2023-001 | 05 SOUTHWEST | Lea | NM | NEET | 8/1/2028 | 10/1/2028 | | | 625 | 625 | 625 | ER/NR | Hybrid | Solar/Storage | Crossroads - Hobbs 345 kV Line | 10/2/2023 | | DISIS STAGE | | | | |
GEN-2023-079 | | DISIS-2023-001 | 02 NEBRASKA | Cass | NE | OPPD | 7/1/2028 | 2/1/2029 | | | 303 | 303 | 303 | ER | Thermal | Gas Turbine | Substation 3740 345 kV | 10/2/2023 | | DISIS STAGE | | | | |
GEN-2023-078 | | DISIS-2023-001 | 02 NEBRASKA | Cass | NE | OPPD | 7/1/2027 | 2/1/2028 | | | 255 | 255 | 255 | ER | Thermal | Gas Turbine | Substation 3740 345 kV | 10/2/2023 | | DISIS STAGE | | | | |
GEN-2023-077 | | DISIS-2023-001 | 02 NEBRASKA | Cass | NE | OPPD | 7/1/2027 | 2/1/2028 | | | 255 | 255 | 255 | ER | Thermal | Gas Turbine | Substation 3740 345 kV | 10/2/2023 | | DISIS STAGE | | | | |
GEN-2023-076 | | DISIS-2023-001 | 04 SOUTHEAST | Nowata/Craig | OK | Evergy | 9/1/2027 | 12/31/2027 | | | 100 | 100 | 100 | ER/NR | Wind | | Delaware - Neosho 345 kV | 10/2/2023 | | DISIS STAGE | | | | |
GEN-2023-075 | | DISIS-2023-001 | 04 SOUTHEAST | Nowata/Craig | OK | Evergy | 10/1/2027 | 12/1/2027 | | | 200 | 200 | 200 | ER/NR | Wind | | Delaware to Neosho 345 kV | 10/2/2023 | | DISIS STAGE | | | | |
GEN-2023-073 | | DISIS-2023-001 | 03 CENTRAL | Butler | KS | Evergy | 8/30/2027 | 12/27/2027 | | | 250 | 250 | 250 | ER/NR | Battery/Storage | | Rose Hill 345 kV Substation | 10/2/2023 | | DISIS STAGE | | | | |
GEN-2023-069 | | DISIS-2023-001 | 04 SOUTHEAST | Atoka | OK | WFEC | 8/30/2027 | 12/17/2027 | | | 100 | 100 | 100 | ER/NR | Hybrid | Solar/Storage | Tupelo - Atoka 138 kV Line | 10/2/2023 | | DISIS STAGE | | | | |
GEN-2023-065 | | DISIS-2023-001 | 03 CENTRAL | Harvey | KS | Evergy | 5/1/2026 | 9/1/2026 | | | 140 | 140 | 140 | ER/NR | Battery/Storage | | Halstead 69 kV Substation | 10/2/2023 | | DISIS STAGE | | | | |
GEN-2023-064 | | DISIS-2023-001 | 04 SOUTHEAST | LeFlore | OK | SWPA | 8/1/2028 | 12/1/2028 | | | 200 | 200 | 200 | ER/NR | Hybrid | Solar/Storage | RS Kerr-Stigler 161 kV line | 10/2/2023 | | DISIS STAGE | | | | |
GEN-2023-063 | | DISIS-2023-001 | 04 SOUTHEAST | Rogers | OK | AEP | 8/1/2028 | 12/1/2028 | | | 135 | 135 | 135 | ER/NR | Hybrid | Solar/Storage | Catoosa - Owasso 88th 138 kV line | 10/2/2023 | | DISIS STAGE | | | | |
GEN-2023-062 | | DISIS-2023-001 | 01 NORTH | Williams | ND | LYREC | 4/30/2028 | 7/31/2028 | | | 98 | 98 | 98 | ER | Thermal | Steam | REN 115 kV Substation | 10/2/2023 | | DISIS STAGE | | | | |
GEN-2023-061 | | DISIS-2023-001 | 03 CENTRAL | Jasper | MO | SWPA | 9/30/2027 | 12/31/2027 | | | 100 | 100 | 100 | ER/NR | Battery/Storage | | Carthage 161 kV Substation | 10/2/2023 | | DISIS STAGE | | | | |
GEN-2023-060 | | DISIS-2023-001 | 05 SOUTHWEST | Lamb | TX | SPS | 9/30/2026 | 12/31/2026 | | | 256 | 256 | 256 | ER/NR | Solar | | Plant X 230kV Substation | 10/2/2023 | | DISIS STAGE | | | | |
GEN-2023-059 | | DISIS-2023-001 | 04 SOUTHEAST | Harrison and Panola | TX | AEP | 9/30/2026 | 12/31/2026 | | | 200 | 200 | 200 | ER/NR | Hybrid | Solar\RECIP Gas | Tap Rockhill to South Shreveport 138 kV line | 9/11/2023 | | DISIS STAGE | | | | |
GEN-2023-057 | | DISIS-2023-001 | 04 SOUTHEAST | Pawnee | OK | GRDA | 12/28/2027 | 5/31/2028 | | | 150 | 150 | 150 | ER/NR | Battery/Storage | | Pawnee Switch 138 kV | 10/2/2023 | | DISIS STAGE | | | | |
GEN-2023-056 | | DISIS-2023-001 | 04 SOUTHEAST | Van Buren County | AR | SWPA | 12/28/2027 | 5/31/2028 | | | 150 | 150 | 150 | ER/NR | Battery/Storage | | Van Buren 161 kV | 10/2/2023 | | DISIS STAGE | | | | |
GEN-2023-055 | | DISIS-2023-001 | 04 SOUTHEAST | Mayes County | OK | GRDA | 12/28/2027 | 5/31/2028 | | | 100 | 100 | 100 | ER/NR | Battery/Storage | | Kerr Grove 161 kV | 10/2/2023 | | DISIS STAGE | | | | |
GEN-2023-050 | | DISIS-2023-001 | 03 CENTRAL | Labette | KS | Evergy | 6/30/2028 | 12/31/2028 | | | 400 | 400 | 400 | ER/NR | Hybrid | Solar/Storage | Neosho 345 kV Substation | 10/2/2023 | | DISIS STAGE | | | | |
GEN-2023-049 | | DISIS-2023-001 | 04 SOUTHEAST | Mayes | OK | GRDA | 6/30/2028 | 12/31/2028 | | | 150 | 150 | 150 | ER/NR | Hybrid | Solar/Storage | Dry Gulch - Pensacola 161 kV Line | 10/2/2023 | | DISIS STAGE | | | | |
GEN-2023-038 | | DISIS-2023-001 | 04 SOUTHEAST | Coal | OK | OGE | 5/24/2026 | 9/1/2026 | | | 200 | 200 | 200 | ER/NR | Solar | | Lula 138 kV Substation | 10/2/2023 | | DISIS STAGE | | | | |
GEN-2023-037 | | DISIS-2023-001 | 03 CENTRAL | Wyandotte | KS | KACY | 4/15/2028 | 7/1/2028 | | | 200 | 200 | 200 | ER/NR | Battery/Storage | | Nearman 161 kV Substation | 10/2/2023 | | DISIS STAGE | | | | |
GEN-2023-036 | | DISIS-2023-001 | 03 CENTRAL | Jackson | MO | INDN | 8/30/2026 | 12/31/2026 | | | 165 | 165 | 165 | ER/NR | Battery/Storage | | Eckles Road 161 kV Substation | 10/2/2023 | | DISIS STAGE | | | | |
GEN-2023-035 | | DISIS-2023-001 | 04 SOUTHEAST | Grady | OK | WFEC | 5/4/2026 | 9/1/2026 | | | 200 | 200 | 200 | ER/NR | Solar | | Cleveland - Amber Tap 138 kV Line | 10/2/2023 | | DISIS STAGE | | | | |
GEN-2023-034 | | DISIS-2023-001 | 03 CENTRAL | Sedgwick | KS | Evergy | 5/24/2026 | 9/1/2026 | | | 130 | 130 | 130 | ER/NR | Solar | | Clear Water - Waco 138 kV line | 10/2/2023 | | DISIS STAGE | | | | |
GEN-2023-033 | | DISIS-2023-001 | 03 CENTRAL | Clay | MO | Evergy | 4/15/2028 | 7/1/2028 | | | 200 | 200 | 200 | ER/NR | Battery/Storage | | Liberty South 161 kV Substation | 10/2/2023 | | DISIS STAGE | | | | |
GEN-2023-032 | | DISIS-2023-001 | 03 CENTRAL | Lafayette | MO | Evergy | 1/1/2028 | 6/1/2028 | | | 200 | 200 | 200 | ER/NR | Solar | | Odessa and Lexington 161 kV Line | 10/2/2023 | | DISIS STAGE | | | | |
GEN-2023-030 | | DISIS-2023-001 | 04 SOUTHEAST | DeSoto Parish | LA | AEP | 9/1/2027 | 12/31/2027 | | | 25 | 25 | 25 | ER/NR | Solar | | Tap between 345 kV SW Shreveport to Dolet Hills Substations | 10/2/2023 | | DISIS STAGE | | | | |
GEN-2023-028 | | DISIS-2023-001 | 04 SOUTHEAST | Mayes | OK | GRDA | 4/30/2028 | 10/31/2028 | | | 230 | 230 | 230 | ER/NR | Hybrid | Solar/Battery | Dry Gulch - Pensacola 161 kV Line | 10/2/2023 | | DISIS STAGE | | | | |
GEN-2023-027 | | DISIS-2023-001 | 04 SOUTHEAST | Mayes | OK | AEP | 4/30/2028 | 11/30/2027 | | | 150 | 150 | 150 | ER/NR | Hybrid | Solar/Battery | Bird Hollow (Langley) - Pryor Junction 138 kV Line | 10/2/2023 | | DISIS STAGE | | | | |
GEN-2023-023 | | DISIS-2023-001 | 03 CENTRAL | Wyandotte | KS | KACY | 4/15/2028 | 7/1/2028 | | | 200 | 200 | 200 | ER/NR | Battery/Storage | | Center City 161 kV Substation | 10/2/2023 | | DISIS STAGE | | | | |
GEN-2023-022 | | DISIS-2023-001 | 04 SOUTHEAST | McIntosh | OK | OGE | 9/1/2027 | 12/31/2027 | | | 250 | 250 | 250 | ER/NR | Wind | | Canadian River 345 kV Substation | 10/2/2023 | | DISIS STAGE | | | | |
GEN-2023-015 | | DISIS-2023-001 | 03 CENTRAL | Finney County | KS | SPS | 5/4/2026 | 9/1/2026 | | | 330 | 330 | 330 | ER/NR | Solar | | Finney-Carpenter 345 KV line | 10/2/2023 | | DISIS STAGE | | | | |
GEN-2023-012 | | DISIS-2023-001 | 01 NORTH | Lake Preston | SD | EREC | 6/15/2026 | 10/31/2026 | | | 98.6 | 98.6 | 98.6 | ER/NR | Wind | | Kingsbury County 115kV Substation | 10/2/2023 | | DISIS STAGE | | | | |
GEN-2023-011 | | DISIS-2023-001 | 02 NEBRASKA | Jefferson | NE | NPPD | 8/30/2030 | 12/31/2030 | | | 190 | 190 | 190 | ER | Wind | | Harbine 115 kV Substation | 10/2/2023 | | DISIS STAGE | | | | |
GEN-2023-010 | | DISIS-2023-001 | 05 SOUTHWEST | Sherman | TX | SPS | 8/30/2030 | 12/31/2030 | | | 280 | 280 | 280 | ER | Wind | | Moore Co 230 kV Substation | 10/2/2023 | | DISIS STAGE | | | | |
GEN-2023-009 | | DISIS-2023-001 | 04 SOUTHEAST | Sawyer | OK | WFEC | 6/1/2028 | 12/1/2028 | | | 250 | 250 | 250 | ER/NR | Battery/Storage | | Hugo 138 kV Substation | 10/2/2023 | | DISIS STAGE | | | | |
GEN-2023-008 | | DISIS-2023-001 | 05 SOUTHWEST | Hale | TX | SPS | 8/8/2030 | 12/31/2030 | | | 75 | 75 | 75 | ER | Solar | | Tuco - Carlisle 230 kV line | 10/2/2023 | | DISIS STAGE | | | | |
GEN-2023-006 | | DISIS-2023-001 | 03 CENTRAL | Barton, Vernon | MO | NEET | 5/1/2029 | 12/31/2029 | | | 202 | 202 | 202 | ER | Wind | | Wolf Creek- Blackberry 345 kV Line Break | 10/2/2023 | | DISIS STAGE | | | | |
GEN-2023-005 | | DISIS-2023-001 | 05 SOUTHWEST | Lamb | TX | SPS | 9/30/2026 | 12/31/2026 | | | 256 | 256 | 256 | ER/NR | Solar | | Plant X 230kV Substation | 9/25/2023 | | DISIS STAGE | | | | |
GEN-2023-001 | | DISIS-2023-001 | 05 SOUTHWEST | Lea | NM | SPS | 7/15/2025 | 12/31/2025 | | | 230 | 230 | 230 | ER/NR | Solar | | T14 Circuit 115 V Line | 5/26/2023 | | DISIS STAGE | 10/3/2023 Updated TO from XCEL to SPS. kr | | | |
GEN-2022-GR1 | | Replacement | 04 SOUTHEAST | Hallsville | TX | AEP | | 3/30/2026 | 3/31/2023 | | 580 | 580 | 580 | ER | Solar | | Pirkey 138 kV | 3/23/2022 | | IA FULLY EXECUTED/ON SCHEDULE | | | | |
GEN-2022-241 | | DISIS-2022-001 | 04 SOUTHEAST | Hempstead | AR | AEP | 3/1/2028 | 9/15/2028 | | | 200 | 200 | 200 | ER/NR | Battery/Storage | | John W Turk Jr Power Plant 345 kV sub | 2/28/2023 | | DISIS STAGE | | | | |
GEN-2022-240 | | DISIS-2022-001 | 04 SOUTHEAST | Hempstead | AR | AEP | 3/1/2028 | 9/15/2028 | | | 200 | 200 | 200 | ER/NR | Battery/Storage | | John W Turk Jr Power Plant 345 kV sub | 2/28/2023 | | DISIS STAGE | | | | |
GEN-2022-239 | | DISIS-2022-001 | 04 SOUTHEAST | Hempstead | AR | AEP | 3/1/2028 | 9/15/2028 | | | 350 | 350 | 350 | ER/NR | Solar | | John W Turk Jr Power Plant 345 kV sub | 2/28/2023 | | DISIS STAGE | | | | |
GEN-2022-238 | | DISIS-2022-001 | 04 SOUTHEAST | Pottawatomie | OK | OGE | 3/1/2028 | 9/15/2028 | | | 150 | 150 | 150 | ER/NR | Battery/Storage | | Maud 138 kV substation | 2/28/2023 | | DISIS STAGE | | | | |
GEN-2022-237 | | DISIS-2022-001 | 04 SOUTHEAST | Pottawatomie | OK | OGE | 3/1/2028 | 9/15/2028 | | | 150 | 150 | 150 | ER/NR | Solar | | Maud 138 kV substation | 2/28/2023 | | DISIS STAGE | | | | |
GEN-2022-235 | | DISIS-2022-001 | 04 SOUTHEAST | Canadian | OK | WFEC | 3/1/2028 | 9/15/2028 | | | 150 | 150 | 150 | ER/NR | Battery/Storage | | El Reno SW 138 kV | 2/28/2023 | | DISIS STAGE | | | | |
GEN-2022-234 | | DISIS-2022-001 | 04 SOUTHEAST | Rogers | OK | AEP | 3/1/2028 | 9/15/2028 | | | 200 | 200 | 200 | ER/NR | Solar | | Alluwe Tap – Chelsea 138 kV line | 2/28/2023 | | DISIS STAGE | | | | |
GEN-2022-231 | | DISIS-2022-001 | 04 SOUTHEAST | Logan | OK | OGE | 3/1/2028 | 9/15/2028 | | | 166 | 166 | 166 | ER/NR | Solar | | Crescent to Cottonwood Creek 138 kV Line | 2/28/2023 | | DISIS STAGE | | | | |
GEN-2022-219 | | DISIS-2022-001 | 01 NORTH | Dawson | MT | WAPA | 10/6/2026 | 12/31/2026 | | | 350 | 350 | 350 | ER/NR | Solar | | Belfield 230 kV Substation | 3/2/2023 | | DISIS STAGE | | | | |
GEN-2022-214 | | DISIS-2022-001 | 03 CENTRAL | Sumner | KS | WERE | 5/1/2027 | 12/15/2028 | | | 239 | 239 | 239 | ER | Solar | | Gill - Viola 138 kV Line Break | 3/2/2023 | | DISIS STAGE | | | | |
GEN-2022-209 | | DISIS-2022-001 | 03 CENTRAL | Andrew/Gentry/Dekalb | MO | KCPL | 7/1/2027 | 12/1/2027 | | | 600 | 600 | 600 | ER/NR | Hybrid | Solar/Storage | Tap on the Mullen Creek to Ketchum 345 kV Line | 3/1/2023 | | DISIS STAGE | | | | |
GEN-2022-208 | | DISIS-2022-001 | 03 CENTRAL | Andrew/Gentry/Dekalb | MO | KCPL | 7/1/2027 | 12/1/2027 | | | 400 | 400 | 400 | ER/NR | Wind | | Tap on the Mullen Creek to Ketchum 345 kV Line | 3/1/2023 | | DISIS STAGE | | | | |
GEN-2022-206 | | DISIS-2022-001 | 03 CENTRAL | Edwards/Hodgeman | KS | ITCGP | 7/1/2027 | 11/1/2027 | | | 250 | 250 | 250 | ER/NR | Wind | | Post Rock - Spearville 345 kV | 3/1/2023 | | DISIS STAGE | | | | |
GEN-2022-205 | | DISIS-2022-001 | 03 CENTRAL | Edwards/Hodgeman | KS | ITCGP | 7/1/2027 | 11/1/2027 | | | 250 | 250 | 250 | ER/NR | Wind | | Post Rock - Spearville 345 kV | 3/1/2023 | | DISIS STAGE | | | | |
GEN-2022-204 | | DISIS-2022-001 | 03 CENTRAL | Edwards/Hodgeman | KS | ITCGP | 7/1/2027 | 11/1/2027 | | | 250 | 250 | 250 | ER/NR | Wind | | Post Rock - Spearville 345 kV | 3/1/2023 | | DISIS STAGE | | | | |
GEN-2022-196 | | DISIS-2022-001 | 04 SOUTHEAST | Pittsburg | OK | AEP | 5/1/2027 | 12/15/2027 | | | 215 | 215 | 215 | ER | Wind | | Pittsburg 345kV Substation | 2/28/2023 | | DISIS STAGE | | | | |
GEN-2022-186 | | DISIS-2022-001 | 03 CENTRAL | Coffey | KS | WERE | 5/6/2026 | 5/30/2026 | | | 684 | 684 | 684 | ER/NR | Solar | | Wolf Creek - Benton 345 kV Substation | 2/28/2023 | | DISIS STAGE | | | | |
GEN-2022-176 | | DISIS-2022-001 | 04 SOUTHEAST | Nowata | OK | AEP | 4/1/2026 | 10/31/2026 | | | 215 | 215 | 215 | ER/NR | Wind | | Northeastern - Delaware 345 kV transmission line | 2/17/2023 | | DISIS STAGE | | | | |
GEN-2022-171 | | DISIS-2022-001 | 05 SOUTHWEST | Curry | NM | SPS | 8/1/2026 | 12/1/2026 | | | 200 | 200 | 200 | ER | Wind | | Pleasant Hill 230 kV Substation | 2/26/2023 | | DISIS STAGE | | | | |
GEN-2022-168 | | DISIS-2022-001 | 03 CENTRAL | Henry | MO | KCPL | 7/31/2027 | 12/31/2027 | | | 380 | 380 | 380 | ER/NR | Solar | | Silwell - Clinton 161 kV Line | 2/26/2023 | | DISIS STAGE | | | | |
GEN-2022-167 | | DISIS-2022-001 | 04 SOUTHEAST | Tulsa | OK | AEP | 6/30/2028 | 10/1/2028 | | | 250 | 250 | 250 | ER/NR | Solar | | Tulsa North - Northeastern 345 kV Line | 2/26/2023 | | DISIS STAGE | | | | |
GEN-2022-163 | | DISIS-2022-001 | 04 SOUTHEAST | Canadian | OK | OGE | 3/15/2026 | 6/15/2026 | | | 200 | 200 | 200 | ER/NR | Battery/Storage | | Cimarron 345kV Substation | 2/26/2023 | | DISIS STAGE | | | | |
GEN-2022-162 | | DISIS-2022-001 | 02 NEBRASKA | Saline | NE | NPPD | 5/1/2025 | 12/31/2025 | | | 118 | 118 | 118 | ER/NR | Wind | | Friend 115 kV Substation | 2/24/2023 | | DISIS STAGE | | | | |
GEN-2022-161 | | DISIS-2022-001 | 03 CENTRAL | Butler | KS | WERE | 12/31/2026 | 3/1/2027 | | | 400 | 400 | 400 | ER | Wind | | Burns 345kV Substation | 2/24/2023 | | DISIS STAGE | | | | |
GEN-2022-160 | | DISIS-2022-001 | 05 SOUTHWEST | Chaves and Lea | NM | NEET | 5/1/2028 | 12/1/2028 | | | 280 | 280 | 280 | ER/NR | Wind | | Crossroads - Hobbs 345 kV Line | 2/24/2023 | | DISIS STAGE | | | | |
GEN-2022-159 | | DISIS-2022-001 | 05 SOUTHWEST | Chaves and Lea | NM | NEET | 5/1/2028 | 12/1/2027 | | | 280 | 280 | 280 | ER/NR | Wind | | Crossroads - Hobbs 345 kV Line | 2/24/2023 | | DISIS STAGE | | | | |
GEN-2022-156 | | DISIS-2022-001 | 04 SOUTHEAST | Creek | OK | GRDA | 9/15/2026 | 12/31/2026 | | | 100 | 100 | 100 | ER | Battery/Storage | | Silver City 138 kV Substation | 2/24/2023 | | DISIS STAGE | | | | |
GEN-2022-155 | | DISIS-2022-001 | 04 SOUTHEAST | Oklahoma | OK | OGE | 9/15/2026 | 12/31/2026 | | | 200 | 200 | 200 | ER | Battery/Storage | | Horseshoe Lake 138 kV Substation | 2/24/2023 | | DISIS STAGE | | | | |
GEN-2022-154 | | DISIS-2022-001 | 04 SOUTHEAST | Cleveland | OK | WFEC | 9/15/2026 | 12/31/2026 | | | 100 | 100 | 100 | ER | Battery/Storage | | Canadian Switch 138 kV Substation | 2/24/2023 | | DISIS STAGE | | | | |
GEN-2022-152 | | DISIS-2022-001 | 02 NEBRASKA | Richardson | NE | NPPD | 5/10/2026 | 8/21/2026 | | | 80 | 80 | 80 | ER/NR | Battery/Storage | | Humboldt 161 kV Substation | 2/23/2023 | | DISIS STAGE | | | | |
GEN-2022-150 | | DISIS-2022-001 | 05 SOUTHWEST | Randall | TX | SPS | 5/10/2026 | 8/21/2026 | | | 150 | 171 | 171 | ER/NR | Battery/Storage | | Randall 115 kV Substation | 2/23/2023 | | DISIS STAGE | | | | |
GEN-2022-147 | | DISIS-2022-001 | 05 SOUTHWEST | Hale | TX | SPS | 2/27/2024 | 4/15/2025 | | | 203 | 196 | 203 | ER | Thermal | CTG | Tuco 345kV | 2/21/2023 | | DISIS STAGE | | | | |
GEN-2022-145 | | DISIS-2022-001 | 04 SOUTHEAST | Cluster | OK | AEP | 9/15/2027 | 12/31/2027 | | | 195 | 195 | 195 | ER | Battery/Storage | | Weatherford Jct. to Hinton 138 kV line | 2/21/2023 | | DISIS STAGE | | | | |
GEN-2022-144 | | DISIS-2022-001 | 03 CENTRAL | Jackson | MO | KCPL | 9/15/2027 | 12/31/2027 | | | 200 | 210.4 | 210.4 | ER/NR | Battery/Storage | | Blue Mills BESS 161kV Substation | 2/21/2023 | | DISIS STAGE | | | | |
GEN-2022-143 | | DISIS-2022-001 | 04 SOUTHEAST | Marshall | OK | OGE | 9/15/2027 | 12/31/2027 | | | 200 | 210.4 | 210.4 | ER/NR | Battery/Storage | | Caney Creek 138 kV Substation | 2/21/2023 | | DISIS STAGE | | | | |
GEN-2022-142 | | DISIS-2022-001 | 03 CENTRAL | Clay | MO | KCPL | 9/15/2027 | 12/31/2027 | | | 200 | 210.4 | 210.4 | ER/NR | Battery/Storage | | Shoal Creek 161 kV Substation | 2/21/2023 | | DISIS STAGE | | | | |
GEN-2022-139 | | DISIS-2022-001 | 04 SOUTHEAST | Harrison | TX | AEP | 9/15/2027 | 12/31/2027 | | | 300 | 315.7 | 315.7 | ER/NR | Battery/Storage | | Pirkey 345kV Substation | 2/21/2023 | | DISIS STAGE | | | | |
GEN-2022-138 | | DISIS-2022-001 | 04 SOUTHEAST | Roger | OK | AEP | 9/15/2027 | 12/31/2027 | | | 300 | 316.6 | 316.6 | ER/NR | Battery/Storage | | Tulsa North - Northeast Station 345 kV Substation | 2/21/2023 | | DISIS STAGE | | | | |
GEN-2022-137 | | DISIS-2022-001 | 04 SOUTHEAST | Cleveland | OK | WFEC | 9/15/2027 | 12/31/2027 | | | 200 | 210.4 | 210.4 | ER/NR | Battery/Storage | | Canadian Switchyard 138kV | 2/21/2023 | | DISIS STAGE | | | | |
GEN-2022-136 | | DISIS-2022-001 | 04 SOUTHEAST | Bryan | OK | WFEC | 9/15/2027 | 12/31/2027 | | | 200 | 210.5 | 210.5 | ER/NR | Battery/Storage | | Colbert 138 kV Substation | 2/21/2023 | | DISIS STAGE | | | | |
GEN-2022-135 | | DISIS-2022-001 | 05 SOUTHWEST | Lea | NM | SPS | 9/15/2027 | 12/31/2027 | | | 150 | 155.1 | 155.1 | ER/NR | Battery/Storage | | Taylor Switching Station 115kV | 2/21/2023 | | DISIS STAGE | | | | |
GEN-2022-132 | | DISIS-2022-001 | 04 SOUTHEAST | Caddo | OK | WFEC | 9/15/2027 | 12/31/2027 | | | 300 | 315.8 | 315.8 | ER/NR | Battery/Storage | | Anadarko 138kV Substation | 2/21/2023 | | DISIS STAGE | | | | |
GEN-2022-131 | | DISIS-2022-001 | 03 CENTRAL | Johnson | MO | KCPL | 9/15/2027 | 12/31/2027 | | | 200 | 200 | 200 | ER/NR | Battery/Storage | | Warrensburg East - Odessa161kV Substation | 2/21/2023 | | DISIS STAGE | | | | |
GEN-2022-130 | | DISIS-2022-001 | 04 SOUTHEAST | Sebastian | AR | OGE | 9/15/2027 | 12/31/2027 | | | 200 | 200 | 200 | ER/NR | Battery/Storage | | Battlefield BESS 161kV | 2/21/2023 | | DISIS STAGE | | | | |
GEN-2022-129 | | DISIS-2022-001 | 04 SOUTHEAST | Osage | OK | AEP | 9/15/2027 | 12/31/2027 | | | 200 | 200 | 200 | ER/NR | Battery/Storage | | Webb City Tap - Shidler 138 kV line | 2/21/2023 | | DISIS STAGE | | | | |
GEN-2022-128 | | DISIS-2022-001 | 05 SOUTHWEST | Eddy | NM | SPS | 9/15/2027 | 12/31/2027 | | | 150 | 150 | 150 | ER/NR | Battery/Storage | | Pecos Interchange 115 kV Substation | 2/21/2023 | | DISIS STAGE | | | | |
GEN-2022-114 | | DISIS-2022-001 | 05 SOUTHWEST | Tillman | OK | AEP | 12/1/2027 | 12/31/2027 | | | 250 | 250 | 250 | ER/NR | Wind | | Lawton to Oklaunion 345kV Line | 2/16/2023 | | DISIS STAGE | | | | |
GEN-2022-113 | | DISIS-2022-001 | 03 CENTRAL | Newton | MO | EDE | 4/1/2026 | 12/31/2027 | | | 200 | 200 | 200 | ER/NR | Solar | | Tipton Station 161 kV Substation | 2/16/2023 | | DISIS STAGE | | | | |
GEN-2022-111 | | DISIS-2022-001 | 04 SOUTHEAST | Marion | TX | AEP | 6/30/2026 | 9/30/2026 | | | 150 | 150 | 150 | ER/NR | Hybrid | Solar/Storage | Wilkes 345 kV Substation | 2/10/2023 | | DISIS STAGE | | | | |
GEN-2022-110 | | DISIS-2022-001 | 04 SOUTHEAST | Coal | OK | AEP | 1/30/2026 | 4/30/2026 | | | 150 | 150 | 150 | ER/NR | Battery/Storage | | Lehigh 138kV Station | 2/10/2023 | | DISIS STAGE | | | | |
GEN-2022-109 | | DISIS-2022-001 | 05 SOUTHWEST | Lea | NM | SPS | 5/1/2026 | 10/1/2026 | | | 150 | 150 | 150 | ER/NR | Solar | | Hobbs - Yoakum 345 kV transmission line | 1/6/2023 | | DISIS STAGE | | | | |
