| Study Number |
Date Requested |
Purpose of Study |
Remarks |
Report |
| ERAS-2025-001 |
March 06, 2026 |
ERAS-2025-001 Interconnection Facility Studies Draft Report |
Posted 5/26/2026 |
Download |
| ERAS-2025-001 |
March 06, 2026 |
Interconnect 104 MW to the LES transmission system |
Posted 5/11/2026 |
Download |
| ERAS-2025-002 |
March 06, 2026 |
Interconnect 217 MW to the SPS Transmission System |
Posted 5/22/2026 |
Download |
| ERAS-2025-005 |
March 06, 2026 |
Interconnect 150 MW to the AEP transmission system |
Posted 5/11/2026 |
Download |
| ERAS-2025-006 |
March 06, 2026 |
Interconnect 717.8 MW to the Evergy transmission system |
Posted 5/11/2026 |
Download |
| ERAS-2025-007 |
March 06, 2026 |
Interconnect 450 MW to the Evergy transmission system |
Posted 5/11/2026 |
Download |
| ERAS-2025-008 |
March 06, 2026 |
Interconnect 721.1 MW to the Evergy transmission system |
Posted 5/11/2026 |
Download |
| ERAS-2025-009 |
March 06, 2026 |
Interconnect 450 MW to the GRDA transmission system |
Posted 5/29/2026 |
Download |
| ERAS-2025-011 |
March 06, 2026 |
Interconnect 750 MW to the BEPC transmission system |
Posted 5/11/2026 |
Download |
| ERAS-2025-012 |
March 06, 2026 |
Interconnect 750 MW to the BEPC transmission system |
Posted 5/11/2026 |
Download |
| ERAS-2025-013 |
March 06, 2026 |
Interconnect 450 MW to the Evergy transmission system |
Posted 5/11/2026 |
Download |
| ERAS-2025-014 |
March 06, 2026 |
Interconnect 159.5 MW to the SPS Transmission System |
Posted 5/22/2026 |
Download |
| ERAS-2025-015 |
March 06, 2026 |
Interconnect 400 MW to the SEPC Transmission System |
Posted 5/11/2026 |
Download |
| ERAS-2025-016 |
March 06, 2026 |
Interconnect 232.5 MW to the SPS Transmission System |
Posted 5/11/2026 |
Download |
| ERAS-2025-017 |
March 06, 2026 |
Interconnect 600 MW to the SEPC Transmission System |
Posted 5/11/2026 |
Download |
| ERAS-2025-018 |
March 06, 2026 |
Interconnect 256 MW to the SPS Transmission System |
Posted 5/22/2026 |
Download |
| ERAS-2025-019 |
March 06, 2026 |
Interconnect 80 MW to the MIDW Transmission System |
Re-posted 5/27/2026 |
Download |
| ERAS-2025-020 |
March 06, 2026 |
Interconnect 400 MW to the SPS Transmission System |
Posted 5/11/2026 |
Download |
| ERAS-2025-021 |
March 06, 2026 |
Interconnect 500 MW to the SPS Transmission System |
Posted 5/22/2026 |
Download |
| ERAS-2025-022 |
March 06, 2026 |
Interconnect 123 MW to the PEC transmission system |
Posted 2/28/2026 |
Download |
| ERAS-2025-023 |
March 06, 2026 |
Interconnect 510 MW to the AEP Transmission System |
Posted 5/22/2026 |
Download |
| ERAS-2025-024 |
March 06, 2026 |
Interconnect 744 MW to the AEP Transmission System |
Re-Posted 5/26/2026 |
Download |
| ERAS-2025-025 |
March 06, 2026 |
Interconnect 175 MW to the WFEC Transmission System |
Posted 5/22/2026 |
Download |
| ERAS-2025-026 |
March 06, 2026 |
Interconnect 744 MW to the AEP Transmission System |
Posted 5/22/2026 |
Download |
| ERAS-2025-027 |
March 06, 2026 |
Interconnect 250 MW to the SPS Transmission System |
Posted 5/22/2026 |
Download |
| ERAS-2025-028 |
March 06, 2026 |
Interconnect 384 MW to the SPS Transmission System |
Posted 5/22/2026 |
Download |
| ERAS-2025-029 |
March 06, 2026 |
Interconnect 170 MW to the KBPU Transmission System |
Posted 5/22/2026 |
Download |
| ERAS-2025-030 |
March 06, 2026 |
Interconnect 350 MW to the SPS Transmission System |
Posted 5/22/2026 |
Download |
| ERAS-2025-031 |
March 06, 2026 |
Interconnect 150 MW to the KBPU Transmission System |
Posted 5/22/2026 |
Download |
| ERAS-2025-032 |
March 06, 2026 |
Interconnect 150 MW to the SEPC transmission system |
Posted 5/29/2026 |
Download |
| ERAS-2025-033 |
March 06, 2026 |
Interconnect 150 MW to the SEPC Transmission System |
Posted 5/22/2026 |
Download |
| ERAS-2025-034 |
March 06, 2026 |
Interconnect 250 MW to the EDE transmission system |
Posted 5/29/2026 |
Download |
| ERAS-2025-035 |
March 06, 2026 |
Interconnect 137.96 MW to the NWE transmission system |
Posted 5/29/2026 |
Download |
| ERAS-2025-036 |
March 06, 2026 |
Interconnect 140 MW to the SPS Transmission System |
Posted 5/22/2026 |
Download |
| GEN-2025-GR2 |
October 09, 2025 |
Replacement Interconnect 120 MW to the SPS Transmission System |
Posted 02/10/2026 |
Download |
| GEN-2025-SR17 Surplus |
October 23, 2025 |
Surplus Interconnect 200 MW to the AEP Transmission System |
Posted 12/22/2025 |
Download |
| GEN-2025-SR21 Surplus |
October 23, 2025 |
Surplus Interconnect 100 MW to the AEP Transmission System |
Posted 12/23/2025 |
Download |
| GEN-2025-SR22 Surplus |
October 15, 2025 |
Surplus Interconnect 100 MW to the OGE Transmission System |
Posted 11/18/2025 |
Download |
| GEN-2025-SR23 Surplus |
October 17, 2025 |
Surplus Interconnect 100 MW to the OGE Transmission System |
Posted 11/25/2025 |
Download |
| GEN-2025-SR24 Surplus |
March 02, 2026 |
Surplus Interconnect 200 MW to the OPPD Transmission System Final |
Posted 04/07/2026 |
Download |
| GEN-2025-SR25 Surplus |
October 23, 2025 |
Surplus Interconnect 200 MW to the AEP Transmission System |
Posted 12/23/2025 |
Download |
| GEN-2025-SR8 Surplus |
November 10, 2025 |
Surplus Interconnect 219.96 MW to the OGE Transmission System |
Posted 12/23/2025 |
Download |
|
Please send your requests to GIStudies@spp.org
If you have any questions, please submit a ticket on RMS.
|