2013 Facility Studies
The following Generator Interconnection Studies have been requested.

Study Number Date Requested Purpose of Study Remarks Report
ASGI-2013-006 November 06, 2013 Interconnect 2 MW to a substation in the SPS Transmission System Posted 11/14/2014 Download
DISIS-2013-001 NPPD FS September 27, 2013 Facility Study for NPPD Interconnection Requests Posted 1/16/2014 Download
GEN-2013-002 September 27, 2013 Interconnect 50.6 MW to the LES transmission system Posted 12/17/2013 Download
GEN-2013-002 September 27, 2013 Interconnect 50.6 MW to the LES transmission system Reposted 11/25/2014 Download
GEN-2013-002 September 27, 2013 Interconnect 50.6 MW to the LES transmission system Reposted 2/18/2015 Download
GEN-2013-002 September 27, 2013 Interconnect 50.6 MW to the LES transmission system Reposted 3/4/2015 Download
GEN-2013-002 and GEN-2013-019 February 15, 2019 Interconnect 124.2 MW to the NPPD Transmission System (queued as IFS-2013-001-01 and IFS-2013-002-01) Posted 03/11/2020 Download
GEN-2013-007 September 27, 2013 Interconnect 100 MW to the OGE transmission system Posted 10/16/2013 Download
GEN-2013-009 September 27, 2013 Interconnect 100.3 MW to the AEPW transmission system Posted 7/9/13 Download
GEN-2013-010 May 18, 2015 Interconnect 99 MW to the ITC Transmission System (queued as IFS-2014-002-01) Posted 10/19/2015 Download
GEN-2013-011 September 27, 2013 Interconnect 30 MW to the AEPW transmission system Posted 7/23/2014 Download
GEN-2013-012 September 27, 2013 Interconnect 68 MW Summer / 147 MW Winter to the OGE transmission system Posted 10/16/2013 Download
GEN-2013-013 September 27, 2013 Interconnect 248.4 MW to the SPS transmission system Posted 8/5/2014 Download
GEN-2013-016 September 17, 2013 Interconnect 191 MW Summer / 203 MW Winter to the SPS transmission system Posted 4/14/2015 Download
GEN-2013-019 April 25, 2014 Interconnect 73.6 MW to the LES transmission system Reposted 3/4/2015 Download
GEN-2013-019 April 25, 2014 Interconnect 73.6 MW to the LES transmission system Reposted 2/18/2015 Download
GEN-2013-019 April 25, 2014 Interconnect 73.6 MW to the LES transmission system Posted 6/16/2014 Download
GEN-2013-019 April 25, 2014 Interconnect 73.6 MW to the LES transmission system Reposted 11/25/2014 Download
GEN-2013-022 February 24, 2014 Interconnect 25 MW to the SPS transmission system Reposted 4/9/2015 Download
GEN-2013-022 February 24, 2014 Interconnect 25 MW to the SPS transmission system Posted 9/18/2014 Download
GEN-2013-022 February 24, 2014 Interconnect 25 MW to the SPS transmission system Reposted 11/5/2014 Download
GEN-2013-022 February 24, 2014 Interconnect 25 MW to the SPS transmission system Posted 10/19/2015 Download
GEN-2013-025 February 24, 2014 Interconnect 50 MW to the OKGE transmission system Posted 4/28/2014 Download
GEN-2013-027 May 18, 2015 Interconnect 150 MWs to the SPS transmission system (queued as IFS-2014-002-02) Posted 2/2/2016 Download
GEN-2013-027 May 18, 2015 Interconnect 150 MWs to the SPS transmission system (queued as IFS-2014-002-02) Posted 3/11/2016 Download
GEN-2013-027 May 18, 2015 Interconnect 150 MWs to the SPS transmission system (queued as IFS-2014-002-02) Posted 11/9/2015 Download
GEN-2013-028 April 25, 2014 Interconnect 495 MW Summer / 538.1 MW Winter to the GRDA transmission system Posted 9/24/2014 Download
GEN-2013-029 February 20, 2014 Interconnect 300 MW to the OKGE transmission system Posted 6/24/2014 Download
GEN-2013-030 February 24, 2014 Interconnect 300 MW to the OKGE transmission system Posted 8/4/2014 Download
GEN-2013-031 April 25, 2014 Interconnect 332 MW Summer / 370 MW Winter to the SPS transmission system Posted 6/18/2014 Download
GEN-2013-032 April 25, 2014 Interconnect 204 MWs to the NPPD transmission system Posted 6/25/2014 Download
GEN-2013-032 April 25, 2014 Interconnect 204 MWs to the NPPD transmission system (queued as IFS-2013-002-06) Reposted 1/20/15 Download
GEN-2013-033 April 29, 2014 Interconnect 28 MW to the MIDW transmission system Posted 6/2/2014 Download
GEN-2013-034 April 02, 2014 Interconnect 73.6 MW to the OKGE transmission system Posted 6/16/2014 Download
GEN-2013-035 September 05, 2014 Interconnect 105.6 MW to the OKGE transmission system Posted 1/9/2015 Download