GEN-2022-108 | | DISIS-2022-001 | 04 SOUTHEAST | DeSoto Parish | LA | AEP | 9/1/2027 | 12/31/2027 | | | 100 | 100 | 100 | ER/NR | Solar | | Tap between 345kV SW Shreveport to Dolet Hills Substations | 1/8/2023 | | DISIS STAGE | | | | |
GEN-2022-107 | | DISIS-2022-001 | 05 SOUTHWEST | Tillman | OK | AEP | 3/1/2026 | 7/31/2026 | | | 400 | 400 | 400 | ER/NR | Solar | | Tap of Oklaunion to Lawton Eastside 345 kV Transmission Line | 1/9/2023 | | DISIS STAGE | | | | |
GEN-2022-106 | | DISIS-2022-001 | 05 SOUTHWEST | Tillman | OK | AEP | 3/1/2026 | 7/31/2026 | | | 300 | 300 | 300 | ER/NR | Solar | | Tap of Oklaunion to Lawton Eastside 345 kV Transmission Line | 1/9/2023 | | DISIS STAGE | | | | |
GEN-2022-105 | | DISIS-2022-001 | 05 SOUTHWEST | Tillman | OK | AEP | 3/1/2026 | 7/31/2026 | | | 300 | 300 | 300 | ER/NR | Solar | | Tap of Oklaunion to Lawton Eastside 345 kV Transmission Line | 1/9/2023 | | DISIS STAGE | | | | |
GEN-2022-104 | | DISIS-2022-001 | 04 SOUTHEAST | Bryan | OK | WFEC | 11/3/2025 | 2/2/2026 | | | 113.078 | 113.078 | 113.078 | ER/NR | Solar | | Brown - South Coleman Junction 138kV line | 1/26/2023 | | DISIS STAGE | | | | |
GEN-2022-103 | | DISIS-2022-001 | 03 CENTRAL | Christian | MO | EDE | 10/1/2026 | 1/1/2027 | | | 74.99 | 74.99 | 74.99 | ER/NR | Battery/Storage | | Ozark South 161kV | 1/30/2023 | | DISIS STAGE | | | | |
GEN-2022-102 | | DISIS-2022-001 | 03 CENTRAL | Clay | MO | KCPL | 10/1/2026 | 1/1/2027 | | | 100 | 100 | 100 | ER/NR | Battery/Storage | | Liberty West 161 kV | 1/6/2023 | | DISIS STAGE | | | | |
GEN-2022-100 | | DISIS-2022-001 | 03 CENTRAL | Cooper | MO | KCPL | 8/1/2025 | 10/1/2026 | | | 80 | 80 | 80 | ER/NR | Hybrid | Solar/Storage | Overton - Sedalia East 161 kV Substation | 3/24/2023 | | DISIS STAGE | | | | |
GEN-2022-098 | | DISIS-2022-001 | 04 SOUTHEAST | Johnston | OK | OGE | 3/1/2024 | 12/1/2024 | | | 200 | 200 | 200 | ER/NR | Solar | | Bison 345kV Substation | 12/6/2022 | | DISIS STAGE | | | | |
GEN-2022-094 | | DISIS-2022-001 | 03 CENTRAL | Osborne | KS | ITCGP | 5/27/2028 | 12/31/2028 | | | 250 | 250 | 250 | ER | Wind | | Postrock to Axtell 345 kV line | 11/15/2022 | | DISIS STAGE | | | | |
GEN-2022-093 | | DISIS-2022-001 | 04 SOUTHEAST | Hempstead | AR | AEP | 10/1/2026 | 4/1/2027 | | | 83 | 83 | 83 | ER/NR | Solar | | Turk - Hope 115 kV line | 11/15/2022 | | DISIS STAGE | | | | |
GEN-2022-092 | | DISIS-2022-001 | 04 SOUTHEAST | Nowata and Craig | OK | AEP | 9/1/2026 | 12/15/2026 | | | 299.2 | 299.2 | 299.2 | ER/NR | Wind | | Neosho-Delaware 345 kV | 11/15/2022 | | DISIS STAGE | | | | |
GEN-2022-091 | | DISIS-2022-001 | 04 SOUTHEAST | McCurtain | OK | AEP | 9/30/2026 | 9/30/2026 | | | 150 | 150 | 150 | ER/NR | Battery/Storage | | Valiant Substation 138kV | 11/15/2022 | | DISIS STAGE | | | | |
GEN-2022-090 | | DISIS-2022-001 | 04 SOUTHEAST | McCurtain | OK | AEP | 9/30/2026 | 9/30/2026 | | | 150 | 150 | 150 | ER/NR | Solar | | Valiant Substation 138kV | 11/15/2022 | | DISIS STAGE | | | | |
GEN-2022-089 | | DISIS-2022-001 | 04 SOUTHEAST | Little River | AR | AEP | 9/30/2026 | 9/30/2026 | | | 74.99 | 74.99 | 74.99 | ER/NR | Battery/Storage | | South Foreman 138 kV Substation | 11/15/2022 | | DISIS STAGE | | | | |
GEN-2022-088 | | DISIS-2022-001 | 04 SOUTHEAST | Little River | AR | AEP | 9/30/2026 | 9/30/2026 | | | 74.99 | 74.99 | 74.99 | ER/NR | Solar | | South Foreman 138 kV Substation | 11/15/2022 | | DISIS STAGE | | | | |
GEN-2022-085 | | DISIS-2022-001 | 04 SOUTHEAST | Ofuskee and Hughes | OK | OGE | 9/1/2025 | 12/31/2025 | | | 241.4 | 241.4 | 241.4 | ER/NR | Wind | | Seminole to Muskogee 345kV Substation | 11/5/2022 | | DISIS STAGE | | | | |
GEN-2022-083 | | DISIS-2022-001 | 01 NORTH | Williams | ND | BEPC | 6/1/2025 | 2/1/2025 | | | 250 | 250 | 265 | ER | Thermal | CTG | Judson Substation 345 kV | 10/21/2022 | | DISIS STAGE | | | | |
GEN-2022-082 | | DISIS-2022-001 | 05 SOUTHWEST | Hale | TX | SPS | 4/1/2025 | 12/31/2028 | | | 180 | 180 | 180 | ER/NR | Solar | | Tuco - Carlisle 230 kV line | 9/22/2022 | | DISIS STAGE | | | | |
GEN-2022-081 | | DISIS-2022-001 | 03 CENTRAL | Washington | KS | SUNC | 4/1/2025 | 11/29/2027 | | | 218 | 218 | 218 | ER/NR | Battery/Storage | | Clifton 115kV Substation | 9/22/2022 | | DISIS STAGE | | | | |
GEN-2022-080 | | DISIS-2022-001 | 03 CENTRAL | Cedar | MO | EDE | 1/1/2026 | 10/31/2027 | | | 96 | 96 | 96 | ER | Battery/Storage | | Dadeville East - Bolivar South 161kV | 9/22/2022 | | DISIS STAGE | | | | |
GEN-2022-079 | | DISIS-2022-001 | 03 CENTRAL | Cedar | MO | EDE | 1/1/2026 | 10/31/2027 | | | 192 | 192 | 192 | ER | Solar | | Dadeville East - Bolivar South 161kV | 9/22/2022 | | DISIS STAGE | | | | |
GEN-2022-077 | | DISIS-2022-001 | 02 NEBRASKA | Chase | NE | NPPD | 1/1/2026 | 12/1/2026 | | | 255 | 255 | 255 | ER/NR | Solar | | Enders 115 kV Substation | 9/21/2022 | | DISIS STAGE | | | | |
GEN-2022-076 | | DISIS-2022-001 | 03 CENTRAL | Stevens | KS | SPS | 3/15/2026 | 11/15/2026 | | | 500 | 500 | 500 | ER/NR | Solar | | Carpenter 345 kV Substation | 9/7/2022 | | DISIS STAGE | | | | |
GEN-2022-075 | | DISIS-2022-001 | 03 CENTRAL | Ellis | KS | ITCGP | 9/3/2027 | 11/19/2027 | | | 175 | 175 | 175 | ER/NR | Solar | | Tap on the Spearville - Post Rock 345kV line | 9/2/2022 | | DISIS STAGE | | | | |
GEN-2022-074 | | DISIS-2022-001 | 04 SOUTHEAST | Eufaula, McIntosh | OK | WFEC | 3/1/2025 | 10/31/2025 | | | 220.86 | 220.86 | 220.86 | ER/NR | Wind | | Hanna 138kV Substation | 9/6/2022 | | DISIS STAGE | | | | |
GEN-2022-073 | | DISIS-2022-001 | 03 CENTRAL | Kay | MO | KCPL | 4/1/2025 | 12/31/2027 | | | 300 | 300 | 300 | ER/NR | Battery/Storage | | Nashua 161 kV Substation | 9/2/2022 | | DISIS STAGE | | | | |
GEN-2022-072 | | DISIS-2022-001 | 04 SOUTHEAST | Mayes | OK | GRDA | 7/1/2025 | 12/31/2028 | | | 181 | 181 | 181 | ER/NR | Solar | | Grand River Dam - Claremore 161 kV Line | 8/12/2022 | | DISIS STAGE | | | | |
GEN-2022-071 | | DISIS-2022-001 | 04 SOUTHEAST | Pittsburg | OK | AEP | 11/3/2025 | 2/2/2026 | | | 90.824 | 90.824 | 90.824 | ER/NR | Solar | | Talawanda to Canadian River 138 kV Line Tap | 8/12/2022 | | DISIS STAGE | | | | |
GEN-2022-068 | | DISIS-2022-001 | 01 NORTH | Hyde | SD | BEPC | 7/1/2026 | 11/1/2026 | | | 250 | 250 | 250 | ER/NR | Wind | | Chappelle Creek 345 kV | 8/11/2022 | | DISIS STAGE | | | | |
GEN-2022-065 | | DISIS-2022-001 | 03 CENTRAL | Edwards | KS | SUNC | 9/4/2027 | 11/19/2027 | | | 145 | 145 | 145 | ER/NR | Solar | | tap on Arthur Mullergreen-Spearville 230 kV line | 7/25/2022 | | DISIS STAGE | | | | |
GEN-2022-062 | | DISIS-2022-001 | 03 CENTRAL | Bourbon | KS | NEET | 4/1/2025 | 12/31/2025 | | | 200 | 200 | 200 | ER/NR | Solar | | Wolf Creek- Blackberry 345 kV | 7/8/2022 | | DISIS STAGE | | | | |
GEN-2022-058 | | DISIS-2022-001 | 03 CENTRAL | Benton | AR | EDE | 7/1/2028 | 12/31/2028 | | | 180 | 180 | 180 | ER/NR | Solar | | Noel Southwest - Decatur 161 kV line tap | 6/23/2022 | | DISIS STAGE | | | | |
GEN-2022-055 | | DISIS-2022-001 | 04 SOUTHEAST | Grady | OK | WFEC | 4/1/2025 | 12/31/2025 | | | 200 | 200 | 200 | ER/NR | Solar | | Sunshine North to Anadarko 138 kV | 6/23/2022 | | DISIS STAGE | | | | |
GEN-2022-054 | | DISIS-2022-001 | 03 CENTRAL | Bourbon | KS | NEET | 4/1/2025 | 12/31/2025 | | | 200 | 200 | 200 | ER/NR | Solar | | Wolf Creek - Blackberry 345 kV Tap | 6/23/2022 | | DISIS STAGE | | | | |
GEN-2022-048 | | DISIS-2022-001 | 04 SOUTHEAST | Woodward | OK | WFEC | 4/1/2025 | 12/31/2025 | | | 250 | 250 | 250 | ER/NR | Wind | | Mooreland 138 kV | 6/23/2022 | | DISIS STAGE | | | | |
GEN-2022-042 | | DISIS-2022-001 | 04 SOUTHEAST | Carter | OK | OGE | 4/1/2025 | 12/31/2025 | | | 174 | 174 | 174 | ER/NR | Solar | | Sunnyside to Pooleville 138 kV line | 6/23/2022 | | DISIS STAGE | | | | |
GEN-2022-041 | | DISIS-2022-001 | 03 CENTRAL | Cowley | KS | WERE | 4/1/2025 | 12/31/2025 | | | 100 | 100 | 100 | ER/NR | Solar | | Tie Substation 69 kV | 6/29/2022 | | DISIS STAGE | | | | |
GEN-2022-038 | | DISIS-2022-001 | 04 SOUTHEAST | Harrison | TX | AEP | 4/1/2025 | 12/31/2025 | | | 200 | 200 | 200 | ER/NR | Solar | | Longwood to Scottville 138 kV line | 6/23/2022 | | DISIS STAGE | | | | |
GEN-2022-026 | | DISIS-2022-001 | 03 CENTRAL | Decatur | KS | SUNC | 6/1/2024 | 12/31/2025 | | | 200 | 200 | 200 | ER/NR | Solar | | Tap of Mingo--Red Willow 345kV line | 6/8/2022 | | DISIS STAGE | | | | |
GEN-2022-025 | | DISIS-2022-001 | 03 CENTRAL | Decatur | KS | SUNC | 6/1/2024 | 12/31/2025 | | | 200 | 200 | 200 | ER/NR | Solar | | Tap of Mingo--Red Willow 345kV line | 6/8/2022 | | DISIS STAGE | | | | |
GEN-2022-024 | | DISIS-2022-001 | 03 CENTRAL | Bourbon | KS | WERE | 6/1/2024 | 12/31/2025 | | | 200 | 200 | 200 | ER/NR | Battery/Storage | | Tap of Neosho - LaCygne 345 kV Line | 6/10/2022 | | DISIS STAGE | | | | |
GEN-2022-021 | | DISIS-2022-001 | 05 SOUTHWEST | Tillman | OK | AEP | 6/1/2024 | 12/31/2025 | | | 100 | 100 | 100 | ER/NR | Battery/Storage | | Tap of Oklaunion - Lawton Eastside 345 kV line | 6/8/2022 | | DISIS STAGE | | | | |
GEN-2022-019 | | DISIS-2022-001 | 05 SOUTHWEST | Tillman | OK | AEP | 6/1/2024 | 12/31/2025 | | | 100 | 100 | 100 | ER/NR | Battery/Storage | | Tap of Oklaunion - Lawton Eastside 345 kV line | 6/8/2022 | | DISIS STAGE | | | | |
GEN-2022-017 | | DISIS-2022-001 | 04 SOUTHEAST | Woodward | OK | OGE | 6/6/2024 | 12/31/2025 | | | 150 | 150 | 150 | ER/NR | Battery/Storage | | Woodward 345kV Substation | 6/8/2022 | | DISIS STAGE | | | | |
GEN-2022-016 | | DISIS-2022-001 | 04 SOUTHEAST | Woodward | OK | OGE | 6/1/2024 | 12/31/2025 | | | 288 | 288 | 288 | ER/NR | Solar | | Woodward 345kV Substation | 6/8/2022 | | DISIS STAGE | | | | |
GEN-2022-015 | | DISIS-2022-001 | 03 CENTRAL | Decatur | KS | SUNC | 6/1/2024 | 12/31/2025 | | | 270 | 270 | 270 | ER/NR | Solar | | Tap of Mingo - Red Willow 345 kV Line | 6/8/2022 | | DISIS STAGE | | | | |
GEN-2022-013 | | DISIS-2022-001 | 03 CENTRAL | Bourbon | KS | WERE | 6/1/2024 | 12/31/2025 | | | 300 | 300 | 300 | ER/NR | Solar | | Tap of Neosho - LaCygne 345 kV Line | 6/8/2022 | | DISIS STAGE | | | | |
GEN-2022-012 | | DISIS-2022-001 | 04 SOUTHEAST | Woodward | OK | OGE | 6/1/2024 | 12/31/2025 | | | 100 | 100 | 100 | ER/NR | Battery/Storage | | Woodward 345 kV Substation | 6/8/2022 | | DISIS STAGE | | | | |
GEN-2022-011 | | DISIS-2022-001 | 05 SOUTHWEST | Tillman | OK | AEP | 6/1/2024 | 12/31/2025 | | | 374 | 374 | 374 | ER/NR | Solar | | Tap of Oklaunion - Lawton Eastside 345 kV line | 6/3/2022 | | DISIS STAGE | | | | |
GEN-2022-010 | | DISIS-2022-001 | 01 NORTH | Williams | ND | BEPC | 7/1/2023 | 2/1/2025 | | | 250 | 250 | 250 | ER | Thermal | | Judson Substation 345 kV | 5/26/2022 | | DISIS STAGE | | | | |
GEN-2022-009 | | DISIS-2022-001 | 01 NORTH | Williams | ND | BEPC | 7/1/2023 | 2/1/2025 | | | 125 | 125 | 125 | ER | Thermal | | Judson Substation 345 kV | 5/26/2022 | | DISIS STAGE | | | | |
GEN-2022-007 | | DISIS-2022-001 | 03 CENTRAL | Lyon | KS | WERE | 5/1/2025 | 10/31/2026 | | | 135 | 135 | 135 | ER/NR | Solar | | Lang - Reading 115 kV Transmission Line | 5/26/2022 | | DISIS STAGE | | | | |
GEN-2022-006 | | DISIS-2022-001 | 03 CENTRAL | Labette | KS | WERE | 4/1/2025 | 10/31/2026 | | | 200 | 200 | 200 | ER/NR | Solar | | Neosho - N345 161 kV Substation | 5/25/2022 | | DISIS STAGE | | | | |
GEN-2022-005 | | DISIS-2022-001 | 03 CENTRAL | Labette | KS | WERE | 4/1/2025 | 10/31/2026 | | | 200 | 200 | 200 | ER/NR | Solar | | Northeast Parsons 138kV Substation | 5/25/2022 | | DISIS STAGE | | | | |
GEN-2022-004 | | DISIS-2022-001 | 03 CENTRAL | Sedgwick | KS | WERE | 8/1/2025 | 10/31/2026 | | | 33 | 33 | 33 | ER/NR | Solar | | Murray Gill 138 kV Substation | 5/26/2022 | | DISIS STAGE | | | | |
GEN-2022-001 | | DISIS-2022-001 | 04 SOUTHEAST | Rogers | OK | AEP | 9/26/2026 | 1/7/2027 | | | 100 | 100 | 100 | ER/NR | Battery/Storage | | Catoosa 138 kV Substation | 12/30/2021 | | DISIS STAGE | | | | |
GEN-2021-SR9 | | Surplus | | Kansas City | MO | KCPL | | 1/11/2023 | | | 10 | 10 | 10 | ER/NR | Solar | | Hawthorn Power Plant | 8/24/2021 | | IA FULLY EXECUTED/COMMERCIAL OPERATION | | | | View |
GEN-2021-SR8 | | Surplus | 03 CENTRAL | Harper | KS | WERE | 11/1/2023 | 11/1/2023 | | | 42 | 42 | 42 | ER | Solar | | Viola 345kV | 5/13/2021 | | IA FULLY EXECUTED/ON SCHEDULE | | | | View |
GEN-2021-108 | | DISIS-2021-001 | 02 NEBRASKA | Cass | NE | OPPD | 5/27/2025 | 5/14/2025 | | | 182.25 | 182.25 | 182.25 | ER/NR | Solar | | OPPD 345KV Cass County Substation | 5/20/2021 | | DISIS STAGE | | | | |
GEN-2021-107 | | DISIS-2021-001 | 03 CENTRAL | Pottawatomie | KS | WERE | 10/1/2026 | 12/1/2026 | | | 201.6 | 201.6 | 201.6 | ER | Solar | | Evergy 345kV Jeffrey Energy Center | 5/20/2021 | | DISIS STAGE | | | | |
GEN-2021-103 | | DISIS-2021-001 | 03 CENTRAL | Johnson | KS | WERE | 8/1/2025 | 9/1/2026 | | | 150 | 150 | 150 | ER/NR | Battery/Storage | | Evergy's Atlantic Substation115kV bus | 5/25/2021 | | DISIS STAGE | | | | |
GEN-2021-101 | | DISIS-2021-001 | 03 CENTRAL | Douglas | KS | WERE | 8/1/2025 | 9/1/2025 | | | 159 | 159 | 159 | ER/NR | Solar | | Evergy's Midland Substation 115kV bus | 5/25/2021 | | DISIS STAGE | | | | |
GEN-2021-098 | | DISIS-2021-001 | 04 SOUTHEAST | Dewey | OK | OGE | 7/1/2026 | 12/31/2026 | | | 160 | 160 | 160 | ER/NR | Hybrid | Wind/Storage | Dewey District 138 kV Substation | 5/24/2021 | | DISIS STAGE | | | | |
GEN-2021-096 | | DISIS-2021-001 | 03 CENTRAL | Coffey | KS | WERE | 5/1/2026 | 12/1/2027 | | | 500 | 500 | 500 | ER/NR | Solar | | Wolf Creek - Benton 345 kV | 4/29/2021 | | DISIS STAGE | | | | |
GEN-2021-090 | | DISIS-2021-001 | 05 SOUTHWEST | Yoakum | TX | SPS | 6/15/2022 | 6/30/2028 | | | 400 | 400 | 400 | ER/NR | Hybrid | Solar/Storage | Yoakum 345kV Substation | 4/30/2021 | | DISIS STAGE | | | | |
GEN-2021-088 | | DISIS-2021-001 | 04 SOUTHEAST | Cleveland | OK | OGE | 12/21/2025 | 1/7/2027 | | | 100 | 100 | 100 | ER/NR | Battery/Storage | | Cedar Lane - Canadian 138 kV Transmission Line | 4/29/2021 | | DISIS STAGE | | | | |
GEN-2021-077 | | DISIS-2021-001 | 03 CENTRAL | Pettis | MO | GMO | 7/1/2025 | 12/31/2027 | | | 95 | 95 | 95 | ER/NR | Hybrid | Solar/Storage | Windsor to AEC Sedalia 161 kV | 4/30/2021 | | DISIS STAGE | | | | |
GEN-2021-076 | | DISIS-2021-001 | 03 CENTRAL | Ellis | KS | ITCGP | 7/1/2026 | 12/31/2026 | | | 113 | 113 | 113 | ER/NR | Solar | | ITC Post Rock 345 kV Substation | 5/13/2021 | | DISIS STAGE | | | | |
GEN-2021-075 | | DISIS-2021-001 | 04 SOUTHEAST | Camp | TX | AEP | 7/1/2026 | 12/31/2027 | | | 300 | 300 | 300 | ER/NR | Hybrid | Solar/Storage | CAMPCOR4 138kV Substation | 5/19/2021 | | DISIS STAGE | | | | |
GEN-2021-070 | | DISIS-2021-001 | 03 CENTRAL | Hodgeman and Ford | KS | SUNC | 8/1/2027 | 12/1/2027 | | | 504 | 504 | 504 | ER | Wind | | SUNC Spearville - Holcomb 345kV | 4/26/2021 | | DISIS STAGE | | | | |
GEN-2021-069 | | DISIS-2021-001 | 03 CENTRAL | Hodgeman and Ford | KS | SUNC | 8/1/2027 | 12/1/2027 | | | 249.6 | 249.6 | 249.6 | ER | Wind | | SUNC Spearville - Holcomb 345kV | 4/26/2021 | | DISIS STAGE | | | | |
GEN-2021-068 | | DISIS-2021-001 | 03 CENTRAL | Hodgeman and Ford | KS | SUNC | 9/1/2025 | 12/1/2027 | | | 249.6 | 249.6 | 249.6 | ER | Wind | | SUNC Spearville - Holcomb 345kV | 4/26/2021 | | DISIS STAGE | | | | |
GEN-2021-064 | | DISIS-2021-001 | 04 SOUTHEAST | Caddo | OK | AEP | 10/25/2025 | 12/31/2027 | | | 100 | 100 | 100 | ER/NR | Hybrid | Solar/Storage | Carnegie South 138kV | 4/28/2021 | | DISIS STAGE | | | | |
GEN-2021-063 | | DISIS-2021-001 | 04 SOUTHEAST | McCurtain | OK | AEP | 10/25/2025 | 12/31/2027 | | | 155 | 155 | 155 | ER/NR | Hybrid | Solar/Storage | Craig JCT 138kV | 4/28/2021 | | DISIS STAGE | | | | |
GEN-2021-057 | | DISIS-2021-001 | 02 NEBRASKA | Antelope | NE | NPPD | | 12/31/2027 | | | 300 | 300 | 300 | ER | Wind | | Antelope 345kV substation | 4/29/2021 | | DISIS STAGE | | | | |
GEN-2021-056 | | DISIS-2021-001 | 03 CENTRAL | Harper and Kingman | KS | WERE | | 12/31/2028 | | | 300 | 300 | 300 | ER | Wind | | Viola 345kV Substation | 4/29/2021 | | DISIS STAGE | | | | |
GEN-2021-053 | | DISIS-2021-001 | 04 SOUTHEAST | Muskogee | OK | OGE | | 5/30/2026 | | | 300 | 300 | 300 | ER | Solar | | Pecan Creek 345 kV Substation | 4/29/2021 | | DISIS STAGE | | | | |
GEN-2021-052 | | DISIS-2021-001 | 04 SOUTHEAST | Muskogee | OK | OGE | | 5/30/2026 | | | 75 | 75 | 75 | ER | Battery/Storage | | Pecan Creek 345kV substation | 4/29/2021 | | DISIS STAGE | | | | |
GEN-2021-051 | | DISIS-2021-001 | 03 CENTRAL | Henry | MO | KCPL | 7/31/2025 | 9/1/2027 | | | 75 | 75 | 75 | ER/NR | Battery/Storage | | 161kV Stilwell-Clinton Line | 4/30/2021 | | DISIS STAGE | | | | |
GEN-2021-050 | | DISIS-2021-001 | 03 CENTRAL | Henry | MO | KCPL | 7/31/2025 | 9/1/2028 | | | 200 | 200 | 200 | ER/NR | Solar | | 161kV Stilwell-Clinton Line | 4/30/2021 | | DISIS STAGE | | | | |
GEN-2021-049 | | DISIS-2021-001 | 02 NEBRASKA | Lancaster | NE | LES | 7/31/2025 | 9/1/2027 | | | 225 | 225 | 225 | ER/NR | Solar | | Wagener 115kV Substation | 4/30/2021 | | DISIS STAGE | | | | |
GEN-2021-048 | | DISIS-2021-001 | 02 NEBRASKA | Lancaster | NE | LES | 7/31/2025 | 9/1/2027 | | | 75 | 75 | 75 | ER/NR | Battery/Storage | | Wagener 115kV Substation | 4/30/2021 | | DISIS STAGE | | | | |
GEN-2021-047 | | DISIS-2021-001 | 04 SOUTHEAST | Mayes | OK | GRDA | 3/1/2026 | 9/30/2029 | | | 250 | 250 | 250 | ER | Solar | | Tulsa (Bus #509852) - Igloo (Bus #513596) 345kV line | 4/29/2021 | | DISIS STAGE | | | | |
GEN-2021-043 | | DISIS-2021-001 | 02 NEBRASKA | Lancaster | NE | LES | 2/1/2026 | 5/31/2028 | | | 250 | 250 | 250 | ER | Battery/Storage | | 8000 SW 12th (Rokeby) Station, 115kV Bus | 4/30/2021 | | DISIS STAGE | | | | |
GEN-2021-042 | | DISIS-2021-001 | 03 CENTRAL | Jackson | MO | INDN | 2/1/2025 | 6/1/2028 | | | 50 | 100 | 100 | ER/NR | Battery/Storage | | Independence Power & Light, Blue Valley Substation, 161kV Bus | 4/30/2021 | | DISIS STAGE | | | | |
GEN-2021-041 | | DISIS-2021-001 | 04 SOUTHEAST | Canadian | OK | OGE | 2/1/2025 | 6/1/2026 | | | 100 | 100.657 | 100.657 | ER/NR | Battery/Storage | | Mustang 138kV Substation | 4/30/2021 | | DISIS STAGE | | | | |
GEN-2021-040 | | DISIS-2021-001 | 02 NEBRASKA | Cass | NE | OPPD | 2/1/2025 | 11/30/2029 | | | 200 | 200 | 200 | ER | Battery/Storage | | OPPD District, Cass County Power Plant Substation, 345kV Bus | 4/30/2021 | | DISIS STAGE | | | | |
GEN-2021-039 | | DISIS-2021-001 | 02 NEBRASKA | Douglas | NE | OPPD | 2/1/2025 | 5/31/2030 | | | 100 | 100 | 100 | ER | Battery/Storage | | New 161kV substation looping in OPPD 161kV lines S1211 to S1220 and S1211 to S1299 | 4/30/2021 | | DISIS STAGE | | | | |
GEN-2021-038 | | DISIS-2021-001 | 04 SOUTHEAST | Titus | TX | AEP | 2/1/2026 | 5/31/2028 | | | 200 | 201.32 | 201.32 | ER/NR | Battery/Storage | | Welsh 345kV Substation | 4/30/2021 | | DISIS STAGE | | | | |
GEN-2021-036 | | DISIS-2021-001 | 04 SOUTHEAST | Little River | AR | AEP | 10/29/2025 | 12/31/2027 | | | 204.12 | 204.12 | 204.12 | ER/NR | Solar | | Craig to Patterson 138 kV Transmission Line | 5/14/2021 | | DISIS STAGE | | | | |
GEN-2021-035 | | DISIS-2021-001 | 03 CENTRAL | Grant | KS | SUNC | 10/29/2025 | 12/31/2026 | | | 113 | 113 | 113 | ER | Solar | | Tap Sunflower Santana 115kV Transmission Line | 5/14/2021 | | DISIS STAGE | | | | |
GEN-2021-034 | | DISIS-2021-001 | 02 NEBRASKA | Lancaster | NE | LES | 10/31/2027 | 12/31/2027 | | | 113 | 113 | 113 | ER | Solar | | Rokeby 115 kV Substation | 5/13/2021 | | DISIS STAGE | | | | |
GEN-2021-033 | | DISIS-2021-001 | 04 SOUTHEAST | Franklin | AR | OGE | 7/1/2027 | 12/31/2027 | | | 204.12 | 204.12 | 204.12 | ER | Solar | | Branch 161kV Substation | 5/14/2021 | | DISIS STAGE | | | | |
