2020 Facility Studies
The following Generator Interconnection Studies have been requested.

Study Number Date Requested Purpose of Study Remarks Report
GEN-2020-002 Interim April 07, 2021 Interconnect 81 MW to the OPPD Transmission System Posted 11/02/2021 Download
GEN-2020-014 Interim February 17, 2021 Interconnect 45 MW to the BEPC Transmission System Posted 11/02/21 Download
GEN-2020-025 Interim July 21, 2022 Interconnect 255 MW to the OPPD Transmission System Posted 09/07/2022 Download
GEN-2020-028 Interim July 21, 2022 Interconnect 255 MW to the OPPD Transmission System Posted 09/07/2022 Download
GEN-2020-043 Interim July 21, 2022 Interconnect 56.52 MW to the OPPD Transmission System Posted 09/07/2022 Download
GEN-2020-044 Interim July 21, 2022 Interconnect 56.52 MW to the OPPD Transmission System Posted 09/07/2022 Download
GEN-2020-045 Interim July 21, 2022 Interconnect 56.52 MW to the OPPD Transmission System Posted 09/07/2022 Download
GEN-2020-056 Interim February 19, 2021 Interconnect 20 MW to the SUNC Transmission System Posted 03/29/2022 Download
GEN-2020-071 Interim August 29, 2023 Interconnect 252 MW to the WERE Transmission System Posted 10/09/2023 Download
GEN-2020-078 Interim July 27, 2020 Interconnect 100 MW to the OPPD Transmission System Posted 12/14/21 Download

Please send your requests to GIStudies@spp.org

If you have any questions, please submit a ticket on RMS.