Study Number |
Date Requested |
Purpose of Study |
Remarks |
Report |
GEN-2017-004 |
April 13, 2017 |
Interconnect 201.6 MW to the ITCGP Transmission System (queued as IFS-2016-001-05) |
Posted 08/02/2022 |
Download |
GEN-2017-005 |
January 25, 2018 |
Interconnect 190 MW to the WERE Transmission System (queued as IFS-2017-001-11) |
Posted 11/19/2021 |
Download |
GEN-2017-009 |
April 12, 2017 |
Interconnect 302 MW to the WERE Transmission System (queued as IFS-2017-001-39) |
Posted 01/14/2022 |
Download |
GEN-2017-010 |
April 18, 2017 |
Interconnect 200.1 MW to the BEPC Transmission System (queued as IFS-2017-001-12) |
Posted 07/29/2022 |
Download |
GEN-2017-011 |
May 30, 2017 |
Interconnect 151.8 MW to the OKGE Transmission System (queued as IFS-2017-001-06) |
Reposted 08/01/2023 |
Download |
GEN-2017-014 |
May 30, 2017 |
Interconnect 300 MW to the WAPA Transmission System (queued as IFS-2017-001-29) |
Posted 03/04/2022 |
Download |
GEN-2017-018 |
May 30, 2017 |
Interconnect 189 MW to the ITCGP Transmission System (queued as IFS-2017-001-27) |
Posted 03/15/2022 |
Download |
GEN-2017-021 |
May 31, 2017 |
Interconnect 200 MW to the ITCGP Transmission System (queued as IFS-2017-001-21) |
Posted 04/20/2022 |
Download |
GEN-2017-022 |
May 31, 2017 |
Interconnect 65 MW to the WERE Transmission System (queued as IFS-2017-001-21) |
Posted 03/28/2022 |
Download |
GEN-2017-023 |
May 31, 2017 |
Interconnect 85 MW to the WFEC Transmission System (queued as IFS-2017-001-21) |
Posted 03/29/2022 |
Download |
GEN-2017-027 |
May 31, 2017 |
Interconnect 140 MW to the OKGE Transmission System (queued as IFS-2017-001-33) |
Posted 01/07/2022 |
Download |
GEN-2017-032 |
May 30, 2017 |
Interconnect 200 MW to the SPS Transmission System (queued as IFS-2017-001-38) |
Posted 03/15/2022 |
Download |
GEN-2017-033 |
May 30, 2017 |
Interconnect 200 MW to the AEP Transmission System (queued as IFS-2017-001-28) |
Posted 12/17/2021 |
Download |
GEN-2017-036 |
May 31, 2017 |
Interconnect 100 MW to the AEPW Transmission System (queued as IFS-2017-001-23) |
Posted 12/29/2021 |
Download |
GEN-2017-040 |
May 17, 2017 |
Interconnect 200.1 MW to the OKGE Transmission System (queued as IFS-2017-001-03) |
Posted 01/24/2022 |
Download |
GEN-2017-047 |
May 26, 2017 |
Interconnect 102 MW to the SWPS Transmission System (queued as IFS-2017-001-19) |
Posted 03/29/2022 |
Download |
GEN-2017-048 |
May 30, 2017 |
Interconnect 300 MW to the BEPC Transmission System (queued as IFS-2017-001-34) |
Posted 02/28/2023 |
Download |
GEN-2017-057 |
October 16, 2018 |
Interconnect 72.5 MW to the AEP Transmission System (queued as IFS-2017-001-13) |
Posted 10/08/2021 |
Download |
GEN-2017-060 |
May 30, 2017 |
Interconnect 149.4 MW to the EMDE Transmission System (queued as IFS-2017-001-01) |
Posted 10/08/2021 |
Download |
GEN-2017-061 |
May 28, 2017 |
Interconnect 101.5 MW to the GRDA Transmission System (queued as IFS-2017-001-25) |
Posted 01/31/2022 |
Download |
GEN-2017-068 |
May 30, 2017 |
