Study Number |
Date Requested |
Purpose of Study |
Remarks |
Report |
|
January 01, 1900 |
|
|
|
DISIS-2009-001 |
September 30, 2009 |
Definitive Interconnection System Impact Study |
Posted 1/31/2010 - Reposted 2/5/2010 |
Download |
DISIS-2009-001 |
September 30, 2009 |
DISIS-2009-001 Appendices |
Posted 1/31/2010 |
Download |
DISIS-2009-001 |
September 30, 2009 |
DISIS-2009-001 Appendices |
Posted 1/31/2010 - Reposted 2/5/2010 |
Download |
DISIS-2009-001-1 |
March 01, 2010 |
Definitive Interconnection System Impact ReStudy |
Posted 6/4/2010 |
Download |
DISIS-2009-001-2 |
November 01, 2010 |
Definitive Interconnection System Impact ReStudy |
Posted 1/18/2011 |
Download |
DISIS-2009-001-3 |
November 01, 2010 |
Definitive Interconnection System Impact ReStudy |
Posted 4/14/2011 |
Download |
DISIS-2009-001-4 |
March 01, 2010 |
Definitive Interconnection System Impact ReStudy |
Posted 1/22/2013 |
Download |
DISIS-2009-001-6 |
November 01, 2010 |
Definitive Interconnection System Impact ReStudy |
Posted 11/18/2013 |
Download |
GEN-2009-008 |
July 13, 2011 |
Limited Operation Impact Study for Generation Interconnection Request |
Posted 3/12/2013 |
Download |
GEN-2009-008 |
November 12, 2012 |
Restudy to Interconnect 198.8MW to the MIDW transmission system |
Posted 2/19/2013 |
Download |
GEN-2009-008 |
November 13, 2012 |
Impact Restudy for Generator Modification (Turbine change) |
Posted 2/17/2015 |
Download |
GEN-2009-008 |
July 13, 2011 |
Limited Operation Impact Study for Generation Interconnection Request |
Posted 8/31/2011 |
Download |
GEN-2009-008 |
August 31, 2010 |
Study to Interconnect 200.1MW to the MIDW transmission system |
Posted 4/4/2011 |
Download |
GEN-2009-011 |
November 22, 2010 |
Restudy to Interconnect 49MW to the MKEC transmission system |
Posted 2/23/2011 |
Download |
GEN-2009-011 |
November 22, 2010 |
Limited Operation Impact Study for Generation Interconnection Request |
Posted 4/21/2011 |
Download |
GEN-2009-016 |
February 10, 2011 |
Restudy to Interconnect 100.8MW to the AEPW transmission system |
Posted 5/6/2011 |
Download |
GEN-2009-016 |
March 08, 2013 |
Generator Modification Evaluation (Turbine Change) |
Posted 4/9/2013 |
Download |
GEN-2009-017-DISIS |
September 30, 2009 |
DISIS for GEN-2009-017 |
Posted 3/1/2010 |
Download |
GEN-2009-020 |
September 10, 2010 |
Limited Operation Impact Study for Generation Interconnection Request |
Posted 5/5/2011 |
Download |
GEN-2009-020 |
September 10, 2010 |
Restudy to Interconnect 49.6MW to the OKGE transmission system |
Posted 2/16/2011 |
Download |
GEN-2009-020 |
September 10, 2010 |
Re-Study to Interconnect 48.3 MW to the OGE transmission system |
Posted 3/1/2013 |
Download |
GEN-2009-020 |
September 10, 2010 |
Limited Operation Impact Study for Generation Interconnection Request |
Posted 3/1/2013 |
Download |
GEN-2009-020 |
November 20, 2012 |
Impact Restudy for Generator Modification (Turbine Change) |
Posted 2/27/2014 |
Download |
GEN-2009-025 |
March 30, 2010 |
Restudy to Interconnect 60 MW on the OKGE transmission system |
Revised Posting 10/13/2011 |
Download |
GEN-2009-025 |
March 30, 2010 |
Restudy to Interconnect 60 MW on the OKGE transmission system |
Posted 6/7/2010 |
Download |
GEN-2009-040 |
August 05, 2014 |
Impact Restudy for Generator Modification (Turbine Change) |
Posted 8/27/2014 |
Download |
GEN-2009-040 |
November 06, 2013 |
Impact Restudy for Generator Modification (Turbine Change) |
Posted 2/11/2014 |
Download |
PISIS-2009-001 |
September 30, 2009 |
Preliminary Impact Study Appendix N-O |
Posted 3/30/2010 |
Download |
PISIS-2009-001 |
September 30, 2009 |
Preliminary Impact Study |
Posted 2/26/2010 - Reposted 3/12/2010 |
Download |
Please send your requests to GIStudies@spp.org
If you have any questions, please submit a ticket on RMS.
|