2016 Facility Studies
The following Generator Interconnection Studies have been requested.

Study Number Date Requested Purpose of Study Remarks Report
ASGI-2016-010 February 02, 2018 Interconnect 90 MW to the TCEC Transmission System Posted 12/18/2020 Download
GEN-2016-003 November 03, 2017 Interconnect 248.4 MW to the OKGE Transmission System (queued as IFS-2016-001-45) Posted 12/03/2018 Download
GEN-2016-004 January 07, 2019 Interconnect 202 MW to the BEPC Transmission System (queued as IFS-2016-001-25) Posted 02/19/2020 Download
GEN-2016-007 March 01, 2017 Interconnect 100.05 MW to the WAPA Transmission System (queued as IFS-2016-001-037) Posted 07/15/2019 Download
GEN-2016-009 April 14, 2017 Interconnect 29 MW to the OKGE Transmission System (queued as IFS-2016-001-02) Posted 1/23/2018 Download
GEN-2016-013 February 02, 2017 Interconnect 10 MW to the EDE Transmission System (queued as IFS-2016-001-03) Posted 10/18/2019 Download
GEN-2016-014 February 02, 2017 Interconnect 10 MW to the EDE Transmission System (queued as IFS-2016-001-04) Posted 10/18/2019 Download
GEN-2016-015 February 24, 2017 Interconnect 100 MW to the SPS Transmission System (queued as IFS-2016-001-30) Posted 8/12/2019 Download
GEN-2016-016 February 24, 2017 Interconnect 78.2 MW to the MIDW Transmission System (queued as IFS-2016-001-07) Posted 12/13/2019 Download
GEN-2016-017 April 14, 2017 Interconnect 250.7 MW to the BEPC Transmission System (queued as IFS-2016-001-08) Posted 10/15/2019 Download
GEN-2016-020 May 09, 2017 Interconnect 150 MW to the WFEC Transmission System (queued as IFS-2016-001-27) Posted 02/14/2019 Download
GEN-2016-021 May 12, 2017 Interconnect 300 MW to the NPPD Transmission System (queued as IFS-2016-001-31) Posted 04/21/2020 Download
GEN-2016-022 November 03, 2017 Interconnect 151.80 MW to the OKGE Transmission System (queued as IFS-2016-001-29) Posted 02/24/2022 Download
GEN-2016-023 March 01, 2017 Interconnect 150.5 MW to the BEPC Transmission System (queued as IFS-2016-001-43) Posted 01/06/2020 Download
GEN-2016-028 December 12, 2017 Interconnect 100 MW to the AEPOK Transmission System (queued as IFS-2016-001-38) Posted 1/4/2018 Download
GEN-2016-029 March 01, 2017 Interconnect 150.5 MW to the BEPC Transmission System (queued as IFS-2016-001-09) Posted 01/06/2020 Download
GEN-2016-030 August 18, 2017 Interconnect 100 MW to the OKGE Transmission System (queued as IFS-2016-001-26) Posted 8/24/2018 Download
GEN-2016-031 April 14, 2017 Interconnect 1.5 MW to the OKGE Transmission System (queued as IFS-2016-001-10) Posted 02/24/2022 Download
GEN-2016-032 April 14, 2017 Interconnect 200 MW to the OKGE Transmission System (queued as IFS-2016-001-11) Posted 02/24/2022 Download
GEN-2016-036 September 19, 2018 Interconnect 44.6 MW to the WAPA Transmission System (queued as IFS-2016-002-42) Posted 06/06/2022 Download
GEN-2016-037 March 31, 2016 Interconnect 300 MW to the AEPW Transmission System (queued as IFS-2017-001-32) Posted 12/21/2021 Download
GEN-2016-043 May 19, 2017 Interconnect 230 MW to the NPPD Transmission System (queued as IFS-2016-001-36) Posted 05/03/2019 Download
GEN-2016-045 December 12, 2017 Interconnect 499.1 MW to the OKGE Transmission System (queued as IFS-2016-001-34) Posted 04/02/2019 Download
GEN-2016-046 February 24, 2017 Interconnect 299 MW to the ITCGP Transmission System (queued as IFS-2016-001-12) Posted 12/13/2019 Download