Interconnect 103.5 MW to the WERE Transmission System (queued as IFS-2017-001-26) |
Posted 03/29/2022 |
Download |
GEN-2017-071 |
May 28, 2017 |
Interconnect 124.7 MW to the OKGE Transmission System (queued as IFS-2017-001-36) |
Posted 01/25/2022 |
Download |
GEN-2017-072 |
May 30, 2017 |
Interconnect 52.2 MW to the OKGE Transmission System (queued as IFS-2017-001-37) |
Posted 01/25/2022 |
Download |
GEN-2017-073 |
May 30, 2017 |
Interconnect 72.5 MW to the GRDA Transmission System (queued as IFS-2017-001-14) |
Posted 01/28/2022 |
Download |
GEN-2017-074 |
May 30, 2017 |
Interconnect 72.5 MW to the AEP Transmission System (queued as IFS-2017-001-15) |
Posted 02/28/2022 |
Download |
GEN-2017-075 |
May 30, 2017 |
Interconnect 200 MW to the OKGE Transmission System (queued as IFS-2017-001-16) |
Posted 01/07/2022 |
Download |
GEN-2017-076 |
October 16, 2018 |
Interconnect 52.2 MW to the AEP Transmission System (queued as IFS-2017-001-17) |
Posted 10/08/2021 |
Download |
GEN-2017-077 |
May 28, 2017 |
Interconnect 124.7 MW to the AEPW Transmission System (queued as IFS-2017-001-18) |
Posted 02/08/2022 |
Download |
GEN-2017-082 |
May 30, 2017 |
Interconnect 149.4 MW to the EMDE Transmission System (queued as IFS-2017-001-02) |
Posted 10/08/2021 |
Download |
GEN-2017-085 |
May 10, 2017 |
Interconnect .6 MW to the NPPD Transmission System (queued as IFS-2017-001-30) |
Posted 12/01/2021 |
Download |
GEN-2017-086 |
November 07, 2017 |
Interconnect 150 MW to the WERE Transmission System (queued as IFS-2017-001-10) |
Posted 03/29/2022 |
Download |
GEN-2017-090 |
November 08, 2017 |
Interconnect 150 MW to the KCPL Transmission System (queued as IFS-2017-001-35) |
Posted 02/28/2022 |
Download |
GEN-2017-092 |
May 30, 2017 |
Interconnect 200 MW to the OKGE Transmission System (queued as IFS-2017-001-04) |
Posted 01/24/2022 |
Download |
GEN-2017-094 |
May 30, 2017 |
Interconnect 200 MW to the WAPA Transmission System (queued as IFS-2017-001-31) |
Posted 03/03/2022 |
Download |
GEN-2017-097 |
May 31, 2017 |
Interconnect 128 MW to the WAPA Transmission System (queued as IFS-2017-001-24) |
Posted 02/14/2022 |
Download |
GEN-2017-099 |
May 31, 2017 |
Interconnect 150 MW to the ITCGP Transmission System (queued as IFS-2017-001-09) |
Posted 04/20/2022 |
Download |
GEN-2017-100 |
May 30, 2017 |
Interconnect 102.6 MW to the SWPS Transmission System (queued as IFS-2017-001-20) |
Posted 03/29/2022 |
Download |
GEN-2017-105 |
October 13, 2022 |
Interconnect 75 MW to the OPPD Transmission System (FINAL) |
Posted 02/13/2023 |
Download |
GEN-2017-108 |
December 29, 2022 |
Interconnect 400 MW to KCPL transmission system FINAL |
Reposted 07/03/2024 |
Download |
GEN-2017-111 |
December 29, 2022 |
Interconnect 152 MW to KCPL transmission system FINAL |
Posted 08/22/2023 |
Download |
GEN-2017-115 |
December 29, 2022 |
Interconnect 244 MW to KCPL transmission system FINAL |
Reposted 07/25/2023 |
Download |
GEN-2017-117 |
December 29, 2022 |
Interconnect 19.8 MW to the WFECTransmission System FINAL |
Reposted 07/03/2024 |
