2020 Impact Studies
The following Generator Interconnection Studies have been requested.

Study Number Date Requested Purpose of Study Remarks Report
DISIS-2020-001 April 30, 2020 DISIS-2020-001 Phase 1 Powerflow and Short Circuit Final Report Posted 03/17/2023 Download
DISIS-2020-001 April 30, 2020 DISIS-2020-001 Phase 2 Powerflow, Stability and Short Circuit Final Report Posted 02/16/2024 Download
GEN-2020-002 March 21, 2023 Modification Impact Study Re-posted 11/29/2023 Download
GEN-2020-014 June 11, 2020 Interim Availability Impact Study for Generation Interconnection Request Posted 9/22/2021 Download
GEN-2020-056 October 06, 2020 Interim Availability Impact Study for Generation Interconnection Request Posted 11/18/2021 Download
GEN-2020-071 February 28, 2022 Interim Impact Study Posted 5/16/2023 Download
GEN-2020-074 and GEN-2020-085 January 28, 2021 Interim Availability Impact Study for Generation Interconnection Request Posted 11/18/2021 Download
GEN-2020-SR1 August 04, 2020 Surplus Interconnection Impact Study Posted 7/23/2021 Download
GEN-2020-SR2 August 04, 2020 Surplus Interconnection Impact Study Posted 7/23/2021 Download
GEN-2020-SR3 August 04, 2020 Surplus Interconnection Impact Study Posted 7/23/2021 Download
Group 9 Interim January 01, 2020 Group 9 Interim Study Posted 07/21/2022 Download