RAPID CITY NON-DC TIE INJECTION POINT - History Log


Transmission service across the Rapid City HVDC Tie is administered by Black Hills Power. SPP administers service to and from the Eastern terminal of this tie (RCEASTINJ). Information provided here represents status of the Eastern terminal of the Rapid City DC Tie as communicated to SPP. .RCEASTINJ_IMPORT will be limited to 0 on 5/13/2024 @ 0900 through 05/17/2024 @ 1700 for planned maintenance. The RCEASTINJ in both directions will be limited to 0 as a result of a planned maintenance outage from 10/28/2024 09:00:00 AM (CS) to 12/19/2024 18:00 AM (CS).
OUTAGE UPDATE
Updated at 4/24/2024 3:50:17 PM – The RAPID CITY NON-DC TIE INJECTION POINT DC Tie has been returned to normal operation.


Transmission service across the Rapid City HVDC Tie is administered by Black Hills Power. SPP administers service to and from the Eastern terminal of this tie (RCEASTINJ). Information provided here represents status of the Eastern terminal of the Rapid City DC Tie as communicated to SPP. .RCEASTINJ_IMPORT will be limited to 0 on 5/13/2024 @ 0900 through 05/17/2024 @ 1700 for planned maintenance. The RCEASTINJ in both directions will be limited to 0 as a result of a planned maintenance outage from 10/28/2024 09:00:00 AM (CS) to 12/19/2024 18:00 AM (CS).
OUTAGE UPDATE
Updated at 4/24/2024 3:48:52 PM – The RAPID CITY NON-DC TIE INJECTION POINT DC Tie has been returned to normal operation.


Transmission service across the Rapid City HVDC Tie is administered by Black Hills Power. SPP administers service to and from the Eastern terminal of this tie (RCEASTINJ). Information provided here represents status of the Eastern terminal of the Rapid City DC Tie as communicated to SPP. .The RCEASTINJ in both directions will be limited to 0 as a result of a planned maintenance outage from 4/29/2024 09:00:00 AM (CD) to 05/16/2024 08:00 AM (CD). RCEASTINJ_IMPORT will be limited to 0 on 5/13/2024 @ 0900 through 05/17/2024 @ 1700 for planned maintenance. The RCEASTINJ in both directions will be limited to 0 as a result of a planned maintenance outage from 10/28/2024 09:00:00 AM (CS) to 12/19/2024 18:00 AM (CS).
OUTAGE UPDATE
Updated at 4/19/2024 4:05:08 PM – The RAPID CITY NON-DC TIE INJECTION POINT DC Tie has been returned to normal operation.


Transmission service across the Rapid City HVDC Tie is administered by Black Hills Power. SPP administers service to and from the Eastern terminal of this tie (RCEASTINJ). Information provided here represents status of the Eastern terminal of the Rapid City DC Tie as communicated to SPP. .The RCEASTINJ in both directions will be limited to 0 as a result of a planned maintenance outage from 4/29/2024 09:00:00 AM (CD) to 05/16/2024 08:00 AM (CD). RCEASTINJ_IMPORT will be limited to 0 on 5/13/2024 @ 0900 through 05/17/2024 @ 1700 for planned maintenance. The RCEASTINJ in both directions will be limited to 0 as a result of a planned maintenance outage from 10/28/2024 09:00:00 AM (CS) to 12/19/2024 18:00 AM (CS).
OUTAGE UPDATE
Updated at 4/19/2024 4:04:02 PM – The RAPID CITY NON-DC TIE INJECTION POINT DC Tie has been returned to normal operation.


Transmission service across the Rapid City HVDC Tie is administered by Black Hills Power. SPP administers service to and from the Eastern terminal of this tie (RCEASTINJ). Information provided here represents status of the Eastern terminal of the Rapid City DC Tie as communicated to SPP. The RAPID CITY NON-DC TIE INJECTION POINT DC Tie in both directions will be limited to 0 as a result of an unplanned maintenance outage from 4/17/2024 08:00 AM (CD) to 4/18/2024 5:00:00 PM (CD). The RCEASTINJ in both directions will be limited to 0 as a result of a planned maintenance outage from 4/29/2024 09:00:00 AM (CD) to 05/16/2024 08:00 AM (CD). RCEASTINJ_IMPORT will be limited to 0 on 5/13/2024 @ 0900 through 05/17/2024 @ 1700 for planned maintenance. The RCEASTINJ in both directions will be limited to 0 as a result of a planned maintenance outage from 10/28/2024 09:00:00 AM (CS) to 12/19/2024 18:00 AM (CS).
OUTAGE UPDATE
Updated at 4/18/2024 3:06:48 PM – The RAPID CITY NON-DC TIE INJECTION POINT DC Tie has been returned to normal operation.


Transmission service across the Rapid City HVDC Tie is administered by Black Hills Power. SPP administers service to and from the Eastern terminal of this tie (RCEASTINJ). Information provided here represents status of the Eastern terminal of the Rapid City DC Tie as communicated to SPP. The RAPID CITY NON-DC TIE INJECTION POINT DC Tie in both directions will be limited to 0 as a result of an unplanned maintenance outage from 4/17/2024 08:00 AM (CD) to 4/18/2024 5:00:00 PM (CD). The RCEASTINJ in both directions will be limited to 0 as a result of a planned maintenance outage from 4/29/2024 09:00:00 AM (CD) to 05/16/2024 08:00 AM (CD). RCEASTINJ_IMPORT will be limited to 0 on 5/13/2024 @ 0900 through 05/17/2024 @ 1700 for planned maintenance. The RCEASTINJ in both directions will be limited to 0 as a result of a planned maintenance outage from 10/28/2024 09:00:00 AM (CS) to 12/19/2024 18:00 AM (CS).
OUTAGE UPDATE
Updated at 4/17/2024 11:27:51 AM (CD) - The RAPID CITY NON-DC TIE INJECTION POINT DC Tie in both directions will be limited to 0 as a result of an unplanned maintenance outage from 4/17/2024 8:00:00 AM (CD) to 4/18/2024 5:00:00 PM (CD).


Transmission service across the Rapid City HVDC Tie is administered by Black Hills Power. SPP administers service to and from the Eastern terminal of this tie (RCEASTINJ). Information provided here represents status of the Eastern terminal of the Rapid City DC Tie as communicated to SPP. The RAPID CITY NON-DC TIE INJECTION POINT DC Tie in both directions will be limited to 0 as a result of an unplanned maintenance outage from 4/17/2024 08:00 AM (CD) to 4/18/2024 5:00:00 PM (CD). The RCEASTINJ in both directions will be limited to 0 as a result of a planned maintenance outage from 4/29/2024 09:00:00 AM (CD) to 05/16/2024 08:00 AM (CD). RCEASTINJ_IMPORT will be limited to 0 on 5/13/2024 @ 0900 through 05/17/2024 @ 1700 for planned maintenance. The RCEASTINJ in both directions will be limited to 0 as a result of a planned maintenance outage from 10/28/2024 09:00:00 AM (CS) to 12/19/2024 18:00 AM (CS).
OUTAGE UPDATE
Updated at 4/17/2024 11:25:29 AM (CD) - The RAPID CITY NON-DC TIE INJECTION POINT DC Tie in both directions will be limited to 0 as a result of a planned maintenance outage from 4/17/2024 11:00:00 AM (CD) to 4/18/2024 5:00:00 PM (CD).


Transmission service across the Rapid City HVDC Tie is administered by Black Hills Power. SPP administers service to and from the Eastern terminal of this tie (RCEASTINJ). Information provided here represents status of the Eastern terminal of the Rapid City DC Tie as communicated to SPP. The RAPID CITY NON-DC TIE INJECTION POINT DC Tie in both directions will be limited to 0 as a result of an unplanned maintenance outage from 4/17/2024 08:00 AM (CD) to 4/18/2024 5:00:00 PM (CD). The RCEASTINJ in both directions will be limited to 0 as a result of a planned maintenance outage from 4/29/2024 09:00:00 AM (CD) to 05/16/2024 08:00 AM (CD). RCEASTINJ_IMPORT will be limited to 0 on 5/13/2024 @ 0900 through 05/17/2024 @ 1700 for planned maintenance. The RCEASTINJ in both directions will be limited to 0 as a result of a planned maintenance outage from 10/28/2024 09:00:00 AM (CS) to 12/19/2024 18:00 AM (CS).
OUTAGE UPDATE
Updated at 4/17/2024 4:23:21 AM – The RAPID CITY NON-DC TIE INJECTION POINT DC Tie has been returned to normal operation.


Transmission service across the Rapid City HVDC Tie is administered by Black Hills Power. SPP administers service to and from the Eastern terminal of this tie (RCEASTINJ). Information provided here represents status of the Eastern terminal of the Rapid City DC Tie as communicated to SPP. The RAPID CITY NON-DC TIE INJECTION POINT DC Tie in both directions will be limited to 0 as a result of an unplanned maintenance outage from 4/17/2024 08:00 AM (CD) to 4/18/2024 5:00:00 PM (CD). The RCEASTINJ in both directions will be limited to 0 as a result of a planned maintenance outage from 4/29/2024 09:00:00 AM (CD) to 05/16/2024 08:00 AM (CD). The RCEASTINJ in both directions will be limited to 0 as a result of a planned maintenance outage from 10/28/2024 09:00:00 AM (CS) to 12/19/2024 18:00 AM (CS).
OUTAGE UPDATE
Updated at 4/17/2024 4:10:35 AM – The RAPID CITY NON-DC TIE INJECTION POINT DC Tie has been returned to normal operation.


Transmission service across the Rapid City HVDC Tie is administered by Black Hills Power. SPP administers service to and from the Eastern terminal of this tie (RCEASTINJ). Information provided here represents status of the Eastern terminal of the Rapid City DC Tie as communicated to SPP. The RAPID CITY NON-DC TIE INJECTION POINT DC Tie in both directions will be limited to 0 as a result of an unplanned maintenance outage from 4/17/2024 08:00 AM (CD) to 4/18/2024 5:00:00 PM (CD). The RCEASTINJ in both directions will be limited to 0 as a result of a planned maintenance outage from 4/29/2024 09:00:00 AM (CD) to 05/16/2024 08:00 AM (CD). The RCEASTINJ in both directions will be limited to 0 as a result of a planned maintenance outage from 10/28/2024 09:00:00 AM (CS) to 12/19/2024 18:00 AM (CS).
OUTAGE UPDATE
Updated at 4/16/2024 5:17:25 PM – The RAPID CITY NON-DC TIE INJECTION POINT DC Tie has been returned to normal operation.


Transmission service across the Rapid City HVDC Tie is administered by Black Hills Power. SPP administers service to and from the Eastern terminal of this tie (RCEASTINJ). Information provided here represents status of the Eastern terminal of the Rapid City DC Tie as communicated to SPP. The RCEASTINJ in both directions will be limited to 0 as a result of a planned maintenance outage from 4/29/2024 09:00:00 AM (CD) to 05/16/2024 08:00 AM (CD). The RCEASTINJ in both directions will be limited to 0 as a result of a planned maintenance outage from 10/28/2024 09:00:00 AM (CS) to 12/19/2024 18:00 AM (CS).
OUTAGE UPDATE
Updated at 4/16/2024 3:49:38 PM (CD) - The RAPID CITY NON-DC TIE INJECTION POINT DC Tie in both directions will be limited to 0 as a result of an unplanned maintenance outage from 4/16/2024 3:00:00 PM (CD) to 4/18/2024 5:00:00 PM (CD).


Transmission service across the Rapid City HVDC Tie is administered by Black Hills Power. SPP administers service to and from the Eastern terminal of this tie (RCEASTINJ). Information provided here represents status of the Eastern terminal of the Rapid City DC Tie as communicated to SPP. The RCEASTINJ in both directions will be limited to 0 as a result of a planned maintenance outage from 4/29/2024 09:00:00 AM (CD) to 05/16/2024 08:00 AM (CD). The RCEASTINJ in both directions will be limited to 0 as a result of a planned maintenance outage from 10/28/2024 09:00:00 AM (CS) to 12/19/2024 18:00 AM (CS).
OUTAGE UPDATE
Updated at 4/15/2024 10:58:08 PM – The RAPID CITY NON-DC TIE INJECTION POINT DC Tie has been returned to normal operation.


