2019 Facility Studies
The following Generator Interconnection Studies have been requested.

Study Number Date Requested Purpose of Study Remarks Report
GEN-2019-011 Interim November 10, 2023 Interconnect 207 MW to the SPS Transmission System Posted 1/11/2024 Download
GEN-2019-012 Interim November 10, 2023 Interconnect 200 MW to the OG&E Transmission System Posted 11/30/2023 Download