Study Number |
Date Requested |
Purpose of Study |
Remarks |
Report |
GEN-2020-002 |
March 20, 2025 |
Interconnect 81 MW to the OPPD Transmission System FINAL |
Posted 5/27/2025 |
Download |
GEN-2020-002 Interim |
April 07, 2021 |
Interconnect 81 MW to the OPPD Transmission System |
Posted 11/02/2021 |
Download |
GEN-2020-007 |
March 20, 2025 |
Interconnect 650 MW to the Evergy Transmission System FINAL |
Posted 5/22/2025 |
Download |
GEN-2020-008 |
March 20, 2025 |
Interconnect 250 MW to the SPS Transmission System |
Posted 5/19/2025 |
Download |
GEN-2020-010 |
March 20, 2025 |
Interconnect 140 MW to the WFEC Transmission System FINAL |
Posted 5/29/2025 |
Download |
GEN-2020-014 |
March 20, 2025 |
Interconnect 45 MW to the BEPC Transmission System FINAL |
Posted 5/29/2025 |
Download |
GEN-2020-014 Interim |
February 17, 2021 |
Interconnect 45 MW to the BEPC Transmission System |
Posted 11/02/21 |
Download |
GEN-2020-020 |
March 20, 2025 |
Interconnect 201.6 MW to the AEP Transmission System |
Posted 5/21/2025 |
Download |
GEN-2020-025 |
March 20, 2025 |
Interconnect 255 MW to the OPPD Transmission System FINAL |
Posted 5/23/2025 |
Download |
GEN-2020-025 Interim |
July 21, 2022 |
Interconnect 255 MW to the OPPD Transmission System |
Posted 09/07/2022 |
Download |
GEN-2020-028 |
March 20, 2025 |
Interconnect 255 MW to the OPPD Transmission System FINAL |
Posted 5/23/2025 |
Download |
GEN-2020-028 Interim |
July 21, 2022 |
Interconnect 255 MW to the OPPD Transmission System |
Posted 09/07/2022 |
Download |
GEN-2020-031 |
March 20, 2025 |
Interconnect 272.7 MW to the OPPD Transmission System FINAL |
Posted 5/23/2025 |
Download |
GEN-2020-038 |
March 20, 2025 |
Interconnect 272.7 MW to the OPPD Transmission System FINAL |
Posted 5/23/2025 |
Download |
GEN-2020-043 |
March 20, 2025 |
Interconnect 56.52 MW to the OPPD Transmission System FINAL |
Posted 5/27/2025 |
Download |
GEN-2020-043 Interim |
July 21, 2022 |
Interconnect 56.52 MW to the OPPD Transmission System |
Posted 09/07/2022 |
Download |
GEN-2020-044 |
March 20, 2025 |
Interconnect 56.52 MW to the OPPD Transmission System FINAL |
Posted 5/27/2025 |
Download |
GEN-2020-044 Interim |
July 21, 2022 |
Interconnect 56.52 MW to the OPPD Transmission System |
Posted 09/07/2022 |
Download |
GEN-2020-045 |
March 20, 2025 |
Interconnect 56.52 MW to the OPPD Transmission System FINAL |
Posted 5/27/2025 |
Download |
GEN-2020-045 Interim |
July 21, 2022 |
Interconnect 56.52 MW to the OPPD Transmission System |
Posted 09/07/2022 |
Download |
GEN-2020-054 |
March 20, 2025 |
Interconnect 298 MW to the AEP Transmission System |
Posted 5/21/2025 |
Download |
GEN-2020-056 |
March 20, 2025 |
Interconnect 20 MW to the SUNC Transmission System |
Posted 5/21/2025 |
Download |
GEN-2020-056 Interim |
February 19, 2021 |
Interconnect 20 MW to the SUNC Transmission System |
Posted 03/29/2022 |
Download |
GEN-2020-057 |
March 20, 2025 |
Interconnect 424.5 MW to the Evergy Transmission System FINAL |
Posted 5/22/2025 |
Download |
GEN-2020-058 |
March 20, 2025 |
Interconnect 424.5 MW to the Evergy Transmission System FINAL |
Posted 5/22/2025 |
Download |
GEN-2020-061 |
March 20, 2025 |
Interconnect 29 MW to the Evergy Transmission System FINAL |
Posted 5/22/2025 |
Download |
GEN-2020-064 |
March 20, 2025 |
Interconnect 64 MW to the EDE Transmission System |
Posted 5/21/2025 |
Download |
GEN-2020-071 Interim |
August 29, 2023 |
Interconnect 252 MW to the WERE Transmission System |
Posted 10/09/2023 |
Download |
GEN-2020-072 |
March 20, 2025 |
Interconnect 150 MW to the Evergy Transmission System FINAL |
Posted 5/22/2025 |
Download |
GEN-2020-073 |
March 20, 2025 |
Interconnect 150 MW to the Evergy Transmission System FINAL |
Posted 5/22/2025 |
Download |
GEN-2020-078 |
March 20, 2025 |
Interconnect 100 MW to the OPPD Transmission System FINAL |
Posted 5/28/2025 |
Download |
GEN-2020-078 Interim |
July 27, 2020 |
Interconnect 100 MW to the OPPD Transmission System |
Posted 12/14/21 |
Download |
GEN-2020-079 |
March 20, 2025 |
Interconnect 225 MW to the EDE Transmission System |
Posted 5/20/2025 |
Download |
GEN-2020-081 |
March 20, 2025 |
Interconnect 200 MW to the AEP Transmission System FINAL |
Posted 5/30/2025 |
Download |
GEN-2020-083 |
March 20, 2025 |
Interconnect 74.5 MW to the WAPA Transmission System |
Posted 5/20/2025 |
Download |
GEN-2020-084 |
March 20, 2025 |
Interconnect 350 MW to the OPPD Transmission System FINAL |
Posted 5/28/2025 |
Download |
GEN-2020-088 |
March 20, 2025 |
Interconnect 150 MW to the EDE Transmission System |
Posted 5/20/2025 |
Download |
GEN-2020-091 |
March 20, 2025 |
Interconnect 150 MW to the BEPC Transmission System |
Reposted 5/27/2025 |
Download |
GEN-2020-092 |
March 20, 2025 |
Interconnect 100 MW to the AEP Transmission System |
Posted 5/19/2025 |
Download |
GEN-2020-094 |
March 20, 2025 |
Interconnect 250 MW to the OPPD Transmission System FINAL |
Posted 5/28/2025 |
Download |
Please send your requests to GIStudies@spp.org
If you have any questions, please submit a ticket on RMS.
|