| Study Number |
Date Requested |
Purpose of Study |
Remarks |
Report |
| DISIS-2022-001 |
September 18, 2025 |
DISIS-2022-001 Interconnection Facility Studies Draft Report |
Posted 11/18/2025 |
Download |
| GEN-2022-004 |
September 18, 2025 |
Interconnect 33 MW to the Evergy Transmission System FINAL |
Posted 12/8/2025 |
Download |
| GEN-2022-006 |
September 18, 2025 |
Interconnect 200 MW to the Evergy Transmission System FINAL |
Posted 12/8/2025 |
Download |
| GEN-2022-007 |
September 18, 2025 |
Interconnect 135 MW to the Evergy Transmission System FINAL |
Posted 12/9/2025 |
Download |
| GEN-2022-009 |
September 18, 2025 |
Interconnect 125 MW to the BEPC Transmission System FINAL |
Posted 12/8/2025 |
Download |
| GEN-2022-009 Interim |
April 16, 2024 |
Interconnect 125 MW to the BEPC Transmission System |
Posted 5/31/2024 |
Download |
| GEN-2022-010 |
September 18, 2025 |
Interconnect 250 MW to the BEPC Transmission System FINAL |
Posted 12/8/2025 |
Download |
| GEN-2022-010 Interim |
April 16, 2024 |
Interconnect 250 MW to the BEPC Transmission System |
Posted 5/31/2024 |
Download |
| GEN-2022-012 |
September 18, 2025 |
Interconnect 100 MW to the OGE Transmission System Rev. 1 FINAL |
Posted 12/11/2025 |
Download |
| GEN-2022-013 |
September 18, 2025 |
Interconnect 300 MW to the Evergy Transmission System FINAL |
Posted 12/5/2025 |
Download |
| GEN-2022-015 |
September 18, 2025 |
Interconnect 270 MW to the SUNC Transmission System FINAL |
Posted 12/5/2025 |
Download |
| GEN-2022-016 |
September 18, 2025 |
Interconnect 288 MW to the OGE Transmission System FINAL |
Posted 12/11/2025 |
Download |
| GEN-2022-017 |
September 18, 2025 |
Interconnect 150 MW to the OGE Transmission System FINAL |
Posted 12/11/2025 |
Download |
| GEN-2022-024 |
September 18, 2025 |
Interconnect 200 MW to the Evergy Transmission System FINAL |
Posted 12/5/2025 |
Download |
| GEN-2022-038 |
September 18, 2025 |
Interconnect 180 MW to the AEP Transmission System FINAL |
Posted 12/8/2025 |
Download |
| GEN-2022-054 |
September 18, 2025 |
Interconnect 200 MW to the NEET Transmission System FINAL |
Posted 12/8/2025 |
Download |
| GEN-2022-055 |
September 18, 2025 |
Interconnect 200 MW to the WFEC Transmission System FINAL |
Posted 12/8/2025 |
Download |
| GEN-2022-065 |
September 18, 2025 |
Interconnect 145 MW to the SUNC Transmission System FINAL |
Posted 12/5/2025 |
Download |
| GEN-2022-071 |
September 18, 2025 |
Interconnect 90.824 MW to the AEP Transmission System FINAL |
Posted 12/22/2025 |
Download |
| GEN-2022-073 |
September 18, 2025 |
Interconnect 300 MW to the KCPL Transmission System FINAL |
Posted 12/8/2025 |
Download |
| GEN-2022-075 |
September 18, 2025 |
Interconnect 175 MW to the ITCGP Transmission System FINAL |
Posted 12/5/2025 |
Download |
| GEN-2022-083 |
September 18, 2025 |
Interconnect 250 MW to the BEPC Transmission System FINAL |
Posted 12/8/2025 |
Download |
| GEN-2022-083 Interim |
April 16, 2024 |
Interconnect 250 MW to the BEPC Transmission System |
Posted 6/6/2024 |
Download |
| GEN-2022-098 |
September 18, 2025 |
Interconnect 200 MW to the OGE Transmission System FINAL |