GEN-2021-030 | | DISIS-2021-001 | 03 CENTRAL | Linn KS and Bates MO | KS | KCPL | 9/28/2026 | 12/31/2026 | | | 510.3 | 510.3 | 510.3 | ER | Solar | | Evergy Tap the La Cygne to Stillwel 345 kV Line | 5/14/2021 | | DISIS STAGE | | | | |
GEN-2021-029 | | DISIS-2021-001 | 03 CENTRAL | Linn KS and Bates MO | KS | KCPL | 7/1/2026 | 12/31/2026 | | | 253.8 | 253.8 | 253.8 | ER | Battery/Storage | | Evergy Tap the La Cygne to Stillwel 345 kV Line | 5/14/2021 | | DISIS STAGE | | | | |
GEN-2021-027 | | DISIS-2021-001 | 02 NEBRASKA | Lancaster | NE | NPPD | 7/1/2026 | 12/31/2026 | | | 102.06 | 102.06 | 102.06 | ER | Solar | | Olive Creek 115 kV Substation | 5/14/2021 | | DISIS STAGE | | | | |
GEN-2021-025 | | DISIS-2021-001 | 04 SOUTHEAST | Woodward | OK | WFEC | 10/31/2025 | 12/1/2026 | | | 203.04 | 203.04 | 203.04 | ER | Wind | | Western Farmers 138kV Mooreland Substation | 5/14/2021 | | DISIS STAGE | | | | |
GEN-2021-023 | | DISIS-2021-001 | 03 CENTRAL | Grant | KS | WERE | 9/30/2026 | 11/30/2026 | | | 306.18 | 306.18 | 306.18 | ER | Solar | | Wild Plains 345kV Substation | 5/14/2021 | | DISIS STAGE | | | | |
GEN-2021-021 | | DISIS-2021-001 | 03 CENTRAL | Stevens | KS | SPS | 9/1/2026 | 12/31/2027 | | | 150 | 150 | 150 | ER | Wind | | Carpenter 345 kV Substation | 4/20/2021 | | DISIS STAGE | | | | |
GEN-2021-019 | | DISIS-2021-001 | 04 SOUTHEAST | Noble | OK | OGE | 4/1/2027 | 12/31/2028 | | | 74.9 | 75.89 | 75.89 | ER/NR | Battery/Storage | | Sooner 345 kV | 4/30/2021 | | DISIS STAGE | | | | |
GEN-2021-018 | | DISIS-2021-001 | 04 SOUTHEAST | Noble | OK | OGE | 4/1/2027 | 12/31/2028 | | | 231 | 235.35 | 235.35 | ER | Solar | | Sooner 345 kV | 4/30/2021 | | DISIS STAGE | | | | |
GEN-2021-017 | | DISIS-2021-001 | 03 CENTRAL | Cloud and Mitchell | KS | ITCGP | 4/1/2025 | 12/31/2027 | | | 37.5 | 37.5 | 37.5 | ER | Wind | | Elm Creek 345 kV interconnection substation | 4/30/2021 | | DISIS STAGE | | | | |
GEN-2021-016 | | DISIS-2021-001 | 04 SOUTHEAST | Johnston and Murray | OK | AEP | 4/1/2025 | 12/31/2029 | | | 250 | 250 | 250 | ER | Wind | | Sunnyside-Johnston 345 kV | 4/30/2021 | | DISIS STAGE | | | | |
GEN-2021-015 | | DISIS-2021-001 | 04 SOUTHEAST | Ellis | OK | OGE | 4/1/2027 | 12/1/2028 | | | 74.9 | 75.91 | 75.91 | ER | Solar | | Bobcat 345 kV interconnection substation | 4/30/2021 | | DISIS STAGE | | | | |
GEN-2021-014 | | DISIS-2021-001 | 04 SOUTHEAST | Beckham | OK | OGE | 4/1/2027 | 12/31/2029 | | | 208 | 233.98 | 233.98 | ER | Solar | | Border 345 kV interconnection substation | 4/30/2021 | | DISIS STAGE | | | | |
GEN-2021-012 | | DISIS-2021-001 | 04 SOUTHEAST | Beckham | OK | OGE | 11/15/2023 | 12/31/2029 | | | 203 | 227 | 227 | ER | Battery/Storage | | Border 345 kV interconnection substation | 4/30/2021 | | DISIS STAGE | | | | |
GEN-2021-010 | | DISIS-2021-001 | 04 SOUTHEAST | Beckham | OK | OGE | 4/1/2027 | 12/31/2029 | | | 208 | 233.98 | 233.98 | ER | Solar | | Border 345 kV interconnection substation | 4/30/2021 | | DISIS STAGE | | | | |
GEN-2021-008 | | DISIS-2021-001 | 01 NORTH | McKenzie | ND | BEPC | 5/9/2026 | 10/19/2030 | | | 200 | 200 | 200 | ER/NR | Solar | | 345kV Bus at BEPC Patent Gate Substation, McKenzie County, ND | 5/10/2021 | | DISIS STAGE | | | | |
GEN-2021-006 | | DISIS-2021-001 | 03 CENTRAL | Labette | KS | WERE | 10/1/2025 | 2/1/2026 | | | 300 | 300 | 300 | ER/NR | Battery/Storage | | Neosho 345kV substation in Labette County, KS | 5/7/2021 | | DISIS STAGE | | | | |
GEN-2021-005 | | DISIS-2021-001 | 03 CENTRAL | Saline | KS | WERE | 11/1/2024 | 3/1/2025 | | | 350 | 350 | 350 | ER/NR | Battery/Storage | | Summit 345 kV substation in Saline County, KS | 5/7/2021 | | DISIS STAGE | | | | |
GEN-2021-001 | | DISIS-2021-001 | 04 SOUTHEAST | Bryan | OK | OGE | 9/25/2024 | 12/24/2027 | | | 100 | 100 | 100 | ER/NR | Battery/Storage | | 138kV Brown Substation | 12/29/2020 | | DISIS STAGE | | | | |
GEN-2020-SR2 | | Surplus | 04 SOUTHEAST | Johnston | OK | OGE | 12/1/2021 | 3/31/2026 | | | 100 | 100 | 100 | ER/NR | Battery/Storage | | Brown 138kV | 8/4/2020 | | IA FULLY EXECUTED/ON SCHEDULE | | | | View |
GEN-2020-094 | | DISIS-2020-001 | 02 NEBRASKA | Syracuse | NE | OPPD | 4/2/2023 | 12/24/2026 | | | 250 | 250 | 250 | ER/NR | Solar | | Neb. City - 103rd & Rokeby 345 kV | 4/30/2020 | | DISIS STAGE | | | | |
GEN-2020-092 | | DISIS-2020-001 | 04 SOUTHEAST | Mayes County | OK | AEP | 11/2/2025 | 11/19/2026 | | | 100 | 100 | 100 | ER/NR | Solar | | Pryor Junction - Midwest Carbide 138kV line | 4/30/2020 | | DISIS STAGE | | | | |
GEN-2020-091 | | DISIS-2020-001 | 01 NORTH | McKenzie | ND | BEPC | 11/2/2025 | 11/19/2026 | | | 150 | 150 | 150 | ER/NR | Solar | | Patent Gate Substation 345 kV | 4/30/2020 | | DISIS STAGE | | | | |
GEN-2020-090 | | DISIS-2020-001 | 03 CENTRAL | Bourbon | KS | WERE | 4/1/2026 | 12/1/2026 | | | 204.3 | 204.3 | 204.3 | ER/NR | Battery/Storage | | Wolf Creek - Blackberry 345 kV Substation | 4/27/2020 | | DISIS STAGE | | | | |
GEN-2020-088 | | DISIS-2020-001 | 03 CENTRAL | Jasper | MO | EDE | 11/30/2022 | 12/31/2025 | | | 150 | 150 | 150 | ER/NR | Solar | | La Russell 161 kV Substation | 4/30/2020 | | DISIS STAGE | | | | |
GEN-2020-087 | | DISIS-2020-001 | 04 SOUTHEAST | Comanche | OK | AEP | 5/1/2023 | 10/1/2026 | | | 500 | 500 | 500 | ER/NR | Solar | | Cimmarron to Lawton 345 kV Line | 4/23/2020 | | DISIS STAGE | | | | |
GEN-2020-085 | | DISIS-2020-001 | 04 SOUTHEAST | Carter | OK | AEP | 4/2/2023 | 10/1/2026 | | | 500 | 500 | 500 | ER/NR | Solar | | Lawton to Sunnyside 345 kV Line | 4/23/2020 | | DISIS STAGE | | | | |
GEN-2020-084 | | DISIS-2020-001 | 02 NEBRASKA | Burt | NE | OPPD | 4/1/2022 | 10/31/2026 | | | 350 | 350 | 350 | ER/NR | Solar | | Raun - Fort Calhoun 345 kV | 4/30/2020 | | DISIS STAGE | | | | |
GEN-2020-083 | | DISIS-2020-001 | 01 NORTH | Fairview | MT | WAPA | 10/1/2024 | 12/1/2026 | | | 74.5 | 74.5 | 74.5 | ER/NR | Hybrid | Solar/Storage | Fairview 115kV Substation | 4/30/2020 | | DISIS STAGE | | | | |
GEN-2020-081 | | DISIS-2020-001 | 04 SOUTHEAST | Rusk | TX | AEP | 5/1/2022 | 6/1/2028 | | | 200 | 200 | 200 | ER/NR | Battery/Storage | | Tenaska Switching Substation 345kV | 4/30/2020 | | DISIS STAGE | | | | |
GEN-2020-079 | | DISIS-2020-001 | 03 CENTRAL | Cherokee | KS | EDE | 7/1/2025 | 12/31/2025 | | | 225 | 225 | 225 | ER/NR | Hybrid | Solar/Storage | Riverton-Neosho 161kV line | 4/30/2020 | | DISIS STAGE | | | | |
GEN-2020-078 | | DISIS-2020-001 | 02 NEBRASKA | Washington | NE | OPPD | 11/30/2022 | 12/31/2025 | | | 100 | 100 | 100 | ER/NR | Solar | | Substation 1226 to Substation 1237, 161kV Tap | 4/30/2020 | | DISIS STAGE | | | | |
GEN-2020-075 | | DISIS-2020-001 | 04 SOUTHEAST | Comanche | OK | AEP | 5/1/2023 | 10/1/2026 | | | 200 | 200 | 200 | ER/NR | Battery/Storage | | Cimmarron to Lawton 345 kV Line | 4/28/2020 | | DISIS STAGE | | | | |
GEN-2020-074 | | DISIS-2020-001 | 04 SOUTHEAST | Carter | OK | AEP | 3/31/2023 | 10/1/2026 | | | 200 | 200 | 200 | ER/NR | Battery/Storage | | Lawton to Sunnyside 345 kV Substation | 4/28/2020 | | DISIS STAGE | | | | |
GEN-2020-073 | | DISIS-2020-001 | 03 CENTRAL | Franklin | KS | KCPL | 7/1/2025 | 12/1/2027 | | | 150 | 150 | 150 | ER/NR | Hybrid | Solar/Storage | SE Ottawa to Pleasant Valley 161kV | 4/30/2020 | | DISIS STAGE | | | | |
GEN-2020-072 | | DISIS-2020-001 | 03 CENTRAL | Windsor | MO | GMO | 7/1/2025 | 12/1/2027 | | | 150 | 150 | 150 | ER/NR | Hybrid | Solar/Storage | Windsor to AEC Sedalia 161 kV line | 4/30/2020 | | DISIS STAGE | | | | |
GEN-2020-069 | | DISIS-2020-001 | 02 NEBRASKA | Cherry | NE | NPPD | 11/30/2023 | 11/30/2025 | | | 52.85 | 52.85 | 52.85 | ER/NR | Wind | | Cody to Valentine 115kV line | 4/24/2020 | | DISIS STAGE | | | | |
GEN-2020-068 | | DISIS-2020-001 | 05 SOUTHWEST | Terry & Hockley | TX | SPS | 11/1/2024 | 12/1/2026 | | | 400 | 400 | 400 | ER | Solar | | Tuco to Yoakum 345kV line | 4/29/2020 | | DISIS STAGE | | | | |
GEN-2020-067 | | DISIS-2020-001 | 05 SOUTHWEST | Terry & Hockley | TX | SPS | 11/1/2024 | 12/1/2026 | | | 352.5 | 352.5 | 352.5 | ER | Wind | | Tuco to Yoakum 345kV line | 4/24/2020 | | DISIS STAGE | | | | |
GEN-2020-065 | | DISIS-2020-001 | 05 SOUTHWEST | Gaines | NM | SPS | 12/1/2025 | 5/15/2028 | | | 1003 | 912.3 | 1003 | ER | Thermal | Combined Cycle | Hobbs-Andrews 345 kV Line | 4/30/2020 | | DISIS STAGE | | | | |
GEN-2020-064 | | DISIS-2020-001 | 03 CENTRAL | Joplin | MO | EDE | 10/1/2020 | 5/17/2021 | | | 64 | 36 | 64 | ER/NR | Thermal | CT | 4544 Stateline CC 161kV Substation | 4/22/2020 | | DISIS STAGE | | | | |
GEN-2020-062 | | DISIS-2020-001 | 05 SOUTHWEST | Curry | NM | SPS | 11/1/2023 | 4/1/2028 | | | 256 | 256 | 256 | ER | Solar | | OASIS 230kV Substation | 4/29/2020 | | DISIS STAGE | | | | |
GEN-2020-061 | | DISIS-2020-001 | 03 CENTRAL | Pleasant Hill | MO | GMO | 5/1/2021 | 5/1/2022 | | | 29 | 29 | 21 | ER/NR | Thermal | Gas | Pleasant Hill 345/161/69 kV Substation | 4/28/2020 | | DISIS STAGE | | | | |
GEN-2020-060 | | DISIS-2020-001 | 05 SOUTHWEST | Lubbock | TX | SPS | 5/1/2026 | 6/1/2027 | | | 200 | 200 | 200 | ER | Battery/Storage | | Lubbock East Substation 230 kV | 4/30/2020 | | DISIS STAGE | | | | |
GEN-2020-059 | | DISIS-2020-001 | 05 SOUTHWEST | Lovington | NM | SPS | 3/2/2025 | 6/1/2027 | | | 250 | 250 | 250 | ER | Hybrid | Solar/Storage | Tuco-Yoakum-Hobbs 345 kV | 4/29/2020 | | DISIS STAGE | | | | |
GEN-2020-058 | | DISIS-2020-001 | 03 CENTRAL | Garner | KS | WERE | 11/1/2026 | 6/1/2028 | | | 424.5 | 424.5 | 424.5 | ER/NR | Solar | | Atlantic 345 kV Substation | 4/30/2020 | | DISIS STAGE | | | | |
GEN-2020-057 | | DISIS-2020-001 | 03 CENTRAL | Garner | KS | WERE | 11/1/2026 | 6/1/2028 | | | 424.5 | 424.5 | 424.5 | ER/NR | Battery/Storage | | Atlantic 345 kV Substation | 4/30/2020 | | DISIS STAGE | | | | |
GEN-2020-056 | | DISIS-2020-001 | 03 CENTRAL | Russell County | KS | SUNC | 3/30/2023 | 1/3/2025 | | | 20 | 20 | 20 | ER/NR | Solar | | Russell 115 kV Substation | 4/30/2020 | | DISIS STAGE | | | | |
GEN-2020-054 | | DISIS-2020-001 | 04 SOUTHEAST | Bowie County | TX | AEP | 8/1/2023 | 9/1/2026 | | | 298 | 298 | 298 | ER/NR | Solar | | Lydia 345 kV Station | 4/27/2020 | | DISIS STAGE | | | | |
GEN-2020-045 | | DISIS-2020-001 | 02 NEBRASKA | Douglas County | NE | OPPD | 4/30/2023 | 8/1/2024 | | | 56.52 | 56.52 | 56.52 | ER | Thermal | Reciprocating Engine | Between Substation 1209 and 1252; 161kV | 4/29/2020 | | DISIS STAGE | | | View | View |
GEN-2020-044 | | DISIS-2020-001 | 02 NEBRASKA | Douglas County | NE | OPPD | 4/30/2023 | 8/1/2024 | | | 56.52 | 56.52 | 56.52 | ER | Thermal | Reciprocating Engine | Between Substation 1209 and 1252; 161kV | 4/29/2020 | | DISIS STAGE | | | View | View |
GEN-2020-043 | | DISIS-2020-001 | 02 NEBRASKA | Douglas County | NE | OPPD | 4/30/2023 | 8/1/2024 | | | 56.52 | 56.52 | 56.52 | ER | Thermal | Reciprocating Engine | Between Substation 1209 and 1252; 161kV | 4/29/2020 | | DISIS STAGE | | | View | View |
GEN-2020-038 | | DISIS-2020-001 | 02 NEBRASKA | Plattsmouth | NE | OPPD | 4/30/2023 | 4/21/2028 | | | 272.7 | 258 | 303 | ER | Thermal | CT | Substation 3740; 345kV | 4/29/2020 | | DISIS STAGE | | | | |
GEN-2020-031 | | DISIS-2020-001 | 02 NEBRASKA | Sarpy County | NE | OPPD | 4/30/2023 | 4/21/2028 | | | 272.7 | 258 | 303 | ER | Thermal | CT | Substation 1363; 161kV Substation | 4/29/2020 | | DISIS STAGE | | | | |
GEN-2020-028 | | DISIS-2020-001 | 02 NEBRASKA | Sarpy County | NE | OPPD | 4/30/2023 | 8/1/2024 | | | 255 | 235 | 255 | ER | Thermal | CT | Substation 1363; 161kV Substation | 4/29/2020 | | DISIS STAGE | | | View | View |
GEN-2020-025 | | DISIS-2020-001 | 02 NEBRASKA | Sarpy County | NE | OPPD | 4/30/2023 | 8/1/2024 | | | 255 | 235 | 255 | ER | Thermal | CT | Substation 1363; 161kV Substation | 4/29/2020 | | DISIS STAGE | | | View | View |
GEN-2020-021 | | DISIS-2020-001 | 01 NORTH | Sioux County | ND | BEPC | 11/30/2023 | 12/31/2026 | | | 235 | 235 | 235 | ER/NR | Wind | | LeLand Olds-Chapelle Creek 345kV line | 4/24/2020 | | DISIS STAGE | | | | |
GEN-2020-020 | | DISIS-2020-001 | 04 SOUTHEAST | McCurtain | OK | AEP | 5/15/2025 | 12/15/2025 | | | 201.6 | 201.6 | 201.6 | ER/NR | Hybrid | Solar/Storage | Tap the 345 kV Northwest Texarkana - Valliant line | 4/28/2020 | | DISIS STAGE | | | | |
GEN-2020-017 | | DISIS-2020-001 | 05 SOUTHWEST | Lamb County | TX | SPS | 10/1/2025 | 12/31/2025 | | | 74.88 | 74.88 | 74.88 | ER/NR | Solar | | 230kV Lamb County Interchange | 4/24/2020 | | DISIS STAGE | | | | |
GEN-2020-014 | | DISIS-2020-001 | 01 NORTH | Alexander | ND | BEPC | 6/17/2021 | 10/18/2021 | | | 45 | 45 | 45 | ER/NR | Thermal | Gas | Lonesome Creek 115kV | 4/20/2020 | | DISIS STAGE | | | | |
GEN-2020-013 | | DISIS-2020-001 | 02 NEBRASKA | Orleans | NE | NPPD | 10/15/2026 | 6/1/2027 | | | 215 | 215 | 215 | ER/NR | Hybrid | Solar/Storage | Orleans-Holdrege Substation 115kV | 4/10/2020 | | DISIS STAGE | | | | |
GEN-2020-012 | | DISIS-2020-001 | 04 SOUTHEAST | Headrick | OK | AEP | 10/15/2026 | 6/1/2027 | | | 113 | 113 | 113 | ER/NR | Hybrid | Solar/Storage | Snyder – Altus Jct. 138kV | 4/10/2020 | | DISIS STAGE | | | | |
GEN-2020-011 | | DISIS-2020-001 | 02 NEBRASKA | Funk | NE | NPPD | 10/15/2026 | 6/1/2027 | | | 320 | 320 | 320 | ER/NR | Hybrid | Solar/Storage | Axtell-Sweetwater Substation 345kV | 4/8/2020 | | DISIS STAGE | | | | |
GEN-2020-010 | | DISIS-2020-001 | 04 SOUTHEAST | Mutual | OK | WFEC | 10/15/2026 | 6/1/2027 | | | 140 | 140 | 140 | ER/NR | Hybrid | Solar/Storage | Seiling-Taloga Substations 138kV | 4/8/2020 | | DISIS STAGE | | | | |
GEN-2020-009 | | DISIS-2020-001 | 05 SOUTHWEST | Cotton | OK | AEP | 10/15/2026 | 12/31/2025 | | | 300 | 300 | 300 | ER/NR | Hybrid | Solar/Storage | Lawton East Side to Oklaunion 345kV | 4/8/2020 | | DISIS STAGE | | | | |
GEN-2020-008 | | DISIS-2020-001 | 03 CENTRAL | Stevens County | KS | SPS | 9/1/2023 | 12/31/2026 | | | 250 | 250 | 250 | ER | Hybrid | Solar/Storage | Corporation Carpenter 345kV Substation | 4/22/2020 | | DISIS STAGE | | | | |
GEN-2020-007 | | DISIS-2020-001 | 03 CENTRAL | Linn & Bates | KS | KCPL | 7/1/2023 | 12/31/2025 | | | 650 | 650 | 650 | ER/NR | Hybrid | Solar/Storage | Evergy La Cygne to Wolf Creek 345kV Substation | 4/22/2020 | | DISIS STAGE | | | | |
GEN-2020-003 | | DISIS-2020-001 | 03 CENTRAL | Winfield | KS | KPP | 3/1/2023 | 6/1/2025 | | | 58 | 58 | 58 | ER/NR | Thermal | Diesel/Gas | East Substation 69 kV | 4/1/2020 | | DISIS STAGE | | | | |
GEN-2020-002 | | DISIS-2020-001 | 02 NEBRASKA | Yutan | NE | OPPD | 11/15/2022 | 5/1/2024 | | | 81 | 81 | 81 | ER | Solar | | 6846 Substation 69 kV | 4/6/2020 | | DISIS STAGE | | | View | View |
GEN-2019-073 | | DISIS-2019-001 | 02 NEBRASKA | Madison | NE | NPPD | 12/31/2023 | 12/31/2027 | | | 100 | 100 | 100 | ER | Solar | | Shell Creek-Hoskins 345kv Line | 5/24/2019 | | DISIS STAGE | | | | |
GEN-2019-070 | | DISIS-2019-001 | 02 NEBRASKA | Madison | NE | NPPD | 12/31/2023 | 12/31/2027 | | | 50 | 50 | 50 | ER | Solar | | Shell Creek-Hoskins 345kv Line | 5/24/2019 | | DISIS STAGE | | | | |
GEN-2019-069 | | DISIS-2019-001 | 02 NEBRASKA | Madison | NE | NPPD | 12/31/2023 | 12/31/2027 | | | 100 | 100 | 100 | ER | Solar | | Shell Creek-Hoskins 345kV Line | 5/24/2019 | | DISIS STAGE | | | | |
GEN-2019-068 | | DISIS-2019-001 | 03 CENTRAL | Barton | KS | SUNC | 6/1/2023 | 5/1/2026 | | | 50 | 50 | 50 | ER/NR | Battery/Storage | | Great Bend - Circle 230kV line | 5/24/2019 | | DISIS STAGE | | | | |
GEN-2019-065 | | DISIS-2019-001 | 04 SOUTHEAST | Smith | TX | AEP | 6/1/2024 | 12/1/2026 | | | 180 | 180 | 180 | ER | Battery/Storage | | Overton-Northwest Henderson 138kV | 5/23/2019 | | DISIS STAGE | | | | |
GEN-2019-063 | | DISIS-2019-001 | 03 CENTRAL | Ford, Clark | KS | ITCGP | 6/1/2023 | 5/1/2026 | | | 50 | 50 | 50 | ER/NR | Battery/Storage | | Clark County 345kV substation | 5/24/2019 | | DISIS STAGE | | | | |
GEN-2019-058 | | DISIS-2019-001 | 03 CENTRAL | Ford, Clark | KS | ITCGP | 6/1/2023 | 5/1/2026 | | | 150 | 150 | 150 | ER/NR | Solar | | Clark County 345kV substation | 5/24/2019 | | DISIS STAGE | | | | |
GEN-2019-055 | | DISIS-2019-001 | 03 CENTRAL | Edwards, Pawnee | KS | SUNC | 6/1/2023 | 5/1/2026 | | | 150 | 150 | 150 | ER/NR | Solar | | Great Bend-Spearville 230kV line | 5/24/2019 | | DISIS STAGE | | | | |
GEN-2019-054 | | DISIS-2019-001 | 03 CENTRAL | Barton | KS | SUNC | 6/1/2023 | 5/1/2026 | | | 150 | 150 | 150 | ER/NR | Solar | | Great Bend- Circle 230kV line | 5/24/2019 | | DISIS STAGE | | | | |
GEN-2019-053 | | DISIS-2019-001 | 03 CENTRAL | Edwards/Pawnee | KS | SUNC | 6/1/2023 | 5/1/2026 | | | 50 | 50 | 50 | ER/NR | Battery/Storage | | Great Bend-Spearville 230kV line | 5/24/2019 | | DISIS STAGE | | | | |
GEN-2019-051 | | DISIS-2019-001 | 03 CENTRAL | Barton | KS | SUNC | 6/1/2023 | 5/1/2026 | | | 40 | 40 | 40 | ER/NR | Battery/Storage | | Frey St 115kV bus | 5/24/2019 | | DISIS STAGE | | | | |
GEN-2019-048 | | DISIS-2019-001 | 03 CENTRAL | Jackson | MO | KCPL | 12/31/2022 | 12/31/2027 | | | 50 | 50 | 50 | ER | Battery/Storage | | Duncan 69kV substation | 5/24/2019 | | DISIS STAGE | | | | |
GEN-2019-045 | | DISIS-2019-001 | 04 SOUTHEAST | Woods | OK | OGE | 12/31/2022 | 12/31/2027 | | | 155 | 155 | 155 | ER | Solar | | DeGrasse 138kV Substation | 5/24/2019 | | DISIS STAGE | | | | |
GEN-2019-044 | | DISIS-2019-001 | 03 CENTRAL | Ford | KS | SUNC | 12/31/2023 | 12/15/2027 | | | 100 | 100 | 100 | ER | Solar | | North Fort Dodge 115kV Substation | 5/24/2019 | | DISIS STAGE | | | | |
GEN-2019-041 | | DISIS-2019-001 | 02 NEBRASKA | Lancaster | NE | NPPD | 12/1/2020 | 12/31/2026 | | | 78 | 78 | 78 | ER/NR | Solar | | 115kV Monolith Substation | 5/23/2019 | | DISIS STAGE | | | | |
GEN-2019-039 | | DISIS-2019-001 | 02 NEBRASKA | Butler | NE | NPPD | 5/16/2022 | 5/1/2025 | | | 174.5 | 174.5 | 174.5 | ER/NR | Solar | | Columbus Southeast-Rising City 115kV | 5/21/2019 | | DISIS STAGE | | | | |
GEN-2019-037 | | DISIS-2019-001 | 01 NORTH | Mercer | ND | BEPC | 12/1/2023 | 12/1/2027 | | | 150 | 150 | 150 | ER/NR | Solar | | Leland Olds 345kV substation | 5/17/2019 | | DISIS STAGE | | | | |
GEN-2019-035 | | DISIS-2019-001 | 03 CENTRAL | Barry | MO | EDE | 12/31/2022 | 12/31/2025 | | | 80 | 80 | 80 | ER/NR | Solar | | Reeds Spring-Aurora 161kV Line | 5/2/2019 | | DISIS STAGE | | | | |
GEN-2019-030 | | DISIS-2019-001 | 03 CENTRAL | Ford | KS | ITCGP | 12/1/2021 | 3/31/2027 | | | 252 | 252 | 252 | ER/NR | Wind | | Spearville to Clark County 345 kV line | 4/25/2019 | | DISIS STAGE | | | | |
GEN-2019-023 | | DISIS-2019-001 | 01 NORTH | Wibaux | MT | WAPA | 12/31/2023 | 6/1/2025 | | | 110 | 110 | 110 | ER/NR | Hybrid | Wind/Storage | WAPA-UGP Mingusville 230kV | 5/8/2019 | | DISIS STAGE | | | | |
GEN-2019-021 | | DISIS-2019-001 | 05 SOUTHWEST | Roosevelt | NM | SPS | 12/1/2022 | 6/1/2025 | | | 50 | 50 | 50 | ER/NR | Solar | | Roosevelt 230kV Substation | 4/29/2019 | | DISIS STAGE | | | | |
GEN-2019-019 | | DISIS-2019-001 | 01 NORTH | Sioux | IA | NIPCO | 2/1/2020 | 2/16/2023 | | | 15.15 | 15.15 | 15.15 | ER/NR | Thermal | Gas Turbine | Siouxland 69kV | 4/24/2019 | | DISIS STAGE | | | | |
GEN-2019-018 | | DISIS-2019-001 | 03 CENTRAL | Rice | KS | MIDW | 3/1/2020 | 6/1/2021 | | | 15.56 | 11.97 | 15.56 | ER/NR | Thermal | Gas Turbine | Saxman 115kV substation | 4/24/2019 | | DISIS STAGE | | | | |
GEN-2019-016 | | DISIS-2019-001 | 03 CENTRAL | Polk and Dade | MO | EDE | 11/30/2022 | 12/31/2026 | | | 200 | 200 | 200 | ER | Solar | | Dadeville 161kV Substation | 4/30/2019 | | DISIS STAGE | | | | |
