OASIS Apps

- Curtailment Viewer
- DC Tie Viewer
- Price Discounts
- Price Matrix
- Transmission Load Relief

- SPP OASIS Archive Map
    > SPP OASIS Archive Page
    > Market System Status
    > Member Related Postings
    > FERC890 Items

- Studies Postings
 

MILES CITY - History Log


MCWEST_EXP will be limited to 60 MW on 04/16/2024 @ 11:00 through 04/16/2024 @ 14:00. MCWEST_EXP will be limited to 60 MW on 04/29/2024 @ 07:00 through 05/02/2024 @ 15:00.
OUTAGE UPDATE
Updated at 3/21/2024 8:32:54 AM – The MILES CITY DC Tie has been returned to normal operation.


MCWEST_EXP will be limited to 60 MW on 3/21/2024 @ 11:00 through 03/21/2024 @ 15:00. MCWEST_EXP will be limited to 60 MW on 04/29/2024 @ 07:00 through 05/02/2024 @ 15:00.
OUTAGE UPDATE
Updated at 3/20/2024 5:01:41 PM – The MILES CITY DC Tie has been returned to normal operation.


Per Kass, MCWEST_EXP will be limited to 60 MW on 3/21/2024 @ 11:00 through 03/21/2024 @ 15:00. Per Kass, MCWEST_EXP will be limited to 60 MW on 04/29/2024 @ 07:00 through 05/02/2024 @ 15:00.
OUTAGE UPDATE
Updated at 3/11/2024 12:21:45 PM – The MILES CITY DC Tie has been returned to normal operation.


Per Kass, MCWEST_EXP will be limited to 60 MW on 3/21/2024 at 11:00 through 15:00. Per Kass, MCWEST_EXP will be limited to 60 MW on 04/29/2024 @ 07:00 through 05/02/2024 @ 15:00.
OUTAGE UPDATE
Updated at 3/11/2024 12:07:59 PM – The MILES CITY DC Tie has been returned to normal operation.


Per Kass, MCWEST_EXP will be limited to 60 MW on 3/21/2024 at 11:00 through 15:00. Per Kass, MCWEST_EXP will be limited to 60 MW on 04/29/2024 @ 07:00 through 05/02/2024 @ 15:00.
OUTAGE UPDATE
Updated at 3/11/2024 12:07:25 PM – The MILES CITY DC Tie has been returned to normal operation.


Per Kass, MCWEST_EXP will be limited to 60 MW on 3/21/2024 at 11:00 through 15:00. Per Kass, MCWEST_EXP will be limited to 60 MW on 04/29/2024 @ 07:00 through 05/02/2024 @ 15:00.
OUTAGE UPDATE
Updated at 3/11/2024 12:05:07 PM – The MILES CITY DC Tie has been returned to normal operation.


Per Kass, MCWEST_EXP will be limited to 60 MW on 04/29/2024 @ 07:00 through 05/02/2024 @ 15:00.
OUTAGE UPDATE
Updated at 3/4/2024 4:59:30 PM – The MILES CITY DC Tie has been returned to normal operation.


OUTAGE UPDATE
Updated at 3/4/2024 3:43:03 PM – The MILES CITY DC Tie has been returned to normal operation.


OUTAGE UPDATE
Updated at 3/3/2024 10:12:06 PM (CS) - The MILES CITY DC Tie from east to west will be limited to 100 as a result of a planned maintenance outage from 3/3/2024 9:30:00 AM (CS) to 3/4/2024 12:00:00 PM (CS).


OUTAGE UPDATE
Updated at 3/3/2024 9:27:07 AM (CS) - The MILES CITY DC Tie from east to west will be limited to 100 as a result of a planned maintenance outage from 3/3/2024 9:27:00 AM (CS) to 3/4/2024 9:30:00 AM (CS).


MCWEST_EXP limited to 60 MW on 02/21/2024 @ 0900CPT through 02/21/2024 @ 1700CPT.
OUTAGE UPDATE
Updated at 2/12/2024 10:54:12 AM – The MILES CITY DC Tie has been returned to normal operation.


MCWEST_EXP limited to 60 MW on 02/20/2024 @ 0900CPT through 02/20/2024 @ 1700CPT.
OUTAGE UPDATE
Updated at 1/19/2024 4:06:18 PM – The MILES CITY DC Tie has been returned to normal operation.


MCWEST_EXP limited to 60 MW on 02/20/2024 @ 0900CPT through 02/20/2024 @ 1700CPT.
OUTAGE UPDATE
Updated at 1/18/2024 10:49:44 AM (CS) - The MILES CITY DC Tie in both directions will be limited to 0 as a result of an emergency outage from 1/13/2024 8:00:00 AM (CS) to 1/20/2024 5:00:00 PM (CS).


MCWEST_EXP limited to 60 MW on 02/20/2024 @ 0900CPT through 02/20/2024 @ 1700CPT.
OUTAGE UPDATE
Updated at 1/13/2024 10:21:02 PM (CS) - The MILES CITY DC Tie in both directions will be limited to 0 as a result of an emergency outage from 1/13/2024 8:24:00 PM (CS) to 1/18/2024 4:00:00 PM (CS).


MCWEST_EXP limited to 60 MW on 02/20/2024 @ 0900CPT through 02/20/2024 @ 1700CPT.
OUTAGE UPDATE
Updated at 1/13/2024 8:25:00 PM (CS) - The MILES CITY DC Tie from east to west will be limited to 0 as a result of a planned maintenance outage from 1/13/2024 8:24:00 PM (CS) to 1/14/2024 12:00:00 AM (CS).


MCWEST_EXP limited to 60 MW on 02/20/2024 @ 0900CPT through 02/20/2024 @ 1700CPT.
OUTAGE UPDATE
Updated at 1/11/2024 12:11:38 PM – The MILES CITY DC Tie has been returned to normal operation.


MCWEST_EXP limited to 60 MW on 04/29/2024 @ 0800CPT through 05/02/2024 @ 1600CPT.
OUTAGE UPDATE
Updated at 12/29/2023 10:43:11 PM – The MILES CITY DC Tie has been returned to normal operation.


MCWEST_EXP limited to 60 MW on 04/29/2024 @ 0800CPT through 05/02/2024 @ 1600CPT.
OUTAGE UPDATE
Updated at 12/29/2023 6:04:16 PM (CS) - The MILES CITY DC Tie from east to west will be limited to 60 as a result of an unplanned maintenance outage from 12/29/2023 6:00:00 PM (CS) to 12/30/2023 12:00:00 AM (CS).


MCWEST_EXP limited to 60 MW on 04/29/2024 @ 0800CPT through 05/02/2024 @ 1600CPT.
OUTAGE UPDATE
Updated at 12/27/2023 1:00:36 PM – The MILES CITY DC Tie has been returned to normal operation.


MCWEST_EXP limited to 60 MW on 04/29/2024 @ 0800CPT through 05/02/2024 @ 1600CPT.
OUTAGE UPDATE
Updated at 12/26/2023 12:36:54 PM (CS) - The MILES CITY DC Tie from east to west will be limited to 60 as a result of a planned maintenance outage from 12/26/2023 12:36:00 PM (CS) to 12/27/2023 6:00:00 PM (CS).


MCWEST_EXP limited to 60 MW on 04/29/2024 @ 0800CPT through 05/02/2024 @ 1600CPT.
OUTAGE UPDATE
Updated at 12/11/2023 2:19:04 PM – The MILES CITY DC Tie has been returned to normal operation.


