2022 Impact Studies |
The following Generator Interconnection Studies have been requested.
|
Study Number |
Date Requested |
Purpose of Study |
Remarks |
Report |
2022 Annual Interim Report |
October 01, 2022 |
2022 Annual Interim Report |
Posted 10/1/2022 |
Download |
DISIS-2022-001 |
January 31, 2023 |
DISIS-2022-001 Phase 1 Powerflow and Short Circuit Final Report |
Reposted 10/20/2023 |
Download |
GEN-2022-009_010_083 |
September 11, 2023 |
Interim Impact Study |
Posted 4/19/2024 |
Download |
GEN-2022-147 |
April 17, 2023 |
Interim Impact Study |
Posted 11/7/2023 |
Download |
GEN-2022-GR1 |
March 28, 2022 |
Replacement Impact Study |
Posted 02/10/2023 |
Download |
GEN-2022-GR1 |
April 25, 2024 |
Modification Impact Study |
Posted 10/17/24 |
Download |