| 2016 Facility Studies | |
| The following Generator Interconnection Studies have been requested. | |
| Study Number | Date Requested | Purpose of Study | Remarks | Report |
|---|---|---|---|---|
| ASGI-2016-010 | February 02, 2018 | Interconnect 90 MW to the TCEC Transmission System | Posted 12/18/2020 | Download |
| GEN-2016-003 | November 03, 2017 | Interconnect 248.4 MW to the OKGE Transmission System (queued as IFS-2016-001-45) | Posted 12/03/2018 | Download |
| GEN-2016-004 | January 07, 2019 | Interconnect 202 MW to the BEPC Transmission System (queued as IFS-2016-001-25) | Posted 02/19/2020 | Download |
| GEN-2016-007 | March 01, 2017 | Interconnect 100.05 MW to the WAPA Transmission System (queued as IFS-2016-001-037) | Posted 07/15/2019 | Download |
| GEN-2016-009 | April 14, 2017 | Interconnect 29 MW to the OKGE Transmission System (queued as IFS-2016-001-02) | Posted 1/23/2018 | Download |
| GEN-2016-013 | February 02, 2017 | Interconnect 10 MW to the EDE Transmission System (queued as IFS-2016-001-03) | Posted 10/18/2019 | Download |
| GEN-2016-014 | February 02, 2017 | Interconnect 10 MW to the EDE Transmission System (queued as IFS-2016-001-04) | Posted 10/18/2019 | Download |
| GEN-2016-015 | February 24, 2017 | Interconnect 100 MW to the SPS Transmission System (queued as IFS-2016-001-30) | Posted 8/12/2019 | Download |
| GEN-2016-016 | February 24, 2017 | Interconnect 78.2 MW to the MIDW Transmission System (queued as IFS-2016-001-07) | Posted 12/13/2019 | Download |
| GEN-2016-017 | April 14, 2017 | Interconnect 250.7 MW to the BEPC Transmission System (queued as IFS-2016-001-08) | Posted 10/15/2019 | Download |
| GEN-2016-020 | May 09, 2017 | Interconnect 150 MW to the WFEC Transmission System (queued as IFS-2016-001-27) | Posted 02/14/2019 | Download |
| GEN-2016-021 | May 12, 2017 | Interconnect 300 MW to the NPPD Transmission System (queued as IFS-2016-001-31) | Posted 04/21/2020 | Download |
| GEN-2016-022 | November 03, 2017 | Interconnect 151.80 MW to the OKGE Transmission System (queued as IFS-2016-001-29) | Posted 02/24/2022 | Download |
| GEN-2016-023 | March 01, 2017 | Interconnect 150.5 MW to the BEPC Transmission System (queued as IFS-2016-001-43) | Posted 01/06/2020 | Download |
| GEN-2016-028 | December 12, 2017 | Interconnect 100 MW to the AEPOK Transmission System (queued as IFS-2016-001-38) | Posted 1/4/2018 | Download |
| GEN-2016-029 | March 01, 2017 | Interconnect 150.5 MW to the BEPC Transmission System (queued as IFS-2016-001-09) | Posted 01/06/2020 | Download |
| GEN-2016-030 | August 18, 2017 | Interconnect 100 MW to the OKGE Transmission System (queued as IFS-2016-001-26) | Posted 8/24/2018 | Download |
| GEN-2016-031 | April 14, 2017 | Interconnect 1.5 MW to the OKGE Transmission System (queued as IFS-2016-001-10) | Posted 02/24/2022 | Download |
| GEN-2016-032 | April 14, 2017 | Interconnect 200 MW to the OKGE Transmission System (queued as IFS-2016-001-11) | Posted 02/24/2022 | Download |
| GEN-2016-036 | September 19, 2018 | Interconnect 44.6 MW to the WAPA Transmission System (queued as IFS-2016-002-42) | Posted 06/06/2022 | Download |
| GEN-2016-037 | March 31, 2016 | Interconnect 300 MW to the AEPW Transmission System (queued as IFS-2017-001-32) | Posted 12/21/2021 | Download |
| GEN-2016-043 | May 19, 2017 | Interconnect 230 MW to the NPPD Transmission System (queued as IFS-2016-001-36) | Posted 05/03/2019 | Download |
| GEN-2016-045 | December 12, 2017 | Interconnect 499.1 MW to the OKGE Transmission System (queued as IFS-2016-001-34) | Posted 04/02/2019 | Download |
| GEN-2016-046 | February 24, 2017 | Interconnect 299 MW to the ITCGP Transmission System (queued as IFS-2016-001-12) | Posted 12/13/2019 | Download |