GEN-2019-013 | | DISIS-2019-001 | 04 SOUTHEAST | Roger Mills | OK | AEP | 12/31/2021 | 5/1/2026 | | | 50 | 50 | 50 | ER/NR | Battery/Storage | | Dempsey 230kV sub/Sweetwater 230kV | 4/24/2019 | | DISIS STAGE | | | | |
GEN-2019-012 | | DISIS-2019-001 | 04 SOUTHEAST | Woodward | OK | OGE | 5/1/2023 | 5/1/2027 | | | 200 | 200 | 200 | ER/NR | Battery/Storage | | Woodward 345kV substation | 5/22/2019 | | DISIS STAGE | | | | |
GEN-2019-011 | | DISIS-2019-001 | 05 SOUTHWEST | Yoakum | TX | SPS | 5/1/2023 | 5/1/2025 | | | 207 | 207 | 207 | ER/NR | Battery/Storage | | Yoakum 345kV Substation | 4/22/2019 | | DISIS STAGE | | | | |
GEN-2019-009 | | DISIS-2019-001 | 02 NEBRASKA | Nemaha | NE | OPPD | 10/31/2022 | 11/30/2026 | | | 100 | 100 | 100 | ER | Solar | | S1263 Brock 161kV substation | 4/24/2019 | | DISIS STAGE | | | | |
GEN-2019-003 | | DISIS-2019-001 | 05 SOUTHWEST | Roosevelt | NM | SPS | 12/1/2022 | 6/1/2025 | | | 150 | 150 | 150 | ER/NR | Solar | | Roosevelt 230kV Substation | 4/19/2019 | | DISIS STAGE | | | | |
GEN-2019-002 | | DISIS-2019-001 | 04 SOUTHEAST | Mayes | OK | GRDA | 12/1/2020 | 6/1/2025 | | | 100 | 100 | 100 | ER | Battery/Storage | | Maid 161kV substation | 11/26/2018 | | DISIS STAGE | | | | |
GEN-2019-001 | | DISIS-2019-001 | 03 CENTRAL | Pratt | KS | WERE | 12/31/2018 | 12/31/2026 | | | 25 | 25 | 25 | ER | Wind | | Thistle-Wichita Dbl Ckt (Buffalo Flats) 345kV | 11/27/2018 | | DISIS STAGE | | | | |
GEN-2018-132 | | DISIS-2018-002 | 02 NEBRASKA | Pierce | NE | NPPD | 12/31/2020 | 12/31/2026 | | | 201.6 | 201.6 | 201.6 | ER/NR | Solar | | Antelope - Hoskins 345 kV | 11/21/2018 | | DISIS STAGE | | | | |
GEN-2018-131 | | DISIS-2018-002 | 02 NEBRASKA | Pierce | NE | NPPD | 12/31/2020 | 12/31/2026 | | | 221.4 | 221.4 | 221.4 | ER/NR | Solar | | Antelope - Hoskins 345 kV | 11/21/2018 | | DISIS STAGE | | | | |
GEN-2018-128 | | DISIS-2018-002 | 03 CENTRAL | Sumner | KS | WERE | 9/1/2021 | 10/1/2027 | | | 200.22 | 200.22 | 200.22 | ER/NR | Wind | | Renfrow-Viola 345 kV | 11/19/2018 | | DISIS STAGE | | | | |
GEN-2018-125 | | DISIS-2018-002 | 02 NEBRASKA | Lincoln | NE | NPPD | 12/15/2022 | 12/1/2027 | | | 231 | 231 | 231 | ER/NR | Wind | | New switching station on Gentleman to Sweetwater 345kV line | 11/19/2018 | | DISIS STAGE | | | | |
GEN-2018-116 | | DISIS-2018-002 | 03 CENTRAL | Barton | KS | SUNC | 12/31/2022 | 5/1/2026 | | | 150 | 150 | 150 | ER/NR | Solar | | Frey Street 115kV bus | 11/20/2018 | | DISIS STAGE | | | | |
GEN-2018-115 | | DISIS-2018-002 | 04 SOUTHEAST | Lawton | OK | AEP | 12/1/2021 | 12/1/2027 | | | 250 | 250 | 250 | ER/NR | Hybrid | Solar/Storage | Lawton East Side 345kV/138kv Substation | 11/21/2018 | | DISIS STAGE | | | | |
GEN-2018-108 | | DISIS-2018-002 | 03 CENTRAL | Barber | KS | ITCGP | 12/31/2027 | 12/31/2027 | | | 95 | 95 | 95 | ER | Battery/Storage | | Thistle 345kV substation | 11/21/2018 | | DISIS STAGE | | | | |
GEN-2018-106 | | DISIS-2018-002 | 04 SOUTHEAST | Caddo | LA | AEP | 12/31/2023 | 12/31/2027 | | | 165 | 165 | 165 | ER | Solar | | Longwood 345kV substation | 11/2/2018 | | DISIS STAGE | | | | |
GEN-2018-099 | | DISIS-2018-002 | 05 SOUTHWEST | Parmer | TX | SPS | 12/31/2023 | 12/31/2027 | | | 300 | 300 | 300 | ER | Wind | | Tolk 230kV Substation | 11/21/2018 | | DISIS STAGE | | | | |
GEN-2018-089 | | DISIS-2018-002 | 05 SOUTHWEST | Castro | TX | SPS | 12/31/2023 | 12/31/2027 | | | 196 | 196 | 196 | ER | Wind | | Newhart 230kV Substation | 11/21/2018 | | DISIS STAGE | | | | |
GEN-2018-088 | | DISIS-2018-002 | 04 SOUTHEAST | Bowie | TX | AEP | 12/31/2023 | 12/15/2027 | | | 130 | 130 | 130 | ER | Solar | | Lydia 345kV substation | 11/21/2018 | | DISIS STAGE | | | | |
GEN-2018-083 | | DISIS-2018-002 | 02 NEBRASKA | Madison | NE | NPPD | 12/31/2023 | 12/31/2027 | | | 250 | 250 | 250 | ER | Wind | | Shell Creek-Hoskins 345kv Line Break | 11/16/2018 | | DISIS STAGE | | | | |
GEN-2018-082 | | DISIS-2018-002 | 04 SOUTHEAST | Pittsburg | OK | AEP | 12/31/2023 | 12/31/2027 | | | 215 | 215 | 215 | ER | Wind | | Pittsburg 345kV Substation | 11/18/2018 | | DISIS STAGE | | | | |
GEN-2018-079 | | DISIS-2018-002 | 04 SOUTHEAST | Craig/Novata | OK | AEP | 12/31/2023 | 12/31/2027 | | | 148 | 148 | 148 | ER | Solar | | Farmland-Delaware 138kV line | 11/18/2018 | | DISIS STAGE | | | | |
GEN-2018-074 | | DISIS-2018-002 | 01 NORTH | Crawford and Carrol | IA | WAPA | 5/10/2022 | 10/31/2026 | | | 72 | 72 | 72 | ER | Wind | | Denison 230kV Substation | 10/31/2018 | | DISIS STAGE | | | | |
GEN-2018-072 | | DISIS-2018-002 | 04 SOUTHEAST | Kay | OK | OGE | 11/30/2021 | 11/30/2025 | | | 151 | 151 | 151 | ER/NR | Battery/Storage | | Interconnecting into OG&E's Ranch Road 345kV substation by tapping a 0.1 gen tie line into the existing Frontier II gen-tie line | 10/26/2018 | | DISIS STAGE | | | | |
GEN-2018-071 | | DISIS-2018-002 | 04 SOUTHEAST | Kay | OK | OGE | 11/30/2021 | 11/30/2025 | | | 151 | 151 | 151 | ER/NR | Battery/Storage | | Interconnecting into OG&E's Ranch Road 345kV substation by tapping a 0.1 gen tie line into the existing Frontier II gen-tie line | 10/25/2018 | | DISIS STAGE | | | | |
GEN-2018-069 | | DISIS-2018-002 | 01 NORTH | Wibaux | MT | WAPA | 12/31/2020 | 6/1/2025 | | | 125 | 125 | 125 | ER/NR | Wind | | WAPA-UGP Mingusville 230kV | 10/26/2018 | | DISIS STAGE | | | | |
GEN-2018-068 | | DISIS-2018-002 | 02 NEBRASKA | Madison | NE | NPPD | 9/1/2022 | 12/1/2027 | | | 302.4 | 302.4 | 302.4 | ER/NR | Wind | | Antelope - Hoskins 345 kV Substation | 10/26/2018 | | DISIS STAGE | | | | |
GEN-2018-067 | | DISIS-2018-002 | 01 NORTH | Williams | ND | MWEC | 10/30/2020 | 10/30/2026 | | | 255 | 255 | 255 | ER | Wind | | 115kV Strandahl sub | 10/25/2018 | | DISIS STAGE | | | | |
GEN-2018-065 | | DISIS-2018-002 | 02 NEBRASKA | Madison | NE | NPPD | 7/1/2020 | 12/1/2027 | | | 19.8 | 19.8 | 19.8 | ER/NR | Wind | | Antelope - Hoskins 345 kV Substation | 10/24/2018 | | DISIS STAGE | | | | |
GEN-2018-064 | | DISIS-2018-002 | 04 SOUTHEAST | Benton County | AR | GRDA | 6/30/2021 | 12/31/2025 | | | 80 | 80 | 80 | ER/NR | Solar | | Tonnece Substation 69kV | 10/24/2018 | | DISIS STAGE | | | | |
GEN-2018-063 | | DISIS-2018-002 | 03 CENTRAL | Greene | MO | EDE | 6/30/2021 | 12/31/2026 | | | 57 | 57 | 57 | ER | Solar | | Sedalia Marshfield Springfield Nichols Street 69kV circuit | 10/23/2018 | | DISIS STAGE | | | | |
GEN-2018-060 | | DISIS-2018-001 | 02 NEBRASKA | Webster | NE | NPPD | 12/1/2020 | 12/31/2026 | | | 50 | 50 | 50 | ER/NR | Wind | | Axtell-Post Rock 345 kV | 5/29/2018 | | IA FULLY EXECUTED/ON SCHEDULE | | | | |
GEN-2018-057 | | DISIS-2018-001 | 03 CENTRAL | Sedgwick | KS | WERE | 12/31/2020 | 5/15/2029 | | | 203.4 | 203.4 | 203.4 | ER/NR | Solar | | Gordon Evans 138kV | 5/29/2018 | | IA FULLY EXECUTED/ON SCHEDULE | | | | |
GEN-2018-055 | | DISIS-2018-001 | 04 SOUTHEAST | Grady | OK | AEP | 12/31/2020 | 12/31/2026 | | | 252 | 252 | 252 | ER/NR | Solar | | Terry Road 345kV station (shared with Rush Springs Windfarm on a common gentie) | 5/29/2018 | | IA FULLY EXECUTED/ON SCHEDULE | | | | |
GEN-2018-052 | | DISIS-2018-001 | 05 SOUTHWEST | Lea | NM | SPS | 12/31/2021 | 12/31/2026 | | | 70 | 70 | 70 | ER | Battery/Storage | | Roadrunner 115kV Substation | 5/29/2018 | | IA FULLY EXECUTED/ON SCHEDULE | | | | |
GEN-2018-050 | | DISIS-2018-001 | 04 SOUTHEAST | Caddo | LA | AEP | 12/31/2021 | 4/15/2027 | | | 200 | 200 | 200 | ER | Solar | | Longwood 345kV Substation | 5/29/2018 | | IA FULLY EXECUTED/ON SCHEDULE | | | | |
GEN-2018-049 | | DISIS-2018-001 | 03 CENTRAL | Sumner | KS | ITCGP | 12/31/2021 | 4/1/2027 | | | 120 | 120 | 120 | ER | Solar | | Thistle 345kV Substation | 5/29/2018 | | IA FULLY EXECUTED/ON SCHEDULE | | | | |
GEN-2018-048 | | DISIS-2018-001 | 04 SOUTHEAST | Caddo | OK | OGE | 12/31/2021 | 12/15/2027 | | | 300 | 300 | 300 | ER | Solar | | Pecan Creek 345kV Substation | 5/29/2018 | | IA FULLY EXECUTED/ON SCHEDULE | | | | |
GEN-2018-043 | | DISIS-2018-001 | 02 NEBRASKA | Burt | NE | OPPD | 12/31/2021 | 12/15/2028 | | | 500 | 500 | 500 | ER | Solar | | Ft. Calhoun - Raun 345 kV Line Break | 5/29/2018 | | IA FULLY EXECUTED/ON SCHEDULE | | | | |
GEN-2018-037 | | DISIS-2018-001 | 02 NEBRASKA | Douglas | NE | OPPD | 12/31/2024 | 5/31/2030 | | | 100 | 100 | 100 | ER | Battery/Storage | | Looping in OPPD (S1211) (S1220) (S1211) (S1299) 161kV | 5/29/2018 | | IA FULLY EXECUTED/ON SCHEDULE | | | | |
GEN-2018-033 | | DISIS-2018-001 | 02 NEBRASKA | Cass | NE | OPPD | 12/31/2023 | 11/30/2029 | | | 200 | 200 | 200 | ER | Battery/Storage | | Cass County 345kV Substation | 5/29/2018 | | IA FULLY EXECUTED/ON SCHEDULE | | | | |
GEN-2018-032 | | DISIS-2018-001 | 03 CENTRAL | McPhearson | KS | WERE | 12/1/2021 | 5/1/2029 | | | 310 | 310 | 310 | ER | Wind | | Neosho 345kV Substation | 5/29/2018 | | IA FULLY EXECUTED/ON SUSPENSION | | | | |
GEN-2018-031 | | DISIS-2018-001 | 03 CENTRAL | Jackson | MO | INDN | 12/31/2024 | 6/30/2028 | | | 50 | 50 | 50 | ER | Battery/Storage | | Blue Valley 161kV Substation | 5/29/2018 | | IA FULLY EXECUTED/ON SCHEDULE | | | | |
GEN-2018-029 | | DISIS-2018-001 | 04 SOUTHEAST | Oklahoma | OK | OGE | 10/15/2023 | 5/31/2028 | | | 100 | 100 | 100 | ER | Battery/Storage | | Horseshoe Lake 138kV Substation | 5/29/2018 | | IA FULLY EXECUTED/ON SCHEDULE | | | | |
GEN-2018-028 | | DISIS-2018-001 | 04 SOUTHEAST | Tulsa | OK | AEP | 10/15/2023 | 5/31/2028 | | | 200 | 200 | 200 | ER | Battery/Storage | | Tulsa North 138kV Substation | 5/29/2018 | | IA FULLY EXECUTED/ON SCHEDULE | | | | |
GEN-2018-027 | | DISIS-2018-001 | 04 SOUTHEAST | Tulsa | OK | AEP | 12/31/2024 | 5/31/2028 | | | 100 | 100 | 100 | ER | Battery/Storage | | Tulsa Power Station 138kV Substation | 5/29/2018 | | IA FULLY EXECUTED/ON SCHEDULE | | | | |
GEN-2018-026 | | DISIS-2018-001 | 04 SOUTHEAST | Canadian | OK | OGE | 10/15/2023 | 5/31/2026 | | | 100 | 100 | 100 | ER | Battery/Storage | | Mustang 138kV Substation | 5/29/2018 | | IA FULLY EXECUTED/ON SCHEDULE | | | | |
GEN-2018-025 | | DISIS-2018-001 | 02 NEBRASKA | Washington | NE | OPPD | 10/15/2023 | 11/30/2028 | | | 200 | 200 | 200 | ER | Battery/Storage | | Fort Calhoun 345kV Substation | 5/29/2018 | | IA FULLY EXECUTED/ON SCHEDULE | | | | |
GEN-2018-024 | | DISIS-2018-001 | 04 SOUTHEAST | Muskogee | OK | OGE | 10/15/2023 | 12/31/2028 | | | 100 | 100 | 100 | ER | Battery/Storage | | Canadian River-Muskogee and Muskogee-Seminole 345kV | 5/28/2018 | | IA FULLY EXECUTED/ON SCHEDULE | | | | |
GEN-2018-021 | | DISIS-2018-001 | 04 SOUTHEAST | Washita | OK | AEP | 12/1/2023 | 12/31/2024 | | | 74.1 | 74.1 | 74.1 | ER/NR | Solar | | Chisholm-Gracemont 345kV Line | 5/24/2018 | | IA PENDING | | | | |
GEN-2018-015 | | DISIS-2018-001 | 05 SOUTHWEST | Paducah | TX | SPS | 10/31/2021 | 11/1/2027 | | | 252 | 252 | 252 | ER/NR | Solar | | Tuco-Oklaunion 345kV Line | 4/27/2018 | | IA FULLY EXECUTED/ON SCHEDULE | | | | |
GEN-2018-013 | | DISIS-2018-001 | 03 CENTRAL | Dickinson | KS | WERE | 12/30/2024 | 12/31/2026 | | | 74.1 | 74.1 | 74.1 | ER | Wind | | Abilene Energy Center-Northview 115kV Line | 4/27/2018 | | IA FULLY EXECUTED/ON SCHEDULE | | | | |
GEN-2018-011 | | DISIS-2018-001 | 04 SOUTHEAST | Kingfisher | OK | WFEC | 12/1/2020 | 12/31/2027 | | | 74.1 | 74.1 | 74.1 | ER/NR | Battery/Storage | | Dover 138 kV Switching Station | 4/27/2018 | | IA FULLY EXECUTED/ON SCHEDULE | | | | |
GEN-2018-010 | | DISIS-2018-001 | 01 NORTH | Montrail | ND | BEPC | 12/1/2021 | 12/31/2026 | | | 74.1 | 74.1 | 74.1 | ER/NR | Battery/Storage | | Neset 230kV Substation | 4/27/2018 | | IA FULLY EXECUTED/ON SCHEDULE | | | | |
GEN-2018-009 | | DISIS-2018-001 | 03 CENTRAL | Seward/Meade | KS | SUNC | 7/15/2025 | 12/31/2028 | | | 150 | 150 | 150 | ER | Wind | | Cimarron 115kV Substation | 4/27/2018 | | IA FULLY EXECUTED/ON SCHEDULE | | | | |
GEN-2018-004 | | DISIS-2018-001 | 05 SOUTHWEST | Lea | NM | SPS | 12/31/2019 | 3/1/2027 | | | 74.99 | 74.99 | 74.99 | ER | Solar | | T14 Circuit 115kV line | 4/26/2018 | | IA FULLY EXECUTED/ON SCHEDULE | | | | |
GEN-2018-003 | | DISIS-2018-001 | 04 SOUTHEAST | Bowie | TX | AEP | 12/31/2021 | 6/1/2027 | | | 150 | 150 | 150 | ER/NR | Solar | | North Boston-Bann 138kV Line | 4/25/2018 | | IA FULLY EXECUTED/ON SCHEDULE | | | | |
GEN-2017-239 | IFS-2017-002-76 | DISIS-2017-002 | 05 SOUTHWEST | Yoakum | TX | SPS | 6/1/2023 | 5/1/2026 | | | 300 | 300 | 300 | ER | Solar | | Mahoney 230kV Substation | 11/30/2017 | | IA FULLY EXECUTED/ON SCHEDULE | | | View | |
GEN-2017-234 | IFS-2017-002-73 | DISIS-2017-002 | 02 NEBRASKA | Greeley | NE | NPPD | 12/31/2019 | 12/31/2024 | | | 115 | 115 | 115 | ER | Wind | | Spalding to North Loup 115kV | 11/6/2017 | | IA FULLY EXECUTED/ON SCHEDULE | | | View | |
GEN-2017-233 | IFS-2017-002-72 | DISIS-2017-002 | 04 SOUTHEAST | Grady | OK | OGE | 12/1/2020 | 12/31/2027 | | | 215 | 215 | 215 | ER/NR | Wind | | Minco 345kV | 11/28/2017 | | IA FULLY EXECUTED/ON SCHEDULE | | | View | |
GEN-2017-232 | IFS-2017-002-71 | DISIS-2017-002 | 04 SOUTHEAST | Bryan County | OK | OGE | 6/1/2020 | 3/31/2026 | | | 52.2 | 52.2 | 52.2 | ER/NR | Solar | | Brown 138kV Substation | 11/28/2017 | | IA FULLY EXECUTED/ON SCHEDULE | | | View | |
GEN-2017-231 | IFS-2017-002-70 | DISIS-2017-002 | 04 SOUTHEAST | Franklin County | AR | OGE | 6/1/2020 | 6/1/2026 | | | 72.5 | 72.5 | 72.5 | ER/NR | Solar | | Branch 161kV Substation | 11/28/2017 | | IA FULLY EXECUTED/ON SCHEDULE | | | | |
GEN-2017-230 | IFS-2017-002-69 | DISIS-2017-002 | 04 SOUTHEAST | Lincoln County | OK | OGE | 6/1/2020 | 5/1/2026 | | | 72.5 | 72.5 | 72.5 | ER/NR | Solar | | Tryon 138kV Substation | 11/28/2017 | | IA FULLY EXECUTED/ON SCHEDULE | | | View | |
GEN-2017-227 | IFS-2017-002-67 | DISIS-2017-002 | 03 CENTRAL | Sedwick County | KS | WERE | 12/31/2020 | 5/15/2029 | | | 201.6 | 201.6 | 201.6 | ER/NR | Battery/Storage | | Gordon Evans 138kV Substation | 11/30/2017 | | IA FULLY EXECUTED/ON SCHEDULE | | | View | |
GEN-2017-226 | IFS-2017-002-66 | DISIS-2017-002 | 03 CENTRAL | Sedgwick County | KS | WERE | 12/1/2020 | 5/15/2029 | | | 201.6 | 201.6 | 201.6 | ER/NR | Solar | | Gordon Evans 138kV Substation | 11/30/2017 | | IA FULLY EXECUTED/ON SCHEDULE | | | View | |
GEN-2017-222 | IFS-2017-002-64 | DISIS-2017-002 | 01 NORTH | Denison | IA | WAPA | 10/6/2020 | 9/1/2025 | | | 180 | 180 | 180 | ER | Wind | | Denison 230kV Substation | 11/30/2017 | | IA FULLY EXECUTED/ON SCHEDULE | | | View | |
GEN-2017-221 | IFS-2017-002-63 | DISIS-2017-002 | 03 CENTRAL | Sedgwick | KS | WERE | 12/31/2020 | 3/30/2029 | | | 152 | 152 | 152 | ER/NR | Battery/Storage | | Buffalo Flats 345kV Substation | 11/30/2017 | | IA FULLY EXECUTED/ON SCHEDULE | | | View | |
GEN-2017-220 | IFS-2017-002-62 | DISIS-2017-002 | 03 CENTRAL | Sedgwick | KS | WERE | 12/1/2020 | 12/31/2029 | | | 201.6 | 201.6 | 201.6 | ER/NR | Solar | | Buffalo Flats 345kV Substation | 11/30/2017 | | IA FULLY EXECUTED/ON SCHEDULE | | | View | |
GEN-2017-215 | IFS-2017-002-60 | DISIS-2017-002 | 01 NORTH | Ward | ND | BEPC | 12/1/2020 | 12/31/2030 | | | 100 | 100 | 100 | ER/NR | Wind | | Logan 230kV Substation | 11/30/2017 | | IA FULLY EXECUTED/ON SCHEDULE | | | View | |
GEN-2017-214 | IFS-2017-002-59 | DISIS-2017-002 | 01 NORTH | Ward | ND | BEPC | 12/1/2020 | 12/31/2030 | | | 100 | 100 | 100 | ER/NR | Wind | | Logan 230kV Substation | 11/30/2017 | | IA FULLY EXECUTED/ON SCHEDULE | | | View | |
GEN-2017-210 | IFS-2017-002-57 | DISIS-2017-002 | 02 NEBRASKA | Cedar | NE | NPPD | 12/1/2021 | 12/1/2026 | | | 310 | 310 | 310 | ER | Hybrid | Solar | McCool 345kV Substation | 11/30/2017 | | IA FULLY EXECUTED/ON SUSPENSION | | | View | |
GEN-2017-203 | IFS-2017-002-55 | DISIS-2017-002 | 04 SOUTHEAST | Grant/Kay | OK | OGE | 7/1/2023 | 12/1/2026 | | | 210 | 210 | 210 | ER | Hybrid | Solar | Renfrow 345kV Substation | 11/30/2017 | | IA FULLY EXECUTED/ON SUSPENSION | | | View | |
GEN-2017-201 | IFS-2017-002-53 | DISIS-2017-002 | 02 NEBRASKA | Wayne County | NE | NPPD | 12/1/2022 | 12/31/2028 | | | 250 | 250 | 250 | ER/NR | Wind | | Hoskins 345kV Substation | 11/30/2017 | | IA FULLY EXECUTED/ON SCHEDULE | | | View | |
GEN-2017-198 | IFS-2017-002-50 | DISIS-2017-002 | 02 NEBRASKA | Omaha | NE | OPPD | 12/1/2022 | 5/31/2026 | | | 11.64 | 11.64 | 11.64 | ER | Battery/Storage | | Jones St. No 1201 69kV substation | 11/30/2017 | | IA FULLY EXECUTED/ON SCHEDULE | | | View | |
GEN-2017-196 | IFS-2017-002-49 | DISIS-2017-002 | 03 CENTRAL | Johnson | KS | KCPL | 12/1/2020 | 12/1/2030 | | | 128 | 128 | 128 | ER/NR | Battery/Storage | | West Gardner 345kV | 11/30/2017 | | IA FULLY EXECUTED/ON SCHEDULE | | | View | |
GEN-2017-195 | IFS-2017-002-48 | DISIS-2017-002 | 03 CENTRAL | Johnson | KS | KCPL | 12/1/2020 | 12/1/2030 | | | 500.4 | 500.4 | 500.4 | ER/NR | Solar | | West Gardner 345kV | 11/30/2017 | | IA FULLY EXECUTED/ON SCHEDULE | | | View | |
GEN-2017-188 | IFS-2017-002-44 | DISIS-2017-002 | 03 CENTRAL | Barry | MO | EDE | 12/31/2020 | 6/15/2026 | | | 130 | 130 | 130 | ER | Solar | | Asbury 161 kV | 11/30/2017 | | IA FULLY EXECUTED/ON SCHEDULE | | | View | |
GEN-2017-187 | IFS-2017-002-43 | DISIS-2017-002 | 05 SOUTHWEST | Terry | TX | SPS | 12/31/2020 | 6/1/2026 | | | 150 | 150 | 150 | ER | Solar | | Flatland 115 kV Substation | 11/30/2017 | | IA FULLY EXECUTED/ON SCHEDULE | | | View | |
GEN-2017-184 | IFS-2017-002-42 | DISIS-2017-002 | 03 CENTRAL | Hodgeman/Ford | KS | KCPL | 12/1/2021 | 6/1/2029 | | | 400 | 400 | 400 | ER/NR | Solar | | Nashua-St. Joe 345kV | 11/29/2017 | | IA FULLY EXECUTED/ON SCHEDULE | | | View | |
GEN-2017-183 | IFS-2017-002-41 | DISIS-2017-002 | 03 CENTRAL | Hodgeman/Ford | KS | KCPL | 12/1/2021 | 6/1/2029 | | | 400 | 400 | 400 | ER/NR | Wind | | Nashua-St. Joe 345kV | 11/29/2017 | | IA FULLY EXECUTED/ON SCHEDULE | | | View | |
GEN-2017-182 | IFS-2017-002-40 | DISIS-2017-002 | 02 NEBRASKA | Lancaster | NE | NPPD | 12/1/2020 | 2/4/2025 | | | 128 | 128 | 128 | ER/NR | Wind | | Tobias 345kV Substation | 11/29/2017 | | IA FULLY EXECUTED/ON SCHEDULE | | | View | |
GEN-2017-181 | IFS-2017-002-39 | DISIS-2017-002 | 02 NEBRASKA | Lancaster | NE | NPPD | 12/1/2020 | 12/8/2024 | | | 300 | 300 | 300 | ER/NR | Wind | | Tobias 345kV Substation | 11/29/2017 | | IA FULLY EXECUTED/ON SCHEDULE | | | View | |
GEN-2017-178 | IFS-2017-002-37 | DISIS-2017-002 | 04 SOUTHEAST | Garfield | OK | OGE | 12/31/2020 | 12/1/2025 | | | 52 | 52 | 52 | ER/NR | Battery/Storage | | Woodring 345kV Substation | 11/29/2017 | | IA FULLY EXECUTED/ON SCHEDULE | | | View | |
GEN-2017-175 | IFS-2017-002-36 | DISIS-2017-002 | 01 NORTH | Turner | SD | WAPA | 9/30/2023 | 12/1/2026 | | | 300 | 300 | 300 | ER | Wind | | Vfodnes-Utica Jct. 230kV | 11/29/2017 | | IA FULLY EXECUTED/ON SCHEDULE | | | View | |
GEN-2017-173 | IFS-2017-002-35 | DISIS-2017-002 | 04 SOUTHEAST | Stephen | OK | AEP | 12/1/2020 | 12/31/2027 | | | 50 | 50 | 50 | ER/NR | Solar | | Lawton Eastside - Terry Road 345kV | 11/29/2017 | | IA FULLY EXECUTED/ON SCHEDULE | | | View | |
GEN-2017-172 | IFS-2017-002-34 | DISIS-2017-002 | 04 SOUTHEAST | Stephen | OK | AEP | 12/1/2020 | 12/31/2027 | | | 50 | 50 | 50 | ER/NR | Solar | | Lawton Eastside - Terry Road 345kV | 11/29/2017 | | IA FULLY EXECUTED/ON SCHEDULE | | | View | |
GEN-2017-171 | IFS-2017-002-33 | DISIS-2017-002 | 04 SOUTHEAST | Stephen | OK | AEP | 12/1/2020 | 12/31/2027 | | | 150 | 150 | 150 | ER/NR | Solar | | Lawton Eastside - Terry Road 345kV | 11/29/2017 | | IA FULLY EXECUTED/ON SCHEDULE | | | View | |
