|
|
| 2013 Impact Studies | |
| The following Generator Interconnection Studies have been requested. | |
| Study Number | Date Requested | Purpose of Study | Remarks | Report |
|---|---|---|---|---|
| January 01, 1900 | ||||
| ASGI-2013-001 LOIS | February 15, 2013 | Limited Operation Impact Study for Generation Interconnection Request | Posted 7/31/2013 | Download |
| ASGI-2013-004 | March 07, 2014 | Modification Request to interconnect 36.6 MW on the SUNC transmission system | Posted 4/10/2014 | Download |
| ASGI-2013-004 LOIS | November 06, 2013 | Limited Operation Impact Study for Generation Interconnection Study | Posted 12/9/2013 | Download |
| DISIS-2013-001 | March 31, 2013 | Definitive Interconnection System Impact Study DISIS-2013-001 | Posted 7/31/2013 | Download |
| DISIS-2013-001-1 | March 31, 2013 | Definitive Interconnection System Impact ReStudy DISIS-2013-001-1 | Posted 8/30/2013 | Download |
| DISIS-2013-001-2 | March 31, 2013 | Definitive Interconnection System Impact ReStudy DISIS-2013-001-2 | Posted 1/31/2014 | Download |
| DISIS-2013-001-3 | March 31, 2013 | Definitive Interconnection System Impact ReStudy DISIS-2013-001-3 | Posted 7/30/2014 | Download |
| DISIS-2013-001-4 | March 31, 2013 | Definitive Interconnection System Impact Restudy DISIS-2013-001-4 | Posted 10/23/2014 | Download |
| DISIS-2013-002 | September 30, 2013 | Definitive Interconnection System Impact Study DISIS-2013-002 | Posted 1/31/2014 | Download |
| DISIS-2013-002-1 | September 30, 2013 | Definitive Interconnection System Impact Restudy DISIS-2013-002-1 | Posted 7/31/2014 | Download |
| DISIS-2013-002-2 | September 30, 2013 | Definitive Interconnection System Impact Restudy DISIS-2013-002-2 | Posted 10/23/2014 | Download |
| GEN-2013-002 | September 27, 2013 | Limited Operation Impact Study for Generation Interconnection Request | Posted 9/25/2014 | Download |
| GEN-2013-002 and GEN-2013-019 | August 21, 2018 | Impact Study for Generator Modification | Posted 02/13/2020 | Download |
| GEN-2013-002 and GEN-2013-019 | January 06, 2023 | Modification Impact Study | Posted 6/7/2023 | Download |
| GEN-2013-002_019 (2) | December 19, 2022 | Modification Impact Study | Posted 12/3/2024 | Download |
| GEN-2013-008 | September 27, 2013 | Limited Operation Impact Study for Generation Interconnection Request | Posted 10/8/2013 | Download |
| GEN-2013-010 | March 17, 2015 | Limited Operation Impact Study for Generation Interconnection Request | Posted 6/12/2015 | Download |
| GEN-2013-014 | October 13, 2014 | Modification Request to interconnect 25.5 MW on the NPPD transmission system | Posted 11/19/2014 | Download |
| GEN-2013-019 | September 27, 2013 | Limited Operation Impact Study for Generation Interconnection Request | Posted 9/25/2014 | Download |
| GEN-2013-022 | May 26, 2016 | Impact Restudy for Generator Modification (Inverter Change) | Posted 6/12/2017 | Download |
| GEN-2013-027 | May 22, 2017 | Impact Restudy for Generator Modification (Turbine Change) | Posted 8/23/2017 | Download |
| GEN-2013-027 | March 20, 2015 | Limited Operation Impact Study for Generation Interconnection Request | Posted 11/12/2015 | Download |
| GEN-2013-027 | March 20, 2015 | Impact Restudy for Generator Modification (Turbine Change) | Posted 5/27/2015 | Download |
| GEN-2013-029 | June 26, 2015 | Impact Restudy for Generator Modification (Turbine Change) | Posted 1/21/2016 | Download |
| GEN-2013-029 | January 14, 2015 | Impact Restudy for Generator Modification (Turbine Change) | Posted 2/27/2015 | Download |
| GEN-2013-030 | May 31, 2016 | Modification Request Impact Study | Posted 11/4/2016 | Download |
| GEN-2013-032 | November 28, 2017 | Impact Restudy for Generator Modification (Turbine Change) | Posted 3/21/2018 | Download |
| GEN-2013-032 | September 27, 2013 | Limited Operation Impact Study for Generation Interconnection Request | Posted 4/8/15 | Download |
| PISIS-2013-001 | June 30, 2013 | Preliminary Interconnection System Impact Study PISIS-2013-001 | Posted 8/30/2013 | Download |
| PISIS-2013-002 | June 30, 2013 | Preliminary Interconnection System Impact Study | Posted 2/28/2014 | Download |
|
Please send your requests to GIStudies@spp.org If you have any questions, please submit a ticket on RMS. |
||||