2022 Impact Studies
The following Generator Interconnection Studies have been requested.

Study Number Date Requested Purpose of Study Remarks Report
2022 Annual Interim Report October 01, 2022 2022 Annual Interim Report Posted 10/1/2022 Download
DISIS-2022-001 January 31, 2023 DISIS-2022-001 Phase 1 Powerflow and Short Circuit Final Report Reposted 10/20/2023 Download
GEN-2022-009_010_083 September 11, 2023 Interim Impact Study Posted 4/19/2024 Download
GEN-2022-147 April 17, 2023 Interim Impact Study Posted 11/7/2023 Download
GEN-2022-GR1 March 28, 2022 Replacement Impact Study Posted 02/10/2023 Download
GEN-2022-GR1 April 25, 2024 Modification Impact Study Posted 10/17/24 Download