GEN-2017-164 | IFS-2017-002-28 | DISIS-2017-002 | 04 SOUTHEAST | Garfield | OK | OGE | 12/1/2020 | 12/31/2025 | | | 250 | 250 | 250 | ER/NR | Solar | | Woodring 345kV Substation | 11/29/2017 | | IA FULLY EXECUTED/ON SCHEDULE | | | View | |
GEN-2017-158 | IFS-2017-002-27 | DISIS-2017-002 | 05 SOUTHWEST | Parmer/Castro | TX | SPS | 12/31/2020 | 8/30/2026 | | | 265 | 265 | 265 | ER | Wind | | Tolk 230kV Substation | 11/29/2017 | | IA FULLY EXECUTED/ON SCHEDULE | | | View | |
GEN-2017-151 | IFS-2017-002-23 | DISIS-2017-002 | 05 SOUTHWEST | Crosby | TX | SPS | 10/31/2020 | 10/15/2026 | | | 300 | 300 | 300 | ER | Wind | | TUCO-Oklaunion 345kV | 11/28/2017 | | IA FULLY EXECUTED/ON SCHEDULE | | | View | |
GEN-2017-150 | IFS-2017-002-22 | DISIS-2017-002 | 04 SOUTHEAST | Grady | OK | OGE | 12/1/2020 | 12/31/2026 | | | 250 | 250 | 250 | ER/NR | Solar | | Minco 345kV | 11/28/2017 | | IA FULLY EXECUTED/ON SCHEDULE | | | View | |
GEN-2017-149 | IFS-2017-002-21 | DISIS-2017-002 | 04 SOUTHEAST | Johnston | OK | OGE | 12/1/2020 | 12/31/2027 | | | 258 | 258 | 258 | ER/NR | Wind | | Johnson County 345kV Substation | 11/27/2017 | | IA FULLY EXECUTED/ON SCHEDULE | | | View | |
GEN-2017-146 | IFS-2017-002-19 | DISIS-2017-002 | 05 SOUTHWEST | Castro | TX | SPS | 10/31/2020 | 10/15/2026 | | | 151.8 | 151.8 | 151.8 | ER | Wind | | Deaf Smith-Plant X 230kV | 11/27/2017 | | IA FULLY EXECUTED/ON SCHEDULE | | | View | |
GEN-2017-144 | IFS-2017-002-18 | DISIS-2017-002 | 02 NEBRASKA | Holt, Antelope, Wheeler | NE | NPPD | 12/31/2021 | 12/31/2025 | | | 200 | 200 | 200 | ER | Wind | | Holt County 345kV | 11/27/2017 | | IA FULLY EXECUTED/ON SCHEDULE | | | View | |
GEN-2017-141 | IFS-2017-002-17 | DISIS-2017-002 | 04 SOUTHEAST | Wagoner | OK | AEP | 12/1/2020 | 12/31/2027 | | | 241.7 | 241.7 | 241.7 | ER/NR | Solar | | Clarksville 345kV Switching Station | 11/22/2017 | | IA FULLY EXECUTED/ON SCHEDULE | | | View | |
GEN-2017-140 | IFS-2017-002-16 | DISIS-2017-002 | 04 SOUTHEAST | Wagoner | OK | AEP | 12/1/2020 | 12/31/2027 | | | 160 | 160 | 160 | ER/NR | Solar | | Clarksville 345kV Switching Station | 11/22/2017 | | IA FULLY EXECUTED/ON SCHEDULE | | | View | |
GEN-2017-137 | IFS-2017-002-15 | DISIS-2017-002 | 04 SOUTHEAST | Oklahoma | OK | OGE | 12/1/2020 | 12/31/2028 | | | 295 | 295 | 295 | ER/NR | Wind | | Arcadia 345kV | 11/22/2017 | | IA FULLY EXECUTED/ON SCHEDULE | | | View | |
GEN-2017-134 | IFS-2017-002-14 | DISIS-2017-002 | 04 SOUTHEAST | Oklahoma | OK | OGE | 12/1/2020 | 12/31/2028 | | | 250 | 250 | 250 | ER/NR | Wind | | Arcadia 345kV | 11/22/2017 | | IA FULLY EXECUTED/ON SCHEDULE | | | View | |
GEN-2017-133 | IFS-2017-002-13 | DISIS-2017-002 | 04 SOUTHEAST | Oklahoma | OK | OGE | 12/1/2020 | 12/31/2028 | | | 200 | 200 | 200 | ER/NR | Wind | | Arcadia 345kV | 11/22/2017 | | IA FULLY EXECUTED/ON SCHEDULE | | | View | |
GEN-2017-131 | IFS-2017-002-11 | DISIS-2017-002 | 03 CENTRAL | Wilson | KS | WERE | 12/1/2020 | 2/1/2026 | | | 29.6 | 29.6 | 29.6 | ER/NR | Battery/Storage | | Altoona- NE Parson 138kV | 11/22/2017 | | IA FULLY EXECUTED/ON SUSPENSION | | | View | |
GEN-2017-121 | IFS-2017-002-08 | DISIS-2017-002 | 03 CENTRAL | Sumner | KS | WERE | 12/1/2021 | 12/1/2026 | | | 200 | 200 | 200 | ER/NR | Wind | | Sumner 138kV | 11/17/2017 | | IA FULLY EXECUTED/ON SCHEDULE | | | View | |
GEN-2017-120 | IFS-2017-002-07 | DISIS-2017-002 | 03 CENTRAL | Dickinson/Marion | KS | WERE | 5/1/2027 | 12/31/2027 | | | 260 | 260 | 260 | ER | Wind | | Abilene Energy Center-Northview 115kV | 11/17/2017 | | IA FULLY EXECUTED/ON SCHEDULE | | | View | |
GEN-2017-119 | IFS-2017-002-06 | DISIS-2017-002 | 03 CENTRAL | Cloud/Mitchell | KS | SUNC | 5/1/2024 | 12/31/2027 | | | 180 | 180 | 180 | ER | Wind | | Elm Creek 345kV substation | 11/17/2017 | | IA FULLY EXECUTED/ON SCHEDULE | | | View | |
GEN-2017-117 | IFS-2017-002-05 | DISIS-2017-002 | 04 SOUTHEAST | Canadian | OK | WFEC | 12/1/2020 | 12/1/2026 | | | 19.8 | 19.8 | 19.8 | ER/NR | Battery/Storage | | El Reno SW 138kV | 11/17/2017 | | IA FULLY EXECUTED/ON SUSPENSION | | | View | |
GEN-2017-115 | IFS-2017-002-04 | DISIS-2017-002 | 03 CENTRAL | Atchinson/Nodaway | MO | KCPL | 5/1/2027 | 12/31/2026 | | | 244 | 244 | 244 | ER | Wind | | Holt County 345 kV | 11/10/2017 | | IA FULLY EXECUTED/ON SCHEDULE | | | View | |
GEN-2017-108 | IFS-2017-002-02 | DISIS-2017-002 | 03 CENTRAL | Henry County | MO | KCPL | 12/1/2022 | 3/1/2027 | | | 400 | 400 | 400 | ER/NR | Solar | | Stillwell - Clinton 161kV Line | 8/26/2017 | | IA FULLY EXECUTED/ON SCHEDULE | | | View | |
GEN-2017-105 | IFS-2017-002-01 | DISIS-2017-002 | 02 NEBRASKA | Burt County | NE | OPPD | 12/15/2018 | 12/20/2026 | | | 75 | 75 | 75 | ER/NR | Wind | | Tekamah - Raun 161 kV Line | 7/12/2017 | | IA FULLY EXECUTED/ON SCHEDULE | | | | |
GEN-2017-100 | IFS-2017-001-20 | DISIS-2017-001 | 05 SOUTHWEST | Texas County | OK | SPS | 12/31/2019 | 12/1/2025 | | | 102.6 | 102.6 | 102.6 | ER/NR | Solar | | Texas County 115kV | 5/31/2017 | | IA FULLY EXECUTED/ON SCHEDULE | | | View | View |
GEN-2017-097 | IFS-2017-001-24 | DISIS-2017-001 | 01 NORTH | Pennington County | SD | WAPA | 1/9/2022 | 6/29/2024 | | | 128 | 128 | 128 | ER | Solar | | Underwood 115 kV Sub | 5/31/2017 | | IA FULLY EXECUTED/COMMERCIAL OPERATION | | | View | |
GEN-2017-094 | IFS-2017-001-31 | DISIS-2017-001 | 01 NORTH | Wessington/Hand Counties | SD | WAPA | 10/6/2020 | 11/1/2023 | | | 200 | 200 | 200 | ER | Wind | | Fort Thompson-Huron 230 kV | 5/24/2017 | | IA FULLY EXECUTED/COMMERCIAL OPERATION | | | View | |
GEN-2017-092 | IFS-2017-001-04 | DISIS-2017-001 | 04 SOUTHEAST | Muskogee County | OK | OGE | 6/1/2023 | 12/31/2025 | | | 200 | 200 | 200 | ER | Solar | | Canadian River-Muskogee and Muskogee-Seminole 345kV | 5/30/2017 | | IA FULLY EXECUTED/ON SCHEDULE | | | View | |
GEN-2017-086 | IFS-2017-001-10 | DISIS-2017-001 | 03 CENTRAL | Harper County | KS | WERE | 12/1/2021 | 3/1/2025 | | | 150 | 150 | 150 | ER | Wind | | Viola 345kV | 5/25/2017 | | IA FULLY EXECUTED/ON SCHEDULE | | | View | View |
GEN-2017-082 | IFS-2017-001-02 | DISIS-2017-001 | 03 CENTRAL | Barton/Jasper Counties | MO | EDE | 7/1/2020 | 12/31/2020 | | | 149.4 | 149.4 | 149.4 | ER | Wind | | Asbury Plant 161 kV | 5/31/2017 | | IA FULLY EXECUTED/COMMERCIAL OPERATION | | | View | |
GEN-2017-077 | IFS-2017-001-18 | DISIS-2017-001 | 04 SOUTHEAST | Mayes County | OK | AEP | 12/1/2021 | 8/8/2025 | | | 124.7 | 124.7 | 124.7 | ER | Solar | | Explorer Claremore Tap EXCLART4 | 5/28/2017 | | IA FULLY EXECUTED/ON SCHEDULE | | | View | View |
GEN-2017-076 | IFS-2017-001-17 | DISIS-2017-001 | 04 SOUTHEAST | Benton County | AR | AEP | 12/1/2021 | 12/1/2024 | | | 52.2 | 52.2 | 52.2 | ER | Solar | | Chamber Springs 161kV sub | 5/28/2017 | | IA FULLY EXECUTED/ON SCHEDULE | | | View | View |
GEN-2017-075 | IFS-2017-001-16 | DISIS-2017-001 | 04 SOUTHEAST | Johnston County | OK | OGE | 12/1/2021 | 12/1/2026 | | | 200 | 200 | 200 | ER | Solar | | Hugo-Sunnyside 345 kV | 5/28/2017 | | IA FULLY EXECUTED/ON SCHEDULE | | | View | |
GEN-2017-074 | IFS-2017-001-15 | DISIS-2017-001 | 04 SOUTHEAST | Mayes County | OK | AEP | 12/1/2021 | 8/8/2025 | | | 72.5 | 72.5 | 72.5 | ER | Solar | | Pryor Junction 138kV sub | 5/28/2017 | | IA FULLY EXECUTED/ON SCHEDULE | | | View | View |
GEN-2017-073 | IFS-2017-001-14 | DISIS-2017-001 | 04 SOUTHEAST | Mayes County | OK | GRDA | 12/1/2021 | 9/1/2025 | | | 72.5 | 72.5 | 72.5 | ER | Solar | | Dry Gulch 161kV sub | 5/28/2017 | | IA FULLY EXECUTED/ON SCHEDULE | | | View | |
GEN-2017-072 | IFS-2017-001-37 | DISIS-2017-001 | 04 SOUTHEAST | Payne County | OK | OGE | 12/1/2021 | 12/1/2025 | | | 52.2 | 52.2 | 52.2 | ER | Solar | | Greenwood 138kV sub | 5/28/2017 | | IA FULLY EXECUTED/ON SCHEDULE | | | View | |
GEN-2017-071 | IFS-2017-001-36 | DISIS-2017-001 | 04 SOUTHEAST | Payne County | OK | OGE | 12/1/2021 | 12/1/2025 | | | 124.7 | 124.7 | 124.7 | ER | Solar | | Greenwood 138kV sub | 5/28/2017 | | IA FULLY EXECUTED/ON SCHEDULE | | | View | |
GEN-2017-068 | IFS-2017-001-26 | DISIS-2017-001 | 03 CENTRAL | Sumner County | KS | WERE | 12/31/2020 | 12/15/2028 | | | 103.5 | 103.5 | 103.5 | ER/NR | Solar | | Gordon Evans 138kV Substation | 5/30/2017 | | IA FULLY EXECUTED/ON SCHEDULE | | | View | View |
GEN-2017-061 | IFS-2017-001-25 | DISIS-2017-001 | 04 SOUTHEAST | Mayes County | OK | GRDA | 12/1/2021 | 9/1/2025 | | | 101.5 | 101.5 | 101.5 | ER | Solar | | GRDA1 to CLARMR 5 161kV line | 5/28/2017 | | IA FULLY EXECUTED/ON SCHEDULE | | | View | |
GEN-2017-060 | IFS-2017-001-01 | DISIS-2017-001 | 03 CENTRAL | Barton County | MO | EDE | 9/1/2020 | 4/21/2021 | | | 149.4 | 149.4 | 149.4 | ER | Wind | | LaRussell Energy Center 161kV | 5/30/2017 | | IA FULLY EXECUTED/COMMERCIAL OPERATION | | | View | |
GEN-2017-057 | IFS-2017-001-13 | DISIS-2017-001 | 04 SOUTHEAST | Caddo Parish | LA | AEP | 12/1/2021 | 2/28/2025 | | | 72.5 | 72.5 | 72.5 | ER | Solar | | Hosston 69kV | 5/30/2017 | | IA FULLY EXECUTED/ON SCHEDULE | | | View | View |
GEN-2017-048 | IFS-2017-001-34 | DISIS-2017-001 | 01 NORTH | Williams County | ND | BEPC | 8/30/2024 | 12/31/2026 | | | 300 | 300 | 300 | ER | Wind | | Neset 230 kV Substation | 5/31/2017 | | IA FULLY EXECUTED/ON SCHEDULE | | | View | |
GEN-2017-047 | IFS-2017-001-19 | DISIS-2017-001 | 05 SOUTHWEST | Beaver County | OK | SPS | 12/31/2019 | 12/31/2024 | | | 102 | 102 | 102 | ER/NR | Wind | | Bull Creek 115 kV substation | 5/18/2017 | | IA FULLY EXECUTED/ON SCHEDULE | | | View | |
GEN-2017-040 | IFS-2017-001-03 | DISIS-2017-001 | 04 SOUTHEAST | Ochiltree County | TX | OGE | 6/1/2020 | 12/31/2025 | | | 200.1 | 200.1 | 200.1 | ER | Solar | | Canadian River-Muskogee and Muskogee-Seminole 345kV | 5/31/2017 | | IA FULLY EXECUTED/ON SCHEDULE | | | View | |
GEN-2017-036 | IFS-2017-001-23 | DISIS-2017-001 | 04 SOUTHEAST | Kiowa County | OK | AEP | 12/1/2022 | 12/1/2024 | | | 100 | 100 | 100 | ER | Solar | | Snyder - Cache 138 kV | 5/31/2017 | | IA FULLY EXECUTED/ON SCHEDULE | | | View | View |
GEN-2017-033 | IFS-2017-001-28 | DISIS-2017-001 | 05 SOUTHWEST | Baylor County | TX | AEP | 12/31/2020 | 12/31/2024 | | | 200 | 200 | 200 | ER | Wind | | Oklaunion 345 kV sub | 5/31/2017 | | IA FULLY EXECUTED/ON SCHEDULE | | | View | View |
GEN-2017-027 | IFS-2017-001-33 | DISIS-2017-001 | 04 SOUTHEAST | Carter County | OK | OGE | 11/1/2021 | 12/21/2021 | | | 140 | 140 | 140 | ER | Wind | | Pooleville-Ratliff (Carter County) 138kV | 5/31/2017 | | IA FULLY EXECUTED/COMMERCIAL OPERATION | | | View | |
GEN-2017-023 | IFS-2017-001-22 | DISIS-2017-001 | 04 SOUTHEAST | Choctaw County | OK | WFEC | | 6/1/2026 | | | 85 | 85 | 85 | ER/NR | Solar | | Hugo Power Plant 138 kV Sub | 5/31/2017 | | IA FULLY EXECUTED/ON SCHEDULE | | | View | |
GEN-2017-022 | IFS-2017-001-21 | DISIS-2017-001 | 03 CENTRAL | Wilson County | KS | WERE | 12/1/2019 | 6/1/2025 | | | 65 | 65 | 65 | ER/NR | Solar | | Altoona- NE Parson 138kV | 5/31/2017 | | IA FULLY EXECUTED/ON SCHEDULE | | | View | |
GEN-2017-018 | IFS-2017-001-27 | DISIS-2017-001 | 03 CENTRAL | Barber County | KS | ITCGP | 12/31/2020 | 4/30/2025 | | | 189 | 189 | 189 | ER/NR | Solar | | Thistle 345 kV sub | 5/30/2017 | | IA FULLY EXECUTED/ON SCHEDULE | | | View | |
GEN-2017-014 | IFS-2017-001-29 | DISIS-2017-001 | 01 NORTH | Haakon County | SD | WAPA | 12/1/2020 | 12/1/2027 | | | 300 | 300 | 300 | ER | Wind | | Philip Tap 230 kV | 5/22/2017 | | IA FULLY EXECUTED/ON SCHEDULE | | | View | |
GEN-2017-011 | IFS-2017-001-06 | DISIS-2017-001 | 04 SOUTHEAST | Ellis County | OK | OGE | 12/31/2019 | 12/31/2026 | | | 151.8 | 151.8 | 151.8 | ER | Solar | | Badger-Woodward EHV Dbl Ckt 345kV | 5/17/2017 | | IA FULLY EXECUTED/ON SCHEDULE | | | View | |
GEN-2017-010 | IFS-2017-001-12 | DISIS-2017-001 | 01 NORTH | Bowman County | ND | BEPC | 10/31/2022 | 12/12/2025 | | | 200.1 | 200.1 | 200.1 | ER | Wind | | Rhame 230 kV Sub | 4/14/2017 | | IA FULLY EXECUTED/ON SCHEDULE | | | View | |
GEN-2017-009 | IFS-2017-001-39 | DISIS-2017-001 | 03 CENTRAL | Neoshoe County | KS | WERE | 10/31/2020 | 5/1/2021 | | | 302 | 302 | 302 | ER | Wind | | Neosho - Caney River 345 kV | 4/14/2017 | | IA FULLY EXECUTED/COMMERCIAL OPERATION | | | View | |
GEN-2017-005 | IFS-2017-001-11 | DISIS-2017-001 | 03 CENTRAL | Bourbon and Crawford Counties | OK | WERE | 12/31/2020 | 12/13/2021 | | | 190 | 190 | 190 | ER | Wind | | Marmaton - Litchfield 161 kV | 4/14/2017 | | IA FULLY EXECUTED/COMMERCIAL OPERATION | Interim IGIA effective 3/3/2021 - AB | | View | |
GEN-2017-004 | IFS-2017-001-05 | DISIS-2017-001 | 03 CENTRAL | Cloud County | KS | ITCGP | 12/31/2021 | 11/30/2027 | | | 201.6 | 201.6 | 201.6 | ER | Wind | | Elm Creek - Summit 345 kV | 4/14/2017 | | IA FULLY EXECUTED/ON SCHEDULE | | | View | View |
GEN-2016-177 | IFS-2016-002-60 | DISIS-2016-002-1 | 05 SOUTHWEST | Gaines | TX | SPS | | 7/28/2021 | | | 17 | 14.4 | 17 | ER | Thermal | Gas Turbine | XTO-Cornell 115 kV station | 1/23/2017 | | IA FULLY EXECUTED/COMMERCIAL OPERATION | | | View | |
GEN-2016-176 | IFS-2016-002-67 | DISIS-2016-002-1 | 03 CENTRAL | Nemaha County | KS | WERE | 12/31/2019 | 12/6/2021 | | | 302 | 302 | 302 | ER | Wind | | Stranger Creek 345kV | 12/15/2016 | | IA FULLY EXECUTED/COMMERCIAL OPERATION | | | View | |
GEN-2016-174 | IFS-2016-002-19 | DISIS-2016-002-1 | 03 CENTRAL | Nemaha | KS | WERE | 9/15/2019 | 11/18/2020 | | | 302 | 302 | 302 | ER | Wind | | Stranger Creek 345kV | 11/30/2016 | | IA FULLY EXECUTED/COMMERCIAL OPERATION | | | View | |
GEN-2016-167 | IFS-2016-002-02 | DISIS-2016-002-1 | 04 SOUTHEAST | Caddo Parish | LA | AEP | 9/1/2023 | 12/1/2024 | | | 73.5 | 73.5 | 73.5 | ER/NR | Solar | | Lieberman - North Benton 138 kV Line | 11/29/2016 | | IA FULLY EXECUTED/ON SCHEDULE | | | View | View |
GEN-2016-160 | IFS-2016-002-04 | DISIS-2016-002-1 | 03 CENTRAL | Ellis | KS | MIDW | 10/2/2023 | 12/31/2026 | | | 20 | 20 | 20 | ER/NR | Battery/Storage | | Post Rock 230kV | 11/21/2016 | | IA FULLY EXECUTED/ON SCHEDULE | | | View | |
GEN-2016-153 | IFS-2016-002-11 | DISIS-2016-002-1 | 03 CENTRAL | Harper County | KS | WERE | 10/30/2019 | 12/31/2024 | | | 134 | 134 | 134 | ER | Wind | | Viola 345kV | 11/30/2016 | | IA FULLY EXECUTED/ON SCHEDULE | | | View | View |
GEN-2016-151 | IFS-2016-002-62 | DISIS-2016-002-1 | 01 NORTH | Burke | ND | BEPC | 9/15/2019 | 12/22/2020 | | | 202 | 202 | 202 | ER | Wind | | Tande 345kV | 11/30/2016 | | IA FULLY EXECUTED/COMMERCIAL OPERATION | | | View | |
GEN-2016-150 | IFS-2016-002-15 | DISIS-2016-002-1 | 03 CENTRAL | Nemaha | KS | WERE | 9/22/2022 | 12/7/2023 | | | 302 | 302 | 302 | ER | Wind | | Stranger Creek 345kV | 11/30/2016 | | IA FULLY EXECUTED/COMMERCIAL OPERATION | | | View | |
GEN-2016-149 | IFS-2016-002-14 | DISIS-2016-002-1 | 03 CENTRAL | Washington | KS | WERE | 9/15/2019 | 12/7/2023 | | | 302 | 302 | 302 | ER | Wind | | Stranger Creek 345kV | 11/30/2016 | | IA FULLY EXECUTED/COMMERCIAL OPERATION | | | View | |
GEN-2016-147 | IFS-2016-002-33 | DISIS-2016-002-1 | 02 NEBRASKA | Cheyenne | NE | Tri-State | 9/15/2019 | 6/28/2024 | | | 40 | 40 | 40 | ER | Solar | | Sidney 115 kV Sub | 11/30/2016 | | IA FULLY EXECUTED/ON SCHEDULE | | | View | |
GEN-2016-146 | IFS-2016-002-56 | DISIS-2016-002-1 | 04 SOUTHEAST | Texas | OK | AEP | 9/1/2020 | 12/31/2025 | | | 175 | 175 | 175 | ER | Wind | | Riverside 345kV Substation | 11/29/2016 | | IA FULLY EXECUTED/ON SCHEDULE | | | View | |
GEN-2016-145 | IFS-2016-002-55 | DISIS-2016-002-1 | 04 SOUTHEAST | Texas | OK | AEP | 9/1/2020 | 12/31/2025 | | | 175 | 175 | 175 | ER | Wind | | Riverside 345kV Substation | 11/29/2016 | | IA FULLY EXECUTED/ON SCHEDULE | | | View | |
GEN-2016-142 | IFS-2016-002-52 | DISIS-2016-002-1 | 04 SOUTHEAST | Texas | OK | AEP | 9/1/2020 | 12/31/2025 | | | 350 | 350 | 350 | ER | Wind | | Riverside 345kV Substation | 11/29/2016 | | IA FULLY EXECUTED/ON SCHEDULE | | | View | |
GEN-2016-141 | IFS-2016-002-51 | DISIS-2016-002-1 | 04 SOUTHEAST | Texas | OK | AEP | 9/1/2020 | 12/31/2025 | | | 350 | 350 | 350 | ER | Wind | | Riverside 345kV Substation | 11/29/2016 | | IA FULLY EXECUTED/ON SCHEDULE | | | View | |
GEN-2016-139 | IFS-2016-002-49 | DISIS-2016-002-1 | 04 SOUTHEAST | Texas | OK | AEP | 9/1/2020 | 12/31/2025 | | | 100 | 100 | 100 | ER | Wind | | Riverside 345kV Substation | 11/29/2016 | | IA FULLY EXECUTED/ON SCHEDULE | | | View | |
GEN-2016-138 | IFS-2016-002-48 | DISIS-2016-002-1 | 04 SOUTHEAST | Texas | OK | AEP | 9/1/2020 | 12/31/2025 | | | 187.5 | 187.5 | 187.5 | ER | Wind | | Riverside 345kV Substation | 11/29/2016 | | IA FULLY EXECUTED/ON SCHEDULE | | | View | View |
GEN-2016-137 | IFS-2016-002-47 | DISIS-2016-002-1 | 04 SOUTHEAST | Texas | OK | AEP | 9/1/2020 | 12/31/2025 | | | 187.5 | 187.5 | 187.5 | ER | Wind | | Riverside 345kV Substation | 11/29/2016 | | IA FULLY EXECUTED/ON SCHEDULE | | | View | View |
GEN-2016-134 | IFS-2016-002-44 | DISIS-2016-002-1 | 04 SOUTHEAST | Texas | OK | AEP | 9/1/2020 | 12/31/2025 | | | 187.5 | 187.5 | 187.5 | ER | Wind | | Riverside 345kV Substation | 11/29/2016 | | IA FULLY EXECUTED/ON SCHEDULE | | | View | View |
GEN-2016-133 | IFS-2016-002-43 | DISIS-2016-002-1 | 04 SOUTHEAST | Texas | OK | AEP | 9/1/2020 | 12/31/2025 | | | 187.5 | 187.1 | 187.5 | ER | Wind | | Riverside 345kV Substation | 11/29/2016 | | IA FULLY EXECUTED/ON SCHEDULE | | | View | View |
GEN-2016-132 | IFS-2016-002-61 | DISIS-2016-002-1 | 04 SOUTHEAST | Roger Mills | OK | AEP | 12/31/2017 | 6/5/2020 | | | 6.1 | 6.1 | 6.1 | ER | Wind | | Sweetwater 230kV | 11/30/2016 | | IA FULLY EXECUTED/COMMERCIAL OPERATION | | | View | |
GEN-2016-131 | IFS-2016-002-37 | DISIS-2016-002-1 | 04 SOUTHEAST | Grady | OK | OGE | 12/31/2017 | 10/25/2021 | | | 2.5 | 2.5 | 2.5 | ER | Wind | | Minco 345kV | 11/30/2016 | | IA FULLY EXECUTED/COMMERCIAL OPERATION | | | View | |
GEN-2016-130 | IFS-2016-002-21 | DISIS-2016-002-1 | 01 NORTH | Mercer | ND | BEPC | 9/15/2019 | 12/31/2024 | | | 202 | 202 | 202 | ER | Wind | | Leland Olds 345 kV | 11/30/2016 | | IA FULLY EXECUTED/ON SCHEDULE | | | View | |
GEN-2016-128 | IFS-2016-002-36 | DISIS-2016-002-1 | 04 SOUTHEAST | Alfalfa | OK | OGE | 9/15/2019 | 12/31/2026 | | | 176 | 176 | 176 | ER | Wind | | Woodring 345kV | 11/30/2016 | | IA FULLY EXECUTED/ON SCHEDULE | | | View | |
GEN-2016-126 | IFS-2016-002-06 | DISIS-2016-002-1 | 04 SOUTHEAST | Murray | OK | OGE | 12/31/2019 | 11/24/2021 | | | 172.5 | 172.5 | 172.5 | ER/NR | Wind | | Arbuckle 138kV substation | 11/30/2016 | | IA FULLY EXECUTED/COMMERCIAL OPERATION | | | View | |
GEN-2016-125 | IFS-2016-002-29 | DISIS-2016-002-1 | 05 SOUTHWEST | Roosevelt | NM | SPS | 12/31/2019 | 12/31/2020 | | | 74 | 74 | 74 | ER | Wind | | Eddy County-Tolk (Crossroads) 345kV | 11/30/2016 | | IA FULLY EXECUTED/COMMERCIAL OPERATION | | | View | |
GEN-2016-124 | IFS-2016-002-28 | DISIS-2016-002-1 | 05 SOUTHWEST | Roosevelt | NM | SPS | 12/31/2019 | 12/31/2020 | | | 150 | 150 | 150 | ER | Wind | | Eddy County-Tolk (Crossroads) 345kV | 11/30/2016 | | IA FULLY EXECUTED/COMMERCIAL OPERATION | | | View | |
GEN-2016-123 | IFS-2016-002-27 | DISIS-2016-002-1 | 05 SOUTHWEST | Roosevelt | NM | SPS | 12/31/2019 | 12/31/2020 | | | 298 | 298 | 298 | ER | Wind | | Eddy County-Tolk (Crossroads) 345kV | 11/30/2016 | | IA FULLY EXECUTED/COMMERCIAL OPERATION | | | View | |
GEN-2016-121 | IFS-2016-002-26 | DISIS-2016-002-1 | 05 SOUTHWEST | Lea | NM | SPS | 10/1/2022 | 12/31/2024 | | | 110 | 110 | 110 | ER | Solar | | Roadrunner 115kV | 11/22/2016 | | IA FULLY EXECUTED/ON SCHEDULE | | | View | |
