| 2016 Impact Studies | |
| The following Generator Interconnection Studies have been requested. | |
| Study Number | Date Requested | Purpose of Study | Remarks | Report |
|---|---|---|---|---|
| DISIS-2016-001 | March 31, 2016 | Definitive Interconnection System Impact Study DISIS-2016-001 | Posted 2/28/2017 | Download |
| DISIS-2016-001-1 | March 31, 2016 | DISIS-2016-001 Restudy #1 (Revised) | Posted 12/22/2017 | Download |
| DISIS-2016-001-2 | March 31, 2016 | DISIS-2016-001 Restudy #2 | Posted 11/13/2018 Group 3, 6, & 8 Restudy | Download |
| DISIS-2016-001-3 | March 31, 2016 | DISIS-2016-001 Restudy #3 | Re-posted 4/12/2019 Groups 3, 6 & 7 Restudy | Download |
| DISIS-2016-001-4 | March 31, 2016 | DISIS-2016-001 Restudy #4 | Re-posted 4/24/2019 Groups 8 & 9 Restudy | Download |
| DISIS-2016-001-5 | March 31, 2016 | DISIS-2016-001 Restudy #5 (Power Flow) | Updated 2/22/2022 Groups 3,6,7, and 8 | Download |
| DISIS-2016-001-5 | March 31, 2016 | DISIS-2016-001 Restudy #5 (Stability) | Posted 2/19/2020 Groups 6 & 8 | Download |
| DISIS-2016-002 | November 30, 2016 | Definitive Interconnection System Impact Study DISIS-2016-002 | Re-posted 8/20/2018 with Group 9,15,16 Results | Download |
| DISIS-2016-002 Appendix G-T | November 30, 2016 | DISIS-2016-002 Appendix G-T in Excel Format | File Re-posted 8/20/2018 | Download |
| DISIS-2016-002 Group 6 | October 25, 2022 | DISIS-2016-02 Group 6 Border 345kV Capacitor Restudy | Posted 3/3/2023 | Download |
| DISIS-2016-002-1 | November 30, 2016 | DISIS-2016-002 Restudy #1 | Posted 4/26/2019 with Group 6 Results | Download |
| DISIS-2016-002-2 | November 30, 2016 | DISIS-2016-002 Restudy #2 (Stability) | Posted 6/30/20 Group 6, 7, 8, 9, 15, 16 & 17 | Download |
| DISIS-2016-002-2 | November 30, 2016 | DISIS-2016-002 Restudy #2 (Power Flow) | Revised 4/23/2021 Groups 4, 9,15 & 16 | Download |
| DISIS-2016-002-2 | November 30, 2016 | DISIS-2016-002-2 Sensitivity Restudy #2 (Stability) | Posted 4/23/2021 Group 9 | Download |
| DISIS-2016-002-3 | November 30, 2016 | DISIS-2016-002 Restudy #3 (Power Flow) Draft Results | Posted 06/18/21 Group 8 Results | Download |
| DISIS-2016-002-3 | November 30, 2016 | DISIS-2016-002 Restudy #3 (Power Flow) Final Results | Posted 6/01/22 Group 8 Results | Download |
| DISIS-2016-002-4 | November 30, 2016 | DISIS-2016-002-4 Restudy Final Results | Posted 10/18/2022 Group 8 Results | Download |
| GEN-2016-003 | June 29, 2020 | Modification Request Impact Study | Posted 3/11/2021 | Download |
| GEN-2016-003 | December 07, 2021 | Modification Request Impact Study | Posted 05/31/2022 | Download |
| GEN-2016-004 | May 08, 2017 | Impact Restudy for Generator Modification | Posted 3/21/2018 | Download |
| GEN-2016-013 and GEN-2016-014 | January 19, 2018 | Modification Request Impact Study for GEN-2016-013 and GEN-2016-014 | Posted 5/8/2018 | Download |
| GEN-2016-017 | December 13, 2019 | Modification Request Impact Study | Posted 2/28/2020 | Download |
| GEN-2016-020 | June 07, 2019 | Modification Request Impact Study | Posted 9/5/2019 | Download |
| GEN-2016-020 | July 10, 2020 | Limited Operation Impact Study for Generation Interconnection Request | Posted 9/16/2020 | Download |
| GEN-2016-021 | December 01, 2020 | Modification Request Impact Study | Posted 4/20/2021 | Download |
| GEN-2016-022 | April 19, 2017 | Impact Restudy for Generator Modification | Posted 3/21/2018 | Download |
| GEN-2016-022 DISIS ILTCR | June 30, 2020 | DISIS-2016-001 ILTCR Study Report | Posted 05/13/2021 | Download |
| GEN-2016-028 | March 15, 2018 | Impact Restudy for Generator Modification | Posted 5/8/2018 | Download |