GEN-2016-047 April 14, 2017 Interconnect 24 MW to the OKGE Transmission System (queued as IFS-2016-001-22) Posted 6/11/2018 Download
GEN-2016-050 March 01, 2017 Interconnect 250.7 MW to the NPPD Transmission System (queued as IFS-2016-001-42) Posted 11/10/2021 Download
GEN-2016-051 May 17, 2017 Interconnect 9.8 MW to the AEP-PSCO Transmission System (queued as IFS-2016-001-13) Posted 05/03/2019 Download
GEN-2016-052 March 01, 2017 Interconnect 3.3 MW to the WAPA Transmission System (queued as IFS-2016-001-23) Posted 9/9/2019 Download
GEN-2016-053 March 01, 2017 Interconnect 3.3 MW to the WAPA Transmission System (queued as IFS-2016-001-46) Posted 9/9/2019 Download
GEN-2016-056 March 01, 2017 Interconnect 200 MW to the SPS Transmission System (queued as IFS-2016-001-41) Posted 8/12/2019 Download
GEN-2016-057 December 12, 2017 Interconnect 499.1 MW to the OKGE Transmission System (queued as IFS-2016-001-35) Posted 04/02/2019 Download
GEN-2016-061 November 03, 2017 Interconnect 250.70 MW to the OKGE Transmission System (queued as IFS-2016-001-15) Posted 02/24/2022 Download
GEN-2016-062 February 24, 2017 Interconnect 250.7 MW to the SPS Transmission System (queued as IFS-2016-001-16) Posted 8/12/2019 Download
GEN-2016-063 May 09, 2017 Interconnect 200 MW to the OKGE Transmission System (queued as IFS-2016-001-17) Posted 7/30/2018 Download
GEN-2016-067 May 18, 2017 Interconnect 73.6 MW to the SUNC Transmission System (queued as IFS-2016-001-27) Posted 6/26/2018 Download
GEN-2016-068 March 01, 2017 Interconnect 250 MW to the OKGE Transmission System (queued as IFS-2016-001-40) Posted 02/24/2022 Download
GEN-2016-069 February 28, 2017 Interconnect 31.35 MW to the SPS Transmission System (queued as IFS-2016-001-32) Posted 8/12/2019 Download
GEN-2016-070 May 17, 2017 Interconnect 5.3 MW to the SWPS Transmission System (queued as IFS-2016-001-18) Posted 4/25/2018 Download
GEN-2016-071 November 03, 2017 Interconnect 200.10 MW to the OKGE Transmission System (queued as IFS-2016-001-19) Posted 02/24/2022 Download
GEN-2016-073 March 01, 2017 Interconnect 220 MW to the WERE Transmission System (queued as IFS-2016-001-48) Posted 02/24/2022 Download
GEN-2016-074 November 19, 2018 Interconnect 200 MW to the NPPD Transmission System (queued as IFS-2016-002-57) Posted 10/01/2021 Download
GEN-2016-075 March 02, 2017 Interconnect 50 MW to the WAPA Transmission System (queued as IFS-2016-001-21) Posted 08/26/2019 Download
GEN-2016-087 September 19, 2018 Interconnect 98.9 MW to the WAPA Transmission System (queued as IFS-2016-002-59) Posted 06/06/2022 Download
GEN-2016-088 May 24, 2018 Interconnect 151.2 MW to the TMO Transmission System (queued as IFS-2016-002-40) Posted 12/09/2019 Download
GEN-2016-091 October 17, 2019 Interconnect 303.6 MW to the AEP Transmission System (queued as IFS-2016-002-22) Posted 09/15/2021 Download
GEN-2016-092 September 05, 2018 Interconnect 175 MW to the BEPC Transmission System (queued as IFS-2016-002-68) Posted 02/19/2021 Download
GEN-2016-094 August 10, 2018 Interconnect 200 MW to the WAPA Transmission System (queued as IFS-2016-002-25) Posted 06/06/2022 Download
GEN-2016-095 October 18, 2018 Interconnect 200 MW to the AEP Transmission System (queued as IFS-2016-002-32) Posted 01/29/2021 Download
GEN-2016-097 October 18, 2018 Interconnect 100 MW to the AEP Transmission System (queued as IFS-2106-002-31) Posted 7/29/2020 Download
GEN-2016-100 June 11, 2018 Interconnect 100 MW to the OKGE Transmission System (queued as IFS-2016-002-12) Posted 01/08/2021 Download
