- Studies Postings
|
|
|
|
2020 Impact Studies |
The following Generator Interconnection Studies have been requested.
|
Study Number |
Date Requested |
Purpose of Study |
Remarks |
Report |
DISIS-2020-001 |
April 30, 2020 |
DISIS-2020-001 Phase 1 Powerflow and Short Circuit Final Report |
Posted 03/17/2023 |
Download |
DISIS-2020-001 |
April 30, 2020 |
DISIS-2020-001 Phase 2 Powerflow, Stability and Short Circuit Final Report |
Posted 02/16/2024 |
Download |
GEN-2020-002 |
March 21, 2023 |
Modification Impact Study |
Re-posted 11/29/2023 |
Download |
GEN-2020-014 |
June 11, 2020 |
Interim Availability Impact Study for Generation Interconnection Request |
Posted 9/22/2021 |
Download |
GEN-2020-056 |
October 06, 2020 |
Interim Availability Impact Study for Generation Interconnection Request |
Posted 11/18/2021 |
Download |
GEN-2020-071 |
February 28, 2022 |
Interim Impact Study |
Posted 5/16/2023 |
Download |
GEN-2020-074 and GEN-2020-085 |
January 28, 2021 |
Interim Availability Impact Study for Generation Interconnection Request |
Posted 11/18/2021 |
Download |
GEN-2020-SR1 |
August 04, 2020 |
Surplus Interconnection Impact Study |
Posted 7/23/2021 |
Download |
GEN-2020-SR2 |
August 04, 2020 |
Surplus Interconnection Impact Study |
Posted 7/23/2021 |
Download |
GEN-2020-SR3 |
August 04, 2020 |
Surplus Interconnection Impact Study |
Posted 7/23/2021 |
Download |
Group 9 Interim |
January 01, 2020 |
Group 9 Interim Study |
Posted 07/21/2022 |
Download |
Please send your requests to GIStudies@spp.org
If you have any questions, please submit a ticket on RMS.
|
|