| 2024 Affected Systems | |
| The following Generator Interconnection Studies have been requested. | |
| Study Number | Date Requested | Purpose of Study | Remarks | Report |
|---|---|---|---|---|
| 2024 AECI GI Limited Operations Study | January 22, 2024 | 2024 AECI GI Limited Operations Study | Posted 01/22/2024 | Download |
| AECI GIA 120-122 | May 20, 2024 | SPP Affected Systems Impact Study for AECI GIA 120-122 | Posted 06/13/2025 | Download |
| AECI GIA 123 | September 03, 2024 | SPP Affected Systems Impact Study for AECI GIA 123 | Posted 09/04/2025 | Download |
| ASGI-2024-001 | September 30, 2024 | Interim Operation Impact Study for Affected System Generation Interconnection Request | Posted 01/24/2025 | Download |
| ASGI-2024-006 | January 14, 2025 | Affected Systems Impact Study | Posted 10/29/2025 | Download |
|