2021 Impact Studies
The following Generator Interconnection Studies have been requested.

Study Number Date Requested Purpose of Study Remarks Report
2021 Annual Interim Report October 18, 2021 2021 Annual Interim Report Posted 12/2/2021 Download
DISIS-2021-001 April 30, 2021 DISIS-2021-001 Phase 1 Powerflow and Short Circuit Final Report Re-Posted 06/30/2023 Download
DISIS-2021-001 April 30, 2021 DISIS-2021-001 Phase 2 Powerflow and Short Circuit Final Report Posted 8/30/24 Download
GEN-2021-GR1 March 31, 2022 Replacement Impact Study Posted 3/10/2023 Download
GEN-2021-SR8 May 13, 2021 Surplus Interconnection Impact Study Posted 12/2/2021 Download
GEN-2021-SR9 August 24, 2021 Surplus Interconnection Impact Study Posted 12/16/2021 Download
Group 9 Interim and Limited Operation February 14, 2019 Group 9 Interim and Limited Operation Posted 7/9/2021 Download

Please send your requests to GIStudies@spp.org