| 2018 Impact Studies | |
| The following Generator Interconnection Studies have been requested. | |
| Study Number | Date Requested | Purpose of Study | Remarks | Report |
|---|---|---|---|---|
| DISIS-2018-001 | March 31, 2018 | DISIS-2018-001 Phase 1 Final Results | Posted 8/9/2022 | Download |
| DISIS-2018-001 | March 31, 2018 | DISIS-2018-001 Phase 2 Final Report | Posted 04/10/2023 | Download |
| DISIS-2018-001-1 | March 31, 2018 | DISIS-2018-001-1 Restudy Power Flow, Stability and Short Circuit | Posted 09/15/2023 | Download |
| DISIS-2018-001-1 | March 31, 2018 | DISIS-2018-001-1 Rev.1 Restudy Power Flow, Stability and Short Circuit | Posted 12/22/2023 | Download |
| DISIS-2018-001-2 | March 31, 2018 | DISIS-2018-001-2 Restudy #2 FINAL Power Flow, Stability and Short Circuit | Posted 9/24/24 | Download |
| DISIS-2018-002/DISIS-2019-001 | March 31, 2018 | DISIS-2018-002/DISIS-2019-001 Phase 2 Powerflow and Short Circuit Final Report | Reposted 09/22/2023 | Download |
| DISIS-2018-002/DISIS-2019-001 | March 31, 2018 | DISIS-2018-002/DISIS-2019-001 Phase 1 Powerflow and Short Circuit Final Report | Reposted 11/16/2022 | Download |
| DISIS-2018-002/DISIS-2019-001-1 | March 31, 2018 | DISIS-2018-002/DISIS-2019-001-1 Restudy Powerflow, Stability and Short Circuit Final Report | Posted 12/10/24 | Download |
| DISIS-2018-002/DISIS-2019-001-1 | March 31, 2018 | DISIS-2018-002/DISIS-2019-001-1 Sensitivity Analysis Report | Posted 5/23/25 | Download |
| DISIS-2018-002/DISIS-2019-001-2 | March 31, 2018 | DISIS-2018-002/DISIS-2019-001-2 Sensitivity Analysis Report | Posted 9/16/25 | Download |
| GEN-2018-003 | October 10, 2024 | Modification Impact Study | Posted 4/15/2025 | Download |
| GEN-2018-003 DISIS ILTCR | November 06, 2024 | DISIS-2018-001 ILTCR Study Report | Posted 1/10/2025 | Download |
| GEN-2018-004 | January 13, 2025 | Modification Impact Study | Posted 5/14/2025 | Download |
| GEN-2018-027 DISIS ILTCR | November 06, 2024 | DISIS-2018-001 ILTCR Study Report | Posted 1/10/2025 | Download |
| GEN-2018-055 | January 30, 2026 | Modification Impact Study | Posted 5/29/2026 | Download |
| GEN-2018-065 DISIS ILTCR | February 03, 2025 | DISIS-2018-002 ILTCR Study Report | Posted 4/11/2025 | Download |
| GEN-2018-067 DISIS ILTCR | February 03, 2025 | DISIS-2018-002 ILTCR Study Report | Posted 4/11/2025 | Download |
| GEN-2018-068 DISIS ILTCR | February 03, 2025 | DISIS-2018-002 ILTCR Study Report | Posted 4/11/2025 | Download |
| GEN-2018-070 | March 22, 2019 | Interim Impact Study Phase 1 | Posted 2/6/2020 | Download |
| GEN-2018-083 DISIS ILTCR | February 03, 2025 | DISIS-2018-002 ILTCR Study Report | Posted 4/11/2025 | Download |
| GEN-2018-131 DISIS ILTCR | February 03, 2025 | DISIS-2018-002 ILTCR Study Report | Posted 4/11/2025 | Download |
| GEN-2018-131-132 | November 18, 2025 | Modification Impact Study | Posted 4/23/2026 | Download |
| GEN-2018-132 DISIS ILTCR | February 03, 2025 | DISIS-2018-002 ILTCR Study Report | Posted 4/11/2025 | Download |
| PISIS-2018-001 | May 29, 2018 | Preliminary Interconnection System Impact Study #1 of 2018 | No requests were entered in this queue cluster | Download |
|
Please send your requests to GIStudies@spp.org If you have any questions, please submit a ticket on RMS. |
||||