2023 Facility Studies |
The following Generator Interconnection Studies have been requested.
|
Study Number |
Date Requested |
Purpose of Study |
Remarks |
Report |
GEN-2023-GR1 Replacement |
May 17, 2024 |
Replacement Interconnect 97.488 MW to the WFEC Transmission System |
Posted 6/25/2024 |
Download |
GEN-2023-GR4 Replacement |
March 05, 2024 |
Replacement Interconnect 72 MW to the SPS Transmission System |
Posted 4/29/2024 |
Download |
GEN-2023-GR5 Replacement |
March 11, 2024 |
Replacement Interconnect 150 MW to the SPS Transmission System |
Posted 5/1/2024 |
Download |
GEN-2023-SR20 Surplus |
October 26, 2023 |
Surplus Interconnect 120 MW to the AEP Transmission System FINAL |
Posted 12/14/2023 |
Download |
GEN-2023-SR22 Surplus |
January 30, 2024 |
Surplus Interconnect 124.7 MW to the AEP Transmission System |
Posted 3/18/2024 |
Download |
GEN-2023-SR23 Surplus |
November 10, 2023 |
Surplus Interconnect 73.5 MW to the AEP Transmission System FINAL |
Posted 1/3/2024 |
Download |
GEN-2023-SR26 Surplus |
November 10, 2023 |
Surplus Interconnect 72.5 MW to the AEP Transmission System FINAL |
Posted 1/2/2024 |
Download |