Study Number |
Date Requested |
Purpose of Study |
Remarks |
Report |
ASGI-2016-010 |
February 02, 2018 |
Interconnect 90 MW to the TCEC Transmission System |
Posted 12/18/2020 |
Download |
GEN-2016-003 |
November 03, 2017 |
Interconnect 248.4 MW to the OKGE Transmission System (queued as IFS-2016-001-45) |
Posted 12/03/2018 |
Download |
GEN-2016-004 |
January 07, 2019 |
Interconnect 202 MW to the BEPC Transmission System (queued as IFS-2016-001-25) |
Posted 02/19/2020 |
Download |
GEN-2016-007 |
March 01, 2017 |
Interconnect 100.05 MW to the WAPA Transmission System (queued as IFS-2016-001-037) |
Posted 07/15/2019 |
Download |
GEN-2016-009 |
April 14, 2017 |
Interconnect 29 MW to the OKGE Transmission System (queued as IFS-2016-001-02) |
Posted 1/23/2018 |
Download |
GEN-2016-013 |
February 02, 2017 |
Interconnect 10 MW to the EDE Transmission System (queued as IFS-2016-001-03) |
Posted 10/18/2019 |
Download |
GEN-2016-014 |
February 02, 2017 |
Interconnect 10 MW to the EDE Transmission System (queued as IFS-2016-001-04) |
Posted 10/18/2019 |
Download |
GEN-2016-015 |
February 24, 2017 |
Interconnect 100 MW to the SPS Transmission System (queued as IFS-2016-001-30) |
Posted 8/12/2019 |
Download |
GEN-2016-016 |
February 24, 2017 |
Interconnect 78.2 MW to the MIDW Transmission System (queued as IFS-2016-001-07) |
Posted 12/13/2019 |
Download |
GEN-2016-017 |
April 14, 2017 |
Interconnect 250.7 MW to the BEPC Transmission System (queued as IFS-2016-001-08) |
Posted 10/15/2019 |
Download |
GEN-2016-020 |
May 09, 2017 |
Interconnect 150 MW to the WFEC Transmission System (queued as IFS-2016-001-27) |
Posted 02/14/2019 |
Download |
GEN-2016-021 |
May 12, 2017 |
Interconnect 300 MW to the NPPD Transmission System (queued as IFS-2016-001-31) |
Posted 04/21/2020 |
Download |
GEN-2016-022 |
November 03, 2017 |
Interconnect 151.80 MW to the OKGE Transmission System (queued as IFS-2016-001-29) |
Posted 02/24/2022 |
Download |
GEN-2016-023 |
March 01, 2017 |
Interconnect 150.5 MW to the BEPC Transmission System (queued as IFS-2016-001-43) |
Posted 01/06/2020 |
Download |
GEN-2016-028 |
December 12, 2017 |
Interconnect 100 MW to the AEPOK Transmission System (queued as IFS-2016-001-38) |
Posted 1/4/2018 |
Download |
GEN-2016-029 |
March 01, 2017 |
Interconnect 150.5 MW to the BEPC Transmission System (queued as IFS-2016-001-09) |
Posted 01/06/2020 |
Download |
GEN-2016-030 |
August 18, 2017 |
Interconnect 100 MW to the OKGE Transmission System (queued as IFS-2016-001-26) |
Posted 8/24/2018 |
Download |
GEN-2016-031 |
April 14, 2017 |
Interconnect 1.5 MW to the OKGE Transmission System (queued as IFS-2016-001-10) |
Posted 02/24/2022 |
Download |
GEN-2016-032 |
April 14, 2017 |
Interconnect 200 MW to the OKGE Transmission System (queued as IFS-2016-001-11) |
Posted 02/24/2022 |
Download |
GEN-2016-036 |
September 19, 2018 |
Interconnect 44.6 MW to the WAPA Transmission System (queued as IFS-2016-002-42) |