MCWEST_EXP limited to 60 MW on 04/29/2024 @ 0800CPT through 05/02/2024 @ 1600CPT.
OUTAGE UPDATE
Updated at 12/11/2023 7:38:35 AM (CS) - The MILES CITY DC Tie from east to west will be limited to 60 as a result of a planned maintenance outage from 12/11/2023 9:00:00 AM (CS) to 12/11/2023 6:00:00 PM (CS).


MCWEST_EXP limited to 60 MW on 04/29/2024 @ 0800CPT through 05/02/2024 @ 1600CPT.
OUTAGE UPDATE
Updated at 12/11/2023 3:55:36 AM – The MILES CITY DC Tie has been returned to normal operation.


MCWEST_EXP limited to 60 MW on 04/29/2024 @ 0800CPT through 05/02/2024 @ 1600CPT.
OUTAGE UPDATE
Updated at 12/4/2023 9:46:03 AM (CS) - The MILES CITY DC Tie from south to north will be limited to 60 as a result of a planned maintenance outage from 12/11/2023 9:00:00 AM (CS) to 12/11/2023 6:00:00 PM (CS).


MCWEST_EXP limited to 60 MW on 04/29/2024 @ 0800CPT through 05/02/2024 @ 1600CPT.
OUTAGE UPDATE
Updated at 10/14/2023 12:18:48 PM – The MILES CITY DC Tie has been returned to normal operation.


MCWEST_EXP limited to 60 MW on 04/29/2024 @ 0800CPT through 05/02/2024 @ 1600CPT.
OUTAGE UPDATE
Updated at 10/14/2023 9:40:39 AM (CD) - The MILES CITY DC Tie in both directions will be limited to 0 as a result of an unplanned maintenance outage from 10/14/2023 9:00:00 AM (CD) to 10/14/2023 11:00:00 AM (CD).


MCWEST_EXP limited to 60 MW on 04/29/2024 @ 0800CPT through 05/02/2024 @ 1600CPT.
OUTAGE UPDATE
Updated at 10/14/2023 8:48:00 AM (CD) - The MILES CITY DC Tie in both directions will be limited to 0 as a result of an unplanned maintenance outage from 10/14/2023 9:00:00 AM (CD) to 10/14/2023 10:00:00 AM (CD).


MCWEST_EXP limited to 60 MW on 04/29/2024 @ 0800CPT through 05/02/2024 @ 1600CPT.
OUTAGE UPDATE
Updated at 10/12/2023 12:39:48 PM – The MILES CITY DC Tie has been returned to normal operation.


MCWEST_EXP limited to 60 MW on 04/29/2024 @ 0800CPT through 05/02/2024 @ 1600CPT.
OUTAGE UPDATE
Updated at 10/3/2023 8:56:21 AM (CD) - The MILES CITY DC Tie from east to west will be limited to 60 as a result of a planned maintenance outage from 10/2/2023 8:00:00 AM (CD) to 10/13/2023 5:00:00 PM (CD).


MCWEST_EXP limited to 60 on 10/2/2023 @ 0800CPT through 10/13/2023 @ 1700CPT. MCWEST_EXP limited to 60 MW on 04/29/2024 @ 0800CPT through 05/02/2024 @ 1600CPT.
OUTAGE UPDATE
Updated at 9/21/2023 5:06:15 PM – The MILES CITY DC Tie has been returned to normal operation.


MCWEST_EXP limited to 60 on 10/2/2023 @ 0800CPT through 10/13/2023 @ 1700CPT. MCWEST_EXP limited to 60 MW on 04/29/2024 @ 0800CPT through 05/02/2024 @ 1600CPT.
OUTAGE UPDATE
Updated at 9/21/2023 5:06:03 PM – The MILES CITY DC Tie has been returned to normal operation.


MCWEST_EXP limited to 60 on 10/2/2023 @ 0800CPT through 10/13/2023 @ 1700CPT. MCWEST_EXP limited to 60 MW on 04/29/2024 @ 0800CPT through 05/02/2024 @ 1600CPT.
OUTAGE UPDATE
Updated at 9/21/2023 5:04:56 PM – The MILES CITY DC Tie has been returned to normal operation.


MCWEST_EXP limited to 60 MW on 04/29/2024 @ 0800CPT through 05/02/2024 @ 1600CPT
OUTAGE UPDATE
Updated at 9/21/2023 5:01:34 PM – The MILES CITY DC Tie has been returned to normal operation.


MCWEST_EXP limited to 60 MW on 10/02/2023 @ 0800CPT through 10/13/2023 @ 1700CPT; MCWEST_EXP limited to 60 MW on 04/29/2024 @ 0800CPT through 05/02/2024 @ 1600CPT
OUTAGE UPDATE
Updated at 9/14/2023 1:26:33 PM – The MILES CITY DC Tie has been returned to normal operation.


MCWEST_EXP limited to 60 MW on 10/02/2023 @ 0800CPT through 10/13/2023 @ 1700CPT; MCWEST_EXP limited to 60 MW on 04/29/2024 @ 0800CPT through 05/02/2024 @ 1600CPT
OUTAGE UPDATE
Updated at 9/14/2023 1:25:53 PM – The MILES CITY DC Tie has been returned to normal operation.


MCWEST_EXP limited to 60 MW on 10/02/2023 @ 0800CPT through 10/13/2023 @ 1700CPT; MCWEST_EXP limited to 60 MW on 10/16/2023 @ 1100CPT through 10/20/2023 @ 1600CPT
OUTAGE UPDATE
Updated at 9/9/2023 9:54:46 AM – The MILES CITY DC Tie has been returned to normal operation.


MCWEST_EXP limited to 60 MW on 10/02/2023 @ 0800CPT through 10/13/2023 @ 1700CPT; MCWEST_EXP limited to 60 MW on 10/16/2023 @ 1100CPT through 10/20/2023 @ 1600CPT
OUTAGE UPDATE
Updated at 9/9/2023 1:15:00 AM (CD) - The MILES CITY DC Tie from east to west will be limited to 100 as a result of a planned maintenance outage from 9/9/2023 12:00:00 AM (CD) to 9/9/2023 12:00:00 PM (CD).


MCWEST_EXP limited to 60 MW on 10/02/2023 @ 0800CPT through 10/13/2023 @ 1700CPT; MCWEST_EXP limited to 60 MW on 10/16/2023 @ 1100CPT through 10/20/2023 @ 1600CPT
OUTAGE UPDATE
Updated at 9/5/2023 2:41:25 PM – The MILES CITY DC Tie has been returned to normal operation.


MCWEST_EXP limited to 60 MW on 10/02/2023 @ 0800CPT through 10/13/2023 @ 1700CPT MCWEST_EXP limited to 60 MW on 10/16/2023 @ 1100CPT through 10/20/2023 @ 1600CPT
OUTAGE UPDATE
Updated at 9/5/2023 2:30:10 PM – The MILES CITY DC Tie has been returned to normal operation.


OUTAGE UPDATE
Updated at 8/23/2023 2:05:12 AM – The MILES CITY DC Tie has been returned to normal operation.


OUTAGE UPDATE
Updated at 8/23/2023 12:36:47 AM (CD) - The MILES CITY DC Tie in both directions will be limited to 0 as a result of an unplanned maintenance outage from 8/23/2023 12:36:00 AM (CD) to 8/23/2023 4:00:00 AM (CD).


OUTAGE UPDATE
Updated at 8/11/2023 3:25:39 AM – The MILES CITY DC Tie has been returned to normal operation.


