| 2018 Facility Studies | |
| The following Generator Interconnection Studies have been requested. | |
| Study Number | Date Requested | Purpose of Study | Remarks | Report |
|---|---|---|---|---|
| GEN-2018-003 | September 18, 2023 | Interconnect 150 MW to the AEP Transmission System FINAL | Reposted 10/27/2025 | Download |
| GEN-2018-004 | September 18, 2023 | Interconnect 74.99 MW to the SPS Transmission System FINAL | Posted 12/05/2023 | Download |
| GEN-2018-008 | September 18, 2023 | Interconnect 252 MW to the BEPC Transmission System | Posted 02/05/2024 | Download |
| GEN-2018-009 | September 18, 2023 | Interconnect 150 MW to the SUNC Transmission System FINAL | Reposted 10/02/2024 | Download |
| GEN-2018-010 | September 18, 2023 | Interconnect 74.1 MW to the BEPC Transmission System FINAL | Reposted 02/05/2024 | Download |
| GEN-2018-011 | September 18, 2023 | Interconnect 74.1 MW to the WFEC Transmission System FINAL | Reposted 10/02/2024 | Download |
| GEN-2018-012 | September 18, 2023 | Interconnect 74.1 MW to the NPPD Transmission System FINAL | Reposted 12/06/2023 | Download |
| GEN-2018-013 | September 18, 2023 | Interconnect 74.1 MW to the WERE Transmission System FINAL | Posted 12/06/2023 | Download |
| GEN-2018-015 | September 18, 2023 | Interconnect 252 MW to the SPS Transmission System FINAL | Posted 12/6/2023 | Download |
| GEN-2018-021 | September 18, 2023 | Interconnect 74.1 MW to the AEP Transmission System FINAL | Reposted 3/12/2024 | Download |
| GEN-2018-022 | September 18, 2023 | Interconnect 300 MW to the GMO Transmission System | Posted 1/29/2024 | Download |
| GEN-2018-024 | September 18, 2023 | Interconnect 100 MW to the OGE Transmission System FINAL | Posted 11/30/2023 | Download |
| GEN-2018-025 | September 18, 2023 | Interconnect 200 MW to the OPPD Transmission System FINAL | Posted 11/30/2023 | Download |
| GEN-2018-026 | September 18, 2023 | Interconnect 100 MW to the OGE Transmission System FINAL | Posted 11/30/2023 | Download |
| GEN-2018-027 | September 18, 2023 | Interconnect 100 MW to the AEP Transmission System FINAL | Posted 12/05/2023 | Download |
| GEN-2018-028 | September 18, 2023 | Interconnect 200 MW to the AEP Transmission System FINAL | Posted 10/24/2025 | Download |
| GEN-2018-029 | September 18, 2023 | Interconnect 100 MW to the OGE Transmission System FINAL | Posted 12/01/2023 | Download |
| GEN-2018-030 | September 18, 2023 | Interconnect 200 MW to the SPS Transmission System | Posted 12/08/2023 | Download |
| GEN-2018-031 | September 18, 2023 | Interconnect 50 MW to the INDN Transmission System FINAL | Reposted 10/02/2024 | Download |
| GEN-2018-032 | September 18, 2023 | Interconnect 310 MW to the WERE Transmission System FINAL | Reposted 10/02/2024 | Download |
| GEN-2018-033 | September 18, 2023 | Interconnect 200 MW to the OPPD Transmission System FINAL | Posted 12/06/2023 | Download |
| GEN-2018-037 | September 18, 2023 | Interconnect 100 MW to the OPPD Transmission System FINAL | Posted 12/06/2023 | Download |
| GEN-2018-039 | September 18, 2023 | Interconnect 72 MW to the WAPA Transmission System | Posted 02/05/2024 | Download |
| GEN-2018-043 | September 18, 2023 | Interconnect 500 MW to the OPPD Transmission System FINAL | Reposted 2/6/2024 | Download |
| GEN-2018-048 | September 18, 2023 | Interconnect 300 MW to the OGE Transmission System FINAL | Posted 12/05/2023 | Download |
| GEN-2018-049 | September 18, 2023 | Interconnect 120 MW to the ITCGP Transmission System FINAL | Reposted 10/02/2024 | Download |
| GEN-2018-050 | September 18, 2023 | Interconnect 200 MW to the AEP Transmission System FINAL | Posted 9/23/2025 | Download |