Transmission service across the Rapid City HVDC Tie is administered by Black Hills Power. SPP administers service to and from the Eastern terminal of this tie (RCEASTINJ). Information provided here represents status of the Eastern terminal of the Rapid City DC Tie as communicated to SPP. The RCEASTINJ in both directions will be limited to 0 as a result of a planned maintenance outage from 4/29/2024 09:00:00 AM (CD) to 05/16/2024 08:00 AM (CD). The RCEASTINJ in both directions will be limited to 0 as a result of a planned maintenance outage from 10/28/2024 09:00:00 AM (CS) to 12/18/2024 18:00 AM (CS).
OUTAGE UPDATE
Updated at 4/15/2024 10:56:45 PM – The RAPID CITY NON-DC TIE INJECTION POINT DC Tie has been returned to normal operation.


Transmission service across the Rapid City HVDC Tie is administered by Black Hills Power. SPP administers service to and from the Eastern terminal of this tie (RCEASTINJ). Information provided here represents status of the Eastern terminal of the Rapid City DC Tie as communicated to SPP. The RCEASTINJ in both directions will be limited to 0 as a result of a planned maintenance outage from 4/29/2024 09:00:00 AM (CD) to 05/16/2024 08:00 AM (CD).
OUTAGE UPDATE
Updated at 4/15/2024 10:51:28 PM – The RAPID CITY NON-DC TIE INJECTION POINT DC Tie has been returned to normal operation.


Transmission service across the Rapid City HVDC Tie is administered by Black Hills Power. SPP administers service to and from the Eastern terminal of this tie (RCEASTINJ). Information provided here represents status of the Eastern terminal of the Rapid City DC Tie as communicated to SPP.
OUTAGE UPDATE
Updated at 4/1/2024 1:30:24 AM – The RAPID CITY NON-DC TIE INJECTION POINT DC Tie has been returned to normal operation.


Transmission service across the Rapid City HVDC Tie is administered by Black Hills Power. SPP administers service to and from the Eastern terminal of this tie (RCEASTINJ). Information provided here represents status of the Eastern terminal of the Rapid City DC Tie as communicated to SPP.
OUTAGE UPDATE
Updated at 3/31/2024 12:34:00 AM (CD) - The RAPID CITY NON-DC TIE INJECTION POINT DC Tie from east to west will be limited to 75 as a result of an unplanned maintenance outage from 3/31/2024 12:30:00 AM (CD) to 4/1/2024 4:00:00 PM (CD).


Transmission service across the Rapid City HVDC Tie is administered by Black Hills Power. SPP administers service to and from the Eastern terminal of this tie (RCEASTINJ). Information provided here represents status of the Eastern terminal of the Rapid City DC Tie as communicated to SPP.
OUTAGE UPDATE
Updated at 3/31/2024 12:34:13 AM (CD) - The RAPID CITY NON-DC TIE INJECTION POINT DC Tie from east to west will be limited to 75 as a result of an unplanned maintenance outage from 3/31/2024 12:30:00 AM (CD) to 3/31/2024 6:00:00 PM (CD).


Transmission service across the Rapid City HVDC Tie is administered by Black Hills Power. SPP administers service to and from the Eastern terminal of this tie (RCEASTINJ). Information provided here represents status of the Eastern terminal of the Rapid City DC Tie as communicated to SPP.
OUTAGE UPDATE
Updated at 3/21/2024 2:00:00 AM – The RAPID CITY NON-DC TIE INJECTION POINT DC Tie has been returned to normal operation.


Transmission service across the Rapid City HVDC Tie is administered by Black Hills Power. SPP administers service to and from the Eastern terminal of this tie (RCEASTINJ). Information provided here represents status of the Eastern terminal of the Rapid City DC Tie as communicated to SPP.
OUTAGE UPDATE
Updated at 3/20/2024 9:17:13 PM (CD) - The RAPID CITY NON-DC TIE INJECTION POINT DC Tie from east to west will be limited to 0 as a result of an unplanned maintenance outage from 3/20/2024 9:17:00 PM (CD) to 3/21/2024 9:30:00 PM (CD).


Transmission service across the Rapid City HVDC Tie is administered by Black Hills Power. SPP administers service to and from the Eastern terminal of this tie (RCEASTINJ). Information provided here represents status of the Eastern terminal of the Rapid City DC Tie as communicated to SPP.
OUTAGE UPDATE
Updated at 3/20/2024 8:51:00 PM (CD) - The RAPID CITY NON-DC TIE INJECTION POINT DC Tie from east to west will be limited to 75 as a result of an unplanned maintenance outage from 3/20/2024 8:45:00 PM (CD) to 3/21/2024 8:49:21 PM (CD).


Transmission service across the Rapid City HVDC Tie is administered by Black Hills Power. SPP administers service to and from the Eastern terminal of this tie (RCEASTINJ). Information provided here represents status of the Eastern terminal of the Rapid City DC Tie as communicated to SPP.
OUTAGE UPDATE
Updated at 3/13/2024 11:28:13 AM – The RAPID CITY NON-DC TIE INJECTION POINT DC Tie has been returned to normal operation.


Transmission service across the Rapid City HVDC Tie is administered by Black Hills Power. SPP administers service to and from the Eastern terminal of this tie (RCEASTINJ). Information provided here represents status of the Eastern terminal of the Rapid City DC Tie as communicated to SPP.
OUTAGE UPDATE
Updated at 3/13/2024 8:13:00 AM (CD) - The RAPID CITY NON-DC TIE INJECTION POINT DC Tie in both directions will be limited to 0 as a result of an emergency outage from 3/13/2024 8:13:00 AM (CD) to 3/13/2024 5:00:00 PM (CD).


Transmission service across the Rapid City HVDC Tie is administered by Black Hills Power. SPP administers service to and from the Eastern terminal of this tie (RCEASTINJ). Information provided here represents status of the Eastern terminal of the Rapid City DC Tie as communicated to SPP.
OUTAGE UPDATE
Updated at 3/13/2024 8:02:22 AM (CD) - The RAPID CITY NON-DC TIE INJECTION POINT DC Tie in both directions will be limited to 0 as a result of an unplanned maintenance outage from 3/14/2024 8:02:22 AM (CD) to 3/14/2024 1:00:00 PM (CD).


Transmission service across the Rapid City HVDC Tie is administered by Black Hills Power. SPP administers service to and from the Eastern terminal of this tie (RCEASTINJ). Information provided here represents status of the Eastern terminal of the Rapid City DC Tie as communicated to SPP.
OUTAGE UPDATE
Updated at 1/28/2024 1:10:17 PM – The RAPID CITY NON-DC TIE INJECTION POINT DC Tie has been returned to normal operation.


Transmission service across the Rapid City HVDC Tie is administered by Black Hills Power. SPP administers service to and from the Eastern terminal of this tie (RCEASTINJ). Information provided here represents status of the Eastern terminal of the Rapid City DC Tie as communicated to SPP.
OUTAGE UPDATE
Updated at 1/22/2024 8:53:42 AM (CS) - The RAPID CITY NON-DC TIE INJECTION POINT DC Tie from west to east will be limited to 0 as a result of a planned maintenance outage from 1/22/2024 9:00:00 AM (CS) to 2/1/2024 5:00:00 PM (CS).


Transmission service across the Rapid City HVDC Tie is administered by Black Hills Power. SPP administers service to and from the Eastern terminal of this tie (RCEASTINJ). Information provided here represents status of the Eastern terminal of the Rapid City DC Tie as communicated to SPP.
OUTAGE UPDATE
Updated at 1/11/2024 11:01:06 AM (CS) - The RAPID CITY NON-DC TIE INJECTION POINT DC Tie in both directions will be limited to 0 as a result of a planned maintenance outage from 1/23/2024 9:00:00 AM (CS) to 1/24/2024 6:00:00 PM (CS).


Transmission service across the Rapid City HVDC Tie is administered by Black Hills Power. SPP administers service to and from the Eastern terminal of this tie (RCEASTINJ). Information provided here represents status of the Eastern terminal of the Rapid City DC Tie as communicated to SPP.
OUTAGE UPDATE
Updated at 1/10/2024 12:13:13 PM – The RAPID CITY NON-DC TIE INJECTION POINT DC Tie has been returned to normal operation.


Transmission service across the Rapid City HVDC Tie is administered by Black Hills Power. SPP administers service to and from the Eastern terminal of this tie (RCEASTINJ). Information provided here represents status of the Eastern terminal of the Rapid City DC Tie as communicated to SPP.
OUTAGE UPDATE
Updated at 1/8/2024 9:34:50 PM (CS) - The RAPID CITY NON-DC TIE INJECTION POINT DC Tie from west to east will be limited to 125 as a result of a planned maintenance outage from 1/9/2024 9:00:00 AM (CS) to 1/10/2024 5:00:00 PM (CS).


Transmission service across the Rapid City HVDC Tie is administered by Black Hills Power. SPP administers service to and from the Eastern terminal of this tie (RCEASTINJ). Information provided here represents status of the Eastern terminal of the Rapid City DC Tie as communicated to SPP.
OUTAGE UPDATE
Updated at 1/4/2024 5:15:08 PM – The RAPID CITY NON-DC TIE INJECTION POINT DC Tie has been returned to normal operation.


Transmission service across the Rapid City HVDC Tie is administered by Black Hills Power. SPP administers service to and from the Eastern terminal of this tie (RCEASTINJ). Information provided here represents status of the Eastern terminal of the Rapid City DC Tie as communicated to SPP.
OUTAGE UPDATE
Updated at 1/3/2024 12:17:38 AM (CS) - The RAPID CITY NON-DC TIE INJECTION POINT DC Tie in both directions will be limited to 0 as a result of a planned maintenance outage from 1/3/2024 11:00:00 AM (CS) to 1/4/2024 6:00:00 PM (CS).


Transmission service across the Rapid City HVDC Tie is administered by Black Hills Power. SPP administers service to and from the Eastern terminal of this tie (RCEASTINJ). Information provided here represents status of the Eastern terminal of the Rapid City DC Tie as communicated to SPP.
OUTAGE UPDATE
Updated at 12/28/2023 9:07:00 PM – The RAPID CITY NON-DC TIE INJECTION POINT DC Tie has been returned to normal operation.


Transmission service across the Rapid City HVDC Tie is administered by Black Hills Power. SPP administers service to and from the Eastern terminal of this tie (RCEASTINJ). Information provided here represents status of the Eastern terminal of the Rapid City DC Tie as communicated to SPP.
OUTAGE UPDATE
Updated at 12/28/2023 2:28:17 PM (CS) - The RAPID CITY NON-DC TIE INJECTION POINT DC Tie in both directions will be limited to 0 as a result of an unplanned maintenance outage from 12/28/2023 10:00:00 PM (CS) to 12/28/2023 10:00:00 PM (CS).


Transmission service across the Rapid City HVDC Tie is administered by Black Hills Power. SPP administers service to and from the Eastern terminal of this tie (RCEASTINJ). Information provided here represents status of the Eastern terminal of the Rapid City DC Tie as communicated to SPP.
OUTAGE UPDATE
Updated at 12/6/2023 8:21:28 PM – The RAPID CITY NON-DC TIE INJECTION POINT DC Tie has been returned to normal operation.


Transmission service across the Rapid City HVDC Tie is administered by Black Hills Power. SPP administers service to and from the Eastern terminal of this tie (RCEASTINJ). Information provided here represents status of the Eastern terminal of the Rapid City DC Tie as communicated to SPP.
OUTAGE UPDATE
Updated at 12/6/2023 8:21:22 PM – The RAPID CITY NON-DC TIE INJECTION POINT DC Tie has been returned to normal operation.


Transmission service across the Rapid City HVDC Tie is administered by Black Hills Power. SPP administers service to and from the Eastern terminal of this tie (RCEASTINJ). Information provided here represents status of the Eastern terminal of the Rapid City DC Tie as communicated to SPP.
OUTAGE UPDATE
Updated at 11/21/2023 12:35:49 PM (CS) - The RAPID CITY NON-DC TIE INJECTION POINT DC Tie from west to east will be limited to 100 as a result of a planned maintenance outage from 11/22/2023 12:35:49 PM (CS) to 11/29/2023 10:00:00 AM (CS).


