Study Number |
Date Requested |
Purpose of Study |
Remarks |
Report |
ASGI-2014-001 |
September 05, 2014 |
Interconnect 2.5 MW to a substation in the SPS Transmission System |
Posted 11/14/2014 |
Download |
GEN-2014-001 |
September 29, 2014 |
Interconnect 200.6 MW to the WERE Transmission System (queued as IFS-2014-001-08) |
Posted 1/9/2015 |
Download |
GEN-2014-001 |
September 29, 2014 |
Interconnect 200.6 MW to the WERE Transmission System (queued as IFS-2014-001-08) |
Reposted 3/5/2015 |
Download |
GEN-2014-001 |
September 19, 2014 |
Interconnect 198.88 MW to the WERE Transmission System (queued as IFS-2014-001-08) |
Reposted 3/26/2020 |
Download |
GEN-2014-001IS |
January 06, 2014 |
Facilities Study by WAPA |
Posted 6/14/2019 with CEII redacted |
Download |
GEN-2014-002 |
September 08, 2014 |
Interconnect 10.53 MW to the OKGE Transmission System (queued as IFS-2014-001-02 ) |
Posted 12/9/2014 |
Download |
GEN-2014-003 |
September 08, 2014 |
Interconnect 15.84 MW to the OKGE Transmission System (queued as IFS-2014-001-03) |
Posted 1/13/2015 |
Download |
GEN-2014-004 |
September 05, 2014 |
Interconnect 3.96 MW to the NPPD Transmission System (queued as IFS-2014-001-04) |
Posted 2/3/2015 |
Download |
GEN-2014-004IS |
December 07, 2015 |
Interconnect 383 MW to the WAPA Transmission System (queued as IFS-2015-001-22) |
Posted 2/13/2017 |
Download |
GEN-2014-005 |
September 08, 2014 |
Interconnect 5.7 MW to the OKGE Transmission System (queued as IFS-2014-001-05) |
Posted 1/12/2015 |
Download |
GEN-2014-012 |
August 29, 2014 |
Interconnect 186 MW Summer/225 MW Winter to the SPS Transmission System (queued as IFS-2014-001-06) |
Posted 6/1/2015 |
Download |
GEN-2014-013 |
September 05, 2014 |
Interconnect 73.5 MW to the NPPD Transmission System (queued as IFS-2014-001-07) |
Posted 2/9/2015 |
Download |
GEN-2014-020 |
February 26, 2015 |
Interconnect 100 MW to the AEPW Transmission System (queued as IFS-2014-002-03) |
Posted 8/26/2015 |
Download |
GEN-2014-021 |
March 11, 2015 |
Interconnect 300 MW to the KCPL Transmission System (queued as IFS-2014-002-04) |
Posted 8/14/2015 |
Download |
GEN-2014-025 |
May 18, 2015 |
Interconnect 2.415 MW to the MIDW Transmission System (queued as IFS-2014-002-05) |
Posted 9/18/2015 |
Download |
GEN-2014-026 |
May 18, 2015 |
Interconnect 150 MW to the OKGE Transmission System (queued as IFS-2014-002-06) |
Posted 10/5/2015 |
Download |
GEN-2014-028 |
March 11, 2015 |
Interconnect 250 MW to the EMDE Transmission System (queued as IFS-2014-002-07) |
Posted 9/28/2015 |
Download |
GEN-2014-031 |
May 18, 2015 |
Interconnect 35.8 MW to the NPPD Transmission System (queued as IFS-2014-002-08) |
Posted 10/2/2015 |
Download |
GEN-2014-032 |
May 18, 2015 |
Interconnect 10.2 MW to the NPPD Transmission System (queued as IFS-2014-002-09) |
Posted 12/29/2021 |
Download |
GEN-2014-033 |
May 18, 2015 |
Interconnect 70 MWs to the SPS transmission system (queued as IFS-2014-002-10) |
Posted 10/19/2015 |
Download |
GEN-2014-033 |
May 18, 2015 |
Interconnect 70 MWs to the SPS transmission system (queued as IFS-2014-002-10) |
Posted 3/11/2016 |
Download |
GEN-2014-033 |
July 15, 2016 |
Interconnect 70 MWs to the SPS transmission system (queued as IFS-2014-002-10) |
Posted 7/27/2016 |
Download |
GEN-2014-034 |
July 15, 2016 |
Interconnect 70 MW to the SPS Transmission System (queued as IFS-2014-002-11) |
Posted 7/27/2016 |
Download |
GEN-2014-034 |
May 18, 2015 |
Interconnect 70 MW to the SPS Transmission System (queued as IFS-2014-002-11) |
Posted 3/11/2016 |
Download |
GEN-2014-034 |