OUTAGE UPDATE
Updated at 8/2/2023 5:47:41 AM (CD) - The MILES CITY DC Tie from east to west will be limited to 60 as a result of an unplanned maintenance outage from 8/2/2023 6:00:00 AM (CD) to 8/2/2023 10:00:00 AM (CD).


OUTAGE UPDATE
Updated at 7/10/2023 5:00:00 PM – The MILES CITY DC Tie has been returned to normal operation.


OUTAGE UPDATE
Updated at 7/10/2023 1:06:49 PM (CD) - The MILES CITY DC Tie in both directions will be limited to 0 as a result of an unplanned maintenance outage from 7/10/2023 1:00:00 PM (CD) to 7/10/2023 5:00:00 PM (CD).


OUTAGE UPDATE
Updated at 7/10/2023 12:57:23 PM (CD) - The MILES CITY DC Tie in both directions will be limited to 0 as a result of an unplanned maintenance outage from 7/10/2023 12:57:00 PM (CD) to 7/10/2023 2:00:00 PM (CD).


OUTAGE UPDATE
Updated at 6/27/2023 2:27:27 PM – The MILES CITY DC Tie has been returned to normal operation.


OUTAGE UPDATE
Updated at 6/27/2023 4:03:37 AM (CD) - The MILES CITY DC Tie from east to west will be limited to 60 as a result of a planned maintenance outage from 6/27/2023 8:00:00 AM (CD) to 6/27/2023 6:00:00 PM (CD).


OUTAGE UPDATE
Updated at 6/8/2023 9:05:36 AM – The MILES CITY DC Tie has been returned to normal operation.


OUTAGE UPDATE
Updated at 6/8/2023 7:30:41 AM (CD) - The MILES CITY DC Tie in both directions will be limited to 0 as a result of an unplanned maintenance outage from 6/8/2023 7:30:00 AM (CD) to 6/8/2023 9:00:00 AM (CD).


OUTAGE UPDATE
Updated at 5/14/2023 9:56:25 AM – The MILES CITY DC Tie has been returned to normal operation.


OUTAGE UPDATE
Updated at 5/8/2023 3:36:40 PM (CD) - The MILES CITY DC Tie in both directions will be limited to 0 as a result of a planned maintenance outage from 4/24/2023 8:00:00 AM (CD) to 5/11/2023 5:00:00 PM (CD).


OUTAGE UPDATE
Updated at 4/18/2023 10:35:17 AM (CD) - The MILES CITY DC Tie in both directions will be limited to 0 as a result of a planned maintenance outage from 4/24/2023 8:00:00 AM (CD) to 5/12/2023 7:00:00 PM (CD).


OUTAGE UPDATE
Updated at 2/27/2023 3:34:56 PM – The MILES CITY DC Tie has been returned to normal operation.


OUTAGE UPDATE
Updated at 2/17/2023 6:59:45 PM (CS) - The MILES CITY DC Tie in both directions will be limited to 0 as a result of a planned maintenance outage from 2/18/2023 6:59:45 PM (CS) to 2/18/2023 9:00:00 PM (CS).


OUTAGE UPDATE
Updated at 2/17/2023 5:10:13 PM (CS) - The MILES CITY DC Tie in both directions will be limited to 0 as a result of a planned maintenance outage from 2/16/2023 5:10:00 PM (CS) to 2/17/2023 7:00:00 PM (CS).


OUTAGE UPDATE
Updated at 2/16/2023 9:00:57 PM (CS) - The MILES CITY DC Tie in both directions will be limited to 0 as a result of an unplanned maintenance outage from 2/16/2023 8:45:00 PM (CS) to 2/17/2023 5:00:00 PM (CS).


OUTAGE UPDATE
Updated at 2/15/2023 8:21:47 PM – The MILES CITY DC Tie has been returned to normal operation.


OUTAGE UPDATE
Updated at 2/15/2023 8:21:43 PM – The MILES CITY DC Tie has been returned to normal operation.


OUTAGE UPDATE
Updated at 2/15/2023 6:46:54 PM (CS) - The MILES CITY DC Tie in both directions will be limited to 0 as a result of an unplanned maintenance outage from 2/14/2023 6:46:00 PM (CS) to 2/15/2023 8:00:00 PM (CS).


OUTAGE UPDATE
Updated at 2/15/2023 6:10:30 PM (CS) - The MILES CITY DC Tie in both directions will be limited to 0 as a result of an unplanned maintenance outage from 2/14/2023 6:10:00 PM (CS) to 2/15/2023 7:00:00 PM (CS).


OUTAGE UPDATE
Updated at 2/14/2023 6:58:34 PM (CS) - The MILES CITY DC Tie in both directions will be limited to 0 as a result of an unplanned maintenance outage from 2/14/2023 12:00:00 AM (CS) to 2/15/2023 5:00:00 PM (CS).


OUTAGE UPDATE
Updated at 2/14/2023 4:40:55 PM (CS) - The MILES CITY DC Tie in both directions will be limited to 0 as a result of an unplanned maintenance outage from 2/14/2023 12:00:00 AM (CS) to 2/14/2023 8:00:00 PM (CS).


OUTAGE UPDATE
Updated at 2/13/2023 7:42:39 PM (CS) - The MILES CITY DC Tie in both directions will be limited to 0 as a result of an unplanned maintenance outage from 2/13/2023 7:42:00 PM (CS) to 2/14/2023 5:00:00 PM (CS).


OUTAGE UPDATE
Updated at 2/13/2023 6:12:22 PM – The MILES CITY DC Tie has been returned to normal operation.


OUTAGE UPDATE
Updated at 2/13/2023 5:20:00 PM (CS) - The MILES CITY DC Tie in both directions will be limited to 0 as a result of an unplanned maintenance outage from 2/13/2023 12:45:00 PM (CS) to 2/13/2023 7:00:00 PM (CS).


OUTAGE UPDATE
Updated at 2/13/2023 5:19:42 PM – The MILES CITY DC Tie has been returned to normal operation.


OUTAGE UPDATE
Updated at 2/13/2023 5:18:52 PM (CS) - The MILES CITY DC Tie in both directions will be limited to 0 as a result of an unplanned maintenance outage from 2/13/2023 12:45:00 PM (CS) to 2/13/2023 7:00:00 PM (CS).


OUTAGE UPDATE
Updated at 2/13/2023 12:57:22 PM (CS) - The MILES CITY DC Tie in both directions will be limited to 0 as a result of an unplanned maintenance outage from 2/13/2023 12:50:00 PM (CS) to 2/13/2023 6:00:00 PM (CS).


OUTAGE UPDATE
Updated at 2/12/2023 8:50:00 PM – The MILES CITY DC Tie has been returned to normal operation.


OUTAGE UPDATE
Updated at 2/12/2023 7:57:07 PM (CS) - The MILES CITY DC Tie in both directions will be limited to 0 as a result of an unplanned maintenance outage from 2/12/2023 4:20:00 AM (CS) to 2/12/2023 9:00:00 PM (CS).


OUTAGE UPDATE
Updated at 2/12/2023 6:01:51 PM (CS) - The MILES CITY DC Tie in both directions will be limited to 0 as a result of an unplanned maintenance outage from 2/12/2023 4:20:00 AM (CS) to 2/12/2023 8:00:00 PM (CS).


