Study Number |
Date Requested |
Purpose of Study |
Remarks |
Report |
|
January 01, 1900 |
|
|
|
ASGI-2013-001 LOIS |
February 15, 2013 |
Limited Operation Impact Study for Generation Interconnection Request |
Posted 7/31/2013 |
Download |
ASGI-2013-004 |
March 07, 2014 |
Modification Request to interconnect 36.6 MW on the SUNC transmission system |
Posted 4/10/2014 |
Download |
ASGI-2013-004 LOIS |
November 06, 2013 |
Limited Operation Impact Study for Generation Interconnection Study |
Posted 12/9/2013 |
Download |
DISIS-2013-001 |
March 31, 2013 |
Definitive Interconnection System Impact Study DISIS-2013-001 |
Posted 7/31/2013 |
Download |
DISIS-2013-001-1 |
March 31, 2013 |
Definitive Interconnection System Impact ReStudy DISIS-2013-001-1 |
Posted 8/30/2013 |
Download |
DISIS-2013-001-2 |
March 31, 2013 |
Definitive Interconnection System Impact ReStudy DISIS-2013-001-2 |
Posted 1/31/2014 |
Download |
DISIS-2013-001-3 |
March 31, 2013 |
Definitive Interconnection System Impact ReStudy DISIS-2013-001-3 |
Posted 7/30/2014 |
Download |
DISIS-2013-001-4 |
March 31, 2013 |
Definitive Interconnection System Impact Restudy DISIS-2013-001-4 |
Posted 10/23/2014 |
Download |
DISIS-2013-002 |
September 30, 2013 |
Definitive Interconnection System Impact Study DISIS-2013-002 |
Posted 1/31/2014 |
Download |
DISIS-2013-002-1 |
September 30, 2013 |
Definitive Interconnection System Impact Restudy DISIS-2013-002-1 |
Posted 7/31/2014 |
Download |
DISIS-2013-002-2 |
September 30, 2013 |
Definitive Interconnection System Impact Restudy DISIS-2013-002-2 |
Posted 10/23/2014 |
Download |
GEN-2013-002 |
September 27, 2013 |
Limited Operation Impact Study for Generation Interconnection Request |
Posted 9/25/2014 |
Download |
GEN-2013-002 and GEN-2013-019 |
August 21, 2018 |
Impact Study for Generator Modification |
Posted 02/13/2020 |
Download |
GEN-2013-002 and GEN-2013-019 |
January 06, 2023 |
Modification Impact Study |
Posted 6/7/2023 |
Download |
GEN-2013-008 |
September 27, 2013 |
Limited Operation Impact Study for Generation Interconnection Request |
Posted 10/8/2013 |
Download |
GEN-2013-010 |
March 17, 2015 |
Limited Operation Impact Study for Generation Interconnection Request |
Posted 6/12/2015 |
Download |
GEN-2013-014 |
October 13, 2014 |
Modification Request to interconnect 25.5 MW on the NPPD transmission system |
Posted 11/19/2014 |
Download |
GEN-2013-019 |
September 27, 2013 |
Limited Operation Impact Study for Generation Interconnection Request |
Posted 9/25/2014 |
Download |
GEN-2013-022 |
May 26, 2016 |
Impact Restudy for Generator Modification (Inverter Change) |
Posted 6/12/2017 |
Download |
GEN-2013-027 |
May 22, 2017 |
Impact Restudy for Generator Modification (Turbine Change) |
Posted 8/23/2017 |
Download |
GEN-2013-027 |
March 20, 2015 |
Limited Operation Impact Study for Generation Interconnection Request |
Posted 11/12/2015 |
Download |
GEN-2013-027 |
March 20, 2015 |
Impact Restudy for Generator Modification (Turbine Change) |
Posted 5/27/2015 |
Download |
GEN-2013-029 |
June 26, 2015 |
Impact Restudy for Generator Modification (Turbine Change) |
Posted 1/21/2016 |
Download |
GEN-2013-029 |
January 14, 2015 |
Impact Restudy for Generator Modification (Turbine Change) |
Posted 2/27/2015 |
Download |
GEN-2013-030 |
May 31, 2016 |
Modification Request Impact Study |
Posted 11/4/2016 |
Download |
GEN-2013-032 |
November 28, 2017 |
Impact Restudy for Generator Modification (Turbine Change) |
Posted 3/21/2018 |
Download |
GEN-2013-032 |
September 27, 2013 |
Limited Operation Impact Study for Generation Interconnection Request |
Posted 4/8/15 |
Download |
PISIS-2013-001 |
June 30, 2013 |
Preliminary Interconnection System Impact Study PISIS-2013-001 |
Posted 8/30/2013 |
Download |
PISIS-2013-002 |
June 30, 2013 |
Preliminary Interconnection System Impact Study |
Posted 2/28/2014 |
Download |
Please send your requests to GIStudies@spp.org
If you have any questions, please submit a ticket on RMS.
|