| 2000 Feasibility Studies | |
| The following Generator Interconnection Studies have been requested. | |
| Study Number | Date Requested | Purpose of Study | Remarks | Report |
|---|---|---|---|---|
| GEN-2000-003 | July 13, 2000 | Request to interconnect 280MW on the SPS transmission system | Withdrawn (Completed Feasibility Study - Sep. 2000) | Download |
| GEN-2000-004 | August 16, 2000 | Request to interconnect 800MW on the AEP West transmission system | Withdrawn (Completed Feasibility Study - Oct. 2000) | Download |
| GEN-2000-009 | October 02, 2000 | Request to interconnect 500MW on the AEP West transmission system | Withdrawn (Feasibility Study complete - Oct. 2000) | Download |
| GEN-2000-010 | October 25, 2000 | Request to interconnect 400MW on the AEP West transmission system | Withdrawn (Feasibility Study complete January 2001) | Download |
|
Please send your requests to GIStudies@spp.org If you have any questions, please submit a ticket on RMS. |
||||