2026 Facility Studies
The following Generator Interconnection Studies have been requested.

Study Number Date Requested Purpose of Study Remarks Report
GEN-2026-SR11 September 02, 2026 Surplus Interconnect 258 MW to the OGE Transmission System Posted 09/20/2026 Download