| GEN-2016-030 | July 22, 2025 | Modification Impact Study | Posted 10/28/2025 | Download |
| GEN-2016-032 | August 12, 2022 | Modification Request Impact Study | Posted 10/31/2022 | Download |
| GEN-2016-032 | May 17, 2019 | Modification Request Impact Study | Posted 11/11/2019 | Download |
| GEN-2016-036 | December 20, 2017 | Interim Availability Impact Study for Generation Interconnection Request | Posted 3/7/2018 | Download |
| GEN-2016-037 | November 08, 2021 | Modification Request Impact Study | Posted 05/11/2022 | Download |
| GEN-2016-037 | April 18, 2022 | Limited Operation Impact Study | Re-posted 2/17/2023 | Download |
| GEN-2016-037 | February 09, 2024 | Limited Impact Study | Reposted 8/21/2024 | Download |
| GEN-2016-037 | February 09, 2024 | Limited Impact Study | Posted 10/1/2024 | Download |
| GEN-2016-037 | February 09, 2024 | Limited Impact Study | Posted 11/5/2024 | Download |
| GEN-2016-043 | March 06, 2017 | Impact Restudy for Generator Modification | Posted 3/21/2018 | Download |
| GEN-2016-043 | November 30, 2018 | Limited Operation Impact Study for Generation Interconnection Request | Re-Posted 4/8/2020 with Stability Analysis | Download |
| GEN-2016-043 | May 16, 2019 | Modification Request Impact Study | Posted 10/25/2019 | Download |
| GEN-2016-045 and GEN-2016-057 | April 10, 2019 | Impact Restudy for Generator Modification (Turbine Change) | Posted 1/31/2020 | Download |
| GEN-2016-045 and GEN-2016-057 | December 21, 2020 | Modification Request Impact Study | Posted 5/10/2021 | Download |
| GEN-2016-046 | October 20, 2020 | Modification Request Impact Study | Posted 3/23/2021 | Download |
| GEN-2016-050 | May 12, 2020 | Limited Operation Impact Study for Generation Interconnection Request | Posted 5/3/2021 | Download |
| GEN-2016-050 | July 02, 2021 | Modification Request Impact Study | Posted 10/28/2021 | Download |
| GEN-2016-061 | January 30, 2020 | Impact Restudy for Generator Modification | Posted 6/17/2020 | Download |
| GEN-2016-068 | June 02, 2020 | Modification Request Impact Study | Posted 9/18/2020 | Download |
| GEN-2016-071 | January 06, 2022 | Modification Request Impact Study | Posted 05/02/2022 | Download |
| GEN-2016-071 | May 24, 2019 | Modification Request Impact Study | Posted 3/3/2020 | Download |
| GEN-2016-071 | September 19, 2017 | Impact Restudy for Generator Modification | Posted 3/21/2018 | Download |
| GEN-2016-071 | December 19, 2017 | Impact Restudy for Generator Modification | Posted 10/30/2018 | Download |
| GEN-2016-071 | November 08, 2018 | Impact Restudy for Generator Modification | 11/27/2018 | Download |
| GEN-2016-071 (2) | March 19, 2025 | Modification Impact Study | Posted 5/19/2025 | Download |
| GEN-2016-074 | May 13, 2022 | Limited Operation Impact Study | Re-posted 2/16/2023 | Download |
| GEN-2016-087 | December 20, 2024 | Modification Impact Study | Posted 06/03/2025 | Download |
| GEN-2016-091 | April 13, 2021 | Modification Request Impact Study | Posted 9/13/2021 | Download |
| GEN-2016-094 | March 08, 2023 | Modification Impact Study | Posted 8/3/2023 | Download |
| GEN-2016-095 | July 29, 2022 | Modification Request Impact Study | Posted 10/17/2022 | Download |
| GEN-2016-097 | July 29, 2022 | Modification Request Impact Study | Posted 10/17/2022 | Download |
| GEN-2016-098 | July 26, 2017 | Interim Availability Impact Study for Generation Interconnection Request | Posted 3/15/2018 | Download |
| GEN-2016-102 | June 11, 2024 | Modification Request Impact Study | Posted 10/2/2024 | Download |
| GEN-2016-115 | February 05, 2019 | Impact Restudy for Generator Modification | Posted 7/30/2019 | Download |