Posted 06/06/2022 |
Download |
GEN-2016-037 |
March 31, 2016 |
Interconnect 300 MW to the AEPW Transmission System (queued as IFS-2017-001-32) |
Posted 12/21/2021 |
Download |
GEN-2016-043 |
May 19, 2017 |
Interconnect 230 MW to the NPPD Transmission System (queued as IFS-2016-001-36) |
Posted 05/03/2019 |
Download |
GEN-2016-045 |
December 12, 2017 |
Interconnect 499.1 MW to the OKGE Transmission System (queued as IFS-2016-001-34) |
Posted 04/02/2019 |
Download |
GEN-2016-046 |
February 24, 2017 |
Interconnect 299 MW to the ITCGP Transmission System (queued as IFS-2016-001-12) |
Posted 12/13/2019 |
Download |
GEN-2016-047 |
April 14, 2017 |
Interconnect 24 MW to the OKGE Transmission System (queued as IFS-2016-001-22) |
Posted 6/11/2018 |
Download |
GEN-2016-050 |
March 01, 2017 |
Interconnect 250.7 MW to the NPPD Transmission System (queued as IFS-2016-001-42) |
Posted 11/10/2021 |
Download |
GEN-2016-051 |
May 17, 2017 |
Interconnect 9.8 MW to the AEP-PSCO Transmission System (queued as IFS-2016-001-13) |
Posted 05/03/2019 |
Download |
GEN-2016-052 |
March 01, 2017 |
Interconnect 3.3 MW to the WAPA Transmission System (queued as IFS-2016-001-23) |
Posted 9/9/2019 |
Download |
GEN-2016-053 |
March 01, 2017 |
Interconnect 3.3 MW to the WAPA Transmission System (queued as IFS-2016-001-46) |
Posted 9/9/2019 |
Download |
GEN-2016-056 |
March 01, 2017 |
Interconnect 200 MW to the SPS Transmission System (queued as IFS-2016-001-41) |
Posted 8/12/2019 |
Download |
GEN-2016-057 |
December 12, 2017 |
Interconnect 499.1 MW to the OKGE Transmission System (queued as IFS-2016-001-35) |
Posted 04/02/2019 |
Download |
GEN-2016-061 |
November 03, 2017 |
Interconnect 250.70 MW to the OKGE Transmission System (queued as IFS-2016-001-15) |
Posted 02/24/2022 |
Download |
GEN-2016-062 |
February 24, 2017 |
Interconnect 250.7 MW to the SPS Transmission System (queued as IFS-2016-001-16) |
Posted 8/12/2019 |
Download |
GEN-2016-063 |
May 09, 2017 |
Interconnect 200 MW to the OKGE Transmission System (queued as IFS-2016-001-17) |
Posted 7/30/2018 |
Download |
GEN-2016-067 |
May 18, 2017 |
Interconnect 73.6 MW to the SUNC Transmission System (queued as IFS-2016-001-27) |
Posted 6/26/2018 |
Download |
GEN-2016-068 |
March 01, 2017 |
Interconnect 250 MW to the OKGE Transmission System (queued as IFS-2016-001-40) |
Posted 02/24/2022 |
Download |
GEN-2016-069 |
February 28, 2017 |
Interconnect 31.35 MW to the SPS Transmission System (queued as IFS-2016-001-32) |
Posted 8/12/2019 |
Download |
GEN-2016-070 |
May 17, 2017 |
Interconnect 5.3 MW to the SWPS Transmission System (queued as IFS-2016-001-18) |
Posted 4/25/2018 |
Download |
GEN-2016-071 |
November 03, 2017 |
Interconnect 200.10 MW to the OKGE Transmission System (queued as IFS-2016-001-19) |
Posted 02/24/2022 |
Download |
GEN-2016-073 |
March 01, 2017 |
Interconnect 220 MW to the WERE Transmission System (queued as IFS-2016-001-48) |
Posted 02/24/2022 |
Download |