OUTAGE UPDATE
Updated at 2/12/2023 4:20:07 PM (CS) - The MILES CITY DC Tie in both directions will be limited to 0 as a result of an unplanned maintenance outage from 2/12/2023 4:20:00 AM (CS) to 2/12/2023 6:00:00 PM (CS).


OUTAGE UPDATE
Updated at 2/12/2023 11:43:44 AM (CS) - The MILES CITY DC Tie in both directions will be limited to 0 as a result of an unplanned maintenance outage from 2/12/2023 11:44:00 AM (CS) to 2/12/2023 5:00:00 PM (CS).


OUTAGE UPDATE
Updated at 2/12/2023 4:18:53 AM (CS) - The MILES CITY DC Tie in both directions will be limited to 0 as a result of a planned maintenance outage from 2/12/2023 4:18:00 AM (CS) to 2/12/2023 12:00:00 PM (CS).


OUTAGE UPDATE
Updated at 2/11/2023 7:14:00 PM – The MILES CITY DC Tie has been returned to normal operation.


OUTAGE UPDATE
Updated at 2/11/2023 5:33:06 PM (CS) - The MILES CITY DC Tie in both directions will be limited to 0 as a result of an unplanned maintenance outage from 2/11/2023 2:13:00 PM (CS) to 2/11/2023 8:00:00 PM (CS).


OUTAGE UPDATE
Updated at 2/11/2023 2:13:13 PM (CS) - The MILES CITY DC Tie in both directions will be limited to 0 as a result of an unplanned maintenance outage from 2/11/2023 2:13:00 PM (CS) to 2/11/2023 6:00:00 PM (CS).


OUTAGE UPDATE
Updated at 2/11/2023 11:04:04 AM (CS) - The MILES CITY DC Tie in both directions will be limited to 0 as a result of an unplanned maintenance outage from 2/11/2023 11:04:00 AM (CS) to 2/11/2023 3:00:00 PM (CS).


OUTAGE UPDATE
Updated at 2/11/2023 5:22:45 AM (CS) - The MILES CITY DC Tie in both directions will be limited to 0 as a result of an unplanned maintenance outage from 2/11/2023 5:22:00 AM (CS) to 2/11/2023 12:00:00 PM (CS).


OUTAGE UPDATE
Updated at 2/10/2023 5:58:03 PM – The MILES CITY DC Tie has been returned to normal operation.


OUTAGE UPDATE
Updated at 2/10/2023 11:14:03 AM (CS) - The MILES CITY DC Tie in both directions will be limited to 0 as a result of a planned maintenance outage from 2/10/2023 11:14:00 AM (CS) to 2/10/2023 6:00:00 PM (CS).


OUTAGE UPDATE
Updated at 2/10/2023 5:45:08 AM (CS) - The MILES CITY DC Tie in both directions will be limited to 0 as a result of an unplanned maintenance outage from 2/10/2023 5:45:00 AM (CS) to 2/10/2023 12:00:00 PM (CS).


OUTAGE UPDATE
Updated at 2/9/2023 4:11:13 AM – The MILES CITY DC Tie has been returned to normal operation.


OUTAGE UPDATE
Updated at 2/8/2023 2:32:50 PM (CS) - The MILES CITY DC Tie in both directions will be limited to 0 as a result of an emergency outage from 2/8/2023 1:05:00 PM (CS) to 2/8/2023 5:00:00 PM (CS).


OUTAGE UPDATE
Updated at 2/8/2023 1:05:00 PM (CS) - The MILES CITY DC Tie in both directions will be limited to 0 as a result of an emergency outage from 2/8/2023 1:05:00 PM (CS) to 2/8/2023 3:08:00 PM (CS).


OUTAGE UPDATE
Updated at 2/6/2023 1:20:50 PM (CS) - The MILES CITY DC Tie from north to south will be limited to 0 as a result of an emergency outage from 2/6/2023 6:14:00 AM (CS) to 2/6/2023 5:00:00 PM (CS).


OUTAGE UPDATE
Updated at 2/6/2023 11:44:25 AM (CS) - The MILES CITY DC Tie in both directions will be limited to 0 as a result of an emergency outage from 2/6/2023 6:14:00 AM (CS) to 2/6/2023 3:00:00 PM (CS).


OUTAGE UPDATE
Updated at 2/6/2023 8:55:00 AM (CS) - The MILES CITY DC Tie from north to south will be limited to 0 as a result of a planned maintenance outage from 2/6/2023 6:14:00 AM (CS) to 2/6/2023 1:00:00 PM (CS).


OUTAGE UPDATE
Updated at 2/6/2023 6:14:00 AM (CS) - The MILES CITY DC Tie in both directions will be limited to 0 as a result of an emergency outage from 2/6/2023 6:14:00 AM (CS) to 2/6/2023 10:00:00 AM (CS).


OUTAGE UPDATE
Updated at 2/5/2023 2:46:02 PM (CS) - The MILES CITY DC Tie in both directions will be limited to 0 as a result of an unplanned maintenance outage from 2/5/2023 2:43:00 AM (CS) to 2/5/2023 6:00:00 PM (CS).


OUTAGE UPDATE
Updated at 2/5/2023 11:43:52 AM (CS) - The MILES CITY DC Tie in both directions will be limited to 0 as a result of an unplanned maintenance outage from 2/5/2023 2:43:00 AM (CS) to 2/5/2023 3:00:00 PM (CS).


OUTAGE UPDATE
Updated at 2/5/2023 9:18:53 AM (CS) - The MILES CITY DC Tie in both directions will be limited to 0 as a result of an unplanned maintenance outage from 2/5/2023 2:34:00 AM (CS) to 2/5/2023 12:00:00 PM (CS).


OUTAGE UPDATE
Updated at 2/5/2023 5:16:45 AM (CS) - The MILES CITY DC Tie in both directions will be limited to 0 as a result of an unplanned maintenance outage from 2/5/2023 2:34:00 AM (CS) to 2/5/2023 9:00:00 AM (CS).


OUTAGE UPDATE
Updated at 2/5/2023 2:34:46 AM (CS) - The MILES CITY DC Tie in both directions will be limited to 0 as a result of an unplanned maintenance outage from 2/5/2023 2:34:00 AM (CS) to 2/5/2023 6:00:00 AM (CS).


OUTAGE UPDATE
Updated at 1/27/2023 3:39:59 PM – The MILES CITY DC Tie has been returned to normal operation.


OUTAGE UPDATE
Updated at 1/25/2023 3:11:08 PM (CS) - The MILES CITY DC Tie in both directions will be limited to 0 as a result of an unplanned maintenance outage from 1/25/2023 7:11:00 AM (CS) to 1/25/2023 6:00:00 PM (CS).


OUTAGE UPDATE
Updated at 1/25/2023 1:26:28 PM (CS) - The MILES CITY DC Tie in both directions will be limited to 0 as a result of an unplanned maintenance outage from 1/25/2023 7:15:00 AM (CS) to 1/25/2023 4:00:00 PM (CS).


OUTAGE UPDATE
Updated at 1/25/2023 11:19:00 AM (CS) - The MILES CITY DC Tie in both directions will be limited to 0 as a result of an unplanned maintenance outage from 1/25/2023 7:15:00 AM (CS) to 1/25/2023 2:00:00 PM (CS).


OUTAGE UPDATE
Updated at 1/25/2023 7:27:03 AM (CS) - The MILES CITY DC Tie in both directions will be limited to 0 as a result of a planned maintenance outage from 1/25/2023 7:15:00 AM (CS) to 1/25/2023 12:00:00 PM (CS).


