2023 Affected Systems
The following Generator Interconnection Studies have been requested.

Study Number Date Requested Purpose of Study Remarks Report
MPC03800-04000 May 09, 2023 Affected System Interconnection Facilities Study Report (WAPA) Posted 10/06/2023 Download
MPC03800-04000 (Group 2021-1) April 25, 2019 SPP Affected System Impact Study for MPC 03800-04000 Final Posted 01/18/2023 Download
MPC04300 November 18, 2022 SPP Affected System Impact Study for MPC 04300 Final Posted 05/11/2023 Download