Study Number |
Date Requested |
Purpose of Study |
Remarks |
Report |
DISIS-2010-001 |
April 01, 2010 |
Definitive Interconnection System Impact Study 2010-001 |
Posted 7/30/2010 |
Download |
DISIS-2010-001-1 |
August 31, 2010 |
Definitive Interconnection System Impact Restudy DISIS-2010-001 |
Posted 1/31/2011 |
Download |
DISIS-2010-001-2 |
March 31, 2011 |
Definitive Interconnection System Impact Restudy DISIS-2010-001 |
Posted 5/13/2011 |
Download |
DISIS-2010-001-3 |
March 31, 2011 |
Definitive Interconnection System Impact Restudy DISIS-2010-001 |
Posted 9/9/2011 - Reposted 11/2/2011 |
Download |
DISIS-2010-001-4 |
March 31, 2011 |
Definitive Interconnection System Impact Restudy DISIS-2010-001 |
Posted 12/2/2011 |
Download |
DISIS-2010-001-5 |
March 31, 2011 |
Definitive Interconnection System Impact Restudy DISIS-2010-001 |
Posted 3/15/2012 |
Download |
DISIS-2010-001-6 |
March 31, 2011 |
Definitive Interconnection System Impact Restudy DISIS-2010-001 |
Posted 3/6/2013 |
Download |
DISIS-2010-001-7 |
March 31, 2011 |
Definitive Interconnection System Impact Restudy DISIS-2010-001 |
Posted 6/25/2013 |
Download |
DISIS-2010-001-8 |
March 31, 2011 |
Definitive Interconnection System Impact ReStudy |
Posted 11/18/2013 |
Download |
DISIS-2010-002 |
October 01, 2010 |
Definitive Interconnection System Impact Study 2010-002 |
Posted 1/31/2011 |
Download |
DISIS-2010-002-1 |
March 31, 2011 |
Definitive Interconnection System Impact Restudy DISIS-2010-002-1 |
Posted 7/26/2011 |
Download |
DISIS-2010-002-2 |
August 19, 2011 |
Definitive Interconnection System Impact Restudy DISIS-2010-002-2 |
Posted 11/8/2011 |
Download |
DISIS-2010-002-3 |
August 19, 2011 |
Definitive Interconnection System Impact Restudy DISIS-2010-002-3 |
Posted 3/26/2012 |
Download |
DISIS-2010-002-4 |
August 19, 2011 |
Definitive Interconnection System Impact Restudy DISIS-2010-002-4 |
Posted 2/8/2013 |
Download |
DISIS-2010-002-6 |
August 19, 2011 |
Definitive Interconnection System Impact Restudy DISIS-2010-002-6 |
Posted 11/26/2013 |
Download |
GEN-2010-001 |
November 20, 2013 |
Impact Restudy for Generator Modification (Turbine Change) |
Posted 12/26/2013 |
Download |
GEN-2010-001 |
July 17, 2013 |
Impact Restudy for Generator Modification (Turbine Change) |
Posted 9/13/2013 |
Download |
GEN-2010-003 |
February 27, 2014 |
Impact Restudy for Generator Modification (Turbine change) |
Posted 4/1/2014 |
Download |
GEN-2010-003 |
May 29, 2015 |
Impact Restudy for Generator Modification (Turbine Change) |
Posted 7/13/2015 |
Download |
GEN-2010-003 |
September 27, 2010 |
Second restudy to Interconnect 100.8MW to the WR transmission system |
Posted 4/24/2012 |
Download |
GEN-2010-003 |
September 07, 2010 |
Restudy to Interconnect 100.8MW to the WR transmission system |
Restudy Posted 1/27/2012 |
Download |
GEN-2010-005 |
June 15, 2011 |
Restudy to Interconnect 300MW to the WERE transmission system |
Restudy Posted 9/22/2011 |
Download |
GEN-2010-005 |
September 27, 2016 |
Impact Restudy for Generator Modification (Turbine Change) |
Posted 3/6/2017 |
Download |
GEN-2010-005 |
September 27, 2016 |
Impact Restudy for Generator Modification (Turbine Change) |
Posted 3/30/2017 |
Download |
GEN-2010-005 |
November 04, 2019 |
Impact Restudy for Generator Modification (Turbine Change) |
Posted 1/28/2020 |
Download |
GEN-2010-006 |
November 15, 2010 |
Interim Operational Impact Study per Appendix 5 of GIP |
Posted 12/9/2010 |
Download |
GEN-2010-009 |
July 08, 2011 |
Limited Operation Impact Study for Generation Interconnection Request |
Posted 8/23/2011 |
Download |
GEN-2010-009 |
August 23, 2011 |
Limited Operation Impact Re-Study for Generation Interconnection Request |
Posted 9/7/2011 |
Download |
GEN-2010-014 and GEN-2011-022 |
February 17, 2021 |
Modification Request Impact Study |
Posted 5/10/2021 |
Download |
GEN-2010-014/GEN-2011-022 |
March 17, 2022 |
Modification Request Impact Study |
Posted 07/11/2022 |
Download |
GEN-2010-040 |
January 04, 2012 |
Restudy to Interconnect 300MW to the OKGE transmission system |
Restudy Posted 3/26/2012 |
Download |
GEN-2010-040 |
September 21, 2011 |
Restudy to Interconnect 299.3MW to the OKGE transmission system |
Posted 11/22/2011 |
Download |
GEN-2010-045 |
April 15, 2011 |
Limited Operation Impact Study for Generation Interconnection Request |
Posted 5/5/2011 |
Download |
GEN-2010-051 |
October 01, 2010 |
Generator Modification Evaluation (Turbine Change) |
Posted 2/3/2014 |
Download |
GEN-2010-051 |
July 16, 2018 |
Impact Restudy for Generator Modification (Turbine Change) |
Posted 10/25/2018 |
Download |
PISIS-2010-001 |
March 31, 2010 |
Preliminary Interconnection System Impact Study |
Posted 8/31/2010 |
Download |
PISIS-2010-002 |
December 31, 2010 |
Preliminary Interconnection System Impact Study |
Posted 2/28/2011 |
Download |
Please send your requests to GIStudies@spp.org
If you have any questions, please submit a ticket on RMS.
|