|
|
| 2021 Impact Studies | |
| The following Generator Interconnection Studies have been requested. | |
| Study Number | Date Requested | Purpose of Study | Remarks | Report |
|---|---|---|---|---|
| 2021 Annual Interim Report | October 18, 2021 | 2021 Annual Interim Report | Posted 12/2/2021 | Download |
| DISIS-2021-001 | April 30, 2021 | DISIS-2021-001 Phase 1 Powerflow and Short Circuit Final Report | Re-Posted 06/30/2023 | Download |
| DISIS-2021-001 | April 30, 2021 | DISIS-2021-001 Phase 2 Powerflow and Short Circuit Final Report | Posted 8/30/24 | Download |
| DISIS-2021-001 | April 30, 2021 | DISIS-2021-001-1 Restudy Powerflow, Stability and Short Circuit Final Report | Posted 06/23/2025 | Download |
| DISIS-2021-001-1 | April 30, 2021 | DISIS-2021-001-1 Sensitivity Analysis Report | Posted 1/30/2026 | Download |
| GEN-2021-001 DISIS ILTCR | August 15, 2025 | DISIS-2021-001 ILTCR STUDY REPORT | Posted 4/9/2026 | Download |
| GEN-2021-006 DISIS ILTCR | August 15, 2025 | DISIS-2021-001 ILTCR STUDY REPORT | Posted 1/12/2025 | Download |
| GEN-2021-021 DISIS ILTCR | August 15, 2025 | DISIS-2021-001 ILTCR STUDY REPORT | Posted 4/9/2026 | Download |
| GEN-2021-042 DISIS ILTCR | August 15, 2025 | DISIS-2021-001 ILTCR STUDY REPORT | Posted 4/9/2026 | Download |
| GEN-2021-056 DISIS ILTCR | August 15, 2025 | DISIS-2021-001 ILTCR STUDY REPORT | Posted 4/9/2026 | Download |
| GEN-2021-068 DISIS ILTCR | August 15, 2025 | DISIS-2021-001 ILTCR STUDY REPORT | Posted 4/9/2026 | Download |
| GEN-2021-069 DISIS ILTCR | August 15, 2025 | DISIS-2021-001 ILTCR STUDY REPORT | Posted 4/9/2026 | Download |
| GEN-2021-070 DISIS ILTCR | August 15, 2025 | DISIS-2021-001 ILTCR STUDY REPORT | Posted 4/9/2026 | Download |
| GEN-2021-090 DISIS ILTCR | August 15, 2025 | DISIS-2021-001 ILTCR STUDY REPORT | Posted 4/9/2026 | Download |
| GEN-2021-096 DISIS ILTCR | August 15, 2025 | DISIS-2021-001 ILTCR STUDY REPORT | Posted 4/9/2026 | Download |
| GEN-2021-101 DISIS ILTCR | August 15, 2025 | DISIS-2021-001 ILTCR STUDY REPORT | Posted 4/9/2026 | Download |
| GEN-2021-103 DISIS ILTCR | August 15, 2025 | DISIS-2021-001 ILTCR STUDY REPORT | Posted 4/9/2026 | Download |
| GEN-2021-GR1 | March 31, 2022 | Replacement Impact Study | Posted 3/10/2023 | Download |
| GEN-2021-SR8 | May 13, 2021 | Surplus Interconnection Impact Study | Posted 12/2/2021 | Download |
| GEN-2021-SR9 | August 24, 2021 | Surplus Interconnection Impact Study | Posted 12/16/2021 | Download |
| Group 9 Interim and Limited Operation | February 14, 2019 | Group 9 Interim and Limited Operation | Posted 7/9/2021 | Download |
|
Please send your requests to GIStudies@spp.org If you have any questions, please submit a ticket on RMS. |
||||