Transmission service across the Rapid City HVDC Tie is administered by Black Hills Power. SPP administers service to and from the Eastern terminal of this tie (RCEASTINJ). Information provided here represents status of the Eastern terminal of the Rapid City DC Tie as communicated to SPP.
OUTAGE UPDATE
Updated at 11/13/2023 2:11:47 PM (CS) - The RAPID CITY NON-DC TIE INJECTION POINT DC Tie from west to east will be limited to 100 as a result of a planned maintenance outage from 10/12/2023 10:00:00 AM (CS) to 11/22/2023 10:00:00 AM (CS).


Transmission service across the Rapid City HVDC Tie is administered by Black Hills Power. SPP administers service to and from the Eastern terminal of this tie (RCEASTINJ). Information provided here represents status of the Eastern terminal of the Rapid City DC Tie as communicated to SPP. RCEASTIN will be limited to 0 MW in both directions starting 11/14/2023 09:00 through 11/15/2023 18:00.
OUTAGE UPDATE
Updated at 11/13/2023 2:08:36 PM (CS) - The RAPID CITY NON-DC TIE INJECTION POINT DC Tie from west to east will be limited to 100 as a result of a planned maintenance outage from 10/12/2023 10:00:00 AM (CS) to 11/22/2023 10:00:00 AM (CS).


Transmission service across the Rapid City HVDC Tie is administered by Black Hills Power. SPP administers service to and from the Eastern terminal of this tie (RCEASTINJ). Information provided here represents status of the Eastern terminal of the Rapid City DC Tie as communicated to SPP. RCEASTIN will be limited to 0 MW in both directions starting 11/14/2023 09:00 through 11/15/2023 18:00.
OUTAGE UPDATE
Updated at 11/13/2023 9:37:46 AM (CS) - The RAPID CITY NON-DC TIE INJECTION POINT DC Tie from west to east will be limited to 100 as a result of a planned maintenance outage from 10/12/2023 10:00:00 AM (CS) to 11/15/2023 10:00:00 AM (CS).


Transmission service across the Rapid City HVDC Tie is administered by Black Hills Power. SPP administers service to and from the Eastern terminal of this tie (RCEASTINJ). Information provided here represents status of the Eastern terminal of the Rapid City DC Tie as communicated to SPP. RCEASTIN will be limited to 0 MW in both directions starting 11/14/2023 09:00 through 11/15/2023 18:00.
OUTAGE UPDATE
Updated at 11/9/2023 1:42:08 PM (CS) - The RAPID CITY NON-DC TIE INJECTION POINT DC Tie from north to south will be limited to 100 as a result of a planned maintenance outage from 10/12/2023 10:00:00 AM (CS) to 11/19/2023 12:00:00 PM (CS).


Transmission service across the Rapid City HVDC Tie is administered by Black Hills Power. SPP administers service to and from the Eastern terminal of this tie (RCEASTINJ). Information provided here represents status of the Eastern terminal of the Rapid City DC Tie as communicated to SPP. RCEASTIN will be limited to 0 MW in both directions starting 11/14/2023 09:00 through 11/15/2023 18:00.
OUTAGE UPDATE
Updated at 10/12/2023 10:13:30 AM (CD) - The RAPID CITY NON-DC TIE INJECTION POINT DC Tie from west to east will be limited to 100 as a result of a planned maintenance outage from 10/12/2023 10:00:00 AM (CD) to 11/9/2023 1:00:00 PM (CD).


Transmission service across the Rapid City HVDC Tie is administered by Black Hills Power. SPP administers service to and from the Eastern terminal of this tie (RCEASTINJ). Information provided here represents status of the Eastern terminal of the Rapid City DC Tie as communicated to SPP. RCEASTINJ_IMP will be limited to 100 MW starting10/12/2023 17:00 through 11/09/2023 13:00. RCEASTIN will be limited to 0 MW in both directions starting 11/14/2023 09:00 through 11/15/2023 18:00.
OUTAGE UPDATE
Updated at 10/12/2023 4:58:53 AM (CD) - The RAPID CITY NON-DC TIE INJECTION POINT DC Tie in both directions will be limited to 0 as a result of a planned maintenance outage from 9/26/2023 8:00:00 AM (CD) to 10/26/2023 2:00:00 PM (CD).


Transmission service across the Rapid City HVDC Tie is administered by Black Hills Power. SPP administers service to and from the Eastern terminal of this tie (RCEASTINJ). Information provided here represents status of the Eastern terminal of the Rapid City DC Tie as communicated to SPP. RCEASTINJ_IMP will be limited to 100 MW starting10/12/2023 17:00 through 11/09/2023 13:00. RCEASTIN will be limited to 0 MW in both directions starting 11/14/2023 09:00 through 11/15/2023 18:00.
OUTAGE UPDATE
Updated at 9/26/2023 8:00:00 AM (CD) - The RAPID CITY NON-DC TIE INJECTION POINT DC Tie in both directions will be limited to 0 as a result of a planned maintenance outage from 9/26/2023 8:00:00 AM (CD) to 10/12/2023 5:00:00 PM (CD).


Transmission service across the Rapid City HVDC Tie is administered by Black Hills Power. SPP administers service to and from the Eastern terminal of this tie (RCEASTINJ). Information provided here represents status of the Eastern terminal of the Rapid City DC Tie as communicated to SPP. RCEASTIN will be limited to 0 MW in both directions starting 09/26/2023 08:00 through 10/12/2023 17:00. RCEASTINJ_IMP will be limited to 100 MW starting10/12/2023 17:00 through 11/09/2023 13:00. RCEASTIN will be limited to 0 MW in both directions starting 11/14/2023 09:00 through 11/15/2023 18:00.
OUTAGE UPDATE
Updated at 9/25/2023 4:27:00 AM (CD) - The RAPID CITY NON-DC TIE INJECTION POINT DC Tie from west to east will be limited to 100 as a result of a planned maintenance outage from 9/23/2023 8:00:00 AM (CD) to 9/26/2023 8:00:00 AM (CD).


Transmission service across the Rapid City HVDC Tie is administered by Black Hills Power. SPP administers service to and from the Eastern terminal of this tie (RCEASTINJ). Information provided here represents status of the Eastern terminal of the Rapid City DC Tie as communicated to SPP. RCEASTIN_IMP will be limited to 100 MW on 09/23/2023 08:00 through 11/09/2023 13:00.
OUTAGE UPDATE
Updated at 9/22/2023 12:00:00 PM (CD) - The RAPID CITY NON-DC TIE INJECTION POINT DC Tie from west to east will be limited to 100 as a result of a planned maintenance outage from 9/23/2023 8:00:00 AM (CD) to 9/26/2023 8:00:00 AM (CD).


Transmission service across the Rapid City HVDC Tie is administered by Black Hills Power. SPP administers service to and from the Eastern terminal of this tie (RCEASTINJ). Information provided here represents status of the Eastern terminal of the Rapid City DC Tie as communicated to SPP. RCEASTIN_IMP will be limited to 100 MW on 09/23/2023 08:00 through 11/09/2023 13:00.
OUTAGE UPDATE
Updated at 9/21/2023 12:00:00 PM – The RAPID CITY NON-DC TIE INJECTION POINT DC Tie has been returned to normal operation.


Transmission service across the Rapid City HVDC Tie is administered by Black Hills Power. SPP administers service to and from the Eastern terminal of this tie (RCEASTINJ). Information provided here represents status of the Eastern terminal of the Rapid City DC Tie as communicated to SPP.
OUTAGE UPDATE
Updated at 9/21/2023 12:00:00 PM – The RAPID CITY NON-DC TIE INJECTION POINT DC Tie has been returned to normal operation.


Transmission service across the Rapid City HVDC Tie is administered by Black Hills Power. SPP administers service to and from the Eastern terminal of this tie (RCEASTINJ). Information provided here represents status of the Eastern terminal of the Rapid City DC Tie as communicated to SPP.
OUTAGE UPDATE
Updated at 9/14/2023 5:54:56 PM – The RAPID CITY NON-DC TIE INJECTION POINT DC Tie has been returned to normal operation.


Transmission service across the Rapid City HVDC Tie is administered by Black Hills Power. SPP administers service to and from the Eastern terminal of this tie (RCEASTINJ). Information provided here represents status of the Eastern terminal of the Rapid City DC Tie as communicated to SPP.
OUTAGE UPDATE
Updated at 9/14/2023 3:11:34 PM (CD) - The RAPID CITY NON-DC TIE INJECTION POINT DC Tie from east to west will be limited to 0 as a result of a planned maintenance outage from 9/14/2023 8:00:00 AM (CD) to 9/14/2023 6:00:00 PM (CD).


Transmission service across the Rapid City HVDC Tie is administered by Black Hills Power. SPP administers service to and from the Eastern terminal of this tie (RCEASTINJ). Information provided here represents status of the Eastern terminal of the Rapid City DC Tie as communicated to SPP.
OUTAGE UPDATE
Updated at 9/14/2023 2:14:37 AM (CD) - The RAPID CITY NON-DC TIE INJECTION POINT DC Tie from east to west will be limited to 0 as a result of a planned maintenance outage from 9/14/2023 8:00:00 AM (CD) to 9/14/2023 5:00:00 PM (CD).


Transmission service across the Rapid City HVDC Tie is administered by Black Hills Power. SPP administers service to and from the Eastern terminal of this tie (RCEASTINJ). Information provided here represents status of the Eastern terminal of the Rapid City DC Tie as communicated to SPP.
OUTAGE UPDATE
Updated at 8/12/2023 5:07:23 PM – The RAPID CITY NON-DC TIE INJECTION POINT DC Tie has been returned to normal operation.


Transmission service across the Rapid City HVDC Tie is administered by Black Hills Power. SPP administers service to and from the Eastern terminal of this tie (RCEASTINJ). Information provided here represents status of the Eastern terminal of the Rapid City DC Tie as communicated to SPP. RCEASTINJ IMP and EXP limited to Zero on 10/2/2023 @ 0800 through 10/12/2023 @ 1700
OUTAGE UPDATE
Updated at 8/11/2023 9:13:59 AM – The RAPID CITY NON-DC TIE INJECTION POINT DC Tie has been returned to normal operation.


Transmission service across the Rapid City HVDC Tie is administered by Black Hills Power. SPP administers service to and from the Eastern terminal of this tie (RCEASTINJ). Information provided here represents status of the Eastern terminal of the Rapid City DC Tie as communicated to SPP.
OUTAGE UPDATE
Updated at 7/28/2023 5:19:18 AM – The RAPID CITY NON-DC TIE INJECTION POINT DC Tie has been returned to normal operation.


Transmission service across the Rapid City HVDC Tie is administered by Black Hills Power. SPP administers service to and from the Eastern terminal of this tie (RCEASTINJ). Information provided here represents status of the Eastern terminal of the Rapid City DC Tie as communicated to SPP.
OUTAGE UPDATE
Updated at 7/29/2023 5:00:00 AM (CD) - The RAPID CITY NON-DC TIE INJECTION POINT DC Tie in both directions will be limited to 0 as a result of an unplanned maintenance outage from 7/28/2023 12:45:00 AM (CD) to 7/29/2023 4:00:00 PM (CD).


Transmission service across the Rapid City HVDC Tie is administered by Black Hills Power. SPP administers service to and from the Eastern terminal of this tie (RCEASTINJ). Information provided here represents status of the Eastern terminal of the Rapid City DC Tie as communicated to SPP.
OUTAGE UPDATE
Updated at 7/28/2023 12:46:30 AM (CD) - The RAPID CITY NON-DC TIE INJECTION POINT DC Tie in both directions will be limited to 0 as a result of an unplanned maintenance outage from 7/28/2023 12:46:00 AM (CD) to 7/29/2023 12:00:00 AM (CD).


Transmission service across the Rapid City HVDC Tie is administered by Black Hills Power. SPP administers service to and from the Eastern terminal of this tie (RCEASTINJ). Information provided here represents status of the Eastern terminal of the Rapid City DC Tie as communicated to SPP.
OUTAGE UPDATE
Updated at 7/8/2023 4:47:12 PM – The RAPID CITY NON-DC TIE INJECTION POINT DC Tie has been returned to normal operation.