OUTAGE UPDATE
Updated at 1/25/2023 7:26:48 AM – The MILES CITY DC Tie has been returned to normal operation.


OUTAGE UPDATE
Updated at 1/25/2023 7:25:48 AM (CS) - The MILES CITY DC Tie in both directions will be limited to 0 as a result of an unplanned maintenance outage from 1/25/2023 7:15:00 AM (CS) to 1/25/2023 12:00:00 PM (CS).


OUTAGE UPDATE
Updated at 1/23/2023 2:28:41 PM – The MILES CITY DC Tie has been returned to normal operation.


OUTAGE UPDATE
Updated at 1/23/2023 1:00:29 PM (CS) - The MILES CITY DC Tie in both directions will be limited to 0 as a result of a planned maintenance outage from 1/23/2023 9:00:00 AM (CS) to 1/23/2023 2:00:00 PM (CS).


OUTAGE UPDATE
Updated at 1/23/2023 9:15:39 AM (CS) - The MILES CITY DC Tie in both directions will be limited to 0 as a result of a planned maintenance outage from 1/23/2023 9:00:00 AM (CS) to 1/24/2023 1:00:00 PM (CS).


OUTAGE UPDATE
Updated at 1/23/2023 7:32:55 AM (CS) - The MILES CITY DC Tie in both directions will be limited to 0 as a result of a planned maintenance outage from 1/23/2023 9:00:00 AM (CS) to 1/23/2023 11:00:00 AM (CS).


OUTAGE UPDATE
Updated at 1/1/2023 6:02:41 PM – The MILES CITY DC Tie has been returned to normal operation.


OUTAGE UPDATE
Updated at 1/1/2023 10:58:31 AM (CS) - The MILES CITY DC Tie in both directions will be limited to 0 as a result of an unplanned maintenance outage from 1/1/2023 10:30:00 AM (CS) to 1/1/2023 6:00:00 PM (CS).


OUTAGE UPDATE
Updated at 12/28/2022 5:03:23 PM – The MILES CITY DC Tie has been returned to normal operation.


OUTAGE UPDATE
Updated at 12/28/2022 2:49:12 AM (CS) - The MILES CITY DC Tie in both directions will be limited to 0 as a result of a planned maintenance outage from 12/28/2022 2:49:00 AM (CS) to 12/28/2022 6:00:00 PM (CS).


OUTAGE UPDATE
Updated at 12/17/2022 5:56:06 PM – The MILES CITY DC Tie has been returned to normal operation.


OUTAGE UPDATE
Updated at 12/16/2022 6:12:15 PM (CS) - The MILES CITY DC Tie from east to west will be limited to 60 as a result of an unplanned maintenance outage from 12/14/2022 11:00:00 AM (CS) to 12/17/2022 6:00:00 PM (CS).


OUTAGE UPDATE
Updated at 12/15/2022 11:22:31 AM (CS) - The MILES CITY DC Tie from east to west will be limited to 60 as a result of an unplanned maintenance outage from 12/14/2022 11:22:00 AM (CS) to 12/16/2022 6:00:00 PM (CS).


OUTAGE UPDATE
Updated at 12/14/2022 10:48:49 PM (CS) - The MILES CITY DC Tie from east to west will be limited to 60 as a result of an unplanned maintenance outage from 12/14/2022 10:45:00 PM (CS) to 12/15/2022 12:00:00 PM (CS).


OUTAGE UPDATE
Updated at 10/25/2022 2:02:26 PM – The MILES CITY DC Tie has been returned to normal operation.


OUTAGE UPDATE
Updated at 10/25/2022 11:23:37 AM (CD) - The MILES CITY DC Tie from east to west will be limited to 60 as a result of an unplanned maintenance outage from 10/25/2022 11:23:00 AM (CD) to 10/25/2022 2:00:00 PM (CD).


OUTAGE UPDATE
Updated at 10/20/2022 6:01:33 PM – The MILES CITY DC Tie has been returned to normal operation.


MCWEST_EXP will be limited to 60 MW on 10/17/2022 @ 12:00 through 10/21/2022 @ 16:00
OUTAGE UPDATE
Updated at 10/17/2022 3:25:58 PM – The MILES CITY DC Tie has been returned to normal operation.


MCWEST_EXP will be limited to 60 MW on 10/17/2022 @ 12:00 through 10/21/2022 @ 16:00
OUTAGE UPDATE
Updated at 10/17/2022 3:22:21 PM – The MILES CITY DC Tie has been returned to normal operation.


MCWEST_EXP will be limited to 60 MW on 10/17/2022 @ 12:00 through 10/17/2022 @ 16:00
OUTAGE UPDATE
Updated at 9/19/2022 3:23:31 PM – The MILES CITY DC Tie has been returned to normal operation.


MCWEST_EXP will be limited to 60 MW on 10/17/2022 @ 12:00 through 10/17/2022 @ 17:00
OUTAGE UPDATE
Updated at 9/19/2022 3:22:59 PM – The MILES CITY DC Tie has been returned to normal operation.


MCWEST_EXP will be limited to 60 MW on 10/03/2022 @ 12:00 through 10/03/2022 @ 17:00
OUTAGE UPDATE
Updated at 8/18/2022 3:06:39 PM – The MILES CITY DC Tie has been returned to normal operation.


MCWEST_EXP will be limited to 60 MW on 8/03/2022 @ 10:00 through 8/03/2022 @ 13:00
OUTAGE UPDATE
Updated at 8/2/2022 1:12:44 PM – The MILES CITY DC Tie has been returned to normal operation.


MCWEST_EXP will be limited to 60 MW on 8/02/2022 @ 10:00 through 8/02/2022 @ 14:00
OUTAGE UPDATE
Updated at 7/12/2022 12:57:34 AM – The MILES CITY DC Tie has been returned to normal operation.


MCWEST_EXP will be limited to 60 MW on 7/13/2022 @ 10:00 through 7/13/2022 @ 13:00
OUTAGE UPDATE
Updated at 7/6/2022 2:48:59 PM – The MILES CITY DC Tie has been returned to normal operation.


OUTAGE UPDATE
Updated at 6/29/2022 2:56:31 PM – The MILES CITY DC Tie has been returned to normal operation.


OUTAGE UPDATE
Updated at 6/7/2022 3:51:28 PM (CD) - The MILES CITY DC Tie from east to west will be limited to 60 as a result of a planned maintenance outage from 6/27/2022 11:00:00 AM (CD) to 6/29/2022 4:00:00 PM (CD).


OUTAGE UPDATE
Updated at 5/24/2022 1:09:12 PM – The MILES CITY DC Tie has been returned to normal operation.


OUTAGE UPDATE
Updated at 5/24/2022 7:23:08 AM (CD) - The MILES CITY DC Tie from east to west will be limited to 100 as a result of an unplanned maintenance outage from 5/24/2022 9:00:00 AM (CD) to 5/24/2022 3:00:00 PM (CD).


OUTAGE UPDATE
Updated at 5/23/2022 11:00:00 AM – The MILES CITY DC Tie has been returned to normal operation.


OUTAGE UPDATE
Updated at 5/23/2022 5:04:00 AM (CD) - The MILES CITY DC Tie in both directions will be limited to 0 as a result of an unplanned maintenance outage from 5/23/2022 5:04:00 AM (CD) to 5/24/2022 12:00:00 PM (CD).


OUTAGE UPDATE
Updated at 5/20/2022 12:51:23 AM – The MILES CITY DC Tie has been returned to normal operation.