GEN-2016-119 | IFS-2016-002-10 | DISIS-2016-002-1 | 04 SOUTHEAST | Kingfisher | OK | OGE | 5/15/2020 | 12/31/2025 | | | 600 | 600 | 600 | ER | Wind | | Spring Creek-Sooner 345kV | 11/30/2016 | | IA FULLY EXECUTED/ON SCHEDULE | | | View | |
GEN-2016-118 | IFS-2016-002-05 | DISIS-2016-002-1 | 04 SOUTHEAST | Kingfisher | OK | WFEC | 5/15/2021 | 9/10/2021 | | | 288 | 288 | 288 | ER | Wind | | Dover Switchyard 138 kV Line | 11/30/2016 | | IA FULLY EXECUTED/COMMERCIAL OPERATION | | | View | View |
GEN-2016-115 | IFS-2016-002-24 | DISIS-2016-002-1 | 03 CENTRAL | Atchison | MO | GMO | 11/16/2020 | 3/2/2021 | | | 300 | 300 | 300 | ER | Wind | | Nebraska City-Mullen Creek (Holt County MO) 345kV | 11/30/2016 | | IA FULLY EXECUTED/COMMERCIAL OPERATION | | | View | |
GEN-2016-111 | IFS-2016-002-18 | DISIS-2016-002-1 | 03 CENTRAL | McPherson | KS | Evergy | 9/15/2019 | 1/15/2027 | | | 302 | 302 | 302 | ER | Wind | | Reno - Summit 345kV | 11/30/2016 | | IA FULLY EXECUTED/ON SCHEDULE | Suspension Start Date of 3/24/2021 | | View | |
GEN-2016-102 | IFS-2016-002-01 | DISIS-2016-002-1 | 04 SOUTHEAST | Pontotoc | OK | OGE | 11/1/2023 | 12/1/2024 | | | 150.9 | 150.9 | 150.9 | ER/NR | Wind | | Blue River 138kV | 11/7/2016 | | IA FULLY EXECUTED/ON SCHEDULE | | | View | |
GEN-2016-097 | IFS-2016-002-31 | DISIS-2016-002-1 | 04 SOUTHEAST | Caddo | OK | AEP | 9/1/2020 | 1/1/2024 | | | 100 | 100 | 100 | ER/NR | Wind | | Tap Southwestern-Fletcher Tap 138kV | 10/19/2016 | | IA FULLY EXECUTED/COMMERCIAL OPERATION | | | View | View |
GEN-2016-095 | IFS-2016-002-32 | DISIS-2016-002-1 | 04 SOUTHEAST | Caddo | OK | AEP | 9/1/2020 | 4/22/2024 | | | 200 | 200 | 200 | ER/NR | Wind | | Gracemont-Lawton East Side 345kV | 12/1/2020 | | IA FULLY EXECUTED/COMMERCIAL OPERATION | | | View | |
GEN-2016-094 | IFS-2016-002-25 | DISIS-2016-002-1 | 01 NORTH | Hyde | SD | WAPA | 10/1/2020 | 1/24/2024 | | | 200 | 200 | 200 | ER | Wind | | Tap Ft Thompson - Oahe 230kV Line (Single Circuit) | 10/31/2016 | | IA FULLY EXECUTED/COMMERCIAL OPERATION | | | View | |
GEN-2016-091 | IFS-2016-002-22 | DISIS-2016-002-1 | 04 SOUTHEAST | Caddo | OK | AEP | 5/6/2020 | 1/8/2022 | | | 303.6 | 303.6 | 303.6 | ER | Wind | | Gracemont-Lawton East Side 345kV | 10/3/2016 | | IA FULLY EXECUTED/COMMERCIAL OPERATION | | | View | View |
GEN-2016-087 | IFS-2016-002-59 | DISIS-2016-002-1 | 01 NORTH | Campbell | SD | WAPA | 11/15/2019 | 12/31/2026 | | | 98.9 | 98.9 | 98.9 | ER | Wind | | Bismark-Glenham 230 kV line | 7/25/2016 | | IA FULLY EXECUTED/ON SCHEDULE | | | View | |
GEN-2016-075 | IFS-2016-001-21 | DISIS-2016-001-3 | 02 NEBRASKA | Holt | NE | WAPA | 12/31/2017 | 12/31/2024 | | | 50 | 50 | 50 | ER | Wind | | Fort Thompson-Grand Island (Grand Prairie) 345kV | 3/31/2016 | | IA FULLY EXECUTED/ON SCHEDULE | | | View | |
GEN-2016-074 | IFS-2016-002-57 | DISIS-2016-002-1 | 02 NEBRASKA | Custer | NE | NPPD | 10/30/2020 | 7/1/2027 | | | 200 | 200 | 200 | ER | Wind | | Sweetwater 345kV | 4/14/2016 | | IA FULLY EXECUTED/ON SCHEDULE | | | View | View |
GEN-2016-071 | IFS-2016-001-19 | DISIS-2016-001-3 | 04 SOUTHEAST | Kay | OK | OGE | 9/30/2018 | 2/27/2027 | | | 200.1 | 200.1 | 200.1 | ER | Wind | | Middleton Tap 138kV Substation | 3/30/2016 | | IA FULLY EXECUTED/ON SCHEDULE | | | View | View |
GEN-2016-070 | IFS-2016-001-18 | DISIS-2016-001-3 | 05 SOUTHWEST | Carson | TX | SPS | 11/1/2016 | 12/11/2020 | | | 5.3 | 5.3 | 5.3 | ER | Wind | | Martin 115 kV Substation | 3/30/2016 | | IA FULLY EXECUTED/COMMERCIAL OPERATION | | | View | |
GEN-2016-068 | IFS-2016-001-40 | DISIS-2016-001-3 | 04 SOUTHEAST | Garfield | OK | OGE | 9/18/2020 | 12/15/2020 | | | 250 | 250 | 250 | ER | Wind | | Woodring 345kV | 3/30/2016 | | IA FULLY EXECUTED/COMMERCIAL OPERATION | | | View | View |
GEN-2016-067 | IFS-2016-001-33 | DISIS-2016-001-3 | 03 CENTRAL | Thomas | KS | SUNC | 11/1/2017 | 7/24/2019 | | | 73.6 | 73.6 | 73.6 | ER | Wind | | Mingo 345kV | 3/31/2016 | | IA FULLY EXECUTED/COMMERCIAL OPERATION | | | View | |
GEN-2016-061 | IFS-2016-001-15 | DISIS-2016-001-3 | 04 SOUTHEAST | Garfield/Noble | OK | OGE | 12/1/2017 | 11/21/2020 | | | 250.7 | 250.7 | 250.7 | ER | Wind | | Sooner-Woodring 345 kV line | 3/29/2016 | | IA FULLY EXECUTED/COMMERCIAL OPERATION | | | View | View |
GEN-2016-057 | IFS-2016-001-35 | DISIS-2016-001-3 | 04 SOUTHEAST | Cimarron, Texas County | OK | OGE | 8/31/2018 | 3/18/2022 | | | 499.1 | 499.1 | 499.1 | ER | Wind | | Mathewson 345kV | 3/31/2016 | | IA FULLY EXECUTED/COMMERCIAL OPERATION | | | View | |
GEN-2016-051 | IFS-2016-001-13 | DISIS-2016-001-3 | 04 SOUTHEAST | Custer | OK | AEP | | 12/18/2020 | | | 9.8 | 9.8 | 9.8 | ER | Wind | | Clinton Junction-Weatherford Southeast 138kV | 3/30/2016 | | IA FULLY EXECUTED/COMMERCIAL OPERATION | | | View | |
GEN-2016-050 | IFS-2016-001-42 | DISIS-2016-001-3 | 02 NEBRASKA | Webster Co | NE | NPPD | 12/1/2017 | 12/9/2021 | | | 250.7 | 250.7 | 250.7 | ER | Wind | | Axtell – Post Rock 345 kV | 3/30/2016 | | IA FULLY EXECUTED/COMMERCIAL OPERATION | | | View | View |
GEN-2016-047 | IFS-2016-001-22 | DISIS-2016-001-3 | 04 SOUTHEAST | Canadian | OK | OGE | 12/31/2017 | 3/24/2018 | | | 24 | 8 | 24 | ER | Thermal | CT | Mustang 69kV | 3/31/2016 | | IA FULLY EXECUTED/COMMERCIAL OPERATION | | | View | View |
GEN-2016-046 | IFS-2016-001-12 | DISIS-2016-001-3 | 03 CENTRAL | Ford County | KS | SUNC | 12/1/2018 | 12/23/2021 | | | 299 | 299 | 299 | ER | Wind | | Clark County-Ironwood 345kV | 3/31/2016 | | IA FULLY EXECUTED/COMMERCIAL OPERATION | | | View | |
GEN-2016-045 | IFS-2016-001-34 | DISIS-2016-001-3 | 04 SOUTHEAST | Cimarron, Texas County | OK | OGE | 8/31/2018 | 3/18/2022 | | | 499.1 | 499.1 | 499.1 | ER | Wind | | Mathewson 345kV | 3/31/2016 | | IA FULLY EXECUTED/COMMERCIAL OPERATION | | | View | |
GEN-2016-043 | IFS-2016-001-36 | DISIS-2016-001-3 | 02 NEBRASKA | Wayne County | NE | NPPD | 9/1/2018 | 6/27/2020 | | | 230 | 230 | 230 | ER | Wind | | Hoskins 345kV | 3/31/2016 | | IA FULLY EXECUTED/COMMERCIAL OPERATION | | | View | View |
GEN-2016-037 | IFS-2017-001-32 | DISIS-2017-001 | 04 SOUTHEAST | Washita County | OK | AEP | 6/1/2021 | 3/21/2023 | | | 300 | 300 | 300 | ER | Wind | | Chisholm-Gracemont 345kV | 3/31/2016 | | IA FULLY EXECUTED/COMMERCIAL OPERATION | | | View | View |
GEN-2016-036 | IFS-2016-002-42 | DISIS-2016-002-1 | 01 NORTH | Chippewa County | MN | WAPA | 11/17/2018 | 12/30/2018 | | | 44.6 | 44.6 | 44.6 | ER | Wind | | Granite Falls 115kV substation | 3/28/2016 | | IA FULLY EXECUTED/COMMERCIAL OPERATION | | | View | |
GEN-2016-032 | IFS-2016-001-11 | DISIS-2016-001-3 | 04 SOUTHEAST | Kingfisher Co | OK | OGE | 2/1/2023 | 4/11/2024 | | | 200 | 200 | 200 | ER/NR | Wind | | Crescent Substation 138 kV | 3/30/2016 | | IA FULLY EXECUTED/COMMERCIAL OPERATION | | | View | |
GEN-2016-031 | IFS-2016-001-10 | DISIS-2016-001-3 | 04 SOUTHEAST | Kay County | OK | OGE | 11/30/2016 | 12/17/2016 | | | 1.5 | 1.5 | 1.5 | ER | Wind | | Rose Hill (Open Sky)-Sooner (Ranch Road) 345kV | 3/25/2016 | | IA FULLY EXECUTED/COMMERCIAL OPERATION | | | View | |
GEN-2016-030 | IFS-2016-001-26 | DISIS-2016-001-3 | 04 SOUTHEAST | Johnston Co | OK | OGE | 8/28/2021 | 3/31/2026 | | | 100 | 100 | 100 | ER/NR | Solar | | Brown 138kV | 3/30/2016 | | IA FULLY EXECUTED/ON SCHEDULE | | | View | |
GEN-2016-028 | IFS-2016-001-38 | DISIS-2016-001-3 | 04 SOUTHEAST | Le Flore Co | OK | AEP | 12/31/2018 | 12/27/2019 | | | 100 | 100 | 100 | ER | Wind | | Clayton 138 kV Sub | 3/29/2016 | | IA FULLY EXECUTED/COMMERCIAL OPERATION | | | View | |
GEN-2016-022 | IFS-2016-001-29 | DISIS-2016-001-3 | 04 SOUTHEAST | Newkirk, Kay County | OK | OGE | 12/31/2017 | 12/10/2020 | | | 151.8 | 151.8 | 151.8 | ER | Wind | | Rose Hill (Open Sky)-Sooner (Ranch Road) 345kV | 3/31/2016 | | IA FULLY EXECUTED/COMMERCIAL OPERATION | | | View | View |
GEN-2016-021 | IFS-2016-001-31 | DISIS-2016-001-3 | 02 NEBRASKA | Dixon County | NE | NPPD | 12/1/2018 | 3/9/2022 | | | 298.47 | 298.47 | 298.47 | ER | Wind | | Hoskins 345kV | 3/31/2016 | | IA FULLY EXECUTED/COMMERCIAL OPERATION | | | View | View |
GEN-2016-020 | IFS-2016-001-27 | DISIS-2016-001-3 | 04 SOUTHEAST | Woodward County | OK | WFEC | 12/31/2018 | 12/18/2020 | | | 148.4 | 148.4 | 148.4 | ER | Wind | | Moreland 138kV Substation | 4/1/2016 | | IA FULLY EXECUTED/COMMERCIAL OPERATION | | | View | |
GEN-2016-017 | IFS-2016-001-08 | DISIS-2016-001-3 | 01 NORTH | Hyde County | SD | BEPC | 12/1/2017 | 11/23/2020 | | | 250.24 | 250.24 | 250.24 | ER | Wind | | Chappelle Creek 345kV | 3/29/2016 | | IA FULLY EXECUTED/COMMERCIAL OPERATION | | | View | |
GEN-2016-014 | IFS-2016-001-04 | DISIS-2016-001-3 | 03 CENTRAL | Joplin | MO | EDE | 4/25/2003 | 4/30/2020 | | | 10 | 10 | 10 | ER | Thermal | CT | LaRussell Energy Center 161kV | 3/29/2016 | | IA FULLY EXECUTED/COMMERCIAL OPERATION | | | View | View |
GEN-2016-013 | IFS-2016-001-03 | DISIS-2016-001-3 | 03 CENTRAL | Joplin | MO | EDE | 4/25/2003 | 4/30/2020 | | | 10 | 10 | 10 | ER | Thermal | CT | LaRussell Energy Center 161kV | 3/29/2016 | | IA FULLY EXECUTED/COMMERCIAL OPERATION | | | View | View |
GEN-2016-009 | IFS-2016-001-02 | DISIS-2016-001-3 | 03 CENTRAL | Ponca City | OK | OGE | 9/30/2018 | 11/18/2020 | | | 29 | 29 | 29 | ER | Thermal | Steam Turbine | Osage 69 kV Sub | 3/24/2016 | | IA FULLY EXECUTED/COMMERCIAL OPERATION | | | View | |
GEN-2016-004 | IFS-2016-001-25 | DISIS-2016-001-3 | 01 NORTH | Oliver | ND | BEPC | 10/5/2022 | 12/31/2025 | | | 202 | 202 | 202 | ER/NR | Wind | | Basin Electric 230 kV | 3/10/2016 | | IA FULLY EXECUTED/ON SCHEDULE | | | View | |
GEN-2016-003 | IFS-2016-001-45 | DISIS-2016-001-3 | 04 SOUTHEAST | Ellis | OK | OGE | 12/31/2017 | 12/21/2022 | | | 250.4 | 250.4 | 250.4 | ER | Wind | | Badger-Woodward EHV Dbl Ckt 345kV | 3/15/2016 | | IA FULLY EXECUTED/COMMERCIAL OPERATION | | | View | |
GEN-2015-096 | IFS-2015-002-43 | DISIS-2015-002-7 | 01 NORTH | Hettinger County | ND | BEPC | 12/31/2017 | 12/29/2016 | | | 150 | 150 | 150 | ER | Wind | | Brady 230kV substation | 10/19/2015 | | IA FULLY EXECUTED/COMMERCIAL OPERATION | | | View | |
GEN-2015-090 | IFS-2015-002-21 | DISIS-2015-002-7 | 03 CENTRAL | Pratt | KS | WERE | 12/1/2017 | 12/14/2018 | | | 220 | 220 | 220 | ER | Wind | | Thistle-Wichita Dbl Ckt (Buffalo Flats) 345kV | 9/29/2015 | | IA FULLY EXECUTED/COMMERCIAL OPERATION | | | View | |
GEN-2015-089 | IFS-2016-001-05 | DISIS-2016-001-3 | 01 NORTH | Bon Homme | SD | WAPA | 6/30/2017 | 4/22/2020 | | | 200 | 200 | 200 | ER | Wind | | Utica 230 kV Substation | 10/13/2015 | | IA FULLY EXECUTED/COMMERCIAL OPERATION | | | View | |
GEN-2015-088 | IFS-2015-002-32 | DISIS-2015-002-7 | 02 NEBRASKA | Saline | NE | NPPD | 1/1/2019 | 12/29/2020 | | | 300 | 300 | 300 | ER/NR | Wind | | Tobias 345kV Substation | 9/30/2015 | | IA FULLY EXECUTED/COMMERCIAL OPERATION | | | View | View |
GEN-2015-082 | IFS-2016-001-28 | DISIS-2016-001-3 | 05 SOUTHWEST | Beaver | OK | OGE | 12/1/2017 | 11/25/2020 | | | 200 | 200 | 200 | ER | Wind | | Beaver County - Woodward EHV Dbl Ckt (Badger) 345kV | 9/28/2015 | | IA FULLY EXECUTED/COMMERCIAL OPERATION | | | View | |
GEN-2015-073 | IFS-2015-002-20 | DISIS-2015-002-7 | 03 CENTRAL | Lyon County | KS | WERE | 12/31/2018 | 12/19/2019 | | | 200.1 | 200.1 | 200.1 | ER/NR | Wind | | Emporia 345kV | 9/28/2015 | | IA FULLY EXECUTED/COMMERCIAL OPERATION | | | View | |
GEN-2015-069 | IFS-2015-002-06 | DISIS-2015-002-7 | 03 CENTRAL | Dickenson / Marion Counties | KS | WERE | 12/1/2017 | 12/17/2018 | | | 300 | 300 | 300 | ER | Wind | | Union Ridge 230kV | 9/21/2015 | | IA FULLY EXECUTED/COMMERCIAL OPERATION | | | View | |
GEN-2015-066 | IFS-2015-002-38 | DISIS-2015-002-7 | 04 SOUTHEAST | Pawnee | OK | OGE | 12/1/2017 | 12/31/2025 | | | 248.4 | 248.4 | 248.4 | ER | Wind | | Sooner - Cleveland 345kV | 10/7/2015 | | IA FULLY EXECUTED/ON SCHEDULE | | | View | |
GEN-2015-065 | IFS-2015-002-19 | DISIS-2015-002-7 | 03 CENTRAL | Thomas County | KS | SUNC | 11/1/2017 | 7/1/2019 | | | 202.4 | 202.4 | 202.4 | ER | Wind | | Mingo 345kV | 10/7/2015 | | IA FULLY EXECUTED/COMMERCIAL OPERATION | | | View | |
GEN-2015-064 | IFS-2015-002-18 | DISIS-2015-002-7 | 03 CENTRAL | Thomas County | KS | SUNC | 11/1/2017 | 3/26/2020 | | | 197.8 | 197.8 | 197.8 | ER | Wind | | Mingo 115kV | 10/7/2015 | | IA FULLY EXECUTED/COMMERCIAL OPERATION | | | View | |
GEN-2015-063 | IFS-2015-002-16 | DISIS-2015-002-7 | 04 SOUTHEAST | Kingfisher County | OK | OGE | 12/1/2017 | 1/1/2018 | | | 300 | 300 | 300 | ER | Wind | | Woodring-Matthewson 345kV | 10/6/2015 | | IA FULLY EXECUTED/COMMERCIAL OPERATION | | | View | |
GEN-2015-062 | IFS-2015-002-15 | DISIS-2015-002-7 | 04 SOUTHEAST | Garfield County | OK | OGE | 3/1/2016 | 8/27/2024 | | | 4.5 | 4.5 | 4.5 | ER | Wind | | Breckinridge 138kV | 10/6/2015 | | IA FULLY EXECUTED/COMMERCIAL OPERATION | | | View | |
GEN-2015-057 | IFS-2015-002-33 | DISIS-2015-002-7 | 04 SOUTHEAST | Grady County | OK | OGE | 12/1/2016 | 12/22/2018 | | | 100 | 100 | 100 | ER | Wind | | Minco 345kV | 10/6/2015 | | IA FULLY EXECUTED/COMMERCIAL OPERATION | | | View | |
GEN-2015-052 | IFS-2015-002-03 | DISIS-2015-002-7 | 03 CENTRAL | Sumner | KS | WERE | 12/1/2017 | 6/1/2025 | | | 300 | 300 | 300 | ER | Wind | | Open Sky-Rose Hill 345kV | 10/5/2015 | | IA FULLY EXECUTED/ON SCHEDULE | | | | |
GEN-2015-048 | IFS-2015-002-11 | DISIS-2015-002-7 | 04 SOUTHEAST | Major County, OK | OK | OGE | 12/1/2017 | 4/14/2021 | | | 200 | 200 | 200 | ER | Wind | | Cleo Corner 138kV | 10/5/2015 | | IA FULLY EXECUTED/COMMERCIAL OPERATION | | | View | |
GEN-2015-047 | IFS-2015-002-02 | DISIS-2015-002-7 | 04 SOUTHEAST | Noble County | OK | OGE | 12/1/2017 | 1/1/2018 | | | 300 | 300 | 300 | ER | Wind | | Sooner 345kV | 10/5/2015 | | IA FULLY EXECUTED/COMMERCIAL OPERATION | | | View | |
GEN-2015-046 | IFS-2015-002-46 | DISIS-2015-002-7 | 01 NORTH | Williams County | ND | BEPC | 12/1/2017 | 5/27/2021 | | | 300 | 300 | 300 | ER | Wind | | Tande 345kV | 10/5/2015 | | IA FULLY EXECUTED/COMMERCIAL OPERATION | | | View | |
GEN-2015-045 | IFS-2015-002-10 | DISIS-2015-002-7 | 04 SOUTHEAST | Grady County | OK | AEP | 12/1/2017 | 2/2/2020 | | | 20 | 20 | 20 | ER | Battery/Storage | | Lawton East Side-Sunnyside (Terry Road) 345kV | 10/5/2015 | | IA FULLY EXECUTED/COMMERCIAL OPERATION | | | View | |
GEN-2015-041 | IFS-2015-002-41 | DISIS-2016-001 | 05 SOUTHWEST | Hale County | TX | SPS | 7/1/2015 | 10/19/2019 | | | 5 | 5 | 0 | ER | Thermal | CT | TUCO 345kV | 9/30/2015 | | IA FULLY EXECUTED/COMMERCIAL OPERATION | | | View | |
GEN-2015-036 | IFS-2016-001-44 | DISIS-2016-001-3 | 04 SOUTHEAST | Johnston County | OK | OGE | 12/31/2017 | 12/13/2020 | | | 303.6 | 303.6 | 303.6 | ER | Wind | | Johnston County 345kV | 9/10/2015 | | IA FULLY EXECUTED/COMMERCIAL OPERATION | | | View | |
GEN-2015-034 | IFS-2015-002-08 | DISIS-2015-002-7 | 04 SOUTHEAST | Kay County | OK | OGE | 10/31/2017 | 12/10/2020 | | | 200 | 200 | 200 | ER | Wind | | Rose Hill (Open Sky)-Sooner (Ranch Road) 345kV | 8/28/2015 | | IA FULLY EXECUTED/COMMERCIAL OPERATION | | | View | |
GEN-2015-025 | IFS-2015-001-03 | DISIS-2015-001-4 | 03 CENTRAL | Pratt | KS | WERE | 12/31/2016 | 12/19/2016 | | | 220 | 220 | 220 | ER | Wind | | Tap Thistle – Wichita 345kV Dbl CKT | 3/26/2015 | | IA FULLY EXECUTED/COMMERCIAL OPERATION | | | View | |
GEN-2015-024 | IFS-2015-001-02 | DISIS-2015-001-4 | 03 CENTRAL | Pratt County | KS | WERE | 12/31/2016 | 12/9/2016 | | | 220 | 220 | 220 | ER | Wind | | Thistle-Wichita Dbl Ckt (Buffalo Flats) 345kV | 3/26/2015 | | IA FULLY EXECUTED/COMMERCIAL OPERATION | | | View | |
GEN-2015-023 | IFS-2015-001-08 | DISIS-2015-001-4 | 02 NEBRASKA | Antelope & Wheeler County | NE | NPPD | 12/31/2019 | 11/16/2022 | | | 300.7 | 300.7 | 300.7 | ER/NR | Wind | | Grand Prairie-Grand Island (Holt County NE) 345kV | 3/31/2015 | | IA FULLY EXECUTED/COMMERCIAL OPERATION | | | View | View |
GEN-2015-021 | IFS-2015-001-16 | DISIS-2015-001-4 | 03 CENTRAL | Stanton | KS | SUNC | 12/31/2016 | 4/7/2020 | | | 20 | 20 | 20 | ER/NR | Solar | | Johnson Corner 115kV | 4/1/2015 | | IA FULLY EXECUTED/COMMERCIAL OPERATION | | | View | |
GEN-2015-016 | IFS-2015-001-05 | DISIS-2015-001-4 | 03 CENTRAL | Allen County | KS | KCPL | 12/31/2017 | 9/11/2019 | | | 200 | 200 | 200 | ER/NR | Wind | | Tap Marmaton - Centerville 161kV | 3/20/2015 | | IA FULLY EXECUTED/COMMERCIAL OPERATION | | | View | |
GEN-2015-015 | IFS-2015-001-14 | DISIS-2015-001-4 | 04 SOUTHEAST | Grant County | OK | OGE | 7/31/2016 | 12/8/2017 | | | 154.56 | 154.56 | 154.56 | ER/NR | Wind | | Tap Medford Tap – Coyote 138kV | 3/27/2015 | | IA FULLY EXECUTED/COMMERCIAL OPERATION | | | View | |
GEN-2015-014 | IFS-2015-001-20 | DISIS-2015-001-4 | 05 SOUTHWEST | Cochran County | TX | SPS | 12/1/2016 | 12/15/2018 | | | 150 | 150 | 150 | ER | Wind | | Tap Cochran - Lehman 115kV substation | 3/31/2015 | | IA FULLY EXECUTED/COMMERCIAL OPERATION | | | View | |
GEN-2015-013 | IFS-2015-001-18 | DISIS-2015-001-4 | 04 SOUTHEAST | Kiowa County | OK | WFEC | 12/1/2016 | 5/23/2024 | | | 120 | 120 | 120 | ER/NR | Solar | | Snyder 138kV | 3/31/2015 | | IA FULLY EXECUTED/COMMERCIAL OPERATION | | | View | |
GEN-2015-007 | IFS-2015-001-01 | DISIS-2015-001-4 | 02 NEBRASKA | Wayne County | NE | NPPD | 11/8/2019 | 12/31/2019 | | | 160 | 160 | 160 | ER | Wind | | Hoskins 345kV | 3/25/2015 | | IA FULLY EXECUTED/COMMERCIAL OPERATION | | | View | View |
GEN-2015-005 | IFS-2015-001-04 | DISIS-2015-001-4 | 03 CENTRAL | DeKalb County | MO | GMO | 12/31/2017 | 12/16/2016 | | | 200.1 | 200.1 | 200.1 | ER | Wind | | Mullen Creek-Sibley (Ketchum) 345kV | 3/25/2015 | | IA FULLY EXECUTED/COMMERCIAL OPERATION | | | View | |
GEN-2015-001 | IFS-2015-001-15 | DISIS-2015-001-4 | 04 SOUTHEAST | Kay | OK | OGE | 12/31/2016 | 12/17/2016 | | | 200 | 200 | 200 | ER | Wind | | Rose Hill (Open Sky)-Sooner (Ranch Road) 345kV | 3/4/2015 | | IA FULLY EXECUTED/COMMERCIAL OPERATION | | | View | |
GEN-2014-064 | IFS-2014-002-24 | DISIS-2014-002-6 | 04 SOUTHEAST | Garfield | OK | OGE | 12/1/2016 | 12/21/2018 | | | 248.4 | 248.4 | 248.4 | ER | Wind | | Otter 138kV | 9/30/2014 | | IA FULLY EXECUTED/COMMERCIAL OPERATION | | | | |
GEN-2014-057 | IFS-2014-002-22 | DISIS-2014-002-6 | 04 SOUTHEAST | Grady | OK | AEP | 12/31/2016 | 12/1/2016 | | | 249.9 | 249.9 | 249.9 | ER | Wind | | Lawton East Side-Sunnyside (Terry Road) 345kV | 9/29/2014 | | IA FULLY EXECUTED/COMMERCIAL OPERATION | | | | |
GEN-2014-056 | IFS-2014-002-21 | DISIS-2014-002-6 | 04 SOUTHEAST | Canadian | OK | OGE | 12/31/2016 | 12/22/2018 | | | 250 | 250 | 250 | ER | Wind | | Minco 345kV | 9/29/2014 | | IA FULLY EXECUTED/COMMERCIAL OPERATION | | | | |
GEN-2014-040 | IFS-2014-002-14 | DISIS-2014-002-6 | 05 SOUTHWEST | Castro | TX | SPS | 9/1/2016 | 12/30/2016 | | | 320 | 320 | 320 | ER | Wind | | Castro 115kV | 9/26/2014 | | IA FULLY EXECUTED/COMMERCIAL OPERATION | | | | |
GEN-2014-035 | IFS-2014-002-12 | DISIS-2014-002-6 | 05 SOUTHWEST | Chaves | NM | SPS | 12/31/2016 | 4/24/2023 | | | 30 | 30 | 30 | ER | Solar | | Chaves County 115kV | 9/29/2014 | | IA FULLY EXECUTED/COMMERCIAL OPERATION | | | | |
GEN-2014-034 | IFS-2014-002-11 | DISIS-2014-002-6 | 05 SOUTHWEST | Chaves | NM | SPS | 12/31/2016 | 10/21/2016 | | | 70 | 70 | 70 | ER | Solar | | Chaves County 115kV | 9/29/2014 | | IA FULLY EXECUTED/COMMERCIAL OPERATION | | | | |
GEN-2014-033 | IFS-2014-002-10 | DISIS-2014-002-6 | 05 SOUTHWEST | Chaves | NM | SPS | 12/31/2016 | 8/25/2016 | | | 70 | 70 | 70 | ER | Solar | | Chaves County 115kV | 9/29/2014 | | IA FULLY EXECUTED/COMMERCIAL OPERATION | | | | |