GEN-2016-101 June 11, 2018 Interconnect 195 MW to the OKGE Transmission System (queued as IFS-2016-002-13) Posted 01/08/2021 Download
GEN-2016-102 May 14, 2018 Interconnect 150.9 MW to the OKGE Transmission System (queued as IFS-2016-002-01) Posted 01/03/2020 Download
GEN-2016-106 March 27, 2019 Interconnect 400 MW to the NPPD Transmission System (queued as IFS-2016-002-65) Posted 01/19/2021 Download
GEN-2016-110 May 22, 2018 Interconnect 152 MW to the BEPC Transmission System (queued as IFS-2016-002-16) Posted 01/19/2021 Download
GEN-2016-111 May 22, 2018 Interconnect 302 MW to the WERE Transmission System (queued as IFS-2016-002-18) Posted 01/06/2022 Download
GEN-2016-112 May 24, 2018 Interconnect 220 MW to the WERE Transmission System (queued as IFS-2016-002-07) Posted 01/11/2021 Download
GEN-2016-114 May 21, 2018 Interconnect 310 MW to the WERE Transmission System (queued as IFS-2016-002-09) Posted 01/08/2021 Download
GEN-2016-115 December 14, 2018 Interconnect 300 MW to the TMO Transmission System (queued as IFS-2016-002-24) Posted 09/13/2019 Download
GEN-2016-118 December 14, 2018 Interconnect 288 MW to the WFEC Transmission System (queued as IFS-2016-002-05) Posted 8/24/2020 Download
GEN-2016-119 June 25, 2018 Interconnect 600 MW to the OGE Transmission System (queued as IFS-2016-002-10) Posted 01/12/2023 Download
GEN-2016-121 August 14, 2018 Interconnect 110 MW to the SPS Transmission System (queued as IFS-2016-002-28) Reposted 04/03/2024 Download
GEN-2016-122 May 21, 2018 Interconnect 225 MW to the WERE Transmission System (queued as IFS-2016-002-08) Posted 01/11/2021 Download
GEN-2016-123 August 14, 2018 Interconnect 298 MW to the SPS Transmission System (queued as IFS-2016-002-27) Reposted 04/03/2024 Download
GEN-2016-124 August 14, 2018 Interconnect 150 MW to the SPS Transmission System (queued as IFS-2016-002-28) Reposted 04/03/2024 Download
GEN-2016-125 August 14, 2018 Interconnect 74 MW to the SPS Transmission System (queued as IFS-2016-002-29) Reposted 04/03/2024 Download
GEN-2016-126 May 11, 2018 Interconnect 172.5 MW to the OKGE Transmission System (queued as IFS-2016-002-06) Posted 01/03/2020 Download
GEN-2016-128 May 22, 2018 Interconnect 176 MW to the OGE Transmission System (queued as IFS-2016-002-36) Posted 07/28/2021 Download
GEN-2016-129 May 22, 2018 Interconnect 132 MW to the AEP Transmission System (queued as IFS-2016-002-41) Posted 01/06/2020 Download
GEN-2016-130 May 22, 2018 Interconnect 202 MW to the BEPC Transmission System (queued as IFS-2016-002-21) Posted 08/04/2022 Download
GEN-2016-131 May 22, 2018 Interconnect 2.5 MW to the OKGE Transmission System (queued as IFS-2016-002-37) Posted 02/24/2020 Download
GEN-2016-132 May 24, 2018 Interconnect 6.12 MW to the AEPOK Transmission System (queued as IFS-2016-002-61) Posted 12/02/2019 Download
GEN-2016-133 June 29, 2018 Interconnect 187.5 MW to the AEP Transmission System (queued as IFS-2106-002-43) Posted 07/28/2021 Download
GEN-2016-134 June 29, 2018 Interconnect 187.5 MW to the AEP Transmission System (queued as IFS-2016-002-44) Posted 07/28/2021 Download
GEN-2016-135 June 29, 2018 Interconnect 100 MW to the AEP Transmission System (queued as IFS-2016-002-45) Posted 09/17/2020 Download
GEN-2016-136 June 29, 2018 Interconnect 75 MW to the AEP Transmission System (queued as IFS-2016-002-46) Posted 09/17/2020 Download
GEN-2016-137 June 29, 2018 Interconnect 187.5 MW to the AEP Transmission System (queued as IFS-2016-002-47) Posted 07/28/2021 Download
