Study Number |
Date Requested |
Purpose of Study |
Remarks |
Report |
GEN-2015-001 |
September 25, 2015 |
Interconnect 200 MW to the OKGE Transmission System (queued as IFS-2015-001-15) |
Posted 11/23/2015 |
Download |
GEN-2015-004 |
September 29, 2015 |
Interconnect 52.9 MW to the OKGE Transmission System (queued as IFS-2015-001-13) |
Posted 4/11/2016 |
Download |
GEN-2015-004 |
September 25, 2015 |
Interconnect 52.9 MW to the OKGE Transmission System (queued as IFS-2015-001-13) |
Posted 01/13/2020 |
Download |
GEN-2015-005 |
September 17, 2015 |
Interconnect 200.1 MW to the KCPL Transmission System (queued as IFS-2015-001-04) |
Posted 6/9/2016 |
Download |
GEN-2015-007 |
October 13, 2015 |
Interconnect160 MW to the NPPD Transmission System (queued as IFS-2015-001-01) |
Posted 7/11/2016 |
Download |
GEN-2015-013 |
October 16, 2015 |
Interconnect 120 MW to the WFEC Transmission System (queued as IFS-2015-001-18) |
Posted 7/29/2016 |
Download |
GEN-2015-014 |
October 27, 2015 |
Interconnect 150 MW to the SPS Transmission System (queued as IFS-2015-001-20) |
Posted 2/13/2018 |
Download |
GEN-2015-015 |
November 05, 2015 |
Interconnect 154.56 MW to the OKGE Transmission System (queued as IFS-2015-001-14) |
Posted 5/11/2016 |
Download |
GEN-2015-016 |
September 17, 2015 |
Interconnect 200 MW to the KCPL Transmission System (queued as IFS-2015-001-05) |
Posted 2/24/2016 |
Download |
GEN-2015-020 |
July 20, 2016 |
Interconnect 100 MW to the SPS Transmission System (queued as IFS-2015-002-07) |
Posted 11/14/2018 |
Download |
GEN-2015-021 |
January 25, 2016 |
Interconnect 20 MW to the SUNC Transmission System (queued as IFS-2015-001-16) |
Posted 7/11/2016 |
Download |
GEN-2015-022 |
October 16, 2015 |
Interconnect 112 MW to the SPS Transmission System (queued as IFS-2015-001-19) |
Posted 7/2/2018 |
Download |
GEN-2015-022 |
October 16, 2015 |
Interconnect 112 MW to the SPS Transmission System (queued as IFS-2015-001-19) |
Posted 8/23/2018 |
Download |
GEN-2015-023 |
October 13, 2015 |
Interconnect 300.7 MW to the NPPD Transmission System (queued as IFS-2015-001-08) |
Posted 09/15/2021 |
Download |
GEN-2015-024 |
September 17, 2015 |
Interconnect 220 MW to the WERE Transmission System (queued as IFS-2015-001-02) |
Posted 1/26/2016 |
Download |
GEN-2015-025 |
September 17, 2015 |
Interconnect 220 MW to the WERE Transmission System (queued as IFS-2015-001-03) |
Posted 2/24/2016 |
Download |
GEN-2015-027 |
September 17, 2015 |
Interconnect 4.9 MW to the SUNCMKEC Transmission System (queued as IFS-2015-001-11) |
Posted 7/11/2016 |
Download |
GEN-2015-028 |
September 17, 2015 |
Interconnect 2.99 MW to the OKGE Transmission System (queued as IFS-2015-001-10) |
Posted 3/30/2016 |
Download |
GEN-2015-029 |
September 28, 2015 |
Interconnect 161 MW to the OKGE Transmission System (queued as IFS-2015-001-12) |
Posted 3/30/2016 |
Download |
GEN-2015-030 |
September 17, 2015 |
Interconnect 200.1 MW to the OKGE Transmission System (queued as IFS-2015-001-09) |
Posted 2/29/2016 |
Download |
GEN-2015-031 |
July 20, 2016 |
Interconnect 150.53 MW to the SPS Transmission System (queued as IFS-2015-002-27) |
