| 2021 Facility Studies | |
| The following Generator Interconnection Studies have been requested. | |
| Study Number | Date Requested | Purpose of Study | Remarks | Report |
|---|---|---|---|---|
| GEN-2021-001 | June 25, 2025 | Interconnect 100 MW to the OGE Transmission System FINAL | Posted 11/21/2025 | Download |
| GEN-2021-005 | June 25, 2025 | Interconnect 350 MW to the WERE Transmission System FINAL | Posted 9/8/2025 | Download |
| GEN-2021-006 | June 25, 2025 | Interconnect 300 MW to the WERE Transmission System Rev. 2 FINAL | Posted 1/27/2026 | Download |
| GEN-2021-008 | June 25, 2025 | Interconnect 200 MW to the BEPC Transmission System FINAL | Posted 9/4/2025 | Download |
| GEN-2021-015 | June 25, 2025 | Interconnect 74.9 MW to the OGE Transmission System FINAL | Posted 9/2/2025 | Download |
| GEN-2021-016 | June 25, 2025 | Interconnect 250 MW to the AEP Transmission System FINAL | Posted 9/18/2025 | Download |
| GEN-2021-017 | June 25, 2025 | Interconnect 37.5 MW to the ITCGP Transmission System | Posted 3/12/2026 | Download |
| GEN-2021-018 | June 25, 2025 | Interconnect 231 MW to the OGE Transmission System FINAL | Posted 9/8/2025 | Download |
| GEN-2021-019 | June 25, 2025 | Interconnect 74.9 MW to the OGE Transmission System FINAL | Posted 9/8/2025 | Download |
| GEN-2021-021 | June 25, 2025 | Interconnect 150 MW to the NPPD Transmission System FINAL | Posted 12/02/2025 | Download |
| GEN-2021-023 | June 25, 2025 | Interconnect 306.18 MW to the WERE Transmission System FINAL | Posted 8/28/2025 | Download |
| GEN-2021-025 | June 25, 2025 | Interconnect 203.04 MW to the WFEC Transmission System FINAL | Posted 9/22/2025 | Download |
| GEN-2021-027 | June 25, 2025 | Interconnect 102.06 MW to the NPPD Transmission System FINAL | Posted 12/2/2025 | Download |
| GEN-2021-029 | June 25, 2025 | Interconnect 253.8 MW to the KCPL Transmission System FINAL | Posted 8/29/2025 | Download |
| GEN-2021-030 | June 25, 2025 | Interconnect 510.3 MW to the KCPL Transmission System FINAL | Posted 8/29/2025 | Download |
| GEN-2021-033 | June 25, 2025 | Interconnect 204.12 MW to the OGE Transmission System FINAL | Posted 8/27/2025 | Download |
| GEN-2021-034 | June 25, 2025 | Interconnect 113 MW to the LES Transmission System FINAL | Posted 9/2/2025 | Download |
| GEN-2021-035 | June 25, 2025 | Interconnect 113 MW to the SUNC Transmission System FINAL | Posted 11/19/2025 | Download |
| GEN-2021-036 | June 25, 2025 | Interconnect 204.12 MW to the AEP Transmission System FINAL | Posted 9/8/2025 | Download |
| GEN-2021-038 | June 25, 2025 | Interconnect 200 MW to the AEP Transmission System FINAL | Posted 9/5/2025 | Download |
| GEN-2021-039 | June 25, 2025 | Interconnect 100 MW to the OPPD Transmission System FINAL | Posted 8/28/2025 | Download |
| GEN-2021-040 | June 25, 2025 | Interconnect 200 MW to the OPPD Transmission System FINAL | Posted 8/27/2025 | Download |
| GEN-2021-041 | June 25, 2025 | Interconnect 100 MW to the OGE Transmission System FINAL | Posted 8/26/2025 | Download |
| GEN-2021-042 | June 25, 2025 | Interconnect 50 MW to the INDN Transmission System FINAL | Posted 8/28/2025 | Download |
