|
|
| 2022 Facility Studies | |
| The following Generator Interconnection Studies have been requested. | |
| Study Number | Date Requested | Purpose of Study | Remarks | Report |
|---|---|---|---|---|
| DISIS-2022-001 | September 18, 2025 | DISIS-2022-001 Interconnection Facility Studies Draft Report | Posted 3/17/2026 | Download |
| GEN-2022-004 | September 18, 2025 | Interconnect 33 MW to the Evergy Transmission System FINAL | Posted 12/8/2025 | Download |
| GEN-2022-006 | September 18, 2025 | Interconnect 200 MW to the Evergy Transmission System FINAL | Posted 12/8/2025 | Download |
| GEN-2022-007 | September 18, 2025 | Interconnect 135 MW to the Evergy Transmission System FINAL | Posted 12/9/2025 | Download |
| GEN-2022-009 | September 18, 2025 | Interconnect 125 MW to the BEPC Transmission System FINAL | Posted 12/8/2025 | Download |
| GEN-2022-009 Interim | April 16, 2024 | Interconnect 125 MW to the BEPC Transmission System | Posted 5/31/2024 | Download |
| GEN-2022-010 | September 18, 2025 | Interconnect 250 MW to the BEPC Transmission System FINAL | Posted 12/8/2025 | Download |
| GEN-2022-010 Interim | April 16, 2024 | Interconnect 250 MW to the BEPC Transmission System | Posted 5/31/2024 | Download |
| GEN-2022-012 | September 18, 2025 | Interconnect 100 MW to the OGE Transmission System Rev. 1 FINAL | Posted 12/11/2025 | Download |
| GEN-2022-013 | September 18, 2025 | Interconnect 300 MW to the Evergy Transmission System FINAL | Posted 12/5/2025 | Download |
| GEN-2022-015 | September 18, 2025 | Interconnect 270 MW to the SUNC Transmission System FINAL | Posted 12/5/2025 | Download |
| GEN-2022-016 | September 18, 2025 | Interconnect 288 MW to the OGE Transmission System FINAL | Posted 12/11/2025 | Download |
| GEN-2022-017 | September 18, 2025 | Interconnect 150 MW to the OGE Transmission System FINAL | Posted 12/11/2025 | Download |
| GEN-2022-024 | September 18, 2025 | Interconnect 200 MW to the Evergy Transmission System FINAL | Posted 12/5/2025 | Download |
| GEN-2022-038 | September 18, 2025 | Interconnect 180 MW to the AEP Transmission System FINAL | Posted 12/8/2025 | Download |
| GEN-2022-054 | September 18, 2025 | Interconnect 200 MW to the NEET Transmission System FINAL | Posted 3/17/2026 | Download |
| GEN-2022-055 | September 18, 2025 | Interconnect 200 MW to the WFEC Transmission System FINAL | Posted 12/8/2025 | Download |
| GEN-2022-065 | September 18, 2025 | Interconnect 145 MW to the SUNC Transmission System FINAL | Posted 12/5/2025 | Download |
| GEN-2022-071 | September 18, 2025 | Interconnect 90.824 MW to the AEP Transmission System FINAL | Posted 12/22/2025 | Download |
| GEN-2022-073 | September 18, 2025 | Interconnect 300 MW to the KCPL Transmission System FINAL | Posted 12/8/2025 | Download |
| GEN-2022-075 | September 18, 2025 | Interconnect 175 MW to the ITCGP Transmission System FINAL | Posted 12/5/2025 | Download |
| GEN-2022-083 | September 18, 2025 | Interconnect 250 MW to the BEPC Transmission System FINAL | Posted 12/8/2025 | Download |
| GEN-2022-083 Interim | April 16, 2024 | Interconnect 250 MW to the BEPC Transmission System | Posted 6/6/2024 | Download |
| GEN-2022-098 | September 18, 2025 | Interconnect 200 MW to the OGE Transmission System FINAL | Posted 12/5/2025 | Download |
| GEN-2022-100 | September 18, 2025 | Interconnect 80 MW to the KCPL Transmission System FINAL | Posted 12/5/2025 | Download |
| GEN-2022-102 | September 18, 2025 | Interconnect 100 MW to the KCPL Transmission System FINAL | Posted 12/5/2025 | Download |
| GEN-2022-104 | September 18, 2025 | Interconnect 113.078 MW to the WFEC Transmission System FINAL | Posted 12/22/2025 | Download |
| GEN-2022-111 | September 18, 2025 | Interconnect 150 MW to the AEP Transmission System | Posted 11/18/2025 | Download |
| GEN-2022-130 | September 18, 2025 | Interconnect 200 MW to the OGE Transmission System FINAL | Posted 12/5/2025 | Download |
| GEN-2022-136 | September 18, 2025 | Interconnect 180 MW to the WFEC Transmission System FINAL | Posted 12/5/2025 | Download |
| GEN-2022-139 | September 18, 2025 | Interconnect 300 MW to the AEP Transmission System FINAL | Posted 12/5/2025 | Download |
| GEN-2022-142 | September 18, 2025 | Interconnect 200 MW to the KCPL Transmission System FINAL | Posted 12/5/2025 | Download |
| GEN-2022-143 | September 18, 2025 | Interconnect 200 MW to the OGE Transmission System FINAL | Posted 12/5/2025 | Download |
| GEN-2022-144 | September 18, 2025 | Interconnect 200 MW to the KCPL Transmission System FINAL | Posted 12/5/2025 | Download |
| GEN-2022-145 | September 18, 2025 | Interconnect 180 MW to the AEP Transmission System FINAL | Posted 12/5/2025 | Download |
| GEN-2022-147 | September 18, 2025 | Interconnect 203 MW to the SPS Transmission System FINAL | Posted 12/15/2025 | Download |
| GEN-2022-147 Interim | November 15, 2023 | Interconnect 203 MW to the SPS Transmission System | Posted 02/15/2024 | Download |
| GEN-2022-154 | September 18, 2025 | Interconnect 100 MW to the WFEC Transmission System FINAL | Posted 12/5/2025 | Download |
| GEN-2022-155 | September 18, 2025 | Interconnect 200 MW to the OGE Transmission System FINAL | Posted 12/5/2025 | Download |
| GEN-2022-156 | September 18, 2025 | Interconnect 100 MW to the GRDA Transmission System FINAL | Posted 12/5/2025 | Download |
| GEN-2022-161 | September 18, 2025 | Interconnect 360 MW to the Evergy Transmission System FINAL | Posted 12/5/2025 | Download |
| GEN-2022-176 | September 18, 2025 | Interconnect 215 MW to the AEP Transmission System FINAL | Posted 12/5/2025 | Download |
| GEN-2022-214 | September 18, 2025 | Interconnect 239 MW to the Evergy Transmission System FINAL | Posted 12/11/2025 | Download |
| GEN-2022-234 | September 18, 2025 | Interconnect 200 MW to the AEP Transmission System | Posted 11/18/2025 | Download |
| GEN-2022-235 | September 18, 2025 | Interconnect 150 MW to the WFEC Transmission System FINAL | Posted 12/5/2025 | Download |
| GEN-2022-238 | September 18, 2025 | Interconnect 150 MW to the OGE Transmission System FINAL | Posted 12/5/2025 | Download |
| GEN-2022-GR1 | April 27, 2023 | Generator Replacement Facility Study Report for Pirkey 138 kV | Posted 08/01/2023 | Download |
|
Please send your requests to GIStudies@spp.org If you have any questions, please submit a ticket on RMS. |
||||