GEN-2016-074 |
November 19, 2018 |
Interconnect 200 MW to the NPPD Transmission System (queued as IFS-2016-002-57) |
Posted 10/01/2021 |
Download |
GEN-2016-075 |
March 02, 2017 |
Interconnect 50 MW to the WAPA Transmission System (queued as IFS-2016-001-21) |
Posted 08/26/2019 |
Download |
GEN-2016-087 |
September 19, 2018 |
Interconnect 98.9 MW to the WAPA Transmission System (queued as IFS-2016-002-59) |
Posted 06/06/2022 |
Download |
GEN-2016-088 |
May 24, 2018 |
Interconnect 151.2 MW to the TMO Transmission System (queued as IFS-2016-002-40) |
Posted 12/09/2019 |
Download |
GEN-2016-091 |
October 17, 2019 |
Interconnect 303.6 MW to the AEP Transmission System (queued as IFS-2016-002-22) |
Posted 09/15/2021 |
Download |
GEN-2016-092 |
September 05, 2018 |
Interconnect 175 MW to the BEPC Transmission System (queued as IFS-2016-002-68) |
Posted 02/19/2021 |
Download |
GEN-2016-094 |
August 10, 2018 |
Interconnect 200 MW to the WAPA Transmission System (queued as IFS-2016-002-25) |
Posted 06/06/2022 |
Download |
GEN-2016-095 |
October 18, 2018 |
Interconnect 200 MW to the AEP Transmission System (queued as IFS-2016-002-32) |
Posted 01/29/2021 |
Download |
GEN-2016-097 |
October 18, 2018 |
Interconnect 100 MW to the AEP Transmission System (queued as IFS-2106-002-31) |
Posted 7/29/2020 |
Download |
GEN-2016-100 |
June 11, 2018 |
Interconnect 100 MW to the OKGE Transmission System (queued as IFS-2016-002-12) |
Posted 01/08/2021 |
Download |
GEN-2016-101 |
June 11, 2018 |
Interconnect 195 MW to the OKGE Transmission System (queued as IFS-2016-002-13) |
Posted 01/08/2021 |
Download |
GEN-2016-102 |
May 14, 2018 |
Interconnect 150.9 MW to the OKGE Transmission System (queued as IFS-2016-002-01) |
Posted 01/03/2020 |
Download |
GEN-2016-106 |
March 27, 2019 |
Interconnect 400 MW to the NPPD Transmission System (queued as IFS-2016-002-65) |
Posted 01/19/2021 |
Download |
GEN-2016-110 |
May 22, 2018 |
Interconnect 152 MW to the BEPC Transmission System (queued as IFS-2016-002-16) |
Posted 01/19/2021 |
Download |
GEN-2016-111 |
May 22, 2018 |
Interconnect 302 MW to the WERE Transmission System (queued as IFS-2016-002-18) |
Posted 01/06/2022 |
Download |
GEN-2016-112 |
May 24, 2018 |
Interconnect 220 MW to the WERE Transmission System (queued as IFS-2016-002-07) |
Posted 01/11/2021 |
Download |
GEN-2016-114 |
May 21, 2018 |
Interconnect 310 MW to the WERE Transmission System (queued as IFS-2016-002-09) |
Posted 01/08/2021 |
Download |
GEN-2016-115 |
December 14, 2018 |
Interconnect 300 MW to the TMO Transmission System (queued as IFS-2016-002-24) |
Posted 09/13/2019 |
Download |
GEN-2016-118 |
December 14, 2018 |
Interconnect 288 MW to the WFEC Transmission System (queued as IFS-2016-002-05) |
Posted 8/24/2020 |
Download |
GEN-2016-119 |
June 25, 2018 |
Interconnect 600 MW to the OGE Transmission System (queued as IFS-2016-002-10) |
Posted 01/12/2023 |
Download |
GEN-2016-121 |
August 14, 2018 |