MCWEST_EXP will be limited to 100 MW on 05/17/2022 @ 1000 through 05/19/2022 @ 1800.
OUTAGE UPDATE
Updated at 5/12/2022 1:01:14 PM – The MILES CITY DC Tie has been returned to normal operation.


MCWEST_EXP will be limited to 100 MW on 05/17/2022 @ 1000 through 05/19/2022 @ 1800.
OUTAGE UPDATE
Updated at 5/12/2022 12:59:44 PM – The MILES CITY DC Tie has been returned to normal operation.


MCWEST_EXP will be limited to 100 MW on 05/17/2022 @ 1000 through 05/19/2022 @ 1800.
OUTAGE UPDATE
Updated at 5/12/2022 11:58:13 AM (CD) - The MILES CITY DC Tie in both directions will be limited to 0 as a result of an unplanned maintenance outage from 4/25/2022 8:00:00 AM (CD) to 5/12/2022 1:00:00 PM (CD).


MCWEST_EXP will be limited to 100 MW on 05/17/2022 @ 1000 through 05/19/2022 @ 1800.
OUTAGE UPDATE
Updated at 5/10/2022 9:07:40 AM (CD) - The MILES CITY DC Tie in both directions will be limited to 0 as a result of a planned maintenance outage from 4/25/2022 8:00:00 AM (CD) to 5/12/2022 3:00:00 PM (CD).


MCWEST_EXP will be limited to 100 MW on 05/17/2022 @ 1000 through 05/19/2022 @ 1800.
OUTAGE UPDATE
Updated at 5/10/2022 9:03:21 AM (CD) - The MILES CITY DC Tie from north to south will be limited to 0 as a result of a planned maintenance outage from 4/25/2022 8:00:00 AM (CD) to 5/12/2022 3:00:00 PM (CD).


MCWEST_EXP will be limited to 100 MW on 05/17/2022 @ 1000 through 05/19/2022 @ 1800.
OUTAGE UPDATE
Updated at 5/9/2022 11:05:06 AM (CD) - The MILES CITY DC Tie in both directions will be limited to 0 as a result of a planned maintenance outage from 4/25/2022 8:00:00 AM (CD) to 5/13/2022 7:00:00 PM (CD).


OUTAGE UPDATE
Updated at 4/25/2022 7:50:45 AM (CD) - The MILES CITY DC Tie in both directions will be limited to 0 as a result of a planned maintenance outage from 4/25/2022 8:00:00 AM (CD) to 5/13/2022 7:00:00 PM (CD).


The MILES CITY DC Tie in both directions will be limited to 0 as a result of a planned maintenance outage from 4/25/2022 8:00:00 AM (CD) to 5/13/2022 7:00:00 PM (CD).
OUTAGE UPDATE
Updated at 4/24/2022 9:52:59 PM – The MILES CITY DC Tie has been returned to normal operation.


The MILES CITY DC Tie in both directions will be limited to 0 as a result of a planned maintenance outage from 4/25/2022 9:00:00 AM (CD) to 5/13/2022 7:00:00 PM (CD).
OUTAGE UPDATE
Updated at 4/24/2022 11:00:10 AM (CD) - The MILES CITY DC Tie in both directions will be limited to 20 as a result of an unplanned maintenance outage from 4/24/2022 11:00:00 AM (CD) to 4/25/2022 8:00:00 AM (CD).


The MILES CITY DC Tie in both directions will be limited to 0 as a result of a planned maintenance outage from 4/25/2022 9:00:00 AM (CD) to 5/13/2022 7:00:00 PM (CD).
OUTAGE UPDATE
Updated at 4/23/2022 10:20:00 PM (CD) - The MILES CITY DC Tie from east to west will be limited to 100 as a result of an emergency outage from 4/24/2022 10:20:00 PM (CD) to 4/25/2022 6:00:00 PM (CD).


The MILES CITY DC TIE has returned to normal operation.
OUTAGE UPDATE
Updated at 4/22/2022 3:17:57 PM (CD) - The MILES CITY DC Tie in both directions will be limited to 0 as a result of a planned maintenance outage from 4/25/2022 9:00:00 AM (CD) to 5/13/2022 7:00:00 PM (CD).


The MILES CITY DC TIE has returned to normal operation.
OUTAGE UPDATE
Updated at 3/25/2022 11:20:46 AM (CD) - The MILES CITY DC Tie from east to west will be limited to 0 as a result of a planned maintenance outage from 4/25/2022 9:00:00 AM (CD) to 5/13/2022 7:00:00 PM (CD).


The MILES CITY DC TIE has returned to normal operation.
OUTAGE UPDATE
Updated at 3/25/2022 9:36:37 AM (CD) - The MILES CITY DC Tie from east to west will be limited to 125 as a result of an unplanned maintenance outage from 3/25/2022 6:31:00 AM (CD) to 3/26/2022 12:00:00 AM (CD).


The MILES CITY DC TIE has returned to normal operation.
OUTAGE UPDATE
Updated at 3/25/2022 6:31:47 AM (CD) - The MILES CITY DC Tie from east to west will be limited to 125 as a result of an unplanned maintenance outage from 3/25/2022 6:30:00 AM (CD) to 3/25/2022 7:00:00 PM (CD).


The MILES CITY DC TIE has returned to normal operation.
OUTAGE UPDATE
Updated at 3/25/2022 6:31:30 AM – The MILES CITY DC Tie has been returned to normal operation.


The MILES CITY DC TIE has returned to normal operation.
OUTAGE UPDATE
Updated at 3/25/2022 6:30:37 AM (CD) - The MILES CITY DC Tie from east to west will be limited to 125 as a result of an unplanned maintenance outage from 3/25/2022 6:30:00 AM (CD) to 3/25/2022 7:00:00 PM (CD).


The MILES CITY DC TIE has returned to normal operation.
OUTAGE UPDATE
Updated at 3/25/2022 2:08:21 AM – The MILES CITY DC Tie has been returned to normal operation.


The MILES CITY DC Tie will be limited to 180 MW from East to West from 2200 on 3/24/2022 to 2300 on 3/25/2022.
OUTAGE UPDATE
Updated at 3/24/2022 9:59:10 PM – The MILES CITY DC Tie has been returned to normal operation.


The MILES CITY DC Tie will be limited to 100 MW from East to West from 1900 to 2200 on 3/24/2022.
OUTAGE UPDATE
Updated at 3/24/2022 7:53:32 PM – The MILES CITY DC Tie has been returned to normal operation.


The MILES CITY DC Tie will be limited to 0 MW from East to West from 1900 to 2200 on 3/24/2022.
OUTAGE UPDATE
Updated at 3/24/2022 7:52:57 PM – The MILES CITY DC Tie has been returned to normal operation.


The MILES CITY DC Tie will be limited to 0 MW from East to West from 1900 to 2200 on 3/24/2022.
OUTAGE UPDATE
Updated at 3/24/2022 7:49:36 PM – The MILES CITY DC Tie has been returned to normal operation.


The MILES CITY DC Tie will be limited to 0 MW in both directions from 04/25/2022 through 05/13/2022 1800.
OUTAGE UPDATE
Updated at 3/21/2022 12:30:00 PM (CD) - The MILES CITY DC Tie from east to west will be limited to 150 as a result of an unplanned maintenance outage from 3/21/2022 12:00:00 PM (CD) to 3/22/2022 4:00:00 PM (CD).