| GEN-2016-047 | April 14, 2017 | Interconnect 24 MW to the OKGE Transmission System (queued as IFS-2016-001-22) | Posted 6/11/2018 | Download |
| GEN-2016-050 | March 01, 2017 | Interconnect 250.7 MW to the NPPD Transmission System (queued as IFS-2016-001-42) | Posted 11/10/2021 | Download |
| GEN-2016-051 | May 17, 2017 | Interconnect 9.8 MW to the AEP-PSCO Transmission System (queued as IFS-2016-001-13) | Posted 05/03/2019 | Download |
| GEN-2016-052 | March 01, 2017 | Interconnect 3.3 MW to the WAPA Transmission System (queued as IFS-2016-001-23) | Posted 9/9/2019 | Download |
| GEN-2016-053 | March 01, 2017 | Interconnect 3.3 MW to the WAPA Transmission System (queued as IFS-2016-001-46) | Posted 9/9/2019 | Download |
| GEN-2016-056 | March 01, 2017 | Interconnect 200 MW to the SPS Transmission System (queued as IFS-2016-001-41) | Posted 8/12/2019 | Download |
| GEN-2016-057 | December 12, 2017 | Interconnect 499.1 MW to the OKGE Transmission System (queued as IFS-2016-001-35) | Posted 04/02/2019 | Download |
| GEN-2016-061 | November 03, 2017 | Interconnect 250.70 MW to the OKGE Transmission System (queued as IFS-2016-001-15) | Posted 02/24/2022 | Download |
| GEN-2016-062 | February 24, 2017 | Interconnect 250.7 MW to the SPS Transmission System (queued as IFS-2016-001-16) | Posted 8/12/2019 | Download |
| GEN-2016-063 | May 09, 2017 | Interconnect 200 MW to the OKGE Transmission System (queued as IFS-2016-001-17) | Posted 7/30/2018 | Download |
| GEN-2016-067 | May 18, 2017 | Interconnect 73.6 MW to the SUNC Transmission System (queued as IFS-2016-001-27) | Posted 6/26/2018 | Download |
| GEN-2016-068 | March 01, 2017 | Interconnect 250 MW to the OKGE Transmission System (queued as IFS-2016-001-40) | Posted 02/24/2022 | Download |
| GEN-2016-069 | February 28, 2017 | Interconnect 31.35 MW to the SPS Transmission System (queued as IFS-2016-001-32) | Posted 8/12/2019 | Download |
| GEN-2016-070 | May 17, 2017 | Interconnect 5.3 MW to the SWPS Transmission System (queued as IFS-2016-001-18) | Posted 4/25/2018 | Download |
| GEN-2016-071 | November 03, 2017 | Interconnect 200.10 MW to the OKGE Transmission System (queued as IFS-2016-001-19) | Posted 02/24/2022 | Download |
| GEN-2016-073 | March 01, 2017 | Interconnect 220 MW to the WERE Transmission System (queued as IFS-2016-001-48) | Posted 02/24/2022 | Download |
| GEN-2016-074 | November 19, 2018 | Interconnect 200 MW to the NPPD Transmission System (queued as IFS-2016-002-57) | Posted 10/01/2021 | Download |
| GEN-2016-075 | March 02, 2017 | Interconnect 50 MW to the WAPA Transmission System (queued as IFS-2016-001-21) | Posted 08/26/2019 | Download |
| GEN-2016-087 | September 19, 2018 | Interconnect 98.9 MW to the WAPA Transmission System (queued as IFS-2016-002-59) | Posted 06/06/2022 | Download |
| GEN-2016-088 | May 24, 2018 | Interconnect 151.2 MW to the TMO Transmission System (queued as IFS-2016-002-40) | Posted 12/09/2019 | Download |
| GEN-2016-091 | October 17, 2019 | Interconnect 303.6 MW to the AEP Transmission System (queued as IFS-2016-002-22) | Posted 09/15/2021 | Download |
| GEN-2016-092 | September 05, 2018 | Interconnect 175 MW to the BEPC Transmission System (queued as IFS-2016-002-68) | Posted 02/19/2021 | Download |
| GEN-2016-094 | August 10, 2018 | Interconnect 200 MW to the WAPA Transmission System (queued as IFS-2016-002-25) | Posted 06/06/2022 | Download |
| GEN-2016-095 | October 18, 2018 | Interconnect 200 MW to the AEP Transmission System (queued as IFS-2016-002-32) | Posted 01/29/2021 | Download |
| GEN-2016-097 | October 18, 2018 | Interconnect 100 MW to the AEP Transmission System (queued as IFS-2106-002-31) | Posted 7/29/2020 | Download |
| GEN-2016-100 | June 11, 2018 | Interconnect 100 MW to the OKGE Transmission System (queued as IFS-2016-002-12) | Posted 01/08/2021 | Download |