| GEN-2018-052 | September 18, 2023 | Interconnect 70 MW to the SPS Transmission System FINAL | Posted 11/29/2023 | Download |
| GEN-2018-055 | September 18, 2023 | Interconnect 252 MW to the AEP Transmission System FINAL | Posted 12/01/2023 | Download |
| GEN-2018-056 | September 18, 2023 | Interconnect 102.6 MW to the WAPA Transmission System | Posted 2/14/2024 | Download |
| GEN-2018-057 | September 18, 2023 | Interconnect 203.4 MW to the WERE Transmission System FINAL | Reposted 10/02/2024 | Download |
| GEN-2018-060 | September 18, 2023 | Interconnect 50 MW to the NPPD Transmission System FINAL | Reposted 10/02/2024 | Download |
| GEN-2018-062 | September 18, 2023 | Interconnect 75.6 MW to the KACY Transmission System FINAL | Posted 02/08/2024 | Download |
| GEN-2018-063 | December 11, 2024 | Interconnect 57 MW to the EDE Transmission System | Posted 2/4/2025 | Download |
| GEN-2018-064 | October 04, 2024 | Interconnect 80 MW to the GRDA Transmission System FINAL | Reposted 2/11/2025 | Download |
| GEN-2018-065 | December 11, 2024 | Interconnect 19.8 MW to the NPPD Transmission System FINAL | Reposted 4/16/2025 | Download |
| GEN-2018-067 | December 11, 2024 | Interconnect 255 MW to the MWEC Transmission System FINAL | Posted 2/21/2025 | Download |
| GEN-2018-068 | December 11, 2024 | Interconnect 302.4 MW to the NPPD Transmission System FINAL | Reposted 4/16/2025 | Download |
| GEN-2018-069 | December 11, 2024 | Interconnect 125 MW to the WAPA Transmission System FINAL | Posted 4/2/2025 | Download |
| GEN-2018-071 | December 11, 2024 | Interconnect 151 MW to the OG&E Transmission System FINAL | Posted 2/13/2025 | Download |
| GEN-2018-072 | December 11, 2024 | Interconnect 151 MW to the OG&E Transmission System FINAL | Posted 2/13/2025 | Download |
| GEN-2018-074 | January 14, 2025 | Interconnect 72 MW to the WAPA Transmission System FINAL | Posted 5/19/2025 | Download |
| GEN-2018-079 | December 11, 2024 | Interconnect 148 MW to the AEP Transmission System FINAL | Posted 10/24/2025 | Download |
| GEN-2018-082 | December 11, 2024 | Interconnect 215 MW to the AEP Transmission System FINAL | Posted 9/23/2025 | Download |
| GEN-2018-083 | December 11, 2024 | Interconnect 250 MW to the NPPD Transmission System FINAL | Reposted 8/13/2025 | Download |
| GEN-2018-089 | December 11, 2024 | Interconnect 196 MW to the SPS Transmission System FINAL | Posted 2/14/2025 | Download |
| GEN-2018-099 | December 11, 2024 | Interconnect 300 MW to the SPS Transmission System FINAL | Posted 2/14/2025 | Download |
| GEN-2018-106 | December 11, 2024 | Interconnect 165 MW to the AEP Transmission System FINAL | Reposted 6/26/2025 | Download |
| GEN-2018-108 | December 11, 2024 | Interconnect 95 MW to the ITCGP Transmission System FINAL | Posted 2/14/2025 | Download |
| GEN-2018-115 | December 11, 2024 | Interconnect 250 MW to the AEP Transmission System FINAL | Posted 2/20/2025 | Download |
| GEN-2018-116 | December 11, 2024 | Interconnect 150 MW to the SUNC Transmission System | Posted 2/6/2025 | Download |
| GEN-2018-125 | December 11, 2024 | Interconnect 251 MW to the NPPD Transmission System FINAL | Posted 2/18/2025 | Download |
| GEN-2018-128 | December 11, 2024 | Interconnect 200.22 MW to the Evergy Transmission System FINAL | Posted 2/19/2025 | Download |
| GEN-2018-131 | December 11, 2024 | Interconnect 221.4 MW to the NPPD Transmission System FINAL | Reposted 5/22/2025 | Download |
| GEN-2018-132 | December 11, 2024 | Interconnect 201.6 MW to the NPPD Transmission System FINAL | Posted 5/22/2025 | Download |
|
Please send your requests to GIStudies@spp.org If you have any questions, please submit a ticket on RMS. |
||||