GEN-2014-032 | IFS-2014-002-09 | DISIS-2014-002-6 | 02 NEBRASKA | Antelope | NE | NPPD | 10/1/2015 | 5/1/2014 | | | 10.2 | 10.2 | 10.2 | ER/NR | Wind | | Meadow Grove 230kV | 9/29/2014 | | IA FULLY EXECUTED/COMMERCIAL OPERATION | | | View | View |
GEN-2014-031 | IFS-2014-002-08 | DISIS-2014-002-6 | 02 NEBRASKA | Antelope County | NE | NPPD | 10/1/2015 | 3/30/2016 | | | 35.8 | 35.8 | 35.8 | ER/NR | Wind | | Meadow Grove 230kV | 9/26/2014 | | IA FULLY EXECUTED/COMMERCIAL OPERATION | | | View | |
GEN-2014-028 | IFS-2014-002-07 | DISIS-2014-002-6 | 03 CENTRAL | Cherokee County | KS | EDE | 1/1/2016 | 4/1/2016 | | | 50 | 0 | 50 | ER | Thermal | CC | Riverton 161kV | 9/25/2014 | | IA FULLY EXECUTED/COMMERCIAL OPERATION | | | | |
GEN-2014-025 | IFS-2014-002-05 | DISIS-2014-002-6 | 03 CENTRAL | Rush | KS | MIDW | 10/15/2015 | 12/1/2015 | | | 2.42 | 2.42 | 2.42 | ER | Wind | | Tap Nekoma - Bazine (Walnut Creek) 69kV | 9/25/2014 | | IA FULLY EXECUTED/COMMERCIAL OPERATION | | | | |
GEN-2014-021 | IFS-2014-002-04 | DISIS-2014-002-6 | 03 CENTRAL | Atchison | MO | GMO | 12/1/2016 | 11/7/2017 | | | 300 | 300 | 300 | ER/NR | Wind | | Nebraska City-Mullen Creek (Holt County MO) 345kV | 9/2/2014 | | IA FULLY EXECUTED/COMMERCIAL OPERATION | | | | |
GEN-2014-020 | IFS-2014-002-03 | DISIS-2014-002-6 | 04 SOUTHEAST | Grady | OK | AEP | 12/31/2014 | 10/10/2017 | | | 100 | 100 | 100 | ER/NR | Wind | | Tuttle 138kV | 7/14/2014 | | IA FULLY EXECUTED/COMMERCIAL OPERATION | | | | |
GEN-2014-013 | IFS-2014-001-07 | DISIS-2014-001-1 | 02 NEBRASKA | Antelope / Boone | NE | NPPD | 12/31/2014 | 12/18/2015 | | | 73.5 | 73.5 | 73.5 | ER/NR | Wind | | Meadow Grove 230kV | 3/31/2014 | | IA FULLY EXECUTED/COMMERCIAL OPERATION | | | | |
GEN-2014-005 | IFS-2014-001-05 | DISIS-2014-001-1 | 04 SOUTHEAST | Caddo | OK | OGE | | 6/1/2015 | | | 5.7 | 5.7 | 5.7 | ER | Wind | | Minco 345kV | 2/19/2014 | | IA FULLY EXECUTED/COMMERCIAL OPERATION | | | | |
GEN-2014-004 | IFS-2014-001-04 | DISIS-2014-001-1 | 02 NEBRASKA | Jefferson | NE | NPPD | | 10/29/2013 | | | 3.96 | 3.96 | 3.96 | ER | Wind | | Steele City 115kV | 2/19/2014 | | IA FULLY EXECUTED/COMMERCIAL OPERATION | | | | |
GEN-2014-002 | IFS-2014-001-02 | DISIS-2014-001-1 | 04 SOUTHEAST | Dewey | OK | OGE | 12/31/2014 | 4/8/2015 | | | 10.5 | 10.5 | 10.5 | ER | Wind | | Tatonga 345kV | 2/18/2014 | | IA FULLY EXECUTED/COMMERCIAL OPERATION | | | | |
GEN-2014-001IS | IFS-2015-001-21 | DISIS-2015-002 Prior Queued | 01 NORTH | Butte | SD | WAPA | 12/15/2015 | 9/24/2020 | | | 103.24 | 103.24 | 103.24 | ER | Wind | | Sulphur 115kV | 11/24/2015 | | IA FULLY EXECUTED/COMMERCIAL OPERATION | | | | |
GEN-2014-001 | IFS-2014-001-08 | DISIS-2014-001-1 | 03 CENTRAL | Marion | KS | WERE | 7/15/2014 | 8/11/2023 | | | 200.6 | 200.6 | 200.6 | ER | Wind | | Tap Wichita - Emporia Energy Center 345kV | 1/15/2014 | | IA FULLY EXECUTED/COMMERCIAL OPERATION | | | | |
GEN-2013-033 | IFS-2013-002-07 | DISIS-2013-002-2 | 03 CENTRAL | Ellis | KS | MIDW | 12/31/2015 | 2/27/2016 | | | 28 | 28 | 28 | ER/NR | Thermal | Gas | Goodman Energy Center 115kV | 9/30/2013 | | IA FULLY EXECUTED/COMMERCIAL OPERATION | | | | View |
GEN-2013-032 | IFS-2013-002-06 | DISIS-2013-002-2 | 02 NEBRASKA | Antelope | NE | NPPD | 12/31/2016 | 12/20/2018 | | | 202.5 | 202.5 | 202.5 | ER | Wind | | Antelope 115kV | 9/30/2013 | | IA FULLY EXECUTED/COMMERCIAL OPERATION | | | | View |
GEN-2013-029 | IFS-2013-002-04 | DISIS-2013-002-2 | 04 SOUTHEAST | Grant | OK | OGE | 12/15/2015 | 4/8/2016 | | | 299 | 299 | 299 | ER | Wind | | Renfrow 345kV | 9/30/2013 | | IA FULLY EXECUTED/COMMERCIAL OPERATION | | | | View |
GEN-2013-028 | IFS-2013-002-03 | DISIS-2013-002-2 | 04 SOUTHEAST | Mayes | OK | GRDA | 4/16/2016 | 12/23/2017 | | | 538 | 495 | 538 | ER | Thermal | Gas | Tap N Tulsa - GRDA 1 345kV | 9/30/2013 | | IA FULLY EXECUTED/COMMERCIAL OPERATION | | | | View |
GEN-2013-027 | IFS-2014-002-02 | DISIS-2014-002-6 | 05 SOUTHWEST | Bailey | TX | SPS | 3/31/2016 | 12/10/2018 | | | 148.4 | 148.4 | 148.4 | ER/NR | Wind | | Tolk - Yoakum 230kV | 9/30/2013 | | IA FULLY EXECUTED/COMMERCIAL OPERATION | | | | |
GEN-2013-022 | IFS-2013-002-02 | DISIS-2013-002-2 | 05 SOUTHWEST | Quay | NM | SPS | 5/1/2015 | 12/7/2016 | | | 25 | 25 | 25 | ER/NR | Solar | | Norton 115kV Switching Station | 9/5/2013 | | IA FULLY EXECUTED/COMMERCIAL OPERATION | | | | View |
GEN-2013-019 | IFS-2013-002-01 | DISIS-2013-002-2 | 02 NEBRASKA | Lancaster | NE | NPPD | 6/30/2014 | 12/1/2026 | | | 73.6 | 73.6 | 73.6 | ER/NR | Hybrid | Wind/Solar | Monolith 115kV | 4/17/2013 | | IA FULLY EXECUTED/ON SCHEDULE | | | View | View |
GEN-2013-016 | IFS-2013-001-03 | DISIS-2013-001-4 | 05 SOUTHWEST | Hale | TX | SPS | 12/1/2016 | 10/19/2019 | | | 203 | 191 | 203 | ER | Thermal | CT | TUCO 345kV | 3/29/2013 | | IA FULLY EXECUTED/COMMERCIAL OPERATION | | | | |
GEN-2013-012 | | DISIS-2013-001-4 | 04 SOUTHEAST | Logan County | OK | OGE | 11/30/2014 | 8/11/2014 | | | 147 | 68 | 147 | ER | Thermal | Gas | Redbud 345kV | 3/28/2013 | | IA FULLY EXECUTED/COMMERCIAL OPERATION | | | | |
GEN-2013-011 | IFS-2013-001-02 | DISIS-2013-001-4 | 04 SOUTHEAST | Hempstead | AR | AEP | | 12/18/2012 | | | 30 | 40 | 30 | ER | Thermal | Coal | Turk 138kV | 3/28/2013 | | IA FULLY EXECUTED/COMMERCIAL OPERATION | | | | |
GEN-2013-008 | | DISIS-2013-001-4 | 02 NEBRASKA | Jefferson | NE | NPPD | 12/31/2013 | 12/31/2013 | | | 1.2 | 1.2 | 1.2 | ER | Wind | | Steele City 115kV | 3/27/2013 | | IA FULLY EXECUTED/COMMERCIAL OPERATION | | | | |
GEN-2013-007 | | DISIS-2013-001-4 | 04 SOUTHEAST | Murray | OK | OGE | 12/31/2014 | 11/23/2015 | | | 100 | 100 | 100 | ER/NR | Wind | | Tap Prices Falls - Carter 138kV | 3/25/2013 | | IA FULLY EXECUTED/COMMERCIAL OPERATION | | | | |
GEN-2013-002 | IFS-2013-001-01 | DISIS-2013-001-4 | 02 NEBRASKA | Lancaster | NE | NPPD | 12/31/2013 | 12/1/2026 | | | 50.6 | 50.6 | 50.6 | ER/NR | Hybrid | Wind/Solar | Monolith 115kV | 3/1/2013 | | IA FULLY EXECUTED/ON SCHEDULE | | | View | View |
GEN-2012-044 | | | | Crawford | KS | WERE | 11/30/2013 | 11/1/2013 | | | 2 | 2 | 2 | ER | Thermal | Gas | Sheffield 69kV | 12/5/2012 | | IA FULLY EXECUTED/COMMERCIAL OPERATION | | | | |
GEN-2012-041 | | DISIS-2012-002-6 | 04 SOUTHEAST | Kay | OK | OGE | 4/15/2015 | 4/15/2015 | | | 121.5 | 85.3 | 121.5 | ER | Thermal | CT | Rose Hill (Open Sky)-Sooner (Ranch Road) 345kV | 9/30/2012 | | IA FULLY EXECUTED/COMMERCIAL OPERATION | | | | |
GEN-2012-037 | | DISIS-2012-002-6 | 05 SOUTHWEST | Hale | TX | SPS | 3/1/2015 | 3/1/2015 | | | 203 | 196 | 203 | ER | Thermal | CT | TUCO 345kV | 9/30/2012 | | IA FULLY EXECUTED/COMMERCIAL OPERATION | | | | |
GEN-2012-036 | | DISIS-2012-002-6 | 05 SOUTHWEST | Yoakum | TX | SPS | 6/1/2013 | 3/1/2013 | | | 7 | 7 | 7 | ER | Thermal | CT | Mustang 230kV | 9/30/2012 | | IA FULLY EXECUTED/COMMERCIAL OPERATION | | | | |
GEN-2012-035 | | DISIS-2012-002-6 | 05 SOUTHWEST | Yoakum | TX | SPS | 6/1/2013 | 4/1/2015 | | | 7 | 7 | 7 | ER | Thermal | CT | Mustang 230kV | 9/30/2012 | | IA FULLY EXECUTED/COMMERCIAL OPERATION | | | | |
GEN-2012-034 | | DISIS-2012-002-6 | 05 SOUTHWEST | Yoakum | TX | SPS | 6/1/2013 | 4/1/2015 | | | 7 | 7 | 7 | ER | Thermal | CT | Mustang 230kV | 9/30/2012 | | IA FULLY EXECUTED/COMMERCIAL OPERATION | | | | |
GEN-2012-033 | | DISIS-2012-002-6 | 04 SOUTHEAST | Garfield | OK | OGE | 12/1/2014 | 9/1/2015 | | | 98.82 | 98.82 | 98.82 | ER | Wind | | Breckinridge 138kV | 9/28/2012 | | IA FULLY EXECUTED/COMMERCIAL OPERATION | | | View | View |
GEN-2012-032 | | DISIS-2012-002-6 | 04 SOUTHEAST | Kay | OK | OGE | 11/30/2014 | 6/30/2015 | | | 299 | 299 | 299 | ER | Wind | | Rose Hill-(Ranch Road) Sooner (Open Sky) 345kV | 9/28/2012 | | IA FULLY EXECUTED/COMMERCIAL OPERATION | | | | |
GEN-2012-028 | | DISIS-2012-002-6 | 04 SOUTHEAST | Washita | OK | WFEC | 12/1/2014 | 12/22/2015 | | | 74 | 74 | 74 | ER | Wind | | Gotebo 69kV | 9/28/2012 | | IA FULLY EXECUTED/COMMERCIAL OPERATION | | | | |
GEN-2012-024 | IFS-2012-002-01 | DISIS-2012-002-6 | 03 CENTRAL | Ford | KS | SUNC | 12/31/2015 | 6/1/2017 | | | 180 | 180 | 180 | ER | Wind | | Clark County 345kV | 9/28/2012 | | IA FULLY EXECUTED/COMMERCIAL OPERATION | | | | |
GEN-2012-021 | | DISIS-2012-002-6 | 02 NEBRASKA | Lincoln | NE | LES | 8/1/2013 | 12/1/2013 | | | 4.8 | 4.8 | 4.8 | ER | Thermal | Gas | Terry Bundy Generating Station 115kV | 9/26/2012 | | IA FULLY EXECUTED/COMMERCIAL OPERATION | | | | |
GEN-2012-020 | | DISIS-2012-002-6 | 05 SOUTHWEST | Abernathy County | TX | SPS | 9/30/2015 | 6/28/2019 | | | 478 | 478 | 478 | ER | Wind | | TUCO 230kV | 9/26/2012 | | IA FULLY EXECUTED/COMMERCIAL OPERATION | | | | |
GEN-2012-007 | | DISIS-2012-001-4 | 03 CENTRAL | Grant County | KS | SUNC | 4/1/2014 | 4/15/2014 | | | 120 | 120 | 120 | ER/NR | Thermal | Gas | Rubart 115kV | 3/29/2012 | | IA FULLY EXECUTED/COMMERCIAL OPERATION | | | | |
GEN-2012-004 | | DISIS-2012-001-4 | 04 SOUTHEAST | Carter County | OK | OGE | 12/31/2013 | 11/21/2014 | | | 40.8 | 40.8 | 40.8 | ER/NR | Wind | | Pooleville-Ratliff (Carter County) 138kV | 3/27/2012 | | IA FULLY EXECUTED/COMMERCIAL OPERATION | | | | |
GEN-2012-001 | | DISIS-2012-001-4 | 05 SOUTHWEST | Lynn County Texas | TX | SPS | 11/30/2012 | 12/21/2012 | | | 61.2 | 61.2 | 61.2 | ER | Wind | | Tap Grassland - Borden County 230 kv | 3/8/2012 | | IA FULLY EXECUTED/COMMERCIAL OPERATION | | | | |
GEN-2011-057 | | DISIS-2011-002-6 | 03 CENTRAL | Sumner County | KS | WERE | 12/31/2013 | 12/30/2015 | | | 150 | 150 | 150 | ER | Wind | | Creswell 138kV | 9/30/2011 | | IA FULLY EXECUTED/COMMERCIAL OPERATION | | | | |
GEN-2011-056B | | DISIS-2011-002-6 | 02 NEBRASKA | North Platte - Lexington | NE | NPPD | 6/30/2012 | 10/31/2012 | | | 4.5 | 4.5 | 4.5 | ER | Hydro | | John 2 115kV | 3/8/2012 | | IA FULLY EXECUTED/COMMERCIAL OPERATION | | | | |
GEN-2011-056A | | DISIS-2011-002-6 | 02 NEBRASKA | North Platte - Lexington | NE | NPPD | 6/30/2012 | 10/31/2012 | | | 3.6 | 3.6 | 3.6 | ER | Hydro | | John 1 115kV | 3/8/2012 | | IA FULLY EXECUTED/COMMERCIAL OPERATION | | | | |
GEN-2011-056 | | DISIS-2011-002-6 | 02 NEBRASKA | North Platte - Lexington | NE | NPPD | 6/30/2012 | 10/31/2012 | | | 3.6 | 3.6 | 3.6 | ER | Hydro | | Jeffrey 115kV | 9/30/2011 | | IA FULLY EXECUTED/COMMERCIAL OPERATION | | | | |
GEN-2011-054 | | DISIS-2011-002-6 | 04 SOUTHEAST | Canadian County | OK | OGE | 11/30/2013 | 12/31/2014 | | | 300 | 300 | 300 | ER | Wind | | Cimarron 345kV | 9/30/2011 | | IA FULLY EXECUTED/COMMERCIAL OPERATION | | | View | View |
GEN-2011-050 | | DISIS-2011-002-6 | 04 SOUTHEAST | Grady County | OK | AEP | 12/31/2013 | 12/13/2016 | | | 108 | 108 | 108 | ER | Wind | | Tap Rush Springs - Marlow 138kV | 9/30/2011 | | IA FULLY EXECUTED/COMMERCIAL OPERATION | | | | |
GEN-2011-048 | | DISIS-2011-002-6 | 05 SOUTHWEST | Denver City | TX | SPS | 3/1/2013 | 3/1/2013 | | | 175 | 165 | 175 | ER/NR | Thermal | CT | Mustang 230kV | 9/30/2011 | | IA FULLY EXECUTED/COMMERCIAL OPERATION | | | | |
GEN-2011-046 | | DISIS-2011-002-6 | 05 SOUTHWEST | Quay County | NM | SPS | 6/1/2013 | 9/5/2013 | | | 23 | 23 | 23 | ER | Thermal | CT | Tucumcari 115kV | 9/29/2011 | | IA FULLY EXECUTED/COMMERCIAL OPERATION | | | | |
GEN-2011-045 | | DISIS-2011-002-6 | 05 SOUTHWEST | Lubbock | TX | SPS | 6/1/2013 | 5/1/2013 | | | 205 | 180 | 205 | ER | Thermal | NG/CT | Jones 230kV | 9/29/2011 | | IA FULLY EXECUTED/COMMERCIAL OPERATION | | | | |
GEN-2011-040 | | DISIS-2011-002-6 | 04 SOUTHEAST | Murray County | OK | OGE | 12/31/2012 | 11/21/2014 | | | 111 | 111 | 111 | ER/NR | Wind | | Pooleville-Ratliff (Carter County) 138kV | 9/16/2011 | | IA FULLY EXECUTED/COMMERCIAL OPERATION | | | | |
GEN-2011-037 | | DISIS-2011-002-6 | 04 SOUTHEAST | Apache | OK | WFEC | 1/1/2012 | 2/5/2013 | | | 6.6 | 6.6 | 6.6 | ER | Wind | | Blue Canyon 5 138kV | 7/1/2011 | | IA FULLY EXECUTED/COMMERCIAL OPERATION | | | | |
GEN-2011-027 | | DISIS-2011-001-8 | 02 NEBRASKA | Winside | NE | NPPD | 12/31/2012 | 12/17/2018 | | | 120 | 120 | 120 | ER/NR | Wind | | Wakefield 230kV | 3/31/2011 | | IA FULLY EXECUTED/COMMERCIAL OPERATION | | | View | View |
GEN-2011-025 | | DISIS-2011-001-8 | 05 SOUTHWEST | Lorenzo | TX | SPS | 6/30/2012 | 12/15/2018 | | | 79.96 | 79.96 | 79.96 | ER | Wind | | Tap Floyd County - Crosby County 115kV | 3/31/2011 | | IA FULLY EXECUTED/COMMERCIAL OPERATION | | | | |
GEN-2011-022 | | DISIS-2011-001-8 | 05 SOUTHWEST | Hansford | TX | SPS | 12/31/2012 | 9/8/2022 | | | 299 | 299 | 299 | ER | Wind | | Hitchland 345kV | 3/31/2011 | | IA FULLY EXECUTED/COMMERCIAL OPERATION | | | | |
GEN-2011-020 | | DISIS-2011-001-8 | 04 SOUTHEAST | Ellis | OK | OGE | 12/31/2012 | 10/31/2027 | | | 165.6 | 165.6 | 165.6 | ER/NR | Wind | | Woodward EHV 345kV | 3/31/2011 | | IA FULLY EXECUTED/ON SCHEDULE | | | | |
GEN-2011-019 | | DISIS-2011-001-8 | 04 SOUTHEAST | Woodward County | OK | OGE | 12/31/2012 | 12/31/2020 | | | 175 | 175 | 175 | ER/NR | Wind | | Woodward EHV 345kV | 3/31/2011 | | IA FULLY EXECUTED/ON SCHEDULE | | | | |
GEN-2011-018 | | DISIS-2011-001-8 | 02 NEBRASKA | Jefferson County | NE | NPPD | 12/1/2013 | 12/31/2013 | | | 73.6 | 73.6 | 73.6 | ER/NR | Wind | | Steele City 115kV | 3/31/2011 | | IA FULLY EXECUTED/COMMERCIAL OPERATION | | | | |
GEN-2011-014 | | DISIS-2011-001-8 | 05 SOUTHWEST | Beaver County | OK | OGE | 12/31/2013 | 12/20/2016 | | | 198 | 198 | 198 | ER | Wind | | Beaver County-Woodward EHV Dbl Ckt (Badger) 345kV | 3/31/2011 | | IA FULLY EXECUTED/COMMERCIAL OPERATION | | | | |
GEN-2011-011 | | DISIS-2011-001-8 | 03 CENTRAL | Weston | MO | KCPL | 12/31/2010 | 6/5/2012 | | | 50 | 50 | 50 | ER | Thermal | Coal | Iatan 345kV | 3/31/2011 | | IA FULLY EXECUTED/COMMERCIAL OPERATION | | | | |
GEN-2011-010 | | DISIS-2011-001-8 | 04 SOUTHEAST | Caddo County | OK | OGE | 12/1/2012 | 10/1/2012 | | | 100.8 | 100.8 | 100.8 | ER | Wind | | Minco 345kV | 3/30/2011 | | IA FULLY EXECUTED/COMMERCIAL OPERATION | | | | |
GEN-2011-008 | | DISIS-2011-001-8 | 03 CENTRAL | Clark County | KS | SUNC | 12/1/2015 | 12/21/2016 | | | 600 | 600 | 600 | ER | Wind | | Clark County 345kV | 3/29/2011 | | IA FULLY EXECUTED/COMMERCIAL OPERATION | | | | |
GEN-2010-057 | | DISIS-2011-001-8 | 03 CENTRAL | Lincoln County | KS | MIDW | 8/1/2012 | 9/28/2012 | | | 201 | 201 | 201 | ER/NR | Wind | | Rice County 230kV | 10/27/2010 | | IA FULLY EXECUTED/COMMERCIAL OPERATION | | | | |
GEN-2010-055 | | DISIS-2011-001-8 | 04 SOUTHEAST | Sand Springs | OK | AEP | 12/31/2011 | 2/27/2013 | | | 4.5 | 4.5 | 4.5 | ER | Thermal | Gas | Wekiwa 138kV | 9/30/2010 | | IA FULLY EXECUTED/COMMERCIAL OPERATION | | | | |
GEN-2010-051 | | DISIS-2010-002-6 | 02 NEBRASKA | Dixon County | NE | NPPD | 12/15/2012 | 12/17/2018 | | | 200 | 200 | 200 | ER | Wind | | Wakefield 230kV | 9/30/2010 | | IA FULLY EXECUTED/COMMERCIAL OPERATION | | | | |
GEN-2010-040 | | DISIS-2010-002-6 | 04 SOUTHEAST | Canadian County | OK | OGE | 11/30/2011 | 11/23/2012 | | | 300 | 300 | 300 | ER | Wind | | Cimarron 345kV | 8/19/2010 | | IA FULLY EXECUTED/COMMERCIAL OPERATION | | | | |
GEN-2010-036 | | DISIS-2010-002-6 | 03 CENTRAL | Douglas County | KS | WERE | 8/1/2012 | 8/1/2012 | | | 4.6 | 4.6 | 4.6 | ER | Hydro | | 6th Street 115kV | 6/30/2010 | | IA FULLY EXECUTED/COMMERCIAL OPERATION | | | | |
GEN-2010-014 | | DISIS-2010-001-8 | 05 SOUTHWEST | Hansford County | TX | SPS | 12/31/2013 | 12/31/2022 | | | 358.8 | 358.8 | 358.8 | ER | Wind | | Hitchland 345kV | 3/31/2010 | | IA FULLY EXECUTED/COMMERCIAL OPERATION | | | | |
GEN-2010-011 | | DISIS-2010-001-8 | 04 SOUTHEAST | Dewey County | OK | OGE | 12/31/2011 | 2/28/2012 | | | 29.7 | 29.7 | 29.7 | ER | Wind | | Tatonga 345kV | 3/31/2010 | | IA FULLY EXECUTED/COMMERCIAL OPERATION | | | | |
GEN-2010-009 | | DISIS-2010-001-8 | 03 CENTRAL | Gray County | KS | SUNC | 12/1/2011 | 12/31/2012 | | | 165.6 | 165.6 | 165.6 | ER | Wind | | Buckner 345kV | 3/29/2010 | | IA FULLY EXECUTED/COMMERCIAL OPERATION | | | | |
GEN-2010-006 | | DISIS-2010-001-8 | 05 SOUTHWEST | Lubbock | TX | SPS | 6/1/2012 | 6/30/2011 | | | 205 | 180 | 205 | ER | Thermal | Gas | Jones 230kV | 3/24/2010 | | IA FULLY EXECUTED/COMMERCIAL OPERATION | | | | |
GEN-2010-005 | | DISIS-2010-001-8 | 03 CENTRAL | Harper County | KS | WERE | 12/1/2012 | 12/31/2021 | | | 299.2 | 299.2 | 299.2 | ER | Wind | | Viola 345kV | 3/15/2010 | | IA FULLY EXECUTED/COMMERCIAL OPERATION | | | | |
GEN-2010-003 | | DISIS-2010-001-8 | 03 CENTRAL | Coffey County | KS | WERE | 12/31/2011 | 7/31/2014 | | | 99.5 | 99.5 | 99.5 | ER | Wind | | Waverly 345kV | 3/8/2010 | | IA FULLY EXECUTED/COMMERCIAL OPERATION | | | | |
GEN-2010-001 | | DISIS-2010-002-6 | 05 SOUTHWEST | Beaver County | OK | OGE | 1/1/2012 | 5/15/2015 | | | 300 | 300 | 300 | ER | Wind | | Hitchland-Woodward EHV Dbl Ckt (Beaver County) 345kV | 3/3/2010 | | IA FULLY EXECUTED/COMMERCIAL OPERATION | | | | |
GEN-2009-040 | | DISIS-2010-001-8 | 03 CENTRAL | Marshall County | KS | WERE | 12/31/2012 | 9/3/2016 | | | 72 | 72 | 72 | ER | Wind | | Tap Smittyville - Knob Hill 115KV | 8/31/2009 | | IA FULLY EXECUTED/COMMERCIAL OPERATION | | | | |
GEN-2009-025 | | DISIS-2009-001-6 | 04 SOUTHEAST | Kay County | OK | OGE | 12/31/2011 | 11/1/2012 | | | 59.8 | 59.8 | 59.8 | ER | Wind | | TAP Deer Creek – Sinclair 69kV | 6/19/2009 | | IA FULLY EXECUTED/COMMERCIAL OPERATION | | | | |
GEN-2009-020 | | DISIS-2010-001-8 | 03 CENTRAL | Rush County | KS | MIDW | 12/31/2011 | 10/15/2015 | | | 48.3 | 48.3 | 48.3 | ER | Wind | | Tap Nekoma - Bazine (Walnut Creek) 69kV | 4/15/2009 | | IA FULLY EXECUTED/COMMERCIAL OPERATION | | | | |
GEN-2009-008 | | DISIS-2010-001-8 | 03 CENTRAL | Ness County | KS | MIDW | 9/1/2011 | 12/1/2015 | | | 198.69 | 198.69 | 198.69 | ER | Wind | | South Hays 230kV | 3/10/2009 | | IA FULLY EXECUTED/COMMERCIAL OPERATION | | | | |
GEN-2008-129 | | DISIS-2009-001-6 | 03 CENTRAL | Cass County | MO | MIPU | 5/1/2009 | 2/15/2002 | | | 72 | 643 | 675 | ER | Thermal | CT | Pleasant Hill 161kV | 12/12/2008 | | IA FULLY EXECUTED/COMMERCIAL OPERATION | | | | |
GEN-2008-124 | | DISIS-2009-001-6 | 03 CENTRAL | Ford County | KS | SUNC | 1/1/2016 | 2/28/2017 | | | 200.1 | 200.1 | 200.1 | ER | Wind | | Clark County-Spearville Ckt 1 (Ironwood) 345kV | 11/14/2008 | | IA FULLY EXECUTED/COMMERCIAL OPERATION | | | | |
GEN-2008-123N | | DISIS-2010-001-8 | 02 NEBRASKA | Webster County | NE | NPPD | 12/31/2016 | 11/16/2017 | | | 89.66 | 89.66 | 89.66 | ER | Wind | | Tap Pauline - Hildreth (Rosemont) 115kV | 11/12/2008 | | IA FULLY EXECUTED/COMMERCIAL OPERATION | | | | |
GEN-2008-119O | | ICS-2008-001 Prior Queued | 02 NEBRASKA | Richardson County | NE | OPPD | 12/31/2009 | | | | 60 | 60 | 60 | ER | Wind | | S1399 161kV | 10/8/2008 | | IA FULLY EXECUTED/COMMERCIAL OPERATION | | | | |
GEN-2008-098 | | DISIS-2010-001-8 | 03 CENTRAL | Coffey County | KS | WERE | 12/31/2011 | 11/30/2015 | | | 99.5 | 99.5 | 99.5 | ER | Wind | | Waverly 345kV | 8/22/2008 | | IA FULLY EXECUTED/COMMERCIAL OPERATION | | | View | View |
GEN-2008-092 | | DISIS-2009-001-6 | 03 CENTRAL | Ellis County | KS | MIDW | 12/1/2011 | 11/30/2015 | | | 200.5 | 200.5 | 200.5 | ER | Wind | | Post Rock 230kV | 8/18/2008 | | IA FULLY EXECUTED/COMMERCIAL OPERATION | | | | |
GEN-2008-086N02 | | DISIS-2009-001-6 | 02 NEBRASKA | Antelope County | NE | NPPD | | 12/31/2014 | | | 201 | 201 | 201 | ER | Wind | | Meadow Grove 230kV | 8/8/2008 | | IA FULLY EXECUTED/COMMERCIAL OPERATION | | | | |
GEN-2008-079 | | DISIS-2009-001-6 | 03 CENTRAL | Gray County | KS | MKEC | 12/1/2010 | 11/2/2011 | | | 98.9 | 98.9 | 98.9 | ER | Wind | | Crooked Creek 115kV | 7/29/2008 | | IA FULLY EXECUTED/COMMERCIAL OPERATION | | | | |