Download |
GEN-2017-119 |
December 29, 2022 |
Interconnect 180 MW to SUNC transmission system FINAL |
Reposted 07/03/2024 |
Download |
GEN-2017-120 |
December 29, 2022 |
Interconnect 260 MW to WERE transmission system FINAL |
Posted 07/25/2023 |
Download |
GEN-2017-121 |
December 29, 2022 |
Interconnect 200 MW to the WERE Transmission System FINAL |
Reposted 07/03/2024 |
Download |
GEN-2017-125 |
December 29, 2022 |
Interconnect 252 MW to the WERE Transmission System FINAL |
Reposted 11/30/2023 |
Download |
GEN-2017-128 |
December 29, 2022 |
Interconnect 202 MW to the WERE Transmission System |
Posted 07/25/2023 |
Download |
GEN-2017-131 |
July 03, 2024 |
Interconnect 29.6 MW to the WERE Transmission System FINAL |
Reposted 07/03/2024 |
Download |
GEN-2017-132 |
December 29, 2022 |
Interconnect 400 MW to the OGE Transmission System FINAL |
Posted 07/26/2023 |
Download |
GEN-2017-133 |
December 29, 2022 |
Interconnect 200 MW to the OGE Transmission System FINAL |
Reposted 07/03/2024 |
Download |
GEN-2017-134 |
December 29, 2022 |
Interconnect 250 MW to the OGE Transmission System FINAL |
Reposted 07/03/2024 |
Download |
GEN-2017-137 |
December 29, 2022 |
Interconnect 295 MW to the OGE Transmission System FINAL |
Reposted 07/03/2024 |
Download |
GEN-2017-140 |
December 29, 2022 |
Interconnect 160 MW to the AEP Transmission System FINAL |
Posted 06/05/2023 |
Download |
GEN-2017-141 |
December 29, 2022 |
Interconnect 241.7 MW to the AEP Transmission System FINAL |
Posted 06/05/2023 |
Download |
GEN-2017-144 |
October 13, 2022 |
Interconnect 200 MW to the NPPD Transmission System (FINAL) |
Posted 02/15/2023 |
Download |
GEN-2017-146 |
December 29, 2022 |
Interconnect 151.8 MW to SPS transmission system FINAL |
Posted 05/15/2023 |
Download |
GEN-2017-148 |
October 13, 2022 |
Interconnect 202 MW to the EDE Transmission System FINAL |
Reposted 08/24/2023 |
Download |
GEN-2017-149 |
December 29, 2022 |
Interconnect 258 MW to the OGE Transmission System FINAL |
Reposted 08/06/2024 |
Download |
GEN-2017-150 |
December 29, 2022 |
Interconnect 250 MW to the OGE Transmission System FINAL |
Reposted 07/03/2024 |
Download |
GEN-2017-151 |
December 29, 2022 |
Interconnect 300 MW to SPS transmission system FINAL |
Posted 05/15/2023 |
Download |
GEN-2017-152 |
December 29, 2022 |
Interconnect 252 MW to the OGE Transmission System FINAL |
Posted 06/05/2023 |
Download |
GEN-2017-154 |
December 29, 2022 |
Interconnect 255 MW to the OGE Transmission System FINAL |
Reposted 08/06/2024 |
Download |
GEN-2017-155 |
December 29, 2022 |
Interconnect 300 MW to the OGE Transmission System FINAL |
Reposted 07/25/2023 |
Download |
GEN-2017-158 |
December 29, 2022 |
Interconnect 265 MW to SPS transmission system FINAL |
Posted 05/19/2023 |
Download |
GEN-2017-164 |
December 29, 2022 |
Interconnect 250 MW to the OGE Transmission System FINAL |
Reposted 07/03/2024 |
Download |
GEN-2017-166 |
December 29, 2022 |
Interconnect 250 MW to the OGE Transmission System FINAL |
Posted 07/25/2023 |
