2025 Affected Systems
The following Generator Interconnection Studies have been requested.

Study Number Date Requested Purpose of Study Remarks Report
2025 AECI GI Limited Operations Study December 20, 2024 2025 AECI GI Limited Operations Study Posted 12/20/2024 Download
SPP ERAS-2025 October 17, 2025 AECI Affected System Impact Study for SPP ERAS Posted 09/11/2026 Download
SPP ERAS-2025 October 17, 2025 MPC Affected System Impact Study for SPP ERAS Posted 9/29/2026 Download