Study Number |
Date Requested |
Purpose of Study |
Remarks |
Report |
GEN-2021-001 |
June 25, 2025 |
Interconnect 100 MW to the OGE Transmission System |
Reposted 8/29/2025 |
Download |
GEN-2021-005 |
June 25, 2025 |
Interconnect 350 MW to the WERE Transmission System FINAL |
Posted 9/8/2025 |
Download |
GEN-2021-006 |
June 25, 2025 |
Interconnect 300 MW to the WERE Transmission System FINAL |
Posted 9/8/2025 |
Download |
GEN-2021-008 |
June 25, 2025 |
Interconnect 200 MW to the BEPC Transmission System FINAL |
Posted 9/4/2025 |
Download |
GEN-2021-015 |
June 25, 2025 |
Interconnect 74.9 MW to the OGE Transmission System FINAL |
Posted 9/2/2025 |
Download |
GEN-2021-016 |
June 25, 2025 |
Interconnect 250 MW to the AEP Transmission System |
Posted 9/4/2025 |
Download |
GEN-2021-018 |
June 25, 2025 |
Interconnect 231 MW to the OGE Transmission System FINAL |
Posted 9/8/2025 |
Download |
GEN-2021-019 |
June 25, 2025 |
Interconnect 74.9 MW to the OGE Transmission System FINAL |
Posted 9/8/2025 |
Download |
GEN-2021-023 |
June 25, 2025 |
Interconnect 306.18 MW to the WERE Transmission System FINAL |
Posted 8/28/2025 |
Download |
GEN-2021-025 |
June 25, 2025 |
Interconnect 203.04 MW to the WFEC Transmission System FINAL |
Posted 9/22/2025 |
Download |
GEN-2021-029 |
June 25, 2025 |
Interconnect 253.8 MW to the KCPL Transmission System FINAL |
Posted 8/29/2025 |
Download |
GEN-2021-030 |
June 25, 2025 |
Interconnect 510.3 MW to the KCPL Transmission System FINAL |
Posted 8/29/2025 |
Download |
GEN-2021-033 |
June 25, 2025 |
Interconnect 204.12 MW to the OGE Transmission System FINAL |
Posted 8/27/2025 |
Download |
GEN-2021-034 |
June 25, 2025 |
Interconnect 113 MW to the LES Transmission System FINAL |
Posted 9/2/2025 |
Download |
GEN-2021-036 |
June 25, 2025 |
Interconnect 204.12 MW to the AEP Transmission System FINAL |
Posted 9/8/2025 |
Download |
GEN-2021-038 |
June 25, 2025 |
Interconnect 200 MW to the AEP Transmission System FINAL |
Posted 9/5/2025 |
Download |
GEN-2021-039 |
June 25, 2025 |
Interconnect 100 MW to the OPPD Transmission System FINAL |
Posted 8/28/2025 |
Download |
GEN-2021-040 |
June 25, 2025 |
Interconnect 200 MW to the OPPD Transmission System FINAL |
Posted 8/27/2025 |
Download |
GEN-2021-041 |
June 25, 2025 |
Interconnect 100 MW to the OGE Transmission System FINAL |
Posted 8/26/2025 |
Download |
GEN-2021-042 |
June 25, 2025 |
Interconnect 50 MW to the INDN Transmission System FINAL |
Posted 8/28/2025 |
Download |
GEN-2021-043 |
June 25, 2025 |
Interconnect 250 MW to the LES Transmission System FINAL |
Posted 8/27/2025 |
Download |
GEN-2021-047 |
June 25, 2025 |
Interconnect 250 MW to the GRDA Transmission System FINAL |
Posted 9/11/2025 |
Download |
GEN-2021-048 |
June 25, 2025 |
Interconnect 75 MW to the LES Transmission System FINAL |
Posted 8/27/2025 |
Download |
GEN-2021-049 |
June 25, 2025 |
Interconnect 225 MW to the LES Transmission System FINAL |
Posted 8/28/2025 |
Download |
GEN-2021-050 |
June 25, 2025 |
Interconnect 200 MW to the KCPL Transmission System FINAL |
Posted 9/3/2025 |
Download |
GEN-2021-051 |
June 25, 2025 |
Interconnect 75 MW to the KCPL Transmission System FINAL |
Posted 9/3/2025 |
Download |
GEN-2021-052 |
June 25, 2025 |
Interconnect 75 MW to the OGE Transmission System FINAL |
Posted 9/5/2025 |
Download |
GEN-2021-053 |
June 25, 2025 |
Interconnect 300 MW to the OGE Transmission System FINAL |
Posted 9/5/2025 |
Download |
GEN-2021-056 |
June 25, 2025 |
Interconnect 300 MW to the WERE Transmission System FINAL |
Posted 9/8/2025 |
Download |
GEN-2021-063 |
June 25, 2025 |
Interconnect 155 MW to the AEP Transmission System FINAL |
Posted 9/11/2025 |
Download |
GEN-2021-064 |
June 25, 2025 |
Interconnect 100 MW to the AEP Transmission System |
Posted 9/4/2025 |
Download |
GEN-2021-064 Interim |
October 04, 2024 |
Interconnect 100 MW to the AEP Transmission System |
Posted 12/3/2024 |
Download |
GEN-2021-077 |
June 25, 2025 |
Interconnect 95 MW to the GMO Transmission System FINAL |
Posted 9/9/2025 |
Download |
GEN-2021-088 |
June 25, 2025 |
Interconnect 100 MW to the OGE Transmission System FINAL |
Posted 9/10/2025 |
Download |
GEN-2021-096 |
June 25, 2025 |
Interconnect 500 MW to the WERE Transmission System FINAL |
Posted 9/10/2025 |
Download |
GEN-2021-101 |
June 25, 2025 |
Interconnect 159 MW to the WERE Transmission System FINAL |
Posted 9/9/2025 |
Download |
GEN-2021-103 |
June 25, 2025 |
Interconnect 150 MW to the WERE Transmission System FINAL |
Posted 9/9/2025 |
Download |
GEN-2021-107 |
June 25, 2025 |
Interconnect 201.6 MW to the WERE Transmission System FINAL |
Posted 9/8/2025 |
Download |
GEN-2021-108 |
June 25, 2025 |
Interconnect 182.25 MW to the OPPD Transmission System FINAL |
Posted 9/4/2025 |
Download |
Please send your requests to GIStudies@spp.org
If you have any questions, please submit a ticket on RMS.
|