Interconnect 110 MW to the SPS Transmission System (queued as IFS-2016-002-28) |
Reposted 04/03/2024 |
Download |
GEN-2016-122 |
May 21, 2018 |
Interconnect 225 MW to the WERE Transmission System (queued as IFS-2016-002-08) |
Posted 01/11/2021 |
Download |
GEN-2016-123 |
August 14, 2018 |
Interconnect 298 MW to the SPS Transmission System (queued as IFS-2016-002-27) |
Reposted 04/03/2024 |
Download |
GEN-2016-124 |
August 14, 2018 |
Interconnect 150 MW to the SPS Transmission System (queued as IFS-2016-002-28) |
Reposted 04/03/2024 |
Download |
GEN-2016-125 |
August 14, 2018 |
Interconnect 74 MW to the SPS Transmission System (queued as IFS-2016-002-29) |
Reposted 04/03/2024 |
Download |
GEN-2016-126 |
May 11, 2018 |
Interconnect 172.5 MW to the OKGE Transmission System (queued as IFS-2016-002-06) |
Posted 01/03/2020 |
Download |
GEN-2016-128 |
May 22, 2018 |
Interconnect 176 MW to the OGE Transmission System (queued as IFS-2016-002-36) |
Posted 07/28/2021 |
Download |
GEN-2016-129 |
May 22, 2018 |
Interconnect 132 MW to the AEP Transmission System (queued as IFS-2016-002-41) |
Posted 01/06/2020 |
Download |
GEN-2016-130 |
May 22, 2018 |
Interconnect 202 MW to the BEPC Transmission System (queued as IFS-2016-002-21) |
Posted 08/04/2022 |
Download |
GEN-2016-131 |
May 22, 2018 |
Interconnect 2.5 MW to the OKGE Transmission System (queued as IFS-2016-002-37) |
Posted 02/24/2020 |
Download |
GEN-2016-132 |
May 24, 2018 |
Interconnect 6.12 MW to the AEPOK Transmission System (queued as IFS-2016-002-61) |
Posted 12/02/2019 |
Download |
GEN-2016-133 |
June 29, 2018 |
Interconnect 187.5 MW to the AEP Transmission System (queued as IFS-2106-002-43) |
Posted 07/28/2021 |
Download |
GEN-2016-134 |
June 29, 2018 |
Interconnect 187.5 MW to the AEP Transmission System (queued as IFS-2016-002-44) |
Posted 07/28/2021 |
Download |
GEN-2016-135 |
June 29, 2018 |
Interconnect 100 MW to the AEP Transmission System (queued as IFS-2016-002-45) |
Posted 09/17/2020 |
Download |
GEN-2016-136 |
June 29, 2018 |
Interconnect 75 MW to the AEP Transmission System (queued as IFS-2016-002-46) |
Posted 09/17/2020 |
Download |
GEN-2016-137 |
June 29, 2018 |
Interconnect 187.5 MW to the AEP Transmission System (queued as IFS-2016-002-47) |
Posted 07/28/2021 |
Download |
GEN-2016-138 |
June 29, 2018 |
Interconnect 187.5 MW to the AEP Transmission System (queued as IFS-2016-002-48) |
Posted 07/28/2021 |
Download |
GEN-2016-139 |
June 29, 2018 |
Interconnect 100 MW to the AEP Transmission System (queued as IFS-2016-002-49) |
Posted 07/28/2021 |
Download |
GEN-2016-140 |
June 29, 2018 |
Interconnect 75 MW to the AEP Transmission System (queued as IFS-2016-002-50) |
Posted 09/17/2020 |
Download |
GEN-2016-141 |
June 29, 2018 |
Interconnect 350 MW to the AEP Transmission System (queued as IFS-2016-002-51) |
Posted 07/28/2021 |
Download |
GEN-2016-142 |
June 29, 2018 |
Interconnect 350 MW to the AEP Transmission System (queued as IFS-2016-002-52) |
