Study Number |
Date Requested |
Purpose of Study |
Remarks |
Report |
DISIS-2018-001 |
March 31, 2018 |
DISIS-2018-001 Phase 1 Final Results |
Posted 8/9/2022 |
Download |
DISIS-2018-001 |
March 31, 2018 |
DISIS-2018-001 Phase 2 Final Report |
Posted 04/10/2023 |
Download |
DISIS-2018-001-1 |
March 31, 2018 |
DISIS-2018-001-1 Restudy Power Flow, Stability and Short Circuit |
Posted 09/15/2023 |
Download |
DISIS-2018-001-1 |
March 31, 2018 |
DISIS-2018-001-1 Rev.1 Restudy Power Flow, Stability and Short Circuit |
Posted 12/22/2023 |
Download |
DISIS-2018-001-2 |
March 31, 2018 |
DISIS-2018-001-2 Restudy #2 FINAL Power Flow, Stability and Short Circuit |
Posted 9/24/24 |
Download |
DISIS-2018-002/DISIS-2019-001 |
March 31, 2018 |
DISIS-2018-002/DISIS-2019-001 Phase 1 Powerflow and Short Circuit Final Report |
Reposted 11/16/2022 |
Download |
DISIS-2018-002/DISIS-2019-001 |
March 31, 2018 |
DISIS-2018-002/DISIS-2019-001 Phase 2 Powerflow and Short Circuit Final Report |
Reposted 09/22/2023 |
Download |
DISIS-2018-002/DISIS-2019-001-1 |
March 31, 2018 |
DISIS-2018-002/DISIS-2019-001-1 Restudy Powerflow, Stability and Short Circuit Final Report |
Posted 12/10/24 |
Download |
GEN-2018-003 DISIS ILTCR |
November 06, 2024 |
DISIS-2018-001 ILTCR Study Report |
Posted 1/10/2025 |
Download |
GEN-2018-027 DISIS ILTCR |
November 06, 2024 |
DISIS-2018-001 ILTCR Study Report |
Posted 1/10/2025 |
Download |
GEN-2018-070 |
March 22, 2019 |
Interim Impact Study Phase 1 |
Posted 2/6/2020 |
Download |
PISIS-2018-001 |
May 29, 2018 |
Preliminary Interconnection System Impact Study #1 of 2018 |
No requests were entered in this queue cluster |
Download |
Please send your requests to GIStudies@spp.org