The MILES CITY DC Tie will be limited to 0 MW in both directions from 04/25/2022 through 05/13/2022 1800.
OUTAGE UPDATE
Updated at 3/8/2022 11:03:00 AM – The MILES CITY DC Tie has been returned to normal operation.


The MILES CITY DC Tie will be limited to 0 MW in both directions from 04/25/2022 through 05/13/2022 1800.
OUTAGE UPDATE
Updated at 3/2/2022 1:06:07 PM (CS) - The MILES CITY DC Tie from east to west will be limited to 60 as a result of a planned maintenance outage from 2/28/2022 9:00:00 AM (CS) to 3/10/2022 6:00:00 PM (CS).


The MILES CITY DC Tie will be limited to 0 MW in both directions from 04/25/2022 through 05/13/2022 1800.
OUTAGE UPDATE
Updated at 2/28/2022 4:52:52 AM (CS) - The MILES CITY DC Tie from east to west will be limited to 60 as a result of a planned maintenance outage from 2/28/2022 9:00:00 AM (CS) to 3/4/2022 6:00:00 PM (CS).


The MILES CITY DC Tie from east to west will be limited to 60 MW from 2/28/2022 @ 0900 to 03/04/2022 @ 1800. Also, the MILES CITY DC Tie will be limited to 0 MW in both directions from 04/25/2022 through 05/13/2022 1800.
OUTAGE UPDATE
Updated at 2/24/2022 12:21:05 PM – The MILES CITY DC Tie has been returned to normal operation.


The MILES CITY DC Tie from east to west will be limited to 60 MW from 2/28/2022 @ 0900 to 03/04/2022 @ 1800.
OUTAGE UPDATE
Updated at 2/8/2022 10:35:57 AM – The MILES CITY DC Tie has been returned to normal operation.


The MILES CITY DC Tie from west to east will be limited to 110 as a result of an unplanned maintenance outage from 1/26/2022 9:51:00 AM (CS) to 1/27/2022 5:00:00 PM (CS).
OUTAGE UPDATE
Updated at 1/27/2022 4:43:30 PM – The MILES CITY DC Tie has been returned to normal operation.


The MILES CITY DC Tie from west to east will be limited to 110 as a result of an unplanned maintenance outage from 1/26/2022 9:51:00 AM (CS) to 1/27/2022 5:00:00 PM (CS).
OUTAGE UPDATE
Updated at 1/27/2022 4:43:13 PM – The MILES CITY DC Tie has been returned to normal operation.


The MILES CITY DC Tie from west to east will be limited to 110 as a result of an unplanned maintenance outage from 1/26/2022 9:51:00 AM (CS) to 1/27/2022 5:00:00 PM (CS).
OUTAGE UPDATE
Updated at 1/27/2022 4:43:00 PM – The MILES CITY DC Tie has been returned to normal operation.


The MILES CITY DC Tie from west to east will be limited to 110 as a result of an unplanned maintenance outage from 1/26/2022 9:51:00 AM (CS) to 1/27/2022 5:00:00 PM (CS).
OUTAGE UPDATE
Updated at 1/27/2022 4:42:48 PM – The MILES CITY DC Tie has been returned to normal operation.


The MILES CITY DC Tie from west to east will be limited to 110 as a result of an unplanned maintenance outage from 1/26/2022 9:51:00 AM (CS) to 1/27/2022 5:00:00 PM (CS).
OUTAGE UPDATE
Updated at 1/26/2022 8:15:50 PM (CS) - The MILES CITY DC Tie from east to west will be limited to 160 as a result of an unplanned maintenance outage from 1/26/2022 8:00:00 PM (CS) to 1/27/2022 5:00:00 PM (CS).


The MILES CITY DC Tie from west to east will be limited to 110 as a result of an unplanned maintenance outage from 1/26/2022 9:51:00 AM (CS) to 1/27/2022 5:00:00 PM (CS).
OUTAGE UPDATE
Updated at 1/26/2022 9:51:41 AM (CS) - The MILES CITY DC Tie from west to east will be limited to 110 as a result of an unplanned maintenance outage from 1/26/2022 9:51:00 AM (CS) to 1/27/2022 5:00:00 PM (CS).


The MILES CITY DC Tie from north to south will be limited to 110 as a result of a planned maintenance outage from 1/25/2022 7:53:00 AM (CS) to 1/26/2022 12:00:00 AM (CS)
OUTAGE UPDATE
Updated at 1/25/2022 7:53:58 AM (CS) - The MILES CITY DC Tie from north to south will be limited to 110 as a result of a planned maintenance outage from 1/25/2022 7:53:00 AM (CS) to 1/26/2022 12:00:00 AM (CS).


MCWEST IMP limited to 120 MW
OUTAGE UPDATE
Updated at 1/25/2022 6:38:05 AM (CS) - The MILES CITY DC Tie from west to east will be limited to 120 as a result of an unplanned maintenance outage from 1/25/2022 6:30:00 AM (CS) to 1/26/2022 12:00:00 AM (CS).


MCWEST EXP limited to 165 and MCWEST IMP limited to 115 through 1/20/2022. MCWEST export and import will be limited to 0 from 4/25/2022 @ 0800 through 5/13/2022 @ 1800 for annual maintenance.
OUTAGE UPDATE
Updated at 1/20/2022 4:58:27 PM – The MILES CITY DC Tie has been returned to normal operation.


MCWEST EXP limited to 165 and MCWEST IMP limited to 115 through 1/20/2022. MCWEST export and import will be limited to 0 from 4/25/2022 @ 0800 through 5/13/2022 @ 1800 for annual maintenance.
OUTAGE UPDATE
Updated at 1/20/2022 4:55:00 PM – The MILES CITY DC Tie has been returned to normal operation.


MCWEST EXP limited to 165 and MCWEST IMP limited to 115 through 1/20/2022. MCWEST export and import will be limited to 0 from 4/25/2022 @ 0800 through 5/13/2022 @ 1800 for annual maintenance.
OUTAGE UPDATE
Updated at 1/20/2022 6:34:51 AM (CS) - The MILES CITY DC Tie from east to west will be limited to 165 as a result of an unplanned maintenance outage from 1/20/2022 6:34:00 AM (CS) to 1/21/2022 12:00:00 AM (CS).


MCWEST export and import will be limited to 0 from 4/25/2022 @ 0800 through 5/13/2022 @ 1800 for annual maintenance.
OUTAGE UPDATE
Updated at 1/13/2022 5:56:01 PM – The MILES CITY DC Tie has been returned to normal operation.


MCWEST export and import will be limited to 0 from 4/25/2022 @ 0800 through 5/13/2022 @ 1800 for annual maintenance.
OUTAGE UPDATE
Updated at 1/11/2022 8:37:52 AM (CS) - The MILES CITY DC Tie from east to west will be limited to 165 as a result of a planned maintenance outage from 1/11/2022 8:37:00 AM (CS) to 1/13/2022 6:00:00 PM (CS).


MCWEST export and import will be limited to 0 from 4/25/2022 @ 0800 through 5/13/2022 @ 1800 for annual maintenance.
OUTAGE UPDATE
Updated at 1/11/2022 8:28:39 AM (CS) - The MILES CITY DC Tie from west to east will be limited to 165 as a result of a planned maintenance outage from 1/11/2022 8:28:00 AM (CS) to 1/13/2022 6:00:00 PM (CS).


