2019 Impact Studies |
The following Generator Interconnection Studies have been requested.
|
Study Number |
Date Requested |
Purpose of Study |
Remarks |
Report |
DISIS-2018-002/DISIS-2019-001 |
March 31, 2018 |
DISIS-2018-002/DISIS-2019-001 Phase 1 Powerflow and Short Circuit Final Report |
Reposted 11/16/2022 |
Download |
DISIS-2018-002/DISIS-2019-001 |
March 31, 2018 |
DISIS-2018-002/DISIS-2019-001 Phase 2 Powerflow and Short Circuit Final Report |
Reposted 09/22/2023 |
Download |
GEN-2019-001 |
November 27, 2018 |
Interim Availability Impact Study for Generation Interconnection Request |
Posted 12/21/2018 |
Download |
GEN-2019-018 |
December 03, 2019 |
Interim Availability Impact Study for Generation Interconnection Request |
Posted 3/10/2021 |
Download |
Group 15 Interim Operation Report |
December 03, 2019 |
Group 15 Interim Operation |
Posted 7/20/2021 |
Download |
Please send your requests to GIStudies@spp.org
If you have any questions, please submit a ticket on RMS.
|
|