Posted 6/29/2018 |
Download |
GEN-2015-034 |
July 20, 2016 |
Interconnect 200 MW to the OKGE Transmission System (queued as IFS-2015-002-08) |
Posted 3/17/2017 |
Download |
GEN-2015-036 |
April 14, 2017 |
Interconnect 303.6 MW to the OKGE Transmission System (queued as IFS-2015-001-44) |
Posted 3/16/2018 |
Download |
GEN-2015-041 |
March 01, 2017 |
Interconnect 5 MW to the SPS Transmission System (queued as IFS-2015-002-41) |
Posted 10/3/2019 |
Download |
GEN-2015-045 |
March 21, 2016 |
Interconnect 20 MW to the AEPOK Transmission System (queued as IFS-2015-002-10) |
Posted 11/8/2017 |
Download |
GEN-2015-046 |
July 20, 2016 |
Interconnect 300.00 MW to the BEPC Transmission System (queued as IFS-2015-002-46) |
Posted 04/12/2019 |
Download |
GEN-2015-047 |
July 20, 2016 |
Interconnect 300 MW to the OKGE Transmission System (queued as IFS-2015-002-02) |
Posted 3/27/2017 |
Download |
GEN-2015-048 |
July 20, 2016 |
Interconnect 200 MW to the OKGE Transmission System (queued as IFS-2015-002-11) |
Posted 3/17/2017 |
Download |
GEN-2015-048 |
July 20, 2016 |
Interconnect 200 MW to the OKGE Transmission System (queued as IFS-2015-002-11) |
Posted 8/28/2017 |
Download |
GEN-2015-052 |
July 20, 2016 |
Interconnect 300.00 MW to the WERE Transmission System (queued as IFS-2015-002-03) |
Posted 1/12/2018 |
Download |
GEN-2015-053 |
July 20, 2016 |
Interconnect 50.12 MW to the NPPD Transmission System (queued as IFS-2015-002-13) |
Posted 9/10/2018 |
Download |
GEN-2015-055 |
March 30, 2016 |
Interconnect 40 MW to the WFEC Transmission System (queued as IFS-2015-002-25) |
Posted 12/12/2019 |
Download |
GEN-2015-056 |
August 01, 2016 |
Interconnect 101.20 MW to the SPS Transmission System (queued as IFS-2015-002-40) |
Posted 11/13/2018 |
Download |
GEN-2015-057 |
December 01, 2016 |
Interconnect 100 MW to the OKGE Transmission System (queued as IFS-2015-002-33) |
Posted 3/28/2017 |
Download |
GEN-2015-058 |
July 20, 2016 |
Interconnect 50.01 MW to the SPS Transmission System (queued as IFS-2015-002-42) |
Posted 10/25/2018 |
Download |
GEN-2015-060 |
July 20, 2016 |
Interconnect 250.5 MW to the OKGE Transmission System (queued as IFS-2015-002-13) |
Posted 4/10/2017 |
Download |
GEN-2015-060 |
July 20, 2016 |
Interconnect 250.5 MW to the OKGE Transmission System (queued as IFS-2015-002-13) |
Posted 2/17/2017 |
Download |
GEN-2015-061 |
July 20, 2016 |
Interconnect 200 MW to the SUNC Transmission System (queued as IFS-2015-002-14) |
Posted 3/20/2017 |
Download |
GEN-2015-061 |
July 20, 2016 |
Interconnect 200 MW to the SUNC Transmission System (queued as IFS-2015-002-14) |
Posted 4/18/2017 |
Download |
GEN-2015-062 |
July 20, 2016 |
Interconnect 4.5 MW to the OKGE Transmission System (queued as IFS-2015-002-15) |
Posted 3/16/2018 |
Download |
GEN-2015-063 |
July 20, 2016 |
Interconnect 300 MW to the OKGE Transmission System (queued as IFS-2015-002-16) |
Posted 3/17/2017 |
Download |
GEN-2015-064 |
July 20, 2016 |
Interconnect 197.80 MW to the SUNC Transmission System (queued as IFS-2015-002-18) |
Posted 3/31/2017 |
Download |
GEN-2015-065 |
July 20, 2016 |