May 18, 2015 |
Interconnect 70 MW to the SPS Transmission System (queued as IFS-2014-002-11) |
Posted 10/28/2015 |
Download |
GEN-2014-035 |
May 18, 2015 |
Interconnect 30 MW to the SPS Transmission System (queued as IFS-2014-002-12) |
Posted 10/28/2015 |
Download |
GEN-2014-035 |
May 18, 2015 |
Interconnect 30 MW to the SPS Transmission System (queued as IFS-2014-002-12) |
Posted 3/11/2016 |
Download |
GEN-2014-035 |
July 15, 2016 |
Interconnect 30 MW to the SPS Transmission System (queued as IFS-2014-002-12) |
Posted 7/27/2016 |
Download |
GEN-2014-037 |
March 29, 2016 |
Interconnect 200.00 MW to the SPS Transmission System (queued as IFS-2015-002-24) |
Posted 11/13/2018 |
Download |
GEN-2014-039 |
May 18, 2015 |
Interconnect 73.4 MW to the NPPD Transmission System (queued as IFS-2014-002-13) |
Posted 10/2/2015 |
Download |
GEN-2014-040 |
March 20, 2015 |
Interconnect 320 MW to the SPS Transmission System (queued as IFS-2014-002-14) |
Posted 6/19/2015 |
Download |
GEN-2014-041 |
April 09, 2015 |
Interconnect 123.165 MW to the SUNC Transmission System (queued as IFS-2014-002-15) |
Posted 10/2/2015 |
Download |
GEN-2014-047 |
May 18, 2015 |
Interconnect 40 MWs to the SPS transmission system (queued as IFS-2014-002-16) |
Posted 3/11/2016 |
Download |
GEN-2014-047 |
May 18, 2015 |
Interconnect 40 MWs to the SPS transmission system (queued as IFS-2014-002-16) |
Posted 10/29/2015 |
Download |
GEN-2014-047 |
May 18, 2015 |
Interconnect 40 MWs to the SPS transmission system (queued as IFS-2014-002-16) |
Posted 2/2/2016 |
Download |
GEN-2014-049 |
May 18, 2015 |
Interconnect 200 MW to the ITC Transmission System (queued as IFS-2014-002-17) |
Posted 10/14/2015 |
Download |
GEN-2014-051 |
September 27, 2014 |
Interconnect 174 MW to the WERE Transmission System (queued as IFS-2014-002-18) |
Posted 7/24/2015 |
Download |
GEN-2014-053 |
May 18, 2015 |
Interconnect 80 MW to the SPS Transmission System (queued as IFS-2014-002-19) |
Posted 10/23/2015 |
Download |
GEN-2014-054 |
May 18, 2015 |
Interconnect 120 MW to the SPS Transmission System (queued as IFS-2014-002-20) |
Posted 10/23/2015 |
Download |
GEN-2014-056 |
May 13, 2015 |
Interconnect 250 MW to the OKGE Transmission System (queued as IFS-2014-002-21) |
Posted 8/27/2015 |
Download |
GEN-2014-057 |
March 25, 2015 |
Interconnect 250 MW to the AEPW Transmission System (queued as IFS-2014-002-22) |
Posted 9/17/2015 |
Download |
GEN-2014-064 |
September 30, 2014 |
Interconnect 248.40 MW to the OKGE Transmission System (queued as IFS-2014-002-24) |
Posted 9/9/2015 |
Download |
GEN-2014-074 |
October 27, 2015 |
Interconnect 152 MW to the SPS Transmission System (queued as IFS-2015-001-17) |
Posted 3/31/2017 |
Download |
IFS-2014-002 |
July 10, 2015 |
Facility Study for Shared Network Upgrades in SPS for IFS-2014-002 (DISIS-2014-002-6) |
Posted 3/11/2016 |
Download |
IFS-2014-002 |
July 10, 2015 |
Facility Study for Shared Network Upgrades in SPS for IFS-2014-002 (DISIS-2014-002) |
Posted 9/18/2015 |
Download |
IFS-2014-002 |
July 10, 2015 |
Facility Study for Shared Network Upgrades in AEP-PSCO for IFS-2014-002 (DISIS-2014-002) |
Posted 9/18/2015 |
Download |
IFS-2014-002 |
July 10, 2015 |
Facility Study for Shared Network Upgrades in SPS for IFS-2014-002 (DISIS-2014-002-4) |
1/11/2016 |
Download |
IFS-2014-002 |
July 10, 2015 |
Facility Study for Shared Network Upgrades in SPS for IFS-2014-002 (DISIS-2014-002-5) |
Posted 2/2/2016 |
Download |
Please send your requests to GIStudies@spp.org
If you have any questions, please submit a ticket on RMS.
|