Transmission service across the Rapid City HVDC Tie is administered by Black Hills Power. SPP administers service to and from the Eastern terminal of this tie (RCEASTINJ). Information provided here represents status of the Eastern terminal of the Rapid City DC Tie as communicated to SPP.
OUTAGE UPDATE
Updated at 7/8/2023 1:08:02 PM (CD) - The RAPID CITY NON-DC TIE INJECTION POINT DC Tie in both directions will be limited to 100 as a result of an unplanned maintenance outage from 7/8/2023 1:08:00 PM (CD) to 7/8/2023 8:00:00 PM (CD).


Transmission service across the Rapid City HVDC Tie is administered by Black Hills Power. SPP administers service to and from the Eastern terminal of this tie (RCEASTINJ). Information provided here represents status of the Eastern terminal of the Rapid City DC Tie as communicated to SPP.
OUTAGE UPDATE
Updated at 6/25/2023 1:17:35 PM – The RAPID CITY NON-DC TIE INJECTION POINT DC Tie has been returned to normal operation.


Transmission service across the Rapid City HVDC Tie is administered by Black Hills Power. SPP administers service to and from the Eastern terminal of this tie (RCEASTINJ). Information provided here represents status of the Eastern terminal of the Rapid City DC Tie as communicated to SPP. The RAPID CITY NON-DC TIE INJECTION POINT DC Tie in both directions will be limited to 0 as a result of a planned maintenance outage from 06/16/2023 12:00:00 PM (CD) to 06/16/2023 13:00:00 PM (CD). The RAPID CITY NON-DC TIE INJECTION POINT DC Tie in both directions will be limited to 0 as a result of a planned maintenance outage from 06/19/2023 9:00:00 AM (CD) to 06/20/2023 6:00:00 PM (CD)
OUTAGE UPDATE
Updated at 6/20/2023 1:04:36 PM – The RAPID CITY NON-DC TIE INJECTION POINT DC Tie has been returned to normal operation.


Transmission service across the Rapid City HVDC Tie is administered by Black Hills Power. SPP administers service to and from the Eastern terminal of this tie (RCEASTINJ). Information provided here represents status of the Eastern terminal of the Rapid City DC Tie as communicated to SPP. The RAPID CITY NON-DC TIE INJECTION POINT DC Tie in both directions will be limited to 0 as a result of a planned maintenance outage from 06/16/2023 12:00:00 PM (CD) to 06/16/2023 13:00:00 PM (CD). The RAPID CITY NON-DC TIE INJECTION POINT DC Tie in both directions will be limited to 0 as a result of a planned maintenance outage from 06/19/2023 9:00:00 AM (CD) to 06/20/2023 6:00:00 PM (CD)
OUTAGE UPDATE
Updated at 6/20/2023 9:00:35 AM (CD) - The RAPID CITY NON-DC TIE INJECTION POINT DC Tie in both directions will be limited to 0 as a result of a planned maintenance outage from 6/20/2023 9:00:00 AM (CD) to 6/20/2023 6:00:00 PM (CD).


Transmission service across the Rapid City HVDC Tie is administered by Black Hills Power. SPP administers service to and from the Eastern terminal of this tie (RCEASTINJ). Information provided here represents status of the Eastern terminal of the Rapid City DC Tie as communicated to SPP. The RAPID CITY NON-DC TIE INJECTION POINT DC Tie in both directions will be limited to 0 as a result of a planned maintenance outage from 06/16/2023 12:00:00 PM (CD) to 06/16/2023 13:00:00 PM (CD). The RAPID CITY NON-DC TIE INJECTION POINT DC Tie in both directions will be limited to 0 as a result of a planned maintenance outage from 06/19/2023 9:00:00 AM (CD) to 06/20/2023 6:00:00 PM (CD)
OUTAGE UPDATE
Updated at 6/19/2023 9:36:15 AM – The RAPID CITY NON-DC TIE INJECTION POINT DC Tie has been returned to normal operation.


Transmission service across the Rapid City HVDC Tie is administered by Black Hills Power. SPP administers service to and from the Eastern terminal of this tie (RCEASTINJ). Information provided here represents status of the Eastern terminal of the Rapid City DC Tie as communicated to SPP. The RAPID CITY NON-DC TIE INJECTION POINT DC Tie in both directions will be limited to 0 as a result of a planned maintenance outage from 06/16/2023 12:00:00 PM (CD) to 06/16/2023 13:00:00 PM (CD). The RAPID CITY NON-DC TIE INJECTION POINT DC Tie in both directions will be limited to 0 as a result of a planned maintenance outage from 06/19/2023 9:00:00 AM (CD) to 06/20/2023 6:00:00 PM (CD)
OUTAGE UPDATE
Updated at 6/18/2023 9:47:37 AM – The RAPID CITY NON-DC TIE INJECTION POINT DC Tie has been returned to normal operation.


Transmission service across the Rapid City HVDC Tie is administered by Black Hills Power. SPP administers service to and from the Eastern terminal of this tie (RCEASTINJ). Information provided here represents status of the Eastern terminal of the Rapid City DC Tie as communicated to SPP. The RAPID CITY NON-DC TIE INJECTION POINT DC Tie in both directions will be limited to 0 as a result of a planned maintenance outage from 06/16/2023 12:00:00 PM (CD) to 06/16/2023 13:00:00 PM (CD). The RAPID CITY NON-DC TIE INJECTION POINT DC Tie in both directions will be limited to 0 as a result of a planned maintenance outage from 06/19/2023 9:00:00 AM (CD) to 06/20/2023 6:00:00 PM (CD)
OUTAGE UPDATE
Updated at 6/18/2023 5:44:14 AM (CD) - The RAPID CITY NON-DC TIE INJECTION POINT DC Tie in both directions will be limited to 0 as a result of an unplanned maintenance outage from 6/18/2023 5:44:00 AM (CD) to 6/19/2023 12:00:00 AM (CD).


Transmission service across the Rapid City HVDC Tie is administered by Black Hills Power. SPP administers service to and from the Eastern terminal of this tie (RCEASTINJ). Information provided here represents status of the Eastern terminal of the Rapid City DC Tie as communicated to SPP. The RAPID CITY NON-DC TIE INJECTION POINT DC Tie in both directions will be limited to 0 as a result of a planned maintenance outage from 06/16/2023 12:00:00 PM (CD) to 06/16/2023 13:00:00 PM (CD). The RAPID CITY NON-DC TIE INJECTION POINT DC Tie in both directions will be limited to 0 as a result of a planned maintenance outage from 06/19/2023 9:00:00 AM (CD) to 06/20/2023 6:00:00 PM (CD)
OUTAGE UPDATE
Updated at 6/15/2023 3:07:42 PM (CD) - The RAPID CITY NON-DC TIE INJECTION POINT DC Tie in both directions will be limited to 0 as a result of an unplanned maintenance outage from 6/15/2023 4:00:00 PM (CD) to 6/15/2023 5:00:00 PM (CD).


Transmission service across the Rapid City HVDC Tie is administered by Black Hills Power. SPP administers service to and from the Eastern terminal of this tie (RCEASTINJ). Information provided here represents status of the Eastern terminal of the Rapid City DC Tie as communicated to SPP. The RAPID CITY NON-DC TIE INJECTION POINT DC Tie in both directions will be limited to 0 as a result of a planned maintenance outage from 06/16/2023 12:00:00 PM (CD) to 06/16/2023 13:00:00 PM (CD). The RAPID CITY NON-DC TIE INJECTION POINT DC Tie in both directions will be limited to 0 as a result of a planned maintenance outage from 06/19/2023 9:00:00 AM (CD) to 06/20/2023 6:00:00 PM (CD)
OUTAGE UPDATE
Updated at 6/7/2023 11:56:11 PM – The RAPID CITY NON-DC TIE INJECTION POINT DC Tie has been returned to normal operation.


Transmission service across the Rapid City HVDC Tie is administered by Black Hills Power. SPP administers service to and from the Eastern terminal of this tie (RCEASTINJ). Information provided here represents status of the Eastern terminal of the Rapid City DC Tie as communicated to SPP. The RAPID CITY NON-DC TIE INJECTION POINT DC Tie in both directions will be limited to 0 as a result of a planned maintenance outage from 06/05/2023 10:00:00 AM (CD) to 06/05/2023 11:00:00 AM (CD). The RAPID CITY NON-DC TIE INJECTION POINT DC Tie in both directions will be limited to 0 as a result of a planned maintenance outage from 06/16/2023 12:00:00 PM (CD) to 06/16/2023 13:00:00 PM (CD). The RAPID CITY NON-DC TIE INJECTION POINT DC Tie in both directions will be limited to 0 as a result of a planned maintenance outage from 06/19/2023 9:00:00 AM (CD) to 06/20/2023 6:00:00 PM (CD)
OUTAGE UPDATE
Updated at 5/31/2023 12:20:36 PM – The RAPID CITY NON-DC TIE INJECTION POINT DC Tie has been returned to normal operation.


Transmission service across the Rapid City HVDC Tie is administered by Black Hills Power. SPP administers service to and from the Eastern terminal of this tie (RCEASTINJ). Information provided here represents status of the Eastern terminal of the Rapid City DC Tie as communicated to SPP. The RAPID CITY NON-DC TIE INJECTION POINT DC Tie in both directions will be limited to 0 as a result of a planned maintenance outage from 06/05/2023 10:00:00 AM (CD) to 06/05/2023 11:00:00 AM (CD). The RAPID CITY NON-DC TIE INJECTION POINT DC Tie in both directions will be limited to 0 as a result of a planned maintenance outage from 06/16/2023 12:00:00 PM (CD) to 06/16/2023 13:00:00 PM (CD). The RAPID CITY NON-DC TIE INJECTION POINT DC Tie in both directions will be limited to 0 as a result of a planned maintenance outage from 06/19/2023 9:00:00 AM (CD) to 06/20/2023 6:00:00 PM (CD)
OUTAGE UPDATE
Updated at 5/30/2023 10:20:16 AM (CD) - The RAPID CITY NON-DC TIE INJECTION POINT DC Tie from west to east will be limited to 100 as a result of a planned maintenance outage from 5/31/2023 9:00:00 AM (CD) to 5/31/2023 11:00:00 AM (CD).


Transmission service across the Rapid City HVDC Tie is administered by Black Hills Power. SPP administers service to and from the Eastern terminal of this tie (RCEASTINJ). Information provided here represents status of the Eastern terminal of the Rapid City DC Tie as communicated to SPP. The RAPID CITY NON-DC TIE INJECTION POINT DC Tie in both directions will be limited to 0 as a result of a planned maintenance outage from 06/05/2023 10:00:00 AM (CD) to 06/05/2023 11:00:00 AM (CD). The RAPID CITY NON-DC TIE INJECTION POINT DC Tie in both directions will be limited to 0 as a result of a planned maintenance outage from 06/16/2023 12:00:00 PM (CD) to 06/16/2023 13:00:00 PM (CD). The RAPID CITY NON-DC TIE INJECTION POINT DC Tie in both directions will be limited to 0 as a result of a planned maintenance outage from 06/19/2023 9:00:00 AM (CD) to 06/20/2023 6:00:00 PM (CD)
OUTAGE UPDATE
Updated at 5/22/2023 5:27:11 AM – The RAPID CITY NON-DC TIE INJECTION POINT DC Tie has been returned to normal operation.


Transmission service across the Rapid City HVDC Tie is administered by Black Hills Power. SPP administers service to and from the Eastern terminal of this tie (RCEASTINJ). Information provided here represents status of the Eastern terminal of the Rapid City DC Tie as communicated to SPP. The RAPID CITY NON-DC TIE INJECTION POINT DC Tie in both directions will be limited to 0 as a result of a planned maintenance outage from 06/19/2023 9:00:00 AM (CD) to 06/20/2023 6:00:00 PM (CD)
OUTAGE UPDATE
Updated at 5/22/2023 4:38:38 AM – The RAPID CITY NON-DC TIE INJECTION POINT DC Tie has been returned to normal operation.


Transmission service across the Rapid City HVDC Tie is administered by Black Hills Power. SPP administers service to and from the Eastern terminal of this tie (RCEASTINJ). Information provided here represents status of the Eastern terminal of the Rapid City DC Tie as communicated to SPP.
OUTAGE UPDATE
Updated at 5/14/2023 9:23:00 AM (CD) - The RAPID CITY NON-DC TIE INJECTION POINT DC Tie in both directions will be limited to 0 as a result of a planned maintenance outage from 5/15/2023 8:00:00 AM (CD) to 5/19/2023 5:00:00 PM (CD).