Interconnect 202.40 MW to the SUNC Transmission System (queued as IFS-2015-002-19) |
Posted 3/20/2017 |
Download |
GEN-2015-065 |
July 20, 2016 |
Interconnect 202.40 MW to the SUNC Transmission System (queued as IFS-2015-002-19) |
Posted 4/18/2017 |
Download |
GEN-2015-065 |
July 20, 2016 |
Interconnect 202.40 MW to the SUNC Transmission System (queued as IFS-2015-002-19) |
Posted 8/28/2017 |
Download |
GEN-2015-066 |
March 11, 2016 |
Interconnect 248.40 MW to the OKGE Transmission System (queued as IFS-2015-002-038) |
Posted 5/9/2017 |
Download |
GEN-2015-066 |
July 20, 2016 |
Interconnect 248.40 MW to the OKGE Transmission System (queued as IFS-2015-002-38) |
Posted 6/11/2020 |
Download |
GEN-2015-067 |
July 20, 2016 |
Interconnect 150.00 MW to the OKGE Transmission System (queued as IFS-2015-002-39) |
Posted 3/15/2017 |
Download |
GEN-2015-067 |
February 27, 2017 |
Interconnect 150 MW to the OKGE Transmission System (queued as IFS-2015-002-39) |
Posted 5/10/2017 |
Download |
GEN-2015-068 |
July 20, 2016 |
Interconnect 300.00 MW to the SPS Transmission System (queued as IFS-2015-002-34) |
Posted 10/26/2018 |
Download |
GEN-2015-069 |
July 20, 2016 |
Interconnect 300.00 MW to the WERE Transmission System (queued as IFS-2015-002-06) |
Posted 4/24/2017 |
Download |
GEN-2015-069 |
July 20, 2016 |
Interconnect 300.00 MW to the WERE Transmission System (queued as IFS-2015-002-06) |
Posted 3/15/2017 |
Download |
GEN-2015-071 |
March 30, 2016 |
Interconnect 200 MW to the AEP-PSCO Transmission System (queued as IFS-2015-002-26) |
Posted 05/10/2019 |
Download |
GEN-2015-073 |
July 20, 2016 |
Interconnect 200.1 MW to the WERE Transmission System (queued as IFS-2015-002-020) |
Posted 3/8/2017 |
Download |
GEN-2015-073 |
July 20, 2016 |
Interconnect 200.1 MW to the WERE Transmission System (queued as IFS-2015-002-020) |
Posted 4/21/2017 |
Download |
GEN-2015-073 |
July 20, 2016 |
Interconnect 200.1 MW to the WERE Transmission System (queued as IFS-2015-002-020) |
Re-posted 5/1/2017 |
Download |
GEN-2015-075 |
July 20, 2016 |
Interconnect 51.50 MW to the SPS Transmission System (queued as IFS-2015-002-30) |
Posted 10/26/18 |
Download |
GEN-2015-076 |
April 11, 2016 |
Interconnect 158.40 MW to the NPPD Transmission System (queued as IFS-2015-002-35) |
Posted 11/15/2017 |
Download |
GEN-2015-079 |
July 20, 2016 |
Interconnect 129.20 MW to the SPS Transmission System (queued as IFS-2015-002-28) |
Posted 10/29/2018 |
Download |
GEN-2015-080 |
July 20, 2016 |
Interconnect 129.20 MW to the SPS Transmission System (queued as IFS-2015-002-29) |
Posted 10/29/2018 |
Download |
GEN-2015-081 |
July 20, 2016 |
Interconnect 180.00 MW to the OKGE Transmission System (queued as IFS-2015-002-04) |
Posted 3/15/2017 |
Download |
GEN-2015-081 |
March 08, 2016 |
Interconnect 180.00 MW to the OKGE Transmission System (queued as IFS-2015-002-04) |
Posted 5/10/2017 |
Download |
GEN-2015-082 |
November 03, 2017 |
Interconnect 200 MW to the OKGE Transmission System (queued as IFS-2016-001-28) |
Posted 11/06/2018 |
Download |
GEN-2015-083 |
July 20, 2016 |
Interconnect 125.00 MW to the WERE Transmission System (queued as IFS-2015-002-017) |
