| 2017 Impact Studies | |
| The following Generator Interconnection Studies have been requested. | |
| Study Number | Date Requested | Purpose of Study | Remarks | Report |
|---|---|---|---|---|
| DISIS-2017-001 | March 31, 2017 | DISIS-2017-001 Phase 1 Results | Reposted 11/18/2020 Revised Cost Assignments | Download |
| DISIS-2017-001 | March 31, 2017 | DISIS-2017-001 Phase 2 ERIS Preliminary Results | Posted 03/08/2021 | Download |
| DISIS-2017-001 | March 31, 2017 | DISIS-2017-001 Phase 2 Power Flow Results | Reposted 05/12/21 | Download |
| DISIS-2017-001 | March 31, 2017 | DISIS-2017-001 Phase 2 Stability and Short Circuit Analysis Results | Reposted 05/12/21 | Download |
| DISIS-2017-001-1 | March 31, 2017 | DISIS-2017-001-1 Restudy Power Flow Final | Posted 11/03/2021 | Download |
| DISIS-2017-001-1 | March 31, 2017 | DISIS-2017-001-1 Restudy Stability Final | Posted 11/03/2021 | Download |
| DISIS-2017-001-2 | March 31, 2017 | DISIS-2017-001-2 Restudy Power Flow Final | Posted 08/04/2022 | Download |
| DISIS-2017-001-2 | March 31, 2017 | DISIS-2017-001-2 Restudy Stability Final | Posted 06/16/2022 | Download |
| DISIS-2017-001-3 | March 31, 2017 | DISIS-2017-001-3 Restudy Power Flow Final | Posted 09/20/2022 | Download |
| DISIS-2017-002 | November 30, 2017 | DISIS-2017-002 Phase 2 Powerflow, Stability and Short Circuit Final Results | Posted 8/29/2022 | Download |
| DISIS-2017-002 | November 30, 2017 | DISIS-2017-002 Phase 1 Power Flow Final Results | Reposted 2/18/2022 | Download |
| DISIS-2017-002-1 | November 30, 2017 | DISIS-2017-002-1 Restudy Power Flow, Stability and Short Circuit | Posted 01/24/2023 | Download |
| DISIS-2017-002-2 | March 31, 2017 | DISIS-2017-002 Phase 2 Restudy #2 Final Powerflow, Stability and Short Circuit Results | Posted 6/26/24 | Download |
| DISIS-2017-002-2 | March 31, 2017 | DISIS-2017-002 Phase 2 Restudy #2 Final Powerflow, Stability and Short Circuit Analysis Results | Posted 11/15/24 | Download |
| GEN-2017-005 | July 27, 2021 | DISIS-2017-001 Sensitivity | Posted 09/29/21 | Download |
| GEN-2017-005 | March 21, 2020 | Interim Availability Impact Study for Generation Interconnection Request | Posted 11/11/2020 | Download |
| GEN-2017-009, GEN-2017-060, GEN-2017-082 | November 16, 2018 | Interim Availability Impact Study for Generation Interconnection Requests | Posted 9/9/2020 | Download |
| GEN-2017-010 | March 29, 2024 | Modification Impact Study | Posted 10/8/24 | Download |
| GEN-2017-018 | June 22, 2023 | Modification Impact Study | Posted 10/26/2023 | Download |
| GEN-2017-018 DISIS ILTCR | July 08, 2022 | DISIS-2017-001 ILTCR Study Report | Posted 9/23/2022 | Download |
| GEN-2017-023 | November 21, 2022 | Modification Request Impact Study | Posted 2/1/2023 | Download |
| GEN-2017-023 | February 21, 2025 | Modification Impact Study | Posted 4/30/2025 | Download |
| GEN-2017-027 | December 23, 2019 | Interim Availability Impact Study for Generation Interconnection Request | Posted 7/22/2021 | Download |
| GEN-2017-033 | May 03, 2023 | Modification Impact Study | Posted 7/13/2023 | Download |
| GEN-2017-033 | August 08, 2024 | Limited Impact Study | Posted 12/19/2024 | Download |
| GEN-2017-036 | November 10, 2022 | Modification Request Impact Study | Posted 1/24/2023 | Download |
| GEN-2017-047 | February 21, 2024 | Modification Impact Study | Posted 8/6/2024 | Download |
| GEN-2017-047 DISIS ILTCR | July 08, 2022 | DISIS-2017-001 ILTCR Study Report | Posted 09/23/2022 | Download |
| GEN-2017-048 DISIS ILTCR | July 08, 2022 | DISIS-2017-001 ILTCR Study Report | Posted 09/23/2022 | Download |
| GEN-2017-057 | November 15, 2024 | Modification Impact Study | Posted 4/16/2025 | Download |
| GEN-2017-061 | February 07, 2025 | Modification Impact Study | Posted 5/12/2025 | Download |
| GEN-2017-068 DISIS ILTCR | July 08, 2022 | DISIS-2017-001 ILTCR Study Report | Posted 09/23/2022 | Download |
| GEN-2017-068, GEN-2017-074, GEN-2017-086 | March 10, 2023 | DISIS-2017-001 Sensitivity | Posted 05/05/2023 | Download |
| GEN-2017-069 | July 18, 2017 | Interim Availability Impact Study for Generation Interconnection Request | Reposted 3/5/2021 | Download |
| GEN-2017-073 | January 26, 2025 | Modification Impact Study | Posted 5/14/2025 | Download |
