2010 Impact Studies
The following Generator Interconnection Studies have been requested.

Study Number Date Requested Purpose of Study Remarks Report
DISIS-2010-001 April 01, 2010 Definitive Interconnection System Impact Study 2010-001 Posted 7/30/2010 Download
DISIS-2010-001-1 August 31, 2010 Definitive Interconnection System Impact Restudy DISIS-2010-001 Posted 1/31/2011 Download
DISIS-2010-001-2 March 31, 2011 Definitive Interconnection System Impact Restudy DISIS-2010-001 Posted 5/13/2011 Download
DISIS-2010-001-3 March 31, 2011 Definitive Interconnection System Impact Restudy DISIS-2010-001 Posted 9/9/2011 - Reposted 11/2/2011 Download
DISIS-2010-001-4 March 31, 2011 Definitive Interconnection System Impact Restudy DISIS-2010-001 Posted 12/2/2011 Download
DISIS-2010-001-5 March 31, 2011 Definitive Interconnection System Impact Restudy DISIS-2010-001 Posted 3/15/2012 Download
DISIS-2010-001-6 March 31, 2011 Definitive Interconnection System Impact Restudy DISIS-2010-001 Posted 3/6/2013 Download
DISIS-2010-001-7 March 31, 2011 Definitive Interconnection System Impact Restudy DISIS-2010-001 Posted 6/25/2013 Download
DISIS-2010-001-8 March 31, 2011 Definitive Interconnection System Impact ReStudy Posted 11/18/2013 Download
DISIS-2010-002 October 01, 2010 Definitive Interconnection System Impact Study 2010-002 Posted 1/31/2011 Download
DISIS-2010-002-1 March 31, 2011 Definitive Interconnection System Impact Restudy DISIS-2010-002-1 Posted 7/26/2011 Download
DISIS-2010-002-2 August 19, 2011 Definitive Interconnection System Impact Restudy DISIS-2010-002-2 Posted 11/8/2011 Download
DISIS-2010-002-3 August 19, 2011 Definitive Interconnection System Impact Restudy DISIS-2010-002-3 Posted 3/26/2012 Download
DISIS-2010-002-4 August 19, 2011 Definitive Interconnection System Impact Restudy DISIS-2010-002-4 Posted 2/8/2013 Download
DISIS-2010-002-6 August 19, 2011 Definitive Interconnection System Impact Restudy DISIS-2010-002-6 Posted 11/26/2013 Download
GEN-2010-001 November 20, 2013 Impact Restudy for Generator Modification (Turbine Change) Posted 12/26/2013 Download
GEN-2010-001 July 17, 2013 Impact Restudy for Generator Modification (Turbine Change) Posted 9/13/2013 Download
GEN-2010-003 February 27, 2014 Impact Restudy for Generator Modification (Turbine change) Posted 4/1/2014 Download
GEN-2010-003 May 29, 2015 Impact Restudy for Generator Modification (Turbine Change) Posted 7/13/2015 Download
GEN-2010-003 September 27, 2010 Second restudy to Interconnect 100.8MW to the WR transmission system Posted 4/24/2012 Download
GEN-2010-003 September 07, 2010 Restudy to Interconnect 100.8MW to the WR transmission system Restudy Posted 1/27/2012 Download
GEN-2010-005 June 15, 2011 Restudy to Interconnect 300MW to the WERE transmission system Restudy Posted 9/22/2011 Download
GEN-2010-005 September 27, 2016 Impact Restudy for Generator Modification (Turbine Change) Posted 3/6/2017 Download
GEN-2010-005 September 27, 2016 Impact Restudy for Generator Modification (Turbine Change) Posted 3/30/2017 Download
GEN-2010-005 November 04, 2019 Impact Restudy for Generator Modification (Turbine Change) Posted 1/28/2020 Download
GEN-2010-006 November 15, 2010 Interim Operational Impact Study per Appendix 5 of GIP Posted 12/9/2010 Download
GEN-2010-009 July 08, 2011 Limited Operation Impact Study for Generation Interconnection Request Posted 8/23/2011 Download
GEN-2010-009 August 23, 2011 Limited Operation Impact Re-Study for Generation Interconnection Request Posted 9/7/2011 Download
GEN-2010-014 and GEN-2011-022 February 17, 2021 Modification Request Impact Study Posted 5/10/2021 Download
GEN-2010-014/GEN-2011-022 March 17, 2022 Modification Request Impact Study Posted 07/11/2022 Download
GEN-2010-040 January 04, 2012 Restudy to Interconnect 300MW to the OKGE transmission system Restudy Posted 3/26/2012 Download
GEN-2010-040 September 21, 2011 Restudy to Interconnect 299.3MW to the OKGE transmission system Posted 11/22/2011 Download
GEN-2010-045 April 15, 2011 Limited Operation Impact Study for Generation Interconnection Request Posted 5/5/2011 Download
GEN-2010-051 October 01, 2010 Generator Modification Evaluation (Turbine Change) Posted 2/3/2014 Download
GEN-2010-051 July 16, 2018 Impact Restudy for Generator Modification (Turbine Change) Posted 10/25/2018 Download
PISIS-2010-001 March 31, 2010 Preliminary Interconnection System Impact Study Posted 8/31/2010 Download
PISIS-2010-002 December 31, 2010 Preliminary Interconnection System Impact Study Posted 2/28/2011 Download

Please send your requests to GIStudies@spp.org