The following Generator Interconnection Studies have been requested.

Study Number Date Requested Purpose of Study Remarks Report
GEN-2020-002 March 20, 2025 Interconnect 81 MW to the OPPD Transmission System FINAL Posted 5/27/2025 Download
GEN-2020-002 Interim April 07, 2021 Interconnect 81 MW to the OPPD Transmission System Posted 11/02/2021 Download
GEN-2020-007 March 20, 2025 Interconnect 650 MW to the Evergy Transmission System FINAL Posted 5/22/2025 Download
GEN-2020-008 March 20, 2025 Interconnect 250 MW to the SPS Transmission System Posted 5/19/2025 Download
GEN-2020-010 March 20, 2025 Interconnect 140 MW to the WFEC Transmission System FINAL Posted 5/29/2025 Download
GEN-2020-014 March 20, 2025 Interconnect 45 MW to the BEPC Transmission System FINAL Posted 5/29/2025 Download
GEN-2020-014 Interim February 17, 2021 Interconnect 45 MW to the BEPC Transmission System Posted 11/02/21 Download
GEN-2020-020 March 20, 2025 Interconnect 201.6 MW to the AEP Transmission System Posted 5/21/2025 Download
GEN-2020-025 March 20, 2025 Interconnect 255 MW to the OPPD Transmission System FINAL Posted 5/23/2025 Download
GEN-2020-025 Interim July 21, 2022 Interconnect 255 MW to the OPPD Transmission System Posted 09/07/2022 Download
GEN-2020-028 March 20, 2025 Interconnect 255 MW to the OPPD Transmission System FINAL Posted 5/23/2025 Download
GEN-2020-028 Interim July 21, 2022 Interconnect 255 MW to the OPPD Transmission System Posted 09/07/2022 Download
GEN-2020-031 March 20, 2025 Interconnect 272.7 MW to the OPPD Transmission System FINAL Posted 5/23/2025 Download
GEN-2020-038 March 20, 2025 Interconnect 272.7 MW to the OPPD Transmission System FINAL Posted 5/23/2025 Download
GEN-2020-043 March 20, 2025 Interconnect 56.52 MW to the OPPD Transmission System FINAL Posted 5/27/2025 Download
GEN-2020-043 Interim July 21, 2022 Interconnect 56.52 MW to the OPPD Transmission System Posted 09/07/2022 Download
GEN-2020-044 March 20, 2025 Interconnect 56.52 MW to the OPPD Transmission System FINAL Posted 5/27/2025 Download
GEN-2020-044 Interim July 21, 2022 Interconnect 56.52 MW to the OPPD Transmission System Posted 09/07/2022 Download
GEN-2020-045 March 20, 2025 Interconnect 56.52 MW to the OPPD Transmission System FINAL Posted 5/27/2025 Download
GEN-2020-045 Interim July 21, 2022 Interconnect 56.52 MW to the OPPD Transmission System Posted 09/07/2022 Download
GEN-2020-054 March 20, 2025 Interconnect 298 MW to the AEP Transmission System Posted 5/21/2025 Download
GEN-2020-056 March 20, 2025 Interconnect 20 MW to the SUNC Transmission System Posted 5/21/2025 Download
GEN-2020-056 Interim February 19, 2021 Interconnect 20 MW to the SUNC Transmission System Posted 03/29/2022 Download
GEN-2020-057 March 20, 2025 Interconnect 424.5 MW to the Evergy Transmission System FINAL Posted 5/22/2025 Download
GEN-2020-058 March 20, 2025 Interconnect 424.5 MW to the Evergy Transmission System FINAL Posted 5/22/2025 Download
GEN-2020-061 March 20, 2025 Interconnect 29 MW to the Evergy Transmission System FINAL Posted 5/22/2025 Download
GEN-2020-064 March 20, 2025 Interconnect 64 MW to the EDE Transmission System Posted 5/21/2025 Download
GEN-2020-071 Interim August 29, 2023 Interconnect 252 MW to the WERE Transmission System Posted 10/09/2023 Download
GEN-2020-072 March 20, 2025 Interconnect 150 MW to the Evergy Transmission System FINAL Posted 5/22/2025 Download
GEN-2020-073 March 20, 2025 Interconnect 150 MW to the Evergy Transmission System FINAL Posted 5/22/2025 Download
GEN-2020-078 March 20, 2025 Interconnect 100 MW to the OPPD Transmission System FINAL Posted 5/28/2025 Download
GEN-2020-078 Interim July 27, 2020 Interconnect 100 MW to the OPPD Transmission System Posted 12/14/21 Download
GEN-2020-079 March 20, 2025 Interconnect 225 MW to the EDE Transmission System Posted 5/20/2025 Download
GEN-2020-081 March 20, 2025 Interconnect 200 MW to the AEP Transmission System FINAL Posted 5/30/2025 Download
GEN-2020-083 March 20, 2025 Interconnect 74.5 MW to the WAPA Transmission System Posted 5/20/2025 Download
GEN-2020-084 March 20, 2025 Interconnect 350 MW to the OPPD Transmission System FINAL Posted 5/28/2025 Download
GEN-2020-088 March 20, 2025 Interconnect 150 MW to the EDE Transmission System Posted 5/20/2025 Download
GEN-2020-091 March 20, 2025 Interconnect 150 MW to the BEPC Transmission System Reposted 5/27/2025 Download
GEN-2020-092 March 20, 2025 Interconnect 100 MW to the AEP Transmission System Posted 5/19/2025 Download
GEN-2020-094 March 20, 2025 Interconnect 250 MW to the OPPD Transmission System FINAL Posted 5/28/2025 Download

Please send your requests to GIStudies@spp.org

If you have any questions, please submit a ticket on RMS.