| GEN-2016-101 | June 11, 2018 | Interconnect 195 MW to the OKGE Transmission System (queued as IFS-2016-002-13) | Posted 01/08/2021 | Download |
| GEN-2016-102 | May 14, 2018 | Interconnect 150.9 MW to the OKGE Transmission System (queued as IFS-2016-002-01) | Posted 01/03/2020 | Download |
| GEN-2016-106 | March 27, 2019 | Interconnect 400 MW to the NPPD Transmission System (queued as IFS-2016-002-65) | Posted 01/19/2021 | Download |
| GEN-2016-110 | May 22, 2018 | Interconnect 152 MW to the BEPC Transmission System (queued as IFS-2016-002-16) | Posted 01/19/2021 | Download |
| GEN-2016-111 | May 22, 2018 | Interconnect 302 MW to the WERE Transmission System (queued as IFS-2016-002-18) | Posted 01/06/2022 | Download |
| GEN-2016-112 | May 24, 2018 | Interconnect 220 MW to the WERE Transmission System (queued as IFS-2016-002-07) | Posted 01/11/2021 | Download |
| GEN-2016-114 | May 21, 2018 | Interconnect 310 MW to the WERE Transmission System (queued as IFS-2016-002-09) | Posted 01/08/2021 | Download |
| GEN-2016-115 | December 14, 2018 | Interconnect 300 MW to the TMO Transmission System (queued as IFS-2016-002-24) | Posted 09/13/2019 | Download |
| GEN-2016-118 | December 14, 2018 | Interconnect 288 MW to the WFEC Transmission System (queued as IFS-2016-002-05) | Posted 8/24/2020 | Download |
| GEN-2016-119 | June 25, 2018 | Interconnect 600 MW to the OGE Transmission System (queued as IFS-2016-002-10) | Posted 01/12/2023 | Download |
| GEN-2016-121 | August 14, 2018 | Interconnect 110 MW to the SPS Transmission System (queued as IFS-2016-002-28) | Reposted 04/03/2024 | Download |
| GEN-2016-122 | May 21, 2018 | Interconnect 225 MW to the WERE Transmission System (queued as IFS-2016-002-08) | Posted 01/11/2021 | Download |
| GEN-2016-123 | August 14, 2018 | Interconnect 298 MW to the SPS Transmission System (queued as IFS-2016-002-27) | Reposted 04/03/2024 | Download |
| GEN-2016-124 | August 14, 2018 | Interconnect 150 MW to the SPS Transmission System (queued as IFS-2016-002-28) | Reposted 04/03/2024 | Download |
| GEN-2016-125 | August 14, 2018 | Interconnect 74 MW to the SPS Transmission System (queued as IFS-2016-002-29) | Reposted 04/03/2024 | Download |
| GEN-2016-126 | May 11, 2018 | Interconnect 172.5 MW to the OKGE Transmission System (queued as IFS-2016-002-06) | Posted 01/03/2020 | Download |
| GEN-2016-128 | May 22, 2018 | Interconnect 176 MW to the OGE Transmission System (queued as IFS-2016-002-36) | Posted 07/28/2021 | Download |
| GEN-2016-129 | May 22, 2018 | Interconnect 132 MW to the AEP Transmission System (queued as IFS-2016-002-41) | Posted 01/06/2020 | Download |
| GEN-2016-130 | May 22, 2018 | Interconnect 202 MW to the BEPC Transmission System (queued as IFS-2016-002-21) | Posted 08/04/2022 | Download |
| GEN-2016-131 | May 22, 2018 | Interconnect 2.5 MW to the OKGE Transmission System (queued as IFS-2016-002-37) | Posted 02/24/2020 | Download |
| GEN-2016-132 | May 24, 2018 | Interconnect 6.12 MW to the AEPOK Transmission System (queued as IFS-2016-002-61) | Posted 12/02/2019 | Download |
| GEN-2016-133 | June 29, 2018 | Interconnect 187.5 MW to the AEP Transmission System (queued as IFS-2106-002-43) | Posted 07/28/2021 | Download |
| GEN-2016-134 | June 29, 2018 | Interconnect 187.5 MW to the AEP Transmission System (queued as IFS-2016-002-44) | Posted 07/28/2021 | Download |
| GEN-2016-135 | June 29, 2018 | Interconnect 100 MW to the AEP Transmission System (queued as IFS-2016-002-45) | Posted 09/17/2020 | Download |
| GEN-2016-136 | June 29, 2018 | Interconnect 75 MW to the AEP Transmission System (queued as IFS-2016-002-46) | Posted 09/17/2020 | Download |
| GEN-2016-137 | June 29, 2018 | Interconnect 187.5 MW to the AEP Transmission System (queued as IFS-2016-002-47) | Posted 07/28/2021 | Download |