Transmission service across the Rapid City HVDC Tie is administered by Black Hills Power. SPP administers service to and from the Eastern terminal of this tie (RCEASTINJ). Information provided here represents status of the Eastern terminal of the Rapid City DC Tie as communicated to SPP.
OUTAGE UPDATE
Updated at 5/14/2023 9:23:03 AM – The RAPID CITY NON-DC TIE INJECTION POINT DC Tie has been returned to normal operation.


Transmission service across the Rapid City HVDC Tie is administered by Black Hills Power. SPP administers service to and from the Eastern terminal of this tie (RCEASTINJ). Information provided here represents status of the Eastern terminal of the Rapid City DC Tie as communicated to SPP.
OUTAGE UPDATE
Updated at 5/14/2023 9:21:43 AM (CD) - The RAPID CITY NON-DC TIE INJECTION POINT DC Tie in both directions will be limited to 0 as a result of a planned maintenance outage from 5/15/2023 8:00:00 AM (CD) to 5/19/2023 5:00:00 PM (CD).


Transmission service across the Rapid City HVDC Tie is administered by Black Hills Power. SPP administers service to and from the Eastern terminal of this tie (RCEASTINJ). Information provided here represents status of the Eastern terminal of the Rapid City DC Tie as communicated to SPP.
OUTAGE UPDATE
Updated at 5/7/2023 2:12:26 PM (CD) - The RAPID CITY NON-DC TIE INJECTION POINT DC Tie from east to west will be limited to 100 as a result of an unplanned maintenance outage from 5/5/2023 4:37:00 AM (CD) to 5/12/2023 5:00:00 PM (CD).


Transmission service across the Rapid City HVDC Tie is administered by Black Hills Power. SPP administers service to and from the Eastern terminal of this tie (RCEASTINJ). Information provided here represents status of the Eastern terminal of the Rapid City DC Tie as communicated to SPP.
OUTAGE UPDATE
Updated at 5/4/2023 4:37:52 AM (CD) - The RAPID CITY NON-DC TIE INJECTION POINT DC Tie from east to west will be limited to 100 as a result of an unplanned maintenance outage from 5/5/2023 4:37:52 AM (CD) to 5/8/2023 6:00:00 AM (CD).


Transmission service across the Rapid City HVDC Tie is administered by Black Hills Power. SPP administers service to and from the Eastern terminal of this tie (RCEASTINJ). Information provided here represents status of the Eastern terminal of the Rapid City DC Tie as communicated to SPP.
OUTAGE UPDATE
Updated at 5/4/2023 4:36:47 AM (CD) - The RAPID CITY NON-DC TIE INJECTION POINT DC Tie from east to west will be limited to 0 as a result of an unplanned maintenance outage from 5/5/2023 4:36:47 AM (CD) to 5/8/2023 6:00:00 AM (CD).


Transmission service across the Rapid City HVDC Tie is administered by Black Hills Power. SPP administers service to and from the Eastern terminal of this tie (RCEASTINJ). Information provided here represents status of the Eastern terminal of the Rapid City DC Tie as communicated to SPP.
OUTAGE UPDATE
Updated at 5/1/2023 3:47:57 AM (CD) - The RAPID CITY NON-DC TIE INJECTION POINT DC Tie in both directions will be limited to 0 as a result of an unplanned maintenance outage from 4/28/2023 10:00:00 PM (CD) to 5/1/2023 5:00:00 PM (CD).


Transmission service across the Rapid City HVDC Tie is administered by Black Hills Power. SPP administers service to and from the Eastern terminal of this tie (RCEASTINJ). Information provided here represents status of the Eastern terminal of the Rapid City DC Tie as communicated to SPP.
OUTAGE UPDATE
Updated at 5/1/2023 3:46:06 AM (CD) - The RAPID CITY NON-DC TIE INJECTION POINT DC Tie in both directions will be limited to 0 as a result of a planned maintenance outage from 4/28/2023 10:43:00 AM (CD) to 5/1/2023 5:00:00 PM (CD).


Transmission service across the Rapid City HVDC Tie is administered by Black Hills Power. SPP administers service to and from the Eastern terminal of this tie (RCEASTINJ). Information provided here represents status of the Eastern terminal of the Rapid City DC Tie as communicated to SPP.
OUTAGE UPDATE
Updated at 4/29/2023 12:13:35 AM (CD) - The RAPID CITY NON-DC TIE INJECTION POINT DC Tie in both directions will be limited to 0 as a result of an unplanned maintenance outage from 4/28/2023 10:43:00 PM (CD) to 4/30/2023 5:00:00 PM (CD).


Transmission service across the Rapid City HVDC Tie is administered by Black Hills Power. SPP administers service to and from the Eastern terminal of this tie (RCEASTINJ). Information provided here represents status of the Eastern terminal of the Rapid City DC Tie as communicated to SPP.
OUTAGE UPDATE
Updated at 4/28/2023 10:43:53 PM (CD) - The RAPID CITY NON-DC TIE INJECTION POINT DC Tie in both directions will be limited to 0 as a result of an unplanned maintenance outage from 4/28/2023 10:43:00 PM (CD) to 4/29/2023 11:00:00 PM (CD).


Transmission service across the Rapid City HVDC Tie is administered by Black Hills Power. SPP administers service to and from the Eastern terminal of this tie (RCEASTINJ). Information provided here represents status of the Eastern terminal of the Rapid City DC Tie as communicated to SPP.
OUTAGE UPDATE
Updated at 4/6/2023 11:30:56 AM – The RAPID CITY NON-DC TIE INJECTION POINT DC Tie has been returned to normal operation.


Transmission service across the Rapid City HVDC Tie is administered by Black Hills Power. SPP administers service to and from the Eastern terminal of this tie (RCEASTINJ). Information provided here represents status of the Eastern terminal of the Rapid City DC Tie as communicated to SPP.
OUTAGE UPDATE
Updated at 3/28/2023 2:34:25 PM (CD) - The RAPID CITY NON-DC TIE INJECTION POINT DC Tie in both directions will be limited to 0 as a result of a planned maintenance outage from 4/6/2023 8:00:00 AM (CD) to 4/6/2023 5:00:00 PM (CD).


Transmission service across the Rapid City HVDC Tie is administered by Black Hills Power. SPP administers service to and from the Eastern terminal of this tie (RCEASTINJ). Information provided here represents status of the Eastern terminal of the Rapid City DC Tie as communicated to SPP.
OUTAGE UPDATE
Updated at 3/23/2023 3:14:25 PM (CD) - The RAPID CITY NON-DC TIE INJECTION POINT DC Tie in both directions will be limited to 0 as a result of a planned maintenance outage from 3/23/2023 3:00:00 PM (CD) to 3/28/2023 12:00:00 AM (CD).


Transmission service across the Rapid City HVDC Tie is administered by Black Hills Power. SPP administers service to and from the Eastern terminal of this tie (RCEASTINJ). Information provided here represents status of the Eastern terminal of the Rapid City DC Tie as communicated to SPP.
OUTAGE UPDATE
Updated at 3/7/2023 5:23:28 PM – The RAPID CITY NON-DC TIE INJECTION POINT DC Tie has been returned to normal operation.


Transmission service across the Rapid City HVDC Tie is administered by Black Hills Power. SPP administers service to and from the Eastern terminal of this tie (RCEASTINJ). Information provided here represents status of the Eastern terminal of the Rapid City DC Tie as communicated to SPP.
OUTAGE UPDATE
Updated at 3/2/2023 5:53:44 PM (CS) - The RAPID CITY NON-DC TIE INJECTION POINT DC Tie in both directions will be limited to 0 as a result of an unplanned maintenance outage from 3/2/2023 6:00:00 PM (CS) to 3/10/2023 6:00:00 PM (CS).


Transmission service across the Rapid City HVDC Tie is administered by Black Hills Power. SPP administers service to and from the Eastern terminal of this tie (RCEASTINJ). Information provided here represents status of the Eastern terminal of the Rapid City DC Tie as communicated to SPP.
OUTAGE UPDATE
Updated at 3/1/2023 5:22:47 PM – The RAPID CITY NON-DC TIE INJECTION POINT DC Tie has been returned to normal operation.


Transmission service across the Rapid City HVDC Tie is administered by Black Hills Power. SPP administers service to and from the Eastern terminal of this tie (RCEASTINJ). Information provided here represents status of the Eastern terminal of the Rapid City DC Tie as communicated to SPP.
OUTAGE UPDATE
Updated at 2/23/2023 8:23:37 AM (CS) - The RAPID CITY NON-DC TIE INJECTION POINT DC Tie from west to east will be limited to 150 as a result of a planned maintenance outage from 2/20/2023 8:00:00 AM (CS) to 3/2/2023 5:00:00 PM (CS).


Transmission service across the Rapid City HVDC Tie is administered by Black Hills Power. SPP administers service to and from the Eastern terminal of this tie (RCEASTINJ). Information provided here represents status of the Eastern terminal of the Rapid City DC Tie as communicated to SPP.
OUTAGE UPDATE
Updated at 2/23/2023 8:23:16 AM – The RAPID CITY NON-DC TIE INJECTION POINT DC Tie has been returned to normal operation.


Transmission service across the Rapid City HVDC Tie is administered by Black Hills Power. SPP administers service to and from the Eastern terminal of this tie (RCEASTINJ). Information provided here represents status of the Eastern terminal of the Rapid City DC Tie as communicated to SPP.
OUTAGE UPDATE
Updated at 2/23/2023 8:21:51 AM (CS) - The RAPID CITY NON-DC TIE INJECTION POINT DC Tie from west to east will be limited to 150 as a result of a planned maintenance outage from 2/20/2023 8:00:00 AM (CS) to 3/2/2023 5:00:00 PM (CS).


Transmission service across the Rapid City HVDC Tie is administered by Black Hills Power. SPP administers service to and from the Eastern terminal of this tie (RCEASTINJ). Information provided here represents status of the Eastern terminal of the Rapid City DC Tie as communicated to SPP.
OUTAGE UPDATE
Updated at 2/6/2023 2:49:00 PM (CS) - The RAPID CITY NON-DC TIE INJECTION POINT DC Tie from west to east will be limited to 150 as a result of a planned maintenance outage from 2/20/2023 8:00:00 AM (CS) to 2/23/2023 5:00:00 PM (CS).


Transmission service across the Rapid City HVDC Tie is administered by Black Hills Power. SPP administers service to and from the Eastern terminal of this tie (RCEASTINJ). Information provided here represents status of the Eastern terminal of the Rapid City DC Tie as communicated to SPP.
OUTAGE UPDATE
Updated at 2/6/2023 2:49:41 PM (CS) - The RAPID CITY NON-DC TIE INJECTION POINT DC Tie in both directions will be limited to 0 as a result of an emergency outage from 2/20/2023 8:00:00 AM (CS) to 2/23/2023 5:00:00 PM (CS).


Transmission service across the Rapid City HVDC Tie is administered by Black Hills Power. SPP administers service to and from the Eastern terminal of this tie (RCEASTINJ). Information provided here represents status of the Eastern terminal of the Rapid City DC Tie as communicated to SPP.
OUTAGE UPDATE
Updated at 2/2/2023 5:53:48 AM (CS) - The RAPID CITY NON-DC TIE INJECTION POINT DC Tie from west to east will be limited to 150 as a result of a planned maintenance outage from 2/13/2023 8:00:00 AM (CS) to 2/16/2023 5:00:00 PM (CS).


Transmission service across the Rapid City HVDC Tie is administered by Black Hills Power. SPP administers service to and from the Eastern terminal of this tie (RCEASTINJ). Information provided here represents status of the Eastern terminal of the Rapid City DC Tie as communicated to SPP.
OUTAGE UPDATE
Updated at 2/2/2023 5:51:58 AM – The RAPID CITY NON-DC TIE INJECTION POINT DC Tie has been returned to normal operation.


Transmission service across the Rapid City HVDC Tie is administered by Black Hills Power. SPP administers service to and from the Eastern terminal of this tie (RCEASTINJ). Information provided here represents status of the Eastern terminal of the Rapid City DC Tie as communicated to SPP.
OUTAGE UPDATE
Updated at 2/1/2023 1:59:20 PM (CS) - The RAPID CITY NON-DC TIE INJECTION POINT DC Tie from west to east will be limited to 150 as a result of a planned maintenance outage from 2/13/2023 8:00:00 AM (CS) to 2/16/2023 5:00:00 PM (CS).