Posted 12/5/2025 |
Download |
| GEN-2022-100 |
September 18, 2025 |
Interconnect 80 MW to the KCPL Transmission System FINAL |
Posted 12/5/2025 |
Download |
| GEN-2022-102 |
September 18, 2025 |
Interconnect 100 MW to the KCPL Transmission System FINAL |
Posted 12/5/2025 |
Download |
| GEN-2022-104 |
September 18, 2025 |
Interconnect 113.078 MW to the WFEC Transmission System FINAL |
Posted 12/22/2025 |
Download |
| GEN-2022-111 |
September 18, 2025 |
Interconnect 150 MW to the AEP Transmission System |
Posted 11/18/2025 |
Download |
| GEN-2022-130 |
September 18, 2025 |
Interconnect 200 MW to the OGE Transmission System FINAL |
Posted 12/5/2025 |
Download |
| GEN-2022-136 |
September 18, 2025 |
Interconnect 180 MW to the WFEC Transmission System FINAL |
Posted 12/5/2025 |
Download |
| GEN-2022-139 |
September 18, 2025 |
Interconnect 300 MW to the AEP Transmission System FINAL |
Posted 12/5/2025 |
Download |
| GEN-2022-142 |
September 18, 2025 |
Interconnect 200 MW to the KCPL Transmission System FINAL |
Posted 12/5/2025 |
Download |
| GEN-2022-143 |
September 18, 2025 |
Interconnect 200 MW to the OGE Transmission System FINAL |
Posted 12/5/2025 |
Download |
| GEN-2022-144 |
September 18, 2025 |
Interconnect 200 MW to the KCPL Transmission System FINAL |
Posted 12/5/2025 |
Download |
| GEN-2022-145 |
September 18, 2025 |
Interconnect 180 MW to the AEP Transmission System FINAL |
Posted 12/5/2025 |
Download |
| GEN-2022-147 |
September 18, 2025 |
Interconnect 203 MW to the SPS Transmission System FINAL |
Posted 12/15/2025 |
Download |
| GEN-2022-147 Interim |
November 15, 2023 |
Interconnect 203 MW to the SPS Transmission System |
Posted 02/15/2024 |
Download |
| GEN-2022-154 |
September 18, 2025 |
Interconnect 100 MW to the WFEC Transmission System FINAL |
Posted 12/5/2025 |
Download |
| GEN-2022-155 |
September 18, 2025 |
Interconnect 200 MW to the OGE Transmission System FINAL |
Posted 12/5/2025 |
Download |
| GEN-2022-156 |
September 18, 2025 |
Interconnect 100 MW to the GRDA Transmission System FINAL |
Posted 12/5/2025 |
Download |
| GEN-2022-161 |
September 18, 2025 |
Interconnect 360 MW to the Evergy Transmission System FINAL |
Posted 12/5/2025 |
Download |
| GEN-2022-176 |
September 18, 2025 |
Interconnect 215 MW to the AEP Transmission System FINAL |
Posted 12/5/2025 |
Download |
| GEN-2022-214 |
September 18, 2025 |
Interconnect 239 MW to the Evergy Transmission System FINAL |
Posted 12/11/2025 |
Download |
| GEN-2022-234 |
September 18, 2025 |
Interconnect 200 MW to the AEP Transmission System |
Posted 11/18/2025 |
Download |
| GEN-2022-235 |
September 18, 2025 |
Interconnect 150 MW to the WFEC Transmission System FINAL |
Posted 12/5/2025 |
Download |
| GEN-2022-238 |
September 18, 2025 |
Interconnect 150 MW to the OGE Transmission System FINAL |
Posted 12/5/2025 |
Download |
| GEN-2022-GR1 |
April 27, 2023 |
Generator Replacement Facility Study Report for Pirkey 138 kV |
Posted 08/01/2023 |
Download |
|
Please send your requests to GIStudies@spp.org
If you have any questions, please submit a ticket on RMS.
|