| GEN-2016-138 | June 29, 2018 | Interconnect 187.5 MW to the AEP Transmission System (queued as IFS-2016-002-48) | Posted 07/28/2021 | Download |
| GEN-2016-139 | June 29, 2018 | Interconnect 100 MW to the AEP Transmission System (queued as IFS-2016-002-49) | Posted 07/28/2021 | Download |
| GEN-2016-140 | June 29, 2018 | Interconnect 75 MW to the AEP Transmission System (queued as IFS-2016-002-50) | Posted 09/17/2020 | Download |
| GEN-2016-141 | June 29, 2018 | Interconnect 350 MW to the AEP Transmission System (queued as IFS-2016-002-51) | Posted 07/28/2021 | Download |
| GEN-2016-142 | June 29, 2018 | Interconnect 350 MW to the AEP Transmission System (queued as IFS-2016-002-52) | Posted 07/28/2021 | Download |
| GEN-2016-143 | June 29, 2018 | Interconnect 175 MW to the AEP Transmission System (queued as IFS-2016-002-53) | Posted 09/17/2020 | Download |
| GEN-2016-144 | June 29, 2018 | Interconnect 175 MW to the AEP Transmission System (queued as IFS-2016-002-54) | Posted 09/17/2020 | Download |
| GEN-2016-145 | June 29, 2018 | Interconnect 175 MW to the AEP Transmission System (queued as IFS-2016-002-55) | Posted 07/028/2021 | Download |
| GEN-2016-146 | June 29, 2018 | Interconnect 175 MW to the AEP Transmission System (queued as IFS-2016-002-56) | Posted 07/28/2021 | Download |
| GEN-2016-147 | May 22, 2018 | Interconnect 40 MW to the Tristate Transmission System (queued as IFS-2016-002-33) | Posted 07/28/2021 | Download |
| GEN-2016-149 | May 22, 2018 | Interconnect 302 MW to the WERE Transmission System (queued as IFS-2016-002-14) | Posted 08/25/2020 | Download |
| GEN-2016-150 | May 22, 2018 | Interconnect 302 MW to the WERE Transmission System (queued as IFS-2016-002-15) | Posted 08/25/2020 | Download |
| GEN-2016-151 | May 22, 2018 | Interconnect 202 MW to the BEPC Transmission System (queued as IFS-2016-002-62) | Posted 06/06/2022 | Download |
| GEN-2016-153 | July 03, 2018 | Interconnect 134 MW to the WERE Transmission System (queued as IFS-2016-002-11) | Posted 12/22/2021 | Download |
| GEN-2016-157 | May 22, 2018 | Interconnect 252 MW to the KCPL Transmission System (queued as IFS-2016-002-20) | Posted 03/28/2023 | Download |
| GEN-2016-158 | May 22, 2018 | Interconnect 252 MW to the KCPL Transmission System (queued as IFS-2016-002-17) | Posted 03/28/2023 | Download |
| GEN-2016-160 | May 09, 2018 | Interconnect 20 MW to the MIDW Transmission System (queued as IFS-2016-002-04) | Posted 01/14/2020 | Download |
| GEN-2016-161 | May 24, 2018 | Interconnect 3 MW to the SPS Transmission System (queued as IFS-2016-002-66) | Posted 01/29/2021 | Download |
| GEN-2016-162 | May 24, 2018 | Interconnect 252 MW to the WERE Transmission System (queued as IFS-2016-002-38) | Posted 07/28/2021 | Download |
| GEN-2016-163 | May 22, 2018 | Interconnect 252 MW to the WERE Transmission System (queued as IFS-2016-002-34) | Posted 07/28/2021 | Download |
| GEN-2016-166 | May 02, 2018 | Interconnect 35 MW to the AEP Transmission System (queued as IFS-2016-002-03) | Posted 01/23/2020 | Download |
| GEN-2016-167 | May 02, 2018 | Interconnect 73.5 MW to the AEP Transmission System (queued as IFS-2016-002-02) | Posted 02/24/2020 | Download |
| GEN-2016-174 | May 22, 2018 | Interconnect 302 MW to the WERE Transmission System (queued as IFS-2016-002-19) | Posted 08/27/2020 | Download |
| GEN-2016-176 | May 22, 2018 | Interconnect 302 MW to the WERE Transmission System (queued as IFS-2016-002-67) | Posted 11/10/2021 | Download |
| GEN-2016-177 | January 24, 2019 | Interconnect 17 MW to the SPS Transmission System (queued as IFS-2016-002-60) | Posted 02/21/2020 | Download |
|
Please send your requests to GIStudies@spp.org If you have any questions, please submit a ticket on RMS. |
||||