2023 Facility Studies
The following Generator Interconnection Studies have been requested.

Study Number Date Requested Purpose of Study Remarks Report
GEN-2023-GR1 Replacement May 17, 2024 Replacement Interconnect 97.488 MW to the WFEC Transmission System Posted 6/25/2024 Download
GEN-2023-GR4 Replacement March 05, 2024 Replacement Interconnect 72 MW to the SPS Transmission System Posted 4/29/2024 Download
GEN-2023-GR5 Replacement March 11, 2024 Replacement Interconnect 150 MW to the SPS Transmission System Posted 5/1/2024 Download
GEN-2023-SR20 Surplus October 26, 2023 Surplus Interconnect 120 MW to the AEP Transmission System FINAL Posted 12/14/2023 Download
GEN-2023-SR22 Surplus January 30, 2024 Surplus Interconnect 124.7 MW to the AEP Transmission System Posted 3/18/2024 Download
GEN-2023-SR23 Surplus November 10, 2023 Surplus Interconnect 73.5 MW to the AEP Transmission System FINAL Posted 1/3/2024 Download
GEN-2023-SR26 Surplus November 10, 2023 Surplus Interconnect 72.5 MW to the AEP Transmission System FINAL Posted 1/2/2024 Download