2021 Impact Studies |
The following Generator Interconnection Studies have been requested.
|
Study Number |
Date Requested |
Purpose of Study |
Remarks |
Report |
2021 Annual Interim Report |
October 18, 2021 |
2021 Annual Interim Report |
Posted 12/2/2021 |
Download |
DISIS-2021-001 |
April 30, 2021 |
DISIS-2021-001 Phase 1 Powerflow and Short Circuit Final Report |
Re-Posted 06/30/2023 |
Download |
DISIS-2021-001 |
April 30, 2021 |
DISIS-2021-001 Phase 2 Powerflow and Short Circuit Final Report |
Posted 8/30/24 |
Download |
GEN-2021-GR1 |
March 31, 2022 |
Replacement Impact Study |
Posted 3/10/2023 |
Download |
GEN-2021-SR8 |
May 13, 2021 |
Surplus Interconnection Impact Study |
Posted 12/2/2021 |
Download |
GEN-2021-SR9 |
August 24, 2021 |
Surplus Interconnection Impact Study |
Posted 12/16/2021 |
Download |
Group 9 Interim and Limited Operation |
February 14, 2019 |
Group 9 Interim and Limited Operation |
Posted 7/9/2021 |
Download |