Download |
GEN-2017-167 |
December 29, 2022 |
Interconnect 52 MW to the OGE Transmission System FINAL |
Reposted 07/03/2024 |
Download |
GEN-2017-168 |
December 29, 2022 |
Interconnect 250 MW to the OGE Transmission System FINAL |
Posted 06/07/2023 |
Download |
GEN-2017-169 |
December 29, 2022 |
Interconnect 52 MW to the OGE Transmission System FINAL |
Posted 06/05/2023 |
Download |
GEN-2017-171 |
December 29, 2022 |
Interconnect 150 MW to the AEP Transmission System FINAL |
Reposted 07/03/2024 |
Download |
GEN-2017-172 |
December 29, 2022 |
Interconnect 50 MW to the AEP Transmission System FINAL |
Reposted 07/03/2024 |
Download |
GEN-2017-173 |
December 29, 2022 |
Interconnect 50 MW to the AEP Transmission System FINAL |
Reposted 07/03/2024 |
Download |
GEN-2017-175 |
December 29, 2022 |
Interconnect 300 MW to WAPA transmission system FINAL |
Reposted 08/14/2023 |
Download |
GEN-2017-178 |
December 29, 2022 |
Interconnect 52 MW to the OGE Transmission System FINAL |
Reposted 07/03/2024 |
Download |
GEN-2017-179 |
December 29, 2022 |
Interconnect 222 MW to the WERE Transmission System FINAL |
Reposted 07/25/2023 |
Download |
GEN-2017-181 |
October 13, 2022 |
Interconnect 300 MW to the NPPD Transmission System (FINAL) |
Reposted 07/03/2024 |
Download |
GEN-2017-182 |
October 13, 2022 |
Interconnect 128 MW to the NPPD Transmission System (FINAL) |
Reposted 07/03/2024 |
Download |
GEN-2017-183 |
December 29, 2022 |
Interconnect 400 MW to KCPL transmission system FINAL |
Reposted 07/03/2024 |
Download |
GEN-2017-184 |
December 29, 2022 |
Interconnect 400 MW to KCPL transmission system FINAL |
Reposted 07/05/2024 |
Download |
GEN-2017-187 |
December 29, 2022 |
Interconnect 150 MW to SPS transmission system FINAL |
Posted 05/24/2023 |
Download |
GEN-2017-188 |
October 13, 2022 |
Interconnect 130 MW to the EDE Transmission System (FINAL) |
Reposted 07/03/2024 |
Download |
GEN-2017-191 |
December 29, 2022 |
Interconnect 201.6 MW to the WERE Transmission System FINAL |
Reposted 07/25/2023 |
Download |
GEN-2017-192 |
December 29, 2022 |
Interconnect 52 MW to the WERE Transmission System FINAL |
Posted 07/07/2023 |
Download |
GEN-2017-194 |
December 29, 2022 |
Interconnect 52 MW to the WERE Transmission System |
Posted 04/13/2023 |
Download |
GEN-2017-195 |
December 29, 2022 |
Interconnect 500.4 MW to the KCPL Transmission System FINAL |
Reposted 07/03/2024 |
Download |
GEN-2017-196 |
March 07, 2024 |
Interconnect 128 MW to KCPL transmission system FINAL |
Reposted 07/03/2024 |
Download |
GEN-2017-198 |
October 13, 2022 |
Interconnect 11.64 MW to the OPPD Transmission System (FINAL) |
Posted 02/03/2023 |
Download |
GEN-2017-199 |
December 29, 2022 |
Interconnect 202 MW to the BEPC Transmission System |
Posted 04/13/2023 |
Download |
GEN-2017-200 |
December 29, 2022 |
Interconnect 302 MW to the BEPC Transmission System |
Posted 04/13/2023 |
Download |
GEN-2017-201 |
October 13, 2022 |
Interconnect 250 MW to the NPPD Transmission System (FINAL) |
Reposted 07/03/2024 |