| GEN-2021-043 | June 25, 2025 | Interconnect 250 MW to the LES Transmission System FINAL | Posted 8/27/2025 | Download |
| GEN-2021-047 | June 25, 2025 | Interconnect 250 MW to the GRDA Transmission System FINAL | Posted 9/11/2025 | Download |
| GEN-2021-048 | June 25, 2025 | Interconnect 75 MW to the LES Transmission System FINAL | Posted 8/27/2025 | Download |
| GEN-2021-049 | June 25, 2025 | Interconnect 225 MW to the LES Transmission System FINAL | Posted 8/28/2025 | Download |
| GEN-2021-050 | June 25, 2025 | Interconnect 200 MW to the KCPL Transmission System FINAL | Posted 9/3/2025 | Download |
| GEN-2021-051 | June 25, 2025 | Interconnect 75 MW to the KCPL Transmission System FINAL | Posted 9/3/2025 | Download |
| GEN-2021-052 | June 25, 2025 | Interconnect 75 MW to the OGE Transmission System FINAL | Posted 9/5/2025 | Download |
| GEN-2021-053 | June 25, 2025 | Interconnect 300 MW to the OGE Transmission System FINAL | Posted 9/5/2025 | Download |
| GEN-2021-056 | June 25, 2025 | Interconnect 300 MW to the WERE Transmission System FINAL | Posted 9/8/2025 | Download |
| GEN-2021-057 | June 25, 2025 | Interconnect 300 MW to the NPPD Transmission System FINAL | Posted 12/2/2025 | Download |
| GEN-2021-063 | June 25, 2025 | Interconnect 155 MW to the AEP Transmission System FINAL | Posted 9/11/2025 | Download |
| GEN-2021-064 | June 25, 2025 | Interconnect 100 MW to the AEP Transmission System FINAL | Posted 9/18/2025 | Download |
| GEN-2021-064 Interim | October 04, 2024 | Interconnect 100 MW to the AEP Transmission System | Posted 12/3/2024 | Download |
| GEN-2021-068 | June 25, 2025 | Interconnect 249.6 MW to the SUNC Transmission System FINAL | Posted 12/9/2025 | Download |
| GEN-2021-069 | June 25, 2025 | Interconnect 249.6 MW to the SUNC Transmission System FINAL | Posted 12/8/2025 | Download |
| GEN-2021-070 | June 25, 2025 | Interconnect 504 MW to the SUNC Transmission System FINAL | Posted 12/9/2025 | Download |
| GEN-2021-076 | June 25, 2025 | Interconnect 113 MW to the ITCGP Transmission System FINAL | Posted 12/2/2025 | Download |
| GEN-2021-077 | June 25, 2025 | Interconnect 95 MW to the GMO Transmission System FINAL | Posted 9/9/2025 | Download |
| GEN-2021-088 | June 25, 2025 | Interconnect 100 MW to the OGE Transmission System FINAL | Posted 9/10/2025 | Download |
| GEN-2021-090 | June 25, 2025 | Interconnect 400 MW to the SPS Transmission System DRAFT | Posted 3/9/2026 | Download |
| GEN-2021-096 | June 25, 2025 | Interconnect 500 MW to the WERE Transmission System FINAL | Posted 9/10/2025 | Download |
| GEN-2021-101 | June 25, 2025 | Interconnect 159 MW to the WERE Transmission System FINAL | Posted 9/9/2025 | Download |
| GEN-2021-103 | June 25, 2025 | Interconnect 150 MW to the WERE Transmission System FINAL | Posted 9/9/2025 | Download |
| GEN-2021-107 | June 25, 2025 | Interconnect 201.6 MW to the WERE Transmission System FINAL | Posted 9/8/2025 | Download |
| GEN-2021-108 | June 25, 2025 | Interconnect 182.25 MW to the OPPD Transmission System FINAL | Posted 9/4/2025 | Download |
|
Please send your requests to GIStudies@spp.org If you have any questions, please submit a ticket on RMS. |
||||