Posted 07/28/2021 |
Download |
GEN-2016-143 |
June 29, 2018 |
Interconnect 175 MW to the AEP Transmission System (queued as IFS-2016-002-53) |
Posted 09/17/2020 |
Download |
GEN-2016-144 |
June 29, 2018 |
Interconnect 175 MW to the AEP Transmission System (queued as IFS-2016-002-54) |
Posted 09/17/2020 |
Download |
GEN-2016-145 |
June 29, 2018 |
Interconnect 175 MW to the AEP Transmission System (queued as IFS-2016-002-55) |
Posted 07/028/2021 |
Download |
GEN-2016-146 |
June 29, 2018 |
Interconnect 175 MW to the AEP Transmission System (queued as IFS-2016-002-56) |
Posted 07/28/2021 |
Download |
GEN-2016-147 |
May 22, 2018 |
Interconnect 40 MW to the Tristate Transmission System (queued as IFS-2016-002-33) |
Posted 07/28/2021 |
Download |
GEN-2016-149 |
May 22, 2018 |
Interconnect 302 MW to the WERE Transmission System (queued as IFS-2016-002-14) |
Posted 08/25/2020 |
Download |
GEN-2016-150 |
May 22, 2018 |
Interconnect 302 MW to the WERE Transmission System (queued as IFS-2016-002-15) |
Posted 08/25/2020 |
Download |
GEN-2016-151 |
May 22, 2018 |
Interconnect 202 MW to the BEPC Transmission System (queued as IFS-2016-002-62) |
Posted 06/06/2022 |
Download |
GEN-2016-153 |
July 03, 2018 |
Interconnect 134 MW to the WERE Transmission System (queued as IFS-2016-002-11) |
Posted 12/22/2021 |
Download |
GEN-2016-157 |
May 22, 2018 |
Interconnect 252 MW to the KCPL Transmission System (queued as IFS-2016-002-20) |
Posted 03/28/2023 |
Download |
GEN-2016-158 |
May 22, 2018 |
Interconnect 252 MW to the KCPL Transmission System (queued as IFS-2016-002-17) |
Posted 03/28/2023 |
Download |
GEN-2016-160 |
May 09, 2018 |
Interconnect 20 MW to the MIDW Transmission System (queued as IFS-2016-002-04) |
Posted 01/14/2020 |
Download |
GEN-2016-161 |
May 24, 2018 |
Interconnect 3 MW to the SPS Transmission System (queued as IFS-2016-002-66) |
Posted 01/29/2021 |
Download |
GEN-2016-162 |
May 24, 2018 |
Interconnect 252 MW to the WERE Transmission System (queued as IFS-2016-002-38) |
Posted 07/28/2021 |
Download |
GEN-2016-163 |
May 22, 2018 |
Interconnect 252 MW to the WERE Transmission System (queued as IFS-2016-002-34) |
Posted 07/28/2021 |
Download |
GEN-2016-166 |
May 02, 2018 |
Interconnect 35 MW to the AEP Transmission System (queued as IFS-2016-002-03) |
Posted 01/23/2020 |
Download |
GEN-2016-167 |
May 02, 2018 |
Interconnect 73.5 MW to the AEP Transmission System (queued as IFS-2016-002-02) |
Posted 02/24/2020 |
Download |
GEN-2016-174 |
May 22, 2018 |
Interconnect 302 MW to the WERE Transmission System (queued as IFS-2016-002-19) |
Posted 08/27/2020 |
Download |
GEN-2016-176 |
May 22, 2018 |
Interconnect 302 MW to the WERE Transmission System (queued as IFS-2016-002-67) |
Posted 11/10/2021 |
Download |
GEN-2016-177 |
January 24, 2019 |
Interconnect 17 MW to the SPS Transmission System (queued as IFS-2016-002-60) |
Posted 02/21/2020 |
Download |
Please send your requests to GIStudies@spp.org