Transmission service across the Rapid City HVDC Tie is administered by Black Hills Power. SPP administers service to and from the Eastern terminal of this tie (RCEASTINJ). Information provided here represents status of the Eastern terminal of the Rapid City DC Tie as communicated to SPP.
OUTAGE UPDATE
Updated at 1/31/2023 8:21:45 AM (CS) - The RAPID CITY NON-DC TIE INJECTION POINT DC Tie from west to east will be limited to 150 as a result of a planned maintenance outage from 2/6/2023 8:00:00 AM (CS) to 2/9/2023 5:00:00 PM (CS).


Transmission service across the Rapid City HVDC Tie is administered by Black Hills Power. SPP administers service to and from the Eastern terminal of this tie (RCEASTINJ). Information provided here represents status of the Eastern terminal of the Rapid City DC Tie as communicated to SPP.
OUTAGE UPDATE
Updated at 12/28/2022 10:46:25 AM – The RAPID CITY NON-DC TIE INJECTION POINT DC Tie has been returned to normal operation.


Transmission service across the Rapid City HVDC Tie is administered by Black Hills Power. SPP administers service to and from the Eastern terminal of this tie (RCEASTINJ). Information provided here represents status of the Eastern terminal of the Rapid City DC Tie as communicated to SPP.
OUTAGE UPDATE
Updated at 12/25/2022 8:18:52 PM (CS) - The RAPID CITY NON-DC TIE INJECTION POINT DC Tie in both directions will be limited to 0 as a result of an unplanned maintenance outage from 12/25/2022 8:00:00 PM (CS) to 12/26/2022 6:00:00 PM (CS).


Transmission service across the Rapid City HVDC Tie is administered by Black Hills Power. SPP administers service to and from the Eastern terminal of this tie (RCEASTINJ). Information provided here represents status of the Eastern terminal of the Rapid City DC Tie as communicated to SPP.
OUTAGE UPDATE
Updated at 12/25/2022 7:45:12 PM – The RAPID CITY NON-DC TIE INJECTION POINT DC Tie has been returned to normal operation.


Transmission service across the Rapid City HVDC Tie is administered by Black Hills Power. SPP administers service to and from the Eastern terminal of this tie (RCEASTINJ). Information provided here represents status of the Eastern terminal of the Rapid City DC Tie as communicated to SPP.
OUTAGE UPDATE
Updated at 12/25/2022 6:06:12 PM (CS) - The RAPID CITY NON-DC TIE INJECTION POINT DC Tie in both directions will be limited to 0 as a result of an unplanned maintenance outage from 12/25/2022 6:00:00 PM (CS) to 12/26/2022 1:00:00 AM (CS).


Transmission service across the Rapid City HVDC Tie is administered by Black Hills Power. SPP administers service to and from the Eastern terminal of this tie (RCEASTINJ). Information provided here represents status of the Eastern terminal of the Rapid City DC Tie as communicated to SPP.
OUTAGE UPDATE
Updated at 12/15/2022 5:01:43 PM – The RAPID CITY NON-DC TIE INJECTION POINT DC Tie has been returned to normal operation.


Transmission service across the Rapid City HVDC Tie is administered by Black Hills Power. SPP administers service to and from the Eastern terminal of this tie (RCEASTINJ). Information provided here represents status of the Eastern terminal of the Rapid City DC Tie as communicated to SPP.
OUTAGE UPDATE
Updated at 12/15/2022 11:27:48 AM (CS) - The RAPID CITY NON-DC TIE INJECTION POINT DC Tie from west to east will be limited to 150 as a result of a planned maintenance outage from 12/15/2022 3:57:00 AM (CS) to 12/16/2022 2:00:00 PM (CS).


Transmission service across the Rapid City HVDC Tie is administered by Black Hills Power. SPP administers service to and from the Eastern terminal of this tie (RCEASTINJ). Information provided here represents status of the Eastern terminal of the Rapid City DC Tie as communicated to SPP.
OUTAGE UPDATE
Updated at 12/15/2022 3:57:03 AM (CS) - The RAPID CITY NON-DC TIE INJECTION POINT DC Tie from west to east will be limited to 150 as a result of a planned maintenance outage from 12/15/2022 4:00:00 AM (CS) to 12/15/2022 11:00:00 AM (CS).


Transmission service across the Rapid City HVDC Tie is administered by Black Hills Power. SPP administers service to and from the Eastern terminal of this tie (RCEASTINJ). Information provided here represents status of the Eastern terminal of the Rapid City DC Tie as communicated to SPP.
OUTAGE UPDATE
Updated at 12/15/2022 3:56:50 AM – The RAPID CITY NON-DC TIE INJECTION POINT DC Tie has been returned to normal operation.


Transmission service across the Rapid City HVDC Tie is administered by Black Hills Power. SPP administers service to and from the Eastern terminal of this tie (RCEASTINJ). Information provided here represents status of the Eastern terminal of the Rapid City DC Tie as communicated to SPP.
OUTAGE UPDATE
Updated at 12/15/2022 3:54:52 AM (CS) - The RAPID CITY NON-DC TIE INJECTION POINT DC Tie from west to east will be limited to 150 as a result of a planned maintenance outage from 12/15/2022 4:00:00 AM (CS) to 12/15/2022 11:00:00 AM (CS).


Transmission service across the Rapid City HVDC Tie is administered by Black Hills Power. SPP administers service to and from the Eastern terminal of this tie (RCEASTINJ). Information provided here represents status of the Eastern terminal of the Rapid City DC Tie as communicated to SPP.
OUTAGE UPDATE
Updated at 12/12/2022 8:57:00 PM – The RAPID CITY NON-DC TIE INJECTION POINT DC Tie has been returned to normal operation.


Transmission service across the Rapid City HVDC Tie is administered by Black Hills Power. SPP administers service to and from the Eastern terminal of this tie (RCEASTINJ). Information provided here represents status of the Eastern terminal of the Rapid City DC Tie as communicated to SPP.
OUTAGE UPDATE
Updated at 12/9/2022 8:17:05 PM – The RAPID CITY NON-DC TIE INJECTION POINT DC Tie has been returned to normal operation.


Transmission service across the Rapid City HVDC Tie is administered by Black Hills Power. SPP administers service to and from the Eastern terminal of this tie (RCEASTINJ). Information provided here represents status of the Eastern terminal of the Rapid City DC Tie as communicated to SPP.
OUTAGE UPDATE
Updated at 12/9/2022 7:50:20 PM (CS) - The RAPID CITY NON-DC TIE INJECTION POINT DC Tie in both directions will be limited to 0 as a result of a planned maintenance outage from 12/9/2022 4:17:00 PM (CS) to 12/10/2022 4:00:00 PM (CS).


Transmission service across the Rapid City HVDC Tie is administered by Black Hills Power. SPP administers service to and from the Eastern terminal of this tie (RCEASTINJ). Information provided here represents status of the Eastern terminal of the Rapid City DC Tie as communicated to SPP.
OUTAGE UPDATE
Updated at 12/9/2022 7:50:20 PM (CS) - The RAPID CITY NON-DC TIE INJECTION POINT DC Tie in both directions will be limited to 0 as a result of a planned maintenance outage from 12/9/2022 4:17:00 PM (CS) to 12/10/2022 4:00:00 PM (CS).


Transmission service across the Rapid City HVDC Tie is administered by Black Hills Power. SPP administers service to and from the Eastern terminal of this tie (RCEASTINJ). Information provided here represents status of the Eastern terminal of the Rapid City DC Tie as communicated to SPP.
OUTAGE UPDATE
Updated at 12/9/2022 4:17:35 PM (CS) - The RAPID CITY NON-DC TIE INJECTION POINT DC Tie from north to south will be limited to 0 as a result of a planned maintenance outage from 12/9/2022 3:43:00 PM (CS) to 12/10/2022 4:00:00 PM (CS).


Transmission service across the Rapid City HVDC Tie is administered by Black Hills Power. SPP administers service to and from the Eastern terminal of this tie (RCEASTINJ). Information provided here represents status of the Eastern terminal of the Rapid City DC Tie as communicated to SPP.
OUTAGE UPDATE
Updated at 12/9/2022 3:13:43 PM (CS) - The RAPID CITY NON-DC TIE INJECTION POINT DC Tie in both directions will be limited to 0 as a result of an unplanned maintenance outage from 12/9/2022 3:00:00 PM (CS) to 12/9/2022 9:00:00 PM (CS).


Transmission service across the Rapid City HVDC Tie is administered by Black Hills Power. SPP administers service to and from the Eastern terminal of this tie (RCEASTINJ). Information provided here represents status of the Eastern terminal of the Rapid City DC Tie as communicated to SPP.
OUTAGE UPDATE
Updated at 11/11/2022 4:32:12 AM (CS) - The RAPID CITY NON-DC TIE INJECTION POINT DC Tie in both directions will be limited to 0 as a result of a planned maintenance outage from 10/10/2022 9:00:00 AM (CS) to 12/9/2022 2:00:00 PM (CS).


Transmission service across the Rapid City HVDC Tie is administered by Black Hills Power. SPP administers service to and from the Eastern terminal of this tie (RCEASTINJ). Information provided here represents status of the Eastern terminal of the Rapid City DC Tie as communicated to SPP. The RAPID CITY NON-DC TIE INJECTION POINT DC Tie from west to east will be limited to 100 as a result of a planned maintenance outage from 10/4/2022 8:00:00 AM (CD) to 10/8/2022 6:00:00 PM (CD).
OUTAGE UPDATE
Updated at 10/20/2022 2:03:57 PM (CD) - The RAPID CITY NON-DC TIE INJECTION POINT DC Tie in both directions will be limited to 0 as a result of a planned maintenance outage from 10/10/2022 9:00:00 AM (CD) to 12/9/2022 2:00:00 PM (CD).


Transmission service across the Rapid City HVDC Tie is administered by Black Hills Power. SPP administers service to and from the Eastern terminal of this tie (RCEASTINJ). Information provided here represents status of the Eastern terminal of the Rapid City DC Tie as communicated to SPP. The RAPID CITY NON-DC TIE INJECTION POINT DC Tie from west to east will be limited to 100 as a result of a planned maintenance outage from 10/4/2022 8:00:00 AM (CD) to 10/8/2022 6:00:00 PM (CD). The RAPID CITY NON-DC TIE INJECTION POINT DC Tie in both directions will be limited to 0 on 10/10/2022 @ 0900 through 12/09/2022 @ 1400.
OUTAGE UPDATE
Updated at 9/26/2022 1:15:19 PM – The RAPID CITY NON-DC TIE INJECTION POINT DC Tie has been returned to normal operation.


Transmission service across the Rapid City HVDC Tie is administered by Black Hills Power. SPP administers service to and from the Eastern terminal of this tie (RCEASTINJ). Information provided here represents status of the Eastern terminal of the Rapid City DC Tie as communicated to SPP. The RAPID CITY NON-DC TIE INJECTION POINT DC Tie from west to east will be limited to 100 as a result of a planned maintenance outage from 10/4/2022 8:00:00 AM (CD) to 10/8/2022 6:00:00 PM (CD). The RAPID CITY NON-DC TIE INJECTION POINT DC Tie in both directions will be limited to 0 on 10/10/2022 @ 0900 through 12/09/2022 @ 1400.
OUTAGE UPDATE
Updated at 9/19/2022 3:04:15 PM (CD) - The RAPID CITY NON-DC TIE INJECTION POINT DC Tie from west to east will be limited to 125 as a result of a planned maintenance outage from 9/26/2022 8:00:00 AM (CD) to 9/26/2022 5:00:00 PM (CD).


Transmission service across the Rapid City HVDC Tie is administered by Black Hills Power. SPP administers service to and from the Eastern terminal of this tie (RCEASTINJ). Information provided here represents status of the Eastern terminal of the Rapid City DC Tie as communicated to SPP. The RAPID CITY NON-DC TIE INJECTION POINT DC Tie in both directions will be limited to 0 on 10/10/2022 @ 0900 through 12/09/2022 @ 1400.
OUTAGE UPDATE
Updated at 9/9/2022 1:51:02 PM (CD) - The RAPID CITY NON-DC TIE INJECTION POINT DC Tie from west to east will be limited to 100 as a result of a planned maintenance outage from 10/4/2022 8:00:00 AM (CD) to 10/8/2022 6:00:00 PM (CD).