Download |
GEN-2017-202 |
October 13, 2022 |
Interconnect 200 MW to the SWPA Transmission System (FINAL) |
Reposted 07/25/2023 |
Download |
GEN-2017-203 |
December 29, 2022 |
Interconnect 210 MW to the OGE Transmission System FINAL |
Reposted 07/03/2024 |
Download |
GEN-2017-209 |
December 29, 2022 |
Interconnect 300 MW to KCPL transmission system FINAL |
Reposted 07/03/2024 |
Download |
GEN-2017-210 |
October 13, 2022 |
Interconnect 310 MW to the NPPD Transmission System (FINAL) |
Reposted 07/03/2024 |
Download |
GEN-2017-214 |
December 29, 2022 |
Interconnect 100 MW to the BEPC Transmission System FINAL |
Reposted 07/03/2024 |
Download |
GEN-2017-215 |
December 29, 2022 |
Interconnect 100 MW to the BEPC Transmission System FINAL |
Reposted 07/03/2024 |
Download |
GEN-2017-216 |
December 29, 2022 |
Interconnect 100 MW to the BEPC Transmission System FINAL |
Posted 05/24/2023 |
Download |
GEN-2017-220 |
December 29, 2022 |
Interconnect 201.6 MW to the WERE Transmission System FINAL |
Reposted 07/03/2024 |
Download |
GEN-2017-221 |
December 29, 2022 |
Interconnect 152 MW to the WERE Transmission System FINAL |
Reposted 07/03/2024 |
Download |
GEN-2017-222 |
October 13, 2022 |
Interconnect 180 MW to the WAPA Transmission System (FINAL) |
Reposted 7/25/2023 |
Download |
GEN-2017-225 |
December 29, 2022 |
Interconnect 76 MW to the KCPL Transmission System |
Posted 04/13/2023 |
Download |
GEN-2017-226 |
December 29, 2022 |
Interconnect 201.6 MW to the WERE Transmission System FINAL |
Reposted 07/03/2024 |
Download |
GEN-2017-227 |
December 29, 2022 |
Interconnect 201.6 MW to the WERE Transmission System FINAL |
Reposted 07/03/2024 |
Download |
GEN-2017-229 |
December 29, 2022 |
Interconnect 76 MW to the WERE Transmission System FINAL |
Posted 07/07/2023 |
Download |
GEN-2017-230 |
December 29, 2022 |
Interconnect 72.5 MW to the OGE Transmission System FINAL |
Reposted 07/03/2024 |
Download |
GEN-2017-231 |
December 29, 2022 |
Interconnect 72.5 MW to OGE transmission system FINAL |
Posted 06/21/2023 |
Download |
GEN-2017-232 |
December 29, 2022 |
Interconnect 52.2 MW to the OGE Transmission System FINAL |
Reposted 07/03/2024 |
Download |
GEN-2017-233 |
December 29, 2022 |
Interconnect 215 MW to the OGE Transmission System FINAL |
Reposted 08/06/2024 |
Download |
GEN-2017-234 |
October 13, 2022 |
Interconnect115 MW to the NPPD Transmission System (FINAL) |
Reposted 07/03/2024 |
Download |
GEN-2017-235 |
December 29, 2022 |
Interconnect 50 MW to BEPC transmission system |
Posted on 04/25/2023 |
Download |
GEN-2017-236 |
December 29, 2022 |
Interconnect 50 MW to BEPC transmission system |
Posted on 04/25/2023 |
Download |
GEN-2017-239 |
December 29, 2022 |
Interconnect 300 MW to SPS transmission system FINAL |
Posted 05/16/2023 |
Download |
GEN-2017-240 |
December 29, 2022 |
Interconnect 202 MW to the OGE Transmission System |
Posted 05/03/2023 |
Download |
Please send your requests to GIStudies@spp.org
If you have any questions, please submit a ticket on RMS.
|