Posted 3/15/2017 |
Download |
GEN-2015-083 |
July 20, 2016 |
Interconnect 125.00 MW to the WERE Transmission System (queued as IFS-2015-002-017) |
Posted 4/21/2017 |
Download |
GEN-2015-084 |
March 18, 2016 |
Interconnect 51.30 MW to the AEP-PSCO Transmission System (queued as IFS-2015-002-22) |
Posted 7/30/2018 |
Download |
GEN-2015-085 |
March 18, 2016 |
Interconnect 122.4 MW to the AEP-PSCO Transmission System (queued as IFS-2015-002-23) |
Posted 7/12/2018 |
Download |
GEN-2015-087 |
July 20, 2016 |
Interconnect 66 MW to the NPPD Transmission System (queued as IFS-2015-002-31) |
Posted 3/16/2017 |
Download |
GEN-2015-088 |
July 20, 2016 |
Interconnect 300 MW to the NPPD Transmission System (queued as IFS-2015-002-32) |
Posted 3/16/2017 |
Download |
GEN-2015-089 |
April 14, 2017 |
Interconnect 200 MW to the WAPA Transmission System (queued as IFS-2016-001-05) |
Posted 5/3/2019 |
Download |
GEN-2015-090 |
July 20, 2016 |
Interconnect 220.00 MW to the WERE Transmission System (queued as IFS-2015-002-21) |
Posted 3/15/2017 |
Download |
GEN-2015-090 |
July 20, 2016 |
Interconnect 220.00 MW to the WERE Transmission System (queued as IFS-2015-002-21) |
Posted 4/28/2017 |
Download |
GEN-2015-091 |
April 27, 2016 |
Interconnect 101.20 MW to the BEPC Transmission System (queued as IFS-2015-002-47) |
Posted 4/13/2017 |
Download |
GEN-2015-092 |
July 20, 2016 |
Interconnect 250 MW to the OKGE Transmission System (queued as IFS-2015-002-36) |
Posted 12/4/2017 |
Download |
GEN-2015-093 |
March 11, 2016 |
Interconnect 250 MW to the OKGE Transmission System (queued as IFS-2015-002-37) |
Posted 6/11/2020 |
Download |
GEN-2015-095 |
April 14, 2017 |
Interconnect 176 MW to the OKGE Transmission System (queued as IFS-2016-001-20) |
Posted 10/23/2018 |
Download |
GEN-2015-096 |
May 02, 2016 |
Interconnect 150.00 MW to the BEPC Transmission System (queued as IFS-2015-002-43) |
Posted 04/12/2019 |
Download |
GEN-2015-098 |
April 28, 2016 |
Interconnect 100.00 MW to the WAPA Transmission System (queued as IFS-2015-002-45 |
Posted 2/06/2018 |
Download |
GEN-2015-099 |
August 15, 2018 |
Interconnect 73.3 MW to the SPS Transmission System (queued as IFS-2016-002-30) |
Posted 02/21/2020 |
Download |
IFS-2015-001 |
October 16, 2015 |
Facility Study for Shared Network Upgrades in AEP-PSCO for IFS-2015-001 (DISIS-2015-001) |
Posted 2/13/2018 |
Download |
IFS-2015-001 |
October 16, 2015 |
Facility Study for Shared Network Upgrades in SPS for IFS-2015-001 (DISIS-2015-001-2) |
Posted 2/10/2017 |
Download |
IFS-2015-002 |
April 28, 2016 |
Facility Study for Shared Network Upgrades in BEPC for IFS-2015-002 (DISIS-2015-002) |
Posted 4/13/2017 |
Download |
IFS-2015-002 |
April 28, 2016 |
Facility Study for Shared Network Upgrades in AEP for IFS-2015-002 (DISIS-2015-002) |
Posted 4/25/2017 |
Download |
IFS-2015-002 |
April 28, 2016 |
Facility Study for Shared Network Upgrades in OKGE for IFS-2015-002 (DISIS-2015-002) |
Posted 4/25/2017 |
Download |
IFS-2015-002 |
April 28, 2017 |
Facility Study for Shared Network Upgrades in SPS for IFS-2015-002 (DISIS-2015-002) |
Posted 4/25/2017 |
Download |