Transmission service across the Rapid City HVDC Tie is administered by Black Hills Power. SPP administers service to and from the Eastern terminal of this tie (RCEASTINJ). Information provided here represents status of the Eastern terminal of the Rapid City DC Tie as communicated to SPP. The RAPID CITY NON-DC TIE INJECTION POINT DC Tie in both directions will be limited to 0 on 10/10/2022 @ 0900 through 12/09/2022 @ 1400.
OUTAGE UPDATE
Updated at 8/26/2022 7:33:29 AM – The RAPID CITY NON-DC TIE INJECTION POINT DC Tie has been returned to normal operation.


Transmission service across the Rapid City HVDC Tie is administered by Black Hills Power. SPP administers service to and from the Eastern terminal of this tie (RCEASTINJ). Information provided here represents status of the Eastern terminal of the Rapid City DC Tie as communicated to SPP. The RAPID CITY NON-DC TIE INJECTION POINT DC Tie in both directions will be limited to 0 on 10/10/2022 @ 0900 through 12/09/2022 @ 1400.
OUTAGE UPDATE
Updated at 8/26/2022 3:55:31 AM (CD) - The RAPID CITY NON-DC TIE INJECTION POINT DC Tie in both directions will be limited to 0 as a result of an unplanned maintenance outage from 8/26/2022 12:01:00 AM (CD) to 8/26/2022 9:00:00 AM (CD).


Transmission service across the Rapid City HVDC Tie is administered by Black Hills Power. SPP administers service to and from the Eastern terminal of this tie (RCEASTINJ). Information provided here represents status of the Eastern terminal of the Rapid City DC Tie as communicated to SPP. The RAPID CITY NON-DC TIE INJECTION POINT DC Tie in both directions will be limited to 0 on 10/10/2022 @ 0900 through 12/09/2022 @ 1400.
OUTAGE UPDATE
Updated at 8/19/2022 4:09:34 PM – The RAPID CITY NON-DC TIE INJECTION POINT DC Tie has been returned to normal operation.


Transmission service across the Rapid City HVDC Tie is administered by Black Hills Power. SPP administers service to and from the Eastern terminal of this tie (RCEASTINJ). Information provided here represents status of the Eastern terminal of the Rapid City DC Tie as communicated to SPP. The RAPID CITY NON-DC TIE INJECTION POINT DC Tie in both directions will be limited to 0 on 10/10/2022 @ 0900 through 12/09/2022 @ 1400.
OUTAGE UPDATE
Updated at 8/17/2022 3:51:35 PM (CD) - The RAPID CITY NON-DC TIE INJECTION POINT DC Tie from east to west will be limited to 150 as a result of a planned maintenance outage from 8/18/2022 8:00:00 AM (CD) to 8/18/2022 1:00:00 PM (CD).


Transmission service across the Rapid City HVDC Tie is administered by Black Hills Power. SPP administers service to and from the Eastern terminal of this tie (RCEASTINJ). Information provided here represents status of the Eastern terminal of the Rapid City DC Tie as communicated to SPP. The RAPID CITY NON-DC TIE INJECTION POINT DC Tie in both directions will be limited to 0 on 10/10/2022 @ 0900 through 12/09/2022 @ 1400.
OUTAGE UPDATE
Updated at 8/4/2022 12:24:58 PM – The RAPID CITY NON-DC TIE INJECTION POINT DC Tie has been returned to normal operation.


Transmission service across the Rapid City HVDC Tie is administered by WAPA. SPP administers service to and from the Eastern terminal of this tie. Information provided here represents status of the HVDC Tie and outage information as communicated to SPP. The RAPID CITY NON-DC TIE INJECTION POINT DC Tie in both directions will be limited to 0 on 10/10/2022 @ 0900 through 12/09/2022 @ 1400.
OUTAGE UPDATE
Updated at 8/1/2022 2:07:38 PM – The RAPID CITY NON-DC TIE INJECTION POINT DC Tie has been returned to normal operation.


Transmission service across the Rapid City HVDC Tie is administered by WAPA. SPP administers service to and from the Eastern terminal of this tie. Information provided here represents status of the HVDC Tie and outage information as communicated to SPP. The RAPID CITY NON-DC TIE INJECTION POINT DC Tie in both directions will be limited to 0 on 10/10/2022 @ 0900 through 12/09/2022 @ 1400.
OUTAGE UPDATE
Updated at 7/28/2022 1:55:57 PM (CD) - The RAPID CITY NON-DC TIE INJECTION POINT DC Tie from west to east will be limited to 150 as a result of a planned maintenance outage from 8/1/2022 8:00:00 AM (CD) to 8/1/2022 5:00:00 PM (CD).


Transmission service across the Rapid City HVDC Tie is administered by WAPA. SPP administers service to and from the Eastern terminal of this tie. Information provided here represents status of the HVDC Tie and outage information as communicated to SPP. The RAPID CITY NON-DC TIE INJECTION POINT DC Tie in both directions will be limited to 0 on 10/10/2022 @ 0900 through 12/09/2022 @ 1400.
OUTAGE UPDATE
Updated at 7/8/2022 9:45:34 AM – The RAPID CITY NON-DC TIE INJECTION POINT DC Tie has been returned to normal operation.


Transmission service across the Rapid City HVDC Tie is administered by WAPA. SPP administers service to and from the Eastern terminal of this tie. Information provided here represents status of the HVDC Tie and outage information as communicated to SPP. The RAPID CITY NON-DC TIE INJECTION POINT DC Tie in both directions will be limited to 0 on 10/10/2022 @ 0900 through 12/09/2022 @ 1400.
OUTAGE UPDATE
Updated at 7/8/2022 9:44:45 AM – The RAPID CITY NON-DC TIE INJECTION POINT DC Tie has been returned to normal operation.


Transmission service across the Rapid City HVDC Tie is administered by WAPA. SPP administers service to and from the Eastern terminal of this tie. Information provided here represents status of the HVDC Tie and outage information as communicated to SPP. The RAPID CITY NON-DC TIE INJECTION POINT DC Tie in both directions will be limited to 0 on 10/10/2022 @ 0900 through 12/09/2022 @ 1400.
OUTAGE UPDATE
Updated at 7/8/2022 9:43:55 AM – The RAPID CITY NON-DC TIE INJECTION POINT DC Tie has been returned to normal operation.


Transmission service across the Rapid City HVDC Tie is administered by WAPA. SPP administers service to and from the Eastern terminal of this tie. Information provided here represents status of the HVDC Tie and outage information as communicated to SPP. The RAPID CITY NON-DC TIE INJECTION POINT DC Tie in both directions will be limited to 0 from 7/11/2022 @0900 through 7/14/2022 @1700 and again on 10/10/2022 @ 0900 through 12/09/2022 @ 1400.
OUTAGE UPDATE
Updated at 6/28/2022 3:33:22 PM – The RAPID CITY NON-DC TIE INJECTION POINT DC Tie has been returned to normal operation.


Transmission service across the Rapid City HVDC Tie is administered by WAPA. SPP administers service to and from the Eastern terminal of this tie. Information provided here represents status of the HVDC Tie and outage information as communicated to SPP. The RAPID CITY NON-DC TIE INJECTION POINT DC Tie in both directions will be limited to 0 from 04/25/2022 @1300 through 05/05/2022 @ 1700 for a planned Maintenance Outage. It will also be limited to 0 MW in both directions from 06/13/2022 @ 0800 through 06/17/2022 @ 1900 and again on 10/10/2022 @ 0900 through 12/09/2022 @ 1400.
OUTAGE UPDATE
Updated at 6/23/2022 8:28:53 AM – The RAPID CITY NON-DC TIE INJECTION POINT DC Tie has been returned to normal operation.


Transmission service across the Rapid City HVDC Tie is administered by WAPA. SPP administers service to and from the Eastern terminal of this tie. Information provided here represents status of the HVDC Tie and outage information as communicated to SPP. The RAPID CITY NON-DC TIE INJECTION POINT DC Tie in both directions will be limited to 0 from 04/25/2022 @1300 through 05/05/2022 @ 1700 for a planned Maintenance Outage. It will also be limited to 0 MW in both directions from 06/13/2022 @ 0800 through 06/17/2022 @ 1900 and again on 10/10/2022 @ 0900 through 12/09/2022 @ 1400.
OUTAGE UPDATE
Updated at 6/23/2022 8:08:25 AM (CD) - The RAPID CITY NON-DC TIE INJECTION POINT DC Tie in both directions will be limited to 100 as a result of an unplanned maintenance outage from 6/23/2022 8:08:00 AM (CD) to 6/23/2022 2:00:00 PM (CD).


Transmission service across the Rapid City HVDC Tie is administered by WAPA. SPP administers service to and from the Eastern terminal of this tie. Information provided here represents status of the HVDC Tie and outage information as communicated to SPP. The RAPID CITY NON-DC TIE INJECTION POINT DC Tie in both directions will be limited to 0 from 04/25/2022 @1300 through 05/05/2022 @ 1700 for a planned Maintenance Outage. It will also be limited to 0 MW in both directions from 06/13/2022 @ 0800 through 06/17/2022 @ 1900 and again on 10/10/2022 @ 0900 through 12/09/2022 @ 1400.
OUTAGE UPDATE
Updated at 6/13/2022 1:36:18 PM – The RAPID CITY NON-DC TIE INJECTION POINT DC Tie has been returned to normal operation.


Transmission service across the Rapid City HVDC Tie is administered by WAPA. SPP administers service to and from the Eastern terminal of this tie. Information provided here represents status of the HVDC Tie and outage information as communicated to SPP. The RAPID CITY NON-DC TIE INJECTION POINT DC Tie in both directions will be limited to 0 from 04/25/2022 @1300 through 05/05/2022 @ 1700 for a planned Maintenance Outage. It will also be limited to 0 MW in both directions from 06/13/2022 @ 0800 through 06/17/2022 @ 1900 and again on 10/10/2022 @ 0900 through 12/09/2022 @ 1400.
OUTAGE UPDATE
Updated at 6/13/2022 1:36:13 PM – The RAPID CITY NON-DC TIE INJECTION POINT DC Tie has been returned to normal operation.


Transmission service across the Rapid City HVDC Tie is administered by WAPA. SPP administers service to and from the Eastern terminal of this tie. Information provided here represents status of the HVDC Tie and outage information as communicated to SPP. The RAPID CITY NON-DC TIE INJECTION POINT DC Tie in both directions will be limited to 0 from 04/25/2022 @1300 through 05/05/2022 @ 1700 for a planned Maintenance Outage. It will also be limited to 0 MW in both directions from 06/13/2022 @ 0800 through 06/17/2022 @ 1900 and again on 10/10/2022 @ 0900 through 12/09/2022 @ 1400.
OUTAGE UPDATE
Updated at 6/13/2022 7:35:37 AM (CD) - The RAPID CITY NON-DC TIE INJECTION POINT DC Tie in both directions will be limited to 0 as a result of an unplanned maintenance outage from 6/13/2022 7:35:00 AM (CD) to 6/17/2022 7:00:00 PM (CD).


Transmission service across the Rapid City HVDC Tie is administered by WAPA. SPP administers service to and from the Eastern terminal of this tie. Information provided here represents status of the HVDC Tie and outage information as communicated to SPP. The RAPID CITY NON-DC TIE INJECTION POINT DC Tie in both directions will be limited to 0 from 04/25/2022 @1300 through 05/05/2022 @ 1700 for a planned Maintenance Outage. It will also be limited to 0 MW in both directions from 06/13/2022 @ 0800 through 06/17/2022 @ 1900 and again on 10/10/2022 @ 0900 through 12/09/2022 @ 1400.
OUTAGE UPDATE
Updated at 6/13/2022 7:34:51 AM (CD) - The RAPID CITY NON-DC TIE INJECTION POINT DC Tie in both directions will be limited to 0 as a result of an unplanned maintenance outage from 6/13/2022 7:34:00 AM (CD) to 6/16/2022 7:00:00 AM (CD).