MCWEST export and import will be limited to 0 from 4/25/2022 @ 0800 through 5/13/2022 @ 1800 for annual maintenance.
OUTAGE UPDATE
Updated at 1/6/2022 8:23:42 PM – The MILES CITY DC Tie has been returned to normal operation.


MCWEST export and import will be limited to 0 from 4/25/2022 @ 0800 through 5/13/2022 @ 1800 for annual maintenance.
OUTAGE UPDATE
Updated at 1/4/2022 2:47:59 PM (CS) - The MILES CITY DC Tie from east to west will be limited to 160 as a result of an unplanned maintenance outage from 1/4/2022 2:47:00 PM (CS) to 1/6/2022 12:00:00 AM (CS).


MCWEST export and import will be limited to 0 from 4/25/2022 @ 0800 through 5/13/2022 @ 1800 for annual maintenance.
OUTAGE UPDATE
Updated at 1/4/2022 6:46:36 AM (CS) - The MILES CITY DC Tie from east to west will be limited to 155 as a result of an unplanned maintenance outage from 1/4/2022 6:48:00 AM (CS) to 1/6/2022 12:00:00 AM (CS).


MCWEST export and import will be limited to 0 from 4/25/2022 @ 0800 through 5/13/2022 @ 1800 for annual maintenance.
OUTAGE UPDATE
Updated at 12/23/2021 12:22:00 PM – The MILES CITY DC Tie has been returned to normal operation.


Miles City DC tie will be limited on 12/21/21 13:00 - 02/01/22 00:00 as follows: Imports 120 mw and Exports 170 mw. MCWEST export and import will be limited to 0 from 4/25/2022 @ 0800 through 5/13/2022 @ 1800 for annual maintenance.
OUTAGE UPDATE
Updated at 12/21/2021 1:02:02 PM (CS) - The MILES CITY DC Tie from west to east will be limited to 120 as a result of a planned maintenance outage from 12/21/2021 1:02:00 PM (CS) to 2/1/2022 12:00:00 AM (CS).


Miles City DC tie will be limited on 12/13/21 08:00 - 12/22/21 18:00 as follows: Imports 120 mw and Exports 170 mw. MCWEST export and import will be limited to 0 from 4/25/2022 @ 0800 through 5/13/2022 @ 1800 for annual maintenance.
OUTAGE UPDATE
Updated at 12/18/2021 12:25:17 PM (CS) - The MILES CITY DC Tie in both directions will be limited to 100 as a result of a planned maintenance outage from 12/19/2021 1:00:00 PM (CS) to 12/24/2021 12:00:00 AM (CS).


Miles City DC tie will be limited on 12/13/21 08:00 - 12/22/21 18:00 as follows: Imports 120 mw and Exports 170 mw. MCWEST export and import will be limited to 0 from 4/25/2022 @ 0800 through 5/13/2022 @ 1800 for annual maintenance.
OUTAGE UPDATE
Updated at 12/17/2021 3:32:44 PM (CS) - The MILES CITY DC Tie from east to west will be limited to 100 as a result of a planned maintenance outage from 12/14/2021 6:30:00 PM (CS) to 12/24/2021 12:00:00 AM (CS).


Miles City DC tie will be limited on 12/13/21 08:00 - 12/22/21 18:00 as follows: Imports 120 mw and Exports 170 mw. MCWEST export and import will be limited to 0 from 4/25/2022 @ 0800 through 5/13/2022 @ 1800 for annual maintenance.
OUTAGE UPDATE
Updated at 12/17/2021 3:31:35 PM (CS) - The MILES CITY DC Tie from west to east will be limited to 100 as a result of a planned maintenance outage from 12/14/2021 6:30:00 PM (CS) to 12/24/2021 12:00:00 AM (CS).


Miles City DC tie will be limited on 12/13/21 08:00 - 12/22/21 18:00 as follows: Imports 120 mw and Exports 170 mw. MCWEST export and import will be limited to 0 from 4/25/2022 @ 0800 through 5/13/2022 @ 1800 for annual maintenance.
OUTAGE UPDATE
Updated at 12/17/2021 3:29:27 PM (CS) - The MILES CITY DC Tie from east to west will be limited to 0 as a result of a planned maintenance outage from 12/14/2021 6:30:00 PM (CS) to 12/24/2021 12:00:00 AM (CS).


Miles City DC tie will be limited on 12/13/21 08:00 - 12/22/21 18:00 as follows: Imports 120 mw and Exports 170 mw. MCWEST export and import will be limited to 0 from 4/25/2022 @ 0800 through 5/13/2022 @ 1800 for annual maintenance.
OUTAGE UPDATE
Updated at 12/14/2021 6:30:11 PM (CS) - The MILES CITY DC Tie from north to south will be limited to 100 as a result of a planned maintenance outage from 12/14/2021 6:30:00 PM (CS) to 12/17/2021 6:00:00 PM (CS).


Miles City DC tie will be limited on 12/13/21 08:00 - 12/22/21 18:00 as follows: Imports 120 mw and Exports 170 mw. MCWEST export and import will be limited to 0 from 4/25/2022 @ 0800 through 5/13/2022 @ 1800 for annual maintenance.
OUTAGE UPDATE
Updated at 12/13/2021 8:26:38 PM (CS) - The MILES CITY DC Tie from east to west will be limited to 100 as a result of an unplanned maintenance outage from 12/13/2021 8:26:00 PM (CS) to 12/15/2021 12:00:00 AM (CS).


Miles City DC tie will be limited on 12/13/21 08:00 - 12/22/21 18:00 as follows: Imports 120 mw and Exports 170 mw. MCWEST export and import will be limited to 0 from 4/25/2022 @ 0800 through 5/13/2022 @ 1800 for annual maintenance.
OUTAGE UPDATE
Updated at 12/11/2021 4:27:54 AM – The MILES CITY DC Tie has been returned to normal operation.


Miles City DC tie will be limited on 12/13/21 08:00 - 12/22/21 18:00 as follows: Imports 120 mw and Exports 170 mw. MCWEST export and import will be limited to 0 from 4/25/2022 @ 0800 through 5/13/2022 @ 1800 for annual maintenance.
OUTAGE UPDATE
Updated at 12/11/2021 4:14:17 AM (CS) - The MILES CITY DC Tie in both directions will be limited to 0 as a result of an unplanned maintenance outage from 12/10/2021 4:14:00 AM (CS) to 12/11/2021 8:00:00 PM (CS).


Miles City DC tie will be limited on 12/13/21 08:00 - 12/22/21 18:00 as follows: Imports 120 mw and Exports 170 mw. MCWEST export and import will be limited to 0 from 4/25/2022 @ 0800 through 5/13/2022 @ 1800 for annual maintenance.
OUTAGE UPDATE
Updated at 12/10/2021 9:39:46 AM – The MILES CITY DC Tie has been returned to normal operation.


Miles City DC tie will be limited on 12/13/21 08:00 - 12/22/21 18:00 as follows: Imports 120 mw and Exports 170 mw
OUTAGE UPDATE
Updated at 12/9/2021 6:33:14 PM – The MILES CITY DC Tie has been returned to normal operation.


OUTAGE UPDATE
Updated at 12/8/2021 11:36:16 AM – The MILES CITY DC Tie has been returned to normal operation.


Miles City DC tie will be limited to 60 MW East to West from 12/13/2021 @ 0900 through 12/17/21 @ 1700.
OUTAGE UPDATE
Updated at 12/5/2021 12:19:21 AM – The MILES CITY DC Tie has been returned to normal operation.


Miles City DC tie will be limited to 60 MW East to West from 12/