|
|
| 2024 Facility Studies | |
| The following Generator Interconnection Studies have been requested. | |
| Study Number | Date Requested | Purpose of Study | Remarks | Report |
|---|---|---|---|---|
| GEN-2024-GR3 | July 10, 2025 | Replacement Interconnect 196 MW to the SPS Transmission System | Posted 11/25/2025 | Download |
| GEN-2024-SR10 Surplus | February 17, 2026 | Surplus Interconnect 80 MW to the NPPD Transmission System | Posted 4/14/2026 | Download |
| GEN-2024-SR16 Surplus | May 21, 2025 | Surplus Interconnect 100 MW to the AEP Transmission System | Posted 07/22/2025 | Download |
| GEN-2024-SR17 Surplus | May 15, 2025 | Surplus Interconnect 50 MW to the OGE Transmission System | Posted 08/06/2025 | Download |
| GEN-2024-SR7 Surplus | May 28, 2025 | Surplus Interconnect 200 MW to the OGE Transmission System Final | Posted 07/11/2025 | Download |
| GEN-2024-SR8 Surplus | February 20, 2026 | Surplus Interconnect 70 MW to the NPPD Transmission System | Posted 04/14/2026 | Download |
| GEN-2024-SR9 Surplus | May 28, 2025 | Surplus Interconnect 150 MW to the OGE Transmission System Final | Posted 07/11/2025 | Download |
|
Please send your requests to GIStudies@spp.org If you have any questions, please submit a ticket on RMS. |
||||