GEN-2008-051 | | DISIS-2009-001-6 | 05 SOUTHWEST | Oldham County | TX | SPS | 12/31/2010 | 12/31/2014 | | | 161 | 161 | 161 | ER | Wind | | Potter County 345kV | 5/30/2008 | | IA FULLY EXECUTED/COMMERCIAL OPERATION | | | | |
GEN-2008-047 | | DISIS-2010-001-8 | 05 SOUTHWEST | Beaver County | OK | OGE | 12/31/2012 | 12/31/2014 | | | 263.13 | 263.13 | 263.13 | ER | Wind | | Hitchland-Woodward EHV Dbl Ckt (Beaver County) 345kV | 5/16/2008 | | IA FULLY EXECUTED/COMMERCIAL OPERATION | | | | |
GEN-2008-044 | | DISIS-2010-001-8 | 04 SOUTHEAST | Dewey County | OK | OGE | 12/1/2011 | 2/28/2012 | | | 197.8 | 197.8 | 197.8 | ER | Wind | | Tatonga 345kV | 5/15/2008 | | IA FULLY EXECUTED/COMMERCIAL OPERATION | | | | |
GEN-2008-037 | | DISIS-2010-001-8 | 04 SOUTHEAST | Commanche County | OK | WFEC | 11/30/2011 | 12/17/2011 | | | 99 | 99 | 99 | ER | Wind | | Tap Washita - Blue Canyon Wind 138kV | 5/12/2008 | | IA FULLY EXECUTED/COMMERCIAL OPERATION | | | | |
GEN-2008-023 | | DISIS-2009-001-6 | 04 SOUTHEAST | Washita County | OK | AEP | 12/1/2010 | 11/30/2012 | | | 150 | 150 | 150 | ER | Wind | | Hobart Junction 138kV | 3/28/2008 | | IA FULLY EXECUTED/COMMERCIAL OPERATION | | | | |
GEN-2008-022 | | DISIS-2010-001-8 | 05 SOUTHWEST | Chaves County | NM | SPS | 9/1/2011 | 11/15/2015 | | | 299.65 | 299.65 | 299.65 | ER | Wind | | Eddy County-Tolk (Crossroads) 345kV | 3/28/2008 | | IA FULLY EXECUTED/COMMERCIAL OPERATION | | | | |
GEN-2008-021 | | | | Coffey County | KS | WERE | 5/16/2011 | 5/16/2011 | | | 42 | 42 | 42 | ER | Thermal | Nuclear | Wolf Creek 345kV | 3/24/2008 | | IA FULLY EXECUTED/COMMERCIAL OPERATION | | | | |
GEN-2008-018 | | ICS-2008-001-6 | 03 CENTRAL | Finney County | KS | SPS | 12/31/2012 | 12/13/2013 | | | 250 | 250 | 250 | ER | Wind | | Finney 345kV | 3/17/2008 | | IA FULLY EXECUTED/COMMERCIAL OPERATION | | | | |
GEN-2008-013 | | ICS-2008-001-6 | 04 SOUTHEAST | Garfield County | OK | OGE | 10/1/2010 | 12/7/2012 | | | 300 | 300 | 300 | ER | Wind | | Hunter 345kV | 2/19/2008 | | IA FULLY EXECUTED/COMMERCIAL OPERATION | | | | |
GEN-2008-006 | | | | Caddo Parish | LA | AEP | 6/1/2010 | 6/16/2010 | | | 30 | 20 | 30 | ER | Thermal | Gas | Arsenal Hill 138kV | 1/31/2008 | | IA FULLY EXECUTED/COMMERCIAL OPERATION | | | | |
GEN-2008-005 | | | | Mayes County | OK | GRDA | 1/9/2009 | 9/2/2009 | | | 16 | 16 | 16 | ER | Hydro | | | 1/28/2008 | | IA FULLY EXECUTED/COMMERCIAL OPERATION | | | | |
GEN-2008-003 | | ICS-2008-001-6 | 04 SOUTHEAST | Woodward | OK | OGE | 8/31/2009 | 12/14/2009 | | | 101.2 | 101.2 | 101.2 | ER | Wind | | Woodward EHV 138kV | 1/25/2008 | | IA FULLY EXECUTED/COMMERCIAL OPERATION | | | | |
GEN-2008-002 | | | | Platte County | MO | KACP | 1/1/2009 | 4/12/2009 | | | 65 | 65 | 65 | ER | Thermal | Coal | | 1/22/2008 | | IA FULLY EXECUTED/COMMERCIAL OPERATION | | | | |
GEN-2007-062 | | ICS-2008-001-6 | 04 SOUTHEAST | Harper County | OK | OGE | 12/31/2011 | 12/21/2016 | | | 424 | 424 | 424 | ER | Wind | | Woodward EHV 345kV | 12/27/2007 | | IA FULLY EXECUTED/COMMERCIAL OPERATION | | | | |
GEN-2007-052 | | ICS-2008-001-6 | 04 SOUTHEAST | Caddo County | OK | WFEC | 5/1/2009 | 7/1/2009 | | | 150 | 150 | 150 | ER | Thermal | Gas | Anadarko 138kV | 11/9/2007 | | IA FULLY EXECUTED/COMMERCIAL OPERATION | | | | |
GEN-2007-050 | | ICS-2008-001-6 | 04 SOUTHEAST | Woodward County | OK | OGE | 10/1/2009 | 12/23/2010 | | | 151.8 | 151.8 | 151.8 | ER | Wind | | Woodward EHV 138kV | 10/22/2007 | | IA FULLY EXECUTED/COMMERCIAL OPERATION | | | | |
GEN-2007-046 | | ICS-2008-001-6 | 05 SOUTHWEST | Texas County | OK | SPS | 12/31/2011 | 12/15/2015 | | | 200 | 200 | 200 | ER | Wind | | Hitchland 115kV | 10/15/2007 | | IA FULLY EXECUTED/COMMERCIAL OPERATION | | | | |
GEN-2007-044 | | ICS-2008-001-6 | 04 SOUTHEAST | Blaine County | OK | OGE | 12/1/2009 | 12/31/2014 | | | 299.2 | 299.2 | 299.2 | ER | Wind | | Tatonga 345kV | 10/2/2007 | | IA FULLY EXECUTED/COMMERCIAL OPERATION | | | | |
GEN-2007-043 | | ICS-2008-001-6 | 04 SOUTHEAST | Grady County | OK | OGE | 12/1/2009 | 11/1/2010 | | | 200 | 200 | 200 | ER | Wind | | Minco 345kV | 10/2/2007 | | IA FULLY EXECUTED/COMMERCIAL OPERATION | | | | |
GEN-2007-040 | | DISIS-2009-001-6 | 03 CENTRAL | Gray County | KS | SUNC | 12/15/2010 | 6/9/2012 | | | 131.1 | 131.1 | 131.1 | ER | Wind | | Buckner 345kV | 9/25/2007 | | IA FULLY EXECUTED/COMMERCIAL OPERATION | | | View | View |
GEN-2007-025 | | ICS-2008-001-6 | 03 CENTRAL | Barber County | KS | WERE | 12/31/2009 | 10/1/2012 | | | 299.2 | 299.2 | 299.2 | ER | Wind | | Viola 345kV | 5/24/2007 | | IA FULLY EXECUTED/COMMERCIAL OPERATION | | | | |
GEN-2007-021 | | ICS-2008-001-6 | 04 SOUTHEAST | Dewey County | OK | OGE | 8/1/2009 | 12/31/2014 | | | 198.9 | 198.9 | 198.9 | ER | Wind | | Tatonga 345kV | 5/9/2007 | | IA FULLY EXECUTED/COMMERCIAL OPERATION | | | | |
GEN-2007-011N08 | | ICS-2008-001 Prior Queued | 02 NEBRASKA | Knox County | NE | NPPD | 1/1/2009 | | | | 81 | 81 | 81 | ER | Wind | | Bloomfield 115kV | 3/19/2007 | | IA FULLY EXECUTED/COMMERCIAL OPERATION | | | | |
GEN-2006-046 | | ICS-2008-001 Prior Queued | 04 SOUTHEAST | Dewey | OK | OGE | 12/31/2009 | 6/6/2011 | | | 129.6 | 129.6 | 129.6 | ER | Wind | | Dewey 138kV | 12/5/2006 | | IA FULLY EXECUTED/COMMERCIAL OPERATION | | | | |
GEN-2006-044N | | DISIS-2009-001-6 | 02 NEBRASKA | Petersburg | NE | NPPD | 1/1/2010 | 12/31/2011 | | | 40.5 | 40.5 | 40.5 | ER | Wind | | North Petersburg 115kV | 12/4/2006 | | IA FULLY EXECUTED/COMMERCIAL OPERATION | | | | |
GEN-2006-044 | | ICS-2008-001 Prior Queued | 05 SOUTHWEST | Hansford | TX | SPS | 10/1/2010 | 12/31/2022 | | | 370 | 370 | 370 | ER | Wind | | Hitchland 345kV | 12/4/2006 | | IA FULLY EXECUTED/COMMERCIAL OPERATION | | | | |
GEN-2006-043 | | ICS-2008-001 Prior Queued | 04 SOUTHEAST | Beckham County | OK | AEP | 8/1/2008 | 12/15/2009 | | | 99 | 99 | 99 | ER | Wind | | Sweetwater 230kV | 11/17/2006 | | IA FULLY EXECUTED/COMMERCIAL OPERATION | | | | |
GEN-2006-038N019 | | ICS-2008-001 Prior Queued | 02 NEBRASKA | Boone County | NE | NPPD | 5/1/2011 | 10/31/2011 | | | 80 | 80 | 80 | ER | Wind | | Petersburg North 115kV | 10/26/2006 | | IA FULLY EXECUTED/COMMERCIAL OPERATION | | | | |
GEN-2006-038N005 | | ICS-2008-001 Prior Queued | 02 NEBRASKA | Custer County | NE | NPPD | 12/1/2010 | 12/31/2012 | | | 80 | 80 | 80 | ER | Wind | | Broken Bow 115kV | 10/17/2006 | | IA FULLY EXECUTED/COMMERCIAL OPERATION | | | | |
GEN-2006-037N1 | | DISIS-2009-001-6 | 02 NEBRASKA | Custer County | NE | NPPD | 1/1/2010 | 12/31/2014 | | | 75 | 75 | 75 | ER | Wind | | Broken Bow 115kV | 10/3/2006 | | IA FULLY EXECUTED/COMMERCIAL OPERATION | | | | |
GEN-2006-035 | | ICS-2008-001 Prior Queued | 04 SOUTHEAST | Beckham County | OK | AEP | 12/1/2008 | 4/27/2012 | | | 132 | 132 | 132 | ER | Wind | | Sweetwater 230kV | 8/29/2006 | | IA FULLY EXECUTED/COMMERCIAL OPERATION | | | | |
GEN-2006-031 | | | 03 CENTRAL | Ellis County | KS | MIDW | 6/1/2008 | 6/1/2008 | | | 75.6 | 75.6 | 75.6 | ER | Thermal | Gas | Knoll 115kV | 8/16/2006 | | IA FULLY EXECUTED/COMMERCIAL OPERATION | | | | |
GEN-2006-028 | | | | Lyon | KS | WERE | 5/1/2009 | 6/1/2009 | | | 360 | 300 | 360 | ER | Thermal | Gas | Emporia 345kV | 8/11/2006 | | IA FULLY EXECUTED/COMMERCIAL OPERATION | | | | |
GEN-2006-027 | | | | Lyon | KS | WERE | 5/1/2008 | 6/1/2008 | | | 380 | 310 | 380 | ER | Thermal | Gas | Emporia 345kV | 8/11/2006 | | IA FULLY EXECUTED/COMMERCIAL OPERATION | | | | |
GEN-2006-026 | | ICS-2008-001 Prior Queued | 05 SOUTHWEST | Lea | NM | SPS | 6/1/2008 | 6/1/2008 | | | 604 | 604 | 604 | ER | Thermal | Gas | Hobbs 230kV & Hobbs 115kV | 7/26/2006 | | IA FULLY EXECUTED/COMMERCIAL OPERATION | | | | |
GEN-2006-024S | | ICS-2008-001 Prior Queued | 04 SOUTHEAST | Harper | OK | WFEC | 12/31/2007 | 12/31/2008 | | | 18.9 | 18.9 | 18.9 | ER | Wind | | Buffalo Bear Tap 69kV | 7/7/2006 | | IA FULLY EXECUTED/COMMERCIAL OPERATION | | | | |
GEN-2006-021 | | ICS-2008-001 Prior Queued | 03 CENTRAL | Barber County | KS | ITCGP | 5/31/2008 | 12/1/2008 | | | 94 | 94 | 94 | ER | Wind | | Flat Ridge Tap 138kV | 6/21/2006 | | IA FULLY EXECUTED/COMMERCIAL OPERATION | | | | |
GEN-2006-020S | | ICS-2008-001 Prior Queued | 05 SOUTHWEST | Hansford | TX | SPS | 9/1/2007 | 3/1/2012 | | | 20 | 20 | 20 | ER | Wind | | DWS Frisco 115kV | 12/31/2010 | | IA FULLY EXECUTED/COMMERCIAL OPERATION | | | | |
GEN-2006-020N | | ICS-2008-001 Prior Queued | 02 NEBRASKA | Bloomfield | NE | NPPD | 1/1/2009 | | | | 42 | 42 | 42 | ER | Wind | | Bloomfield 115kV | 6/20/2006 | | IA FULLY EXECUTED/COMMERCIAL OPERATION | | | | |
GEN-2006-019 | | | | Greene | MO | SPRM | 6/1/2010 | 1/1/2011 | | | 275 | 275 | 275 | ER | Thermal | Coal | | 6/19/2006 | | IA FULLY EXECUTED/COMMERCIAL OPERATION | | | | |
GEN-2006-018 | | ICS-2008-001 Prior Queued | 05 SOUTHWEST | Hale | TX | SPS | 6/1/2007 | 3/22/2011 | | | 168.1 | 168.1 | 168.1 | ER | Thermal | CT | TUCO 230kV | 6/1/2010 | | IA FULLY EXECUTED/COMMERCIAL OPERATION | | | | |
GEN-2006-015 | | | 05 SOUTHWEST | Denver City | TX | SPS | 4/1/2007 | 6/1/2007 | | | 150 | 150 | 150 | ER | Thermal | Gas | Mustang 230kV | 4/24/2006 | | IA FULLY EXECUTED/COMMERCIAL OPERATION | | | | |
GEN-2006-010 | | | 04 SOUTHEAST | Hempstead Co. | AR | AEP | 6/1/2011 | 12/20/2012 | | | 620 | 610 | 620 | ER | Thermal | Coal | Turk 138kV | 2/27/2006 | | IA FULLY EXECUTED/COMMERCIAL OPERATION | | | | |
GEN-2006-008 | | | | Caddo Prsh. | LA | AEP | 6/1/2008 | 6/26/2010 | | | 550 | 490 | 550 | ER | Thermal | Gas | Arsenal Hill 138kV | 2/27/2006 | | IA FULLY EXECUTED/COMMERCIAL OPERATION | | | | |
GEN-2006-002 | | ICS-2008-001 Prior Queued | 04 SOUTHEAST | Beckham | OK | AEP | 12/31/2006 | 12/28/2010 | | | 100.8 | 100.8 | 100.8 | ER | Wind | | Sweetwater 230kV | 1/9/2006 | | IA FULLY EXECUTED/COMMERCIAL OPERATION | | | | |
GEN-2005-024 | | | | Tulsa County | OK | AEP | 6/1/2007 | 3/22/2007 | | | 181 | 172 | 181 | ER | Thermal | Gas | | 12/13/2005 | | IA FULLY EXECUTED/COMMERCIAL OPERATION | | | | |
GEN-2005-022 | | | | Caddo County | OK | AEP | 6/1/2007 | 12/27/2007 | | | 177 | 168 | 177 | ER | Thermal | Gas | | 12/13/2005 | | IA FULLY EXECUTED/COMMERCIAL OPERATION | | | | |
GEN-2005-013 | | ICS-2008-001 Prior Queued | 03 CENTRAL | Elk County | KS | WERE | 11/1/2007 | 7/5/2011 | | | 199.8 | 199.8 | 199.8 | ER | Wind | | Caney River 345kV | 8/22/2005 | | IA FULLY EXECUTED/COMMERCIAL OPERATION | | | | |
GEN-2005-012 | | ICS-2008-001 Prior Queued | 03 CENTRAL | Ford County | KS | SUNC | 12/31/2015 | 9/1/2012 | | | 248.4 | 248.4 | 248.4 | ER | Wind | | Clark County-Spearville Ckt 1 (Ironwood) 345kV | 8/8/2005 | | IA FULLY EXECUTED/COMMERCIAL OPERATION | | | | |
GEN-2005-008 | | ICS-2008-001 Prior Queued | 04 SOUTHEAST | Harper County | OK | OGE | 7/31/2007 | 6/30/2007 | | | 120 | 120 | 120 | ER | Wind | | Woodward 138kV | 4/1/2005 | | IA FULLY EXECUTED/COMMERCIAL OPERATION | | | | |
GEN-2005-003 | | ICS-2008-001 Prior Queued | 04 SOUTHEAST | Caddo & Kiowa Counties | OK | WFEC | 12/1/2005 | 12/15/2005 | | | 30.6 | 30.6 | 30.6 | ER | Wind | | Washita 138kV | 1/21/2005 | | IA FULLY EXECUTED/COMMERCIAL OPERATION | | | | |
GEN-2004-023N | | ICS-2008-001 Prior Queued | 02 NEBRASKA | Columbus | NE | NPPD | 1/1/2009 | | | | 75 | 75 | 75 | ER | Thermal | Coal | Columbus Co 115kV | 11/29/2004 | | IA FULLY EXECUTED/COMMERCIAL OPERATION | | | | |
GEN-2004-023 | | ICS-2008-001 Prior Queued | 04 SOUTHEAST | Apache | OK | WFEC | 12/1/2005 | 12/15/2005 | | | 20.6 | 20.6 | 20.6 | ER | Wind | | Washita 138kV | 10/26/2004 | | IA FULLY EXECUTED/COMMERCIAL OPERATION | | | | |
GEN-2004-022N | | | | Hastings | NE | NPPD | 1/1/2005 | | | | 11 | 11 | 11 | ER | Thermal | | | 10/20/2004 | | IA FULLY EXECUTED/COMMERCIAL OPERATION | | | | |
GEN-2004-020 | | ICS-2008-001 Prior Queued | 04 SOUTHEAST | Custer County | OK | AEP | 12/31/2005 | 1/1/2006 | | | 27 | 27 | 27 | ER | Wind | | Clinton Junction-Weatherford Southeast 138kV | 10/8/2004 | | IA FULLY EXECUTED/COMMERCIAL OPERATION | | | | |
GEN-2004-019N | | | | Colfax County | NE | NPPD | 1/1/2005 | | | | 0.1 | 0.1 | 0.1 | ER | Thermal | Gas | | 10/4/2004 | | IA FULLY EXECUTED/COMMERCIAL OPERATION | | | | |
GEN-2004-018N1 | | | | Brownsville | NE | NPPD | 1/1/2005 | | | | 22 | 22 | 22 | ER | Thermal | Nuclear | | 9/20/2004 | | IA FULLY EXECUTED/COMMERCIAL OPERATION | | | | |
GEN-2004-017N | | | | Columbus | NE | NPPD | 1/1/2007 | | | | 5 | 5 | 5 | ER | Hydro | | | 9/13/2004 | | IA FULLY EXECUTED/COMMERCIAL OPERATION | | | | |
GEN-2004-017 | | | 03 CENTRAL | Riverton SE Cherokee Cnty | KS | EDE | 1/1/2007 | | | | 250 | 250 | 250 | ER/NR | Thermal | CT/ST | Riverton 161kV | 8/23/2004 | | IA FULLY EXECUTED/COMMERCIAL OPERATION | | | | |
GEN-2004-015 | | | 05 SOUTHWEST | Denver City/Yoakum | TX | SPS | 4/1/2006 | 4/1/2006 | | | 150 | 150 | 150 | ER | Thermal | CT | | 7/12/2004 | | IA FULLY EXECUTED/COMMERCIAL OPERATION | | | | |
GEN-2004-014 | | ICS-2008-001 Prior Queued | 03 CENTRAL | Edwards | KS | MKEC | 11/15/2005 | 12/31/2012 | | | 152 | 152 | 152 | ER | Wind | | Spearville 230kV | 4/22/2004 | | IA FULLY EXECUTED/COMMERCIAL OPERATION | | | | |
GEN-2004-008 | | | 03 CENTRAL | Platte County | MO | KCPL | 6/1/2009 | 6/5/2012 | | | 850 | 850 | 850 | ER | Thermal | Coal | | 3/26/2004 | | IA FULLY EXECUTED/COMMERCIAL OPERATION | | | | |
GEN-2004-002O | | | | Washington County | NE | OPPD | 1/1/2007 | | | | 48 | 48 | 48 | ER | Thermal | Nuclear | | 1/21/2004 | | IA FULLY EXECUTED/COMMERCIAL OPERATION | | | | |
GEN-2003-022 | | ICS-2008-001 Prior Queued | 04 SOUTHEAST | Custer/Wasita | OK | AEP | 12/31/2004 | 1/1/2006 | | | 120 | 120 | 120 | ER | Wind | | Clinton Junction-Weatherford Southeast 138kV | 12/31/2003 | | IA FULLY EXECUTED/COMMERCIAL OPERATION | | | | |
GEN-2003-021N | | ICS-2008-001 Prior Queued | 02 NEBRASKA | Ainsworth | NE | NPPD | 10/1/2005 | | | | 75 | 75 | 75 | ER | Wind | | Ainsworth Wind Tap 115kV | 12/29/2003 | | IA FULLY EXECUTED/COMMERCIAL OPERATION | | | | |
GEN-2003-020 | | ICS-2008-001 Prior Queued | 05 SOUTHWEST | Carson County | TX | SPS | 6/1/2007 | 8/1/2012 | | | 159.1 | 159.1 | 159.1 | ER | Wind | | Martin 115kV | 12/29/2003 | | IA FULLY EXECUTED/COMMERCIAL OPERATION | | | | |
GEN-2003-019 | | ICS-2008-001 Prior Queued | 03 CENTRAL | Salina NC Ellsworth Cnty | KS | MIDW | 11/1/2006 | 11/1/2006 | | | 249.3 | 249.3 | 249.3 | ER | Wind | | Smoky Hills Tap 230kV | 11/24/2003 | | IA FULLY EXECUTED/COMMERCIAL OPERATION | | | View | View |
GEN-2003-017N | | | | Brownsville | NE | NPPD | 1/1/2007 | | | | 50 | 50 | 50 | ER | Thermal | Nuclear | | 10/15/2003 | | IA FULLY EXECUTED/COMMERCIAL OPERATION | | | | |
GEN-2003-008O | | | | Otoe County | NE | OPPD | 5/1/2009 | | | | 700 | 700 | 700 | ER | Thermal | Coal | | 7/15/2003 | | IA FULLY EXECUTED/COMMERCIAL OPERATION | | | | |
GEN-2003-006A | | ICS-2008-001 Prior Queued | 03 CENTRAL | Cloud County | KS | MKEC | | | | | 201 | 201 | 201 | ER | Wind | | Elm Creek 230kV | 7/9/2003 | | IA FULLY EXECUTED/COMMERCIAL OPERATION | | | | |
GEN-2003-005 | | ICS-2008-001 Prior Queued | 04 SOUTHEAST | Apache | OK | WFEC | 12/1/2006 | | | | 99 | 99 | 99 | ER | Wind | | Anadarko - Paradise (Blue Canyon) 138kV | 6/5/2003 | | IA FULLY EXECUTED/COMMERCIAL OPERATION | | | | |
GEN-2003-004 | | ICS-2008-001 Prior Queued | 04 SOUTHEAST | Apache | OK | WFEC | 12/1/2005 | 12/15/2005 | | | 100 | 100 | 100 | ER | Wind | | Washita 138kV | 6/5/2003 | | IA FULLY EXECUTED/COMMERCIAL OPERATION | | | | |
GEN-2002-025A | | ICS-2008-001 Prior Queued | 03 CENTRAL | Spearville | KS | MKEC | 6/1/2006 | | | | 100.5 | 100.5 | 100.5 | ER | Wind | | Spearville 230kV | 10/31/2002 | | IA FULLY EXECUTED/COMMERCIAL OPERATION | | | | |
GEN-2002-023N | | | | Harmony | NE | NPPD | | | | | 0.8 | 0.8 | 0.8 | ER | Wind | | Harmony 115kV | 9/28/2002 | | IA FULLY EXECUTED/COMMERCIAL OPERATION | | | | |
GEN-2002-022 | | ICS-2008-001 Prior Queued | 05 SOUTHWEST | Oldham County (Wildorado) | TX | SPS | 12/15/2006 | | | | 239.2 | 239.2 | 239.2 | ER | Wind | | Bushland 230kV | 9/12/2002 | | IA FULLY EXECUTED/COMMERCIAL OPERATION | | | | |
GEN-2002-009 | | ICS-2008-001 Prior Queued | 05 SOUTHWEST | Hansford County | TX | SPS | 9/30/2006 | 9/30/2006 | | | 67.2 | 67.2 | 67.2 | ER | Wind | | Hansford 115kV | 7/19/2002 | | IA FULLY EXECUTED/COMMERCIAL OPERATION | | | | |
GEN-2002-008 | | ICS-2008-001 Prior Queued | 05 SOUTHWEST | Hansford County | TX | SPS | 11/1/2007 | 12/30/2008 | | | 240 | 240 | 240 | ER | Wind | | Hitchland 345kV | 7/19/2002 | | IA FULLY EXECUTED/COMMERCIAL OPERATION | | | | |
GEN-2002-005 | | ICS-2008-001 Prior Queued | 04 SOUTHEAST | Hammon | OK | WFEC | 12/31/2006 | 12/31/2008 | | | 123 | 123 | 123 | ER | Wind | | Red Hills Tap 138kV | 4/28/2002 | | IA FULLY EXECUTED/COMMERCIAL OPERATION | | | | |
GEN-2002-004N | | | | Grand Island | NE | NPPD | 12/1/2003 | | | | 80 | 80 | 80 | ER | Thermal | Gas | | 4/16/2002 | | IA FULLY EXECUTED/COMMERCIAL OPERATION | | | | |
GEN-2002-004 | | ICS-2008-001 Prior Queued | 03 CENTRAL | Beaumont SE Butler Cnty | KS | WERE | 9/30/2003 | 12/15/2005 | | | 153 | 153 | 153 | ER | Wind | | Latham 345kV | 4/12/2002 | | IA FULLY EXECUTED/COMMERCIAL OPERATION | | | | |
GEN-2001-040 | | | 03 CENTRAL | LaRussell Energy Ctr. | MO | EDE | 6/1/2003 | 4/24/2003 | | | 50 | 50 | 50 | ER | Thermal | CT | LaRussell Energy Center 161kV | 11/27/2001 | | IA FULLY EXECUTED/COMMERCIAL OPERATION | | | | |
GEN-2001-039M | | ICS-2008-001 Prior Queued | 03 CENTRAL | Wichita County | KS | SUNC | 12/1/2008 | | | | 100 | 100 | 100 | ER | Wind | | Central Plains Tap 115kV | 11/1/2001 | | IA FULLY EXECUTED/COMMERCIAL OPERATION | | | | |
GEN-2001-039A | | ICS-2008-001 Prior Queued | 03 CENTRAL | Kiowa County | KS | MKEC | | | | | 104 | 104 | 104 | ER | Wind | | Shooting Star Tap 115kV | 10/30/2001 | | IA FULLY EXECUTED/COMMERCIAL OPERATION | | | | |
GEN-2001-037 | | ICS-2008-001 Prior Queued | 04 SOUTHEAST | Woodward | OK | OGE | 10/1/2002 | 11/12/2003 | | | 102 | 102 | 102 | ER | Wind | | FPL Moreland Tap 138kV | 10/18/2001 | | IA FULLY EXECUTED/COMMERCIAL OPERATION | | | | |
GEN-2001-033 | | ICS-2008-001 Prior Queued | 05 SOUTHWEST | Chaves County (Melrose) | NM | SPS | 10/1/2002 | 12/22/2005 | | | 120 | 120 | 120 | ER | Wind | | San Juan Tap 230kV | 9/17/2001 | | IA FULLY EXECUTED/COMMERCIAL OPERATION | | | | |
GEN-2001-030 | | | 03 CENTRAL | LaRussell Energy Center | MO | EDE | 6/1/2003 | 4/25/2003 | | | 50 | 50 | 50 | ER | Thermal | CT | LaRussell Energy Center 161kV | 9/4/2001 | | IA FULLY EXECUTED/COMMERCIAL OPERATION | | | | |
GEN-2001-029N | | | | Beatrice | NE | NPPD | 1/1/2005 | 1/1/2005 | | | 250 | 250 | 250 | ER | Thermal | Gas | | 8/15/2001 | | IA FULLY EXECUTED/COMMERCIAL OPERATION | | | | |
GEN-2001-026 | | ICS-2008-001 Prior Queued | 04 SOUTHEAST | Meers | OK | WFEC | 10/1/2003 | 10/1/2003 | | | 74.25 | 74.25 | 74.25 | ER | Wind | | Washita 138kV | 7/24/2001 | | IA FULLY EXECUTED/COMMERCIAL OPERATION | | | | |
GEN-2001-024 | | | | Washington County | AR | AEP | 5/1/2007 | 7/1/2007 | | | 630 | 580 | 630 | ER | Thermal | CT | SWEPCO Tontitown 161kV Substation | 7/9/2001 | | IA FULLY EXECUTED/COMMERCIAL OPERATION | | | | |
GEN-2001-018 | | | | Neosho County | KS | WERE | 1/1/2002 | 1/1/2002 | | | 47 | 47 | 47 | ER | Thermal | Gas | Chanute NW Neosho Cnty By Tioga Sub | 5/15/2001 | | IA FULLY EXECUTED/COMMERCIAL OPERATION | | | | |
GEN-2001-014 | | ICS-2008-001 Prior Queued | 04 SOUTHEAST | Sleeping Bear | OK | WFEC | 6/30/2007 | 4/15/2007 | | | 94.5 | 94.5 | 94.5 | ER | Wind | | Ft Supply 138kV | 4/24/2001 | | IA FULLY EXECUTED/COMMERCIAL OPERATION | | | | |