Transmission service across the Rapid City HVDC Tie is administered by WAPA. SPP administers service to and from the Eastern terminal of this tie. Information provided here represents status of the HVDC Tie and outage information as communicated to SPP. The RAPID CITY NON-DC TIE INJECTION POINT DC Tie in both directions will be limited to 0 from 04/25/2022 @1300 through 05/05/2022 @ 1700 for a planned Maintenance Outage. It will also be limited to 0 MW in both directions from 06/13/2022 @ 0800 through 06/17/2022 @ 1900 and again on 10/10/2022 @ 0900 through 12/09/2022 @ 1400.
OUTAGE UPDATE
Updated at 5/21/2022 6:38:36 AM (CD) - The RAPID CITY NON-DC TIE INJECTION POINT DC Tie in both directions will be limited to 0 as a result of an unplanned maintenance outage from 5/21/2022 6:38:00 AM (CD) to 6/1/2022 8:00:00 AM (CD).


Transmission service across the Rapid City HVDC Tie is administered by WAPA. SPP administers service to and from the Eastern terminal of this tie. Information provided here represents status of the HVDC Tie and outage information as communicated to SPP. The RAPID CITY NON-DC TIE INJECTION POINT DC Tie in both directions will be limited to 0 from 04/25/2022 @1300 through 05/05/2022 @ 1700 for a planned Maintenance Outage. It will also be limited to 0 MW in both directions from 06/13/2022 @ 0800 through 06/17/2022 @ 1900 and again on 10/10/2022 @ 0900 through 12/09/2022 @ 1400.
OUTAGE UPDATE
Updated at 5/20/2022 3:17:55 PM – The RAPID CITY NON-DC TIE INJECTION POINT DC Tie has been returned to normal operation.


Transmission service across the Rapid City HVDC Tie is administered by WAPA. SPP administers service to and from the Eastern terminal of this tie. Information provided here represents status of the HVDC Tie and outage information as communicated to SPP. The RAPID CITY NON-DC TIE INJECTION POINT DC Tie in both directions will be limited to 0 from 04/25/2022 @1300 through 05/05/2022 @ 1700 for a planned Maintenance Outage. It will also be limited to 0 MW in both directions from 10/10/2022 @ 0900 through 12/09/2022 @ 1400.
OUTAGE UPDATE
Updated at 5/5/2022 6:36:57 PM – The RAPID CITY NON-DC TIE INJECTION POINT DC Tie has been returned to normal operation.


Transmission service across the Rapid City HVDC Tie is administered by WAPA. SPP administers service to and from the Eastern terminal of this tie. Information provided here represents status of the HVDC Tie and outage information as communicated to SPP. The RAPID CITY NON-DC TIE INJECTION POINT DC Tie in both directions will be limited to 0 from 04/25/2022 @1300 through 05/05/2022 @ 1700 for a planned Maintenance Outage. It will also be limited to 0 MW in both directions from 10/10/2022 @ 0900 through 12/09/2022 @ 1400.
OUTAGE UPDATE
Updated at 5/5/2022 5:48:46 PM (CD) - The RAPID CITY NON-DC TIE INJECTION POINT DC Tie in both directions will be limited to 0 as a result of a planned maintenance outage from 5/6/2022 5:48:46 PM (CD) to 5/6/2022 10:00:00 PM (CD).


Transmission service across the Rapid City HVDC Tie is administered by WAPA. SPP administers service to and from the Eastern terminal of this tie. Information provided here represents status of the HVDC Tie and outage information as communicated to SPP. The RAPID CITY NON-DC TIE INJECTION POINT DC Tie in both directions will be limited to 0 from 04/25/2022 @1300 through 05/05/2022 @ 1700 for a planned Maintenance Outage. It will also be limited to 0 MW in both directions from 10/10/2022 @ 0900 through 12/09/2022 @ 1400.
OUTAGE UPDATE
Updated at 5/5/2022 5:48:27 PM – The RAPID CITY NON-DC TIE INJECTION POINT DC Tie has been returned to normal operation.


Transmission service across the Rapid City HVDC Tie is administered by WAPA. SPP administers service to and from the Eastern terminal of this tie. Information provided here represents status of the HVDC Tie and outage information as communicated to SPP. The RAPID CITY NON-DC TIE INJECTION POINT DC Tie in both directions will be limited to 0 from 04/25/2022 @1300 through 05/05/2022 @ 1700 for a planned Maintenance Outage. It will also be limited to 0 MW in both directions from 10/10/2022 @ 0900 through 12/09/2022 @ 1400.
OUTAGE UPDATE
Updated at 5/5/2022 5:47:28 PM (CD) - The RAPID CITY NON-DC TIE INJECTION POINT DC Tie in both directions will be limited to 0 as a result of a planned maintenance outage from 5/6/2022 5:47:28 PM (CD) to 5/6/2022 10:00:00 PM (CD).


Transmission service across the Rapid City HVDC Tie is administered by WAPA. SPP administers service to and from the Eastern terminal of this tie. Information provided here represents status of the HVDC Tie and outage information as communicated to SPP. The RAPID CITY NON-DC TIE INJECTION POINT DC Tie in both directions will be limited to 0 from 04/25/2022 @1300 through 05/05/2022 @ 1700 for a planned Maintenance Outage. It will also be limited to 0 MW in both directions from 10/10/2022 @ 0900 through 12/09/2022 @ 1400.
OUTAGE UPDATE
Updated at 4/22/2022 3:22:15 PM (CD) - The RAPID CITY NON-DC TIE INJECTION POINT DC Tie in both directions will be limited to 0 as a result of a planned maintenance outage from 4/25/2022 1:00:00 PM (CD) to 5/5/2022 5:00:00 PM (CD).


Transmission service across the Rapid City HVDC Tie is administered by WAPA. SPP administers service to and from the Eastern terminal of this tie. Information provided here represents status of the HVDC Tie and outage information as communicated to SPP. The RAPID CITY NON-DC TIE INJECTION POINT DC Tie in both directions will be limited to 0 from 04/25/2022 @1300 through 05/05/2022 @ 1700 for a planned Maintenance Outage. It will also be limited to 0 MW in both directions from 10/10/2022 @ 0900 through 12/09/2022 @ 1400.
OUTAGE UPDATE
Updated at 4/18/2022 6:20:53 AM (CD) - The RAPID CITY NON-DC TIE INJECTION POINT DC Tie in both directions will be limited to 0 as a result of an unplanned maintenance outage from 4/18/2022 2:36:00 AM (CD) to 5/23/2022 11:59:00 PM (CD).


Transmission service across the Rapid City HVDC Tie is administered by WAPA. SPP administers service to and from the Eastern terminal of this tie. Information provided here represents status of the HVDC Tie and outage information as communicated to SPP. The RAPID CITY NON-DC TIE INJECTION POINT DC Tie in both directions will be limited to 0 from 04/25/2022 @1300 through 05/05/2022 @ 1700 for a planned Maintenance Outage. It will also be limited to 0 MW in both directions from 10/10/2022 @ 0900 through 12/09/2022 @ 1400.
OUTAGE UPDATE
Updated at 4/18/2022 6:07:15 AM (CD) - The RAPID CITY NON-DC TIE INJECTION POINT DC Tie in both directions will be limited to 0 as a result of an unplanned maintenance outage from 4/18/2022 2:36:00 AM (CD) to 4/18/2022 6:00:00 PM (CD).


Transmission service across the Rapid City HVDC Tie is administered by WAPA. SPP administers service to and from the Eastern terminal of this tie. Information provided here represents status of the HVDC Tie and outage information as communicated to SPP. The RAPID CITY NON-DC TIE INJECTION POINT DC Tie in both directions will be limited to 0 from 04/25/2022 @1300 through 05/05/2022 @ 1700 for a planned Maintenance Outage. It will also be limited to 0 MW in both directions from 10/10/2022 @ 0900 through 12/09/2022 @ 1400.
OUTAGE UPDATE
Updated at 4/18/2022 2:36:45 AM (CD) - The RAPID CITY NON-DC TIE INJECTION POINT DC Tie in both directions will be limited to 0 as a result of an unplanned maintenance outage from 4/18/2022 2:36:00 AM (CD) to 4/18/2022 7:00:00 AM (CD).


Transmission service across the Rapid City HVDC Tie is administered by WAPA. SPP administers service to and from the Eastern terminal of this tie. Information provided here represents status of the HVDC Tie and outage information as communicated to SPP. The RAPID CITY NON-DC TIE INJECTION POINT DC Tie in both directions will be limited to 0 from 04/25/2022 @1300 through 05/05/2022 @ 1700 for a planned Maintenance Outage. It will also be limited to 0 MW in both directions from 10/10/2022 @ 0900 through 12/09/2022 @ 1400.
OUTAGE UPDATE
Updated at 3/22/2022 1:00:44 AM – The RAPID CITY NON-DC TIE INJECTION POINT DC Tie has been returned to normal operation.


Transmission service across the Rapid City HVDC Tie is administered by WAPA. SPP administers service to and from the Eastern terminal of this tie. Information provided here represents status of the HVDC Tie and outage information as communicated to SPP. The RAPID CITY NON-DC TIE INJECTION POINT DC Tie in both directions will be limited to 0 from 04/25/2022 @1300 through 05/05/2022 @ 1700 for a planned Maintenance Outage
OUTAGE UPDATE
Updated at 3/10/2022 4:13:58 PM – The RAPID CITY NON-DC TIE INJECTION POINT DC Tie has been returned to normal operation.


Transmission service across the Rapid City HVDC Tie is administered by WAPA. SPP administers service to and from the Eastern terminal of this tie. Information provided here represents status of the HVDC Tie and outage information as communicated to SPP. The RAPID CITY NON-DC TIE INJECTION POINT DC Tie in both directions will be limited to 0 from 04/25/2022 @1300 through 05/05/2022 @ 1700 for a planned Maintenance Outage
OUTAGE UPDATE
Updated at 3/10/2022 10:05:22 AM (CS) - The RAPID CITY NON-DC TIE INJECTION POINT DC Tie in both directions will be limited to 0 as a result of an unplanned maintenance outage from 3/10/2022 9:52:00 AM (CS) to 3/11/2022 11:00:00 PM (CS).


Transmission service across the Rapid City HVDC Tie is administered by WAPA. SPP administers service to and from the Eastern terminal of this tie. Information provided here represents status of the HVDC Tie and outage information as communicated to SPP. The RAPID CITY NON-DC TIE INJECTION POINT DC Tie in both directions will be limited to 0 from 04/25/2022 @1300 through 05/05/2022 @ 1700 for a planned Maintenance Outage
OUTAGE UPDATE
Updated at 3/1/2022 8:49:21 AM – The RAPID CITY NON-DC TIE INJECTION POINT DC Tie has been returned to normal operation.


Transmission service across the Rapid City HVDC Tie is administered by WAPA. SPP administers service to and from the Eastern terminal of this tie. Information provided here represents status of the HVDC Tie and outage information as communicated to SPP.
OUTAGE UPDATE
Updated at 2/28/2022 8:57:56 AM (CS) - The RAPID CITY NON-DC TIE INJECTION POINT DC Tie in both directions will be limited to 0 as a result of an unplanned maintenance outage from 2/28/2022 8:57:00 AM (CS) to 3/4/2022 6:00:00 PM (CS).


Transmission service across the Rapid City HVDC Tie is administered by WAPA. SPP administers service to and from the Eastern terminal of this tie. Information provided here represents status of the HVDC Tie and outage information as communicated to SPP.
OUTAGE UPDATE
Updated at 2/1/2022 12:41:56 PM – The RAPID CITY NON-DC TIE INJECTION POINT DC Tie has been returned to normal operation.


Transmission service across the Rapid City HVDC Tie is administered by WAPA. SPP administers service to and from the Eastern terminal of this tie. Information provided here represents status of the HVDC Tie and outage information as communicated to SPP.
OUTAGE UPDATE
Updated at 1/3/2022 8:55:25 AM (CS) - The RAPID CITY NON-DC TIE INJECTION POINT DC Tie from west to east will be limited to 0 as a result of a planned maintenance outage from 1/24/2022 10:00:00 AM (CS) to 2/3/2022 7:00:00 PM (CS).


Transmission service across the Rapid City HVDC Tie is administered by WAPA. SPP administers service to and from the Eastern terminal of this tie. Information provided here represents status of the HVDC Tie and outage information as communicated to SPP.
OUTAGE UPDATE
Updated at 12/3/2021 10:14:08 AM – The RAPID CITY NON-DC TIE INJECTION POINT DC Tie has been returned to normal operation.


Added Rapid City