| GEN-2016-118 | June 02, 2020 | Modification Request Impact Study | Posted 2/9/2021 | Download |
| GEN-2016-119 | May 03, 2022 | Modification Request Impact Study | Posted 1/24/2023 | Download |
| GEN-2016-119 DISIS ILTCR | June 30, 2020 | DISIS-2016-002 ILTCR Study Report | Posted 08/06/2021 | Download |
| GEN-2016-121 | July 08, 2025 | Modification Impact Study | Reposted 10/29/2025 | Download |
| GEN-2016-121 | August 08, 2024 | Limited Impact Study | Posted 2/10/2025 | Download |
| GEN-2016-123 through 125 | April 25, 2019 | Limited Operation Impact Study for Generation Interconnection Request | Reposted 8/13/2021 | Download |
| GEN-2016-126 | May 21, 2018 | Impact Restudy for Generator Modification (POI Change) | Posted 12/19/2018 | Download |
| GEN-2016-128 | July 13, 2018 | Impact Restudy for Generator Modification | Posted 2/7/2019 | Download |
| GEN-2016-130 | May 06, 2024 | Modification Impact Study | Posted 10/17/24 | Download |
| GEN-2016-130 | February 16, 2024 | Limited Impact Study | Posted 8/21/2024 | Download |
| GEN-2016-133 DISIS ILTCR | June 30, 2020 | DISIS-2016-002 ILTCR Study Report | Posted 08/06/2021 | Download |
| GEN-2016-134 DISIS ILTCR | June 30, 2020 | DISIS-2016-002 ILTCR Study Report | Posted 08/06/2021 | Download |
| GEN-2016-137 DISIS ILTCR | June 30, 2020 | DISIS-2016-002 ILTCR Study Report | Posted 08/06/2021 | Download |
| GEN-2016-138 DISIS ILTCR | June 30, 2020 | DISIS-2016-002 ILTCR Study Report | Posted 08/06/2021 | Download |
| GEN-2016-139 DISIS ILTCR | June 30, 2020 | DISIS-2016-002 ILTCR Study Report | Posted 08/06/2021 | Download |
| GEN-2016-141 DISIS ILTCR | June 30, 2020 | DISIS-2016-002 ILTCR Study Report | Posted 08/06/2021 | Download |
| GEN-2016-142 DISIS ILTCR | June 30, 2020 | DISIS-2016-002 ILTCR Study Report | Posted 08/06/2021 | Download |
| GEN-2016-145 DISIS ILTCR | June 30, 2020 | DISIS-2016-002 ILTCR Study Report | Posted 08/06/2021 | Download |
| GEN-2016-146 DISIS ILTCR | June 30, 2020 | DISIS-2016-002 ILTCR Study Report | Posted 08/06/2021 | Download |
| GEN-2016-147 | December 01, 2023 | Limited Impact Study | Reposted 6/28/2024 | Download |
| GEN-2016-149_GEN-2016-150 | March 30, 2023 | Modification Impact Study | Posted 8/3/2023 | Download |
| GEN-2016-151 | November 09, 2020 | Modification Request Impact Study for GEN-2016-151 | Posted 11/25/2020 | Download |
| GEN-2016-153 | February 12, 2021 | Limited Operation Impact Study for Generation Interconnection Request | Posted 12/6/2021 | Download |
| GEN-2016-153 | September 12, 2024 | Limited Impact Study | Posted 12/23/2024 | Download |
| GEN-2016-153 DISIS ILTCR | June 30, 2020 | DISIS-2016-002 ILTCR Study Report | Posted 08/06/2021 | Download |
| GEN-2016-153_GEN-2017-086 | June 02, 2023 | Modification Impact Study | Posted 9/1/2023 | Download |
| GEN-2016-174 | May 06, 2020 | Modification Request Impact Study for GEN-2016-174 | Posted 9/16/2020 | Download |
| GEN-2016-176 | April 01, 2021 | Modification Request Impact Study | Posted 10/28/2021 | Download |
| Group 9 Interim and Limited Operation | February 14, 2019 | Group 9 Interim and Limited Operation | RePosted 7/15/2021 | Download |
| LOIS-2016-001 Group 8 | June 06, 2019 | Limited Operation Impact Study for Generation Interconnection Requests GEN-2016-022, GEN-2016-031, GEN-2016-061, GEN-2016-068, & GEN-2016-071 | Posted 7/7/2020 | Download |
| PISIS-2016-001 | March 31, 2016 | Preliminary Interconnection System Impact Study PISIS-2016-001 | Posted 10/31/2016 | Download |
| PISIS-2016-002 | November 30, 2016 | Preliminary Interconnection System Impact Study PISIS-2016-002 | No requests were entered in this queue cluster | |
|