- Studies Postings
|
|
|
| |
| 2021 Affected Systems |
|
The following Generator Interconnection Studies have been requested.
|
| Study Number |
Date Requested |
Purpose of Study |
Remarks |
Report |
| CIPCO IR24 & IR32 |
December 02, 2019 |
Affected System Impact Study |
Posted 4/15/2021 |
Download |
| DISIS-2021-001 |
April 30, 2021 |
MPC Affected System Impact Restudy Draft |
Posted 10/29/2025 |
Download |
| DISIS-2021-001 |
April 30, 2021 |
AECI Affected System Impact Results v0 |
Posted 07/19/2024 |
Download |
| DISIS-2021-001 |
April 20, 2021 |
MISO Affected System Impact Results |
Re-Posted 08/09/2024 |
Download |
| DISIS-2021-001 |
April 30, 2021 |
MPC Affected System Impact Study |
Posted 09/24/2024 |
Download |
| FINAL SPP Affected System Impact Study for AECI Group 8, 12, and 13 |
May 24, 2018 |
FINAL SPP Affected System Impact Study for AECI Group 8, 12, and 13 |
Posted 05/11/2022 |
Download |
| MISO AFS DISIS 2021-001 |
April 30, 2021 |
Affected Systems Impact Restudy (Phase 3) Final |
Re-Posted 7/21/2025 |
Download |
|