| GEN-2017-074 | November 15, 2024 | Modification Impact Study | Posted 5/14/2025 | Download |
| GEN-2017-075 | February 04, 2026 | Modification Impact Study | Posted 5/18/2026 | Download |
| GEN-2017-077 | January 26, 2025 | Modification Impact Study | Posted 5/14/2025 | Download |
| GEN-2017-086 | September 12, 2024 | Limited Impact Study | Posted 2/25/2025 | Download |
| GEN-2017-086 DISIS ILTCR | July 08, 2022 | DISIS-2017-001 ILTCR Study Report | Posted 09/23/2022 | Download |
| GEN-2017-086_GEN-2016-153 | June 02, 2023 | Modification Impact Study | Posted 9/1/2023 | Download |
| GEN-2017-094 | September 09, 2022 | Modification Request Impact Study | Posted 1/24/2023 | Download |
| GEN-2017-094 | October 28, 2022 | Modification Request Impact Study | Posted 01/06/2023 | Download |
| GEN-2017-094 | October 04, 2018 | Revised Interim Availability Impact Study for Generation Interconnection Request | Posted 1/15/2021 | Download |
| GEN-2017-094 | October 04, 2018 | Interim Availability Impact Study for Generation Interconnection Request | Posted 05/24/2019 | Download |
| GEN-2017-097 | May 23, 2022 | Modification Request Impact Study | Posted 08/15/2022 | Download |
| GEN-2017-097 | October 14, 2022 | Modification Request Impact Study | Posted 1/27/2023 | Download |
| GEN-2017-100 | January 30, 2026 | Modification Impact Study | Posted 5/29/2026 | Download |
| GEN-2017-100 DISIS ILTCR | July 08, 2022 | DISIS-2017-001 ILTCR Study Report | Posted 09/23/2022 | Download |
| GEN-2017-105 | October 25, 2025 | Modification Impact Study | Posted 2/11/2026 | Download |
| GEN-2017-108 | May 25, 2021 | Interim Availability Impact Study for Generation Interconnection Request | Posted 2/4/2022 | Download |
| GEN-2017-108 DISIS ILTCR | June 05, 2024 | DISIS-2017-002 ILTCR Study Report | Reposted 10/31/2024 | Download |
| GEN-2017-119 DISIS ILTCR | June 05, 2024 | DISIS-2017-002 ILTCR Study Report | Reposted 10/31/2024 | Download |
| GEN-2017-144 DISIS ILTCR | June 05, 2024 | DISIS-2017-002 ILTCR Study Report | Posted 08/26/2024 | Download |
| GEN-2017-146 | November 07, 2025 | Modification Impact Study | Reposted 3/24/2026 | Download |
| GEN-2017-149 | November 17, 2025 | Modification Impact Study | Posted 4/10/2026 | Download |
| GEN-2017-151 | October 20, 2025 | Modification Impact Study | Posted 1/22/2026 | Download |
| GEN-2017-158 | November 27, 2023 | Modification Impact Study | Posted 6/14/2024 | Download |
| GEN-2017-164-178 | April 24, 2025 | Modification Impact Study | Posted 8/11/2025 | Download |
| GEN-2017-179 | August 27, 2018 | Interim Availability Impact Study for Generation Interconnection Request | Posted 7/3/2019 | Download |
| GEN-2017-183 DISIS ILTCR | June 05, 2024 | DISIS-2017-002 ILTCR Study Report | Reposted 10/31/2024 | Download |
| GEN-2017-184 DISIS ILTCR | June 05, 2024 | DISIS-2017-002 ILTCR Study Report | Reposted 10/31/2024 | Download |
| GEN-2017-187 | June 05, 2025 | Modification Impact Study | Reposted 10/7/2025 | Download |
| GEN-2017-188 | November 07, 2025 | Modification Impact Study | Reposted 2/16/2026 | Download |
| GEN-2017-220 | July 24, 2024 | Modification Impact Study | Posted 3/4/2025 | Download |
| GEN-2017-220 (2) | November 17, 2025 | Modification Impact Study | Posted 4/23/2026 | Download |
| GEN-2017-221 | July 24, 2024 | Modification Impact Study | Posted 2/24/2025 | Download |
| GEN-2017-222 DISIS ILTCR | June 05, 2024 | DISIS-2017-002 ILTCR Study Report | Posted 08/26/2024 | Download |
| GEN-2017-232 | July 22, 2025 | Modification Impact Study | Posted 10/28/2025 | Download |
| GEN-2017-232 DISIS ILTCR | June 05, 2024 | DISIS-2017-002 ILTCR Study Report | Posted 08/26/2024 | Download |
| GEN-2017-232 DISIS ILTCR | June 05, 2024 | DISIS-2017-002 ILTCR Study Report | Posted 08/26/2024 | Download |
| GEN-2017-234 | July 26, 2024 | Limited Impact Study | Posted 1/23/2025 | Download |
| GEN-2017-239 | December 10, 2024 | Modification Impact Study | Posted 6/5/2025 | Download |
| PISIS-2017-001 | May 31, 2017 | Preliminary Interconnection System Impact Study #1 of 2017 | No requests were entered in this queue cluster | |
| PISIS-2017-002 | November 30, 2017 | Preliminary Interconnection System Impact Study #2 of 2017 | Posted 5/11/2018 | Download |
|