|
|
| 2022 Impact Studies | |
| The following Generator Interconnection Studies have been requested. | |
| Study Number | Date Requested | Purpose of Study | Remarks | Report |
|---|---|---|---|---|
| 2022 Annual Interim Report | October 01, 2022 | 2022 Annual Interim Report | Posted 10/1/2022 | Download |
| DISIS-2022-001 | January 31, 2023 | DISIS-2022-001 Phase 1 Powerflow and Short Circuit Final Report | Reposted 10/20/2023 | Download |
| DISIS-2022-001 | January 31, 2023 | DISIS-2022-001 Phase 2 Powerflow and Short Circuit FINAL Report | Posted 2/20/25 | Download |
| DISIS-2022-001 | January 31, 2023 | DISIS-2022-001-1 Restudy Powerflow, Stability and Short Circuit Final Report | Reposted 2/24/2026 | Download |
| DISIS-2022-001 | January 31, 2023 | DISIS-2022-001-2 Restudy Powerflow, Stability and Short Circuit FINAL Report | Re-Posted 4/24/2026 | Download |
| GEN-2022-009_010_083 | September 11, 2023 | Interim Impact Study | Posted 4/19/2024 | Download |
| GEN-2022-147 | April 17, 2023 | Interim Impact Study | Posted 11/7/2023 | Download |
| GEN-2022-GR1 | March 28, 2022 | Replacement Impact Study | Posted 02/10/2023 | Download |
| GEN-2022-GR1 | April 25, 2024 | Modification Impact Study | Posted 10/17/24 | Download |
|
Please send your requests to GIStudies@spp.org If you have any questions, please submit a ticket on RMS. |
||||