GEN-2016-138 June 29, 2018 Interconnect 187.5 MW to the AEP Transmission System (queued as IFS-2016-002-48) Posted 07/28/2021 Download
GEN-2016-139 June 29, 2018 Interconnect 100 MW to the AEP Transmission System (queued as IFS-2016-002-49) Posted 07/28/2021 Download
GEN-2016-140 June 29, 2018 Interconnect 75 MW to the AEP Transmission System (queued as IFS-2016-002-50) Posted 09/17/2020 Download
GEN-2016-141 June 29, 2018 Interconnect 350 MW to the AEP Transmission System (queued as IFS-2016-002-51) Posted 07/28/2021 Download
GEN-2016-142 June 29, 2018 Interconnect 350 MW to the AEP Transmission System (queued as IFS-2016-002-52) Posted 07/28/2021 Download
GEN-2016-143 June 29, 2018 Interconnect 175 MW to the AEP Transmission System (queued as IFS-2016-002-53) Posted 09/17/2020 Download
GEN-2016-144 June 29, 2018 Interconnect 175 MW to the AEP Transmission System (queued as IFS-2016-002-54) Posted 09/17/2020 Download
GEN-2016-145 June 29, 2018 Interconnect 175 MW to the AEP Transmission System (queued as IFS-2016-002-55) Posted 07/028/2021 Download
GEN-2016-146 June 29, 2018 Interconnect 175 MW to the AEP Transmission System (queued as IFS-2016-002-56) Posted 07/28/2021 Download
GEN-2016-147 May 22, 2018 Interconnect 40 MW to the Tristate Transmission System (queued as IFS-2016-002-33) Posted 07/28/2021 Download
GEN-2016-149 May 22, 2018 Interconnect 302 MW to the WERE Transmission System (queued as IFS-2016-002-14) Posted 08/25/2020 Download
GEN-2016-150 May 22, 2018 Interconnect 302 MW to the WERE Transmission System (queued as IFS-2016-002-15) Posted 08/25/2020 Download
GEN-2016-151 May 22, 2018 Interconnect 202 MW to the BEPC Transmission System (queued as IFS-2016-002-62) Posted 06/06/2022 Download
GEN-2016-153 July 03, 2018 Interconnect 134 MW to the WERE Transmission System (queued as IFS-2016-002-11) Posted 12/22/2021 Download
GEN-2016-157 May 22, 2018 Interconnect 252 MW to the KCPL Transmission System (queued as IFS-2016-002-20) Posted 03/28/2023 Download
GEN-2016-158 May 22, 2018 Interconnect 252 MW to the KCPL Transmission System (queued as IFS-2016-002-17) Posted 03/28/2023 Download
GEN-2016-160 May 09, 2018 Interconnect 20 MW to the MIDW Transmission System (queued as IFS-2016-002-04) Posted 01/14/2020 Download
GEN-2016-161 May 24, 2018 Interconnect 3 MW to the SPS Transmission System (queued as IFS-2016-002-66) Posted 01/29/2021 Download
GEN-2016-162 May 24, 2018 Interconnect 252 MW to the WERE Transmission System (queued as IFS-2016-002-38) Posted 07/28/2021 Download
GEN-2016-163 May 22, 2018 Interconnect 252 MW to the WERE Transmission System (queued as IFS-2016-002-34) Posted 07/28/2021 Download
GEN-2016-166 May 02, 2018 Interconnect 35 MW to the AEP Transmission System (queued as IFS-2016-002-03) Posted 01/23/2020 Download
GEN-2016-167 May 02, 2018 Interconnect 73.5 MW to the AEP Transmission System (queued as IFS-2016-002-02) Posted 02/24/2020 Download
GEN-2016-174 May 22, 2018 Interconnect 302 MW to the WERE Transmission System (queued as IFS-2016-002-19) Posted 08/27/2020 Download
GEN-2016-176 May 22, 2018 Interconnect 302 MW to the WERE Transmission System (queued as IFS-2016-002-67) Posted 11/10/2021 Download
GEN-2016-177 January 24, 2019 Interconnect 17 MW to the SPS Transmission System (queued as IFS-2016-002-60) Posted 02/21/2020 Download

Please send your requests to GIStudies@spp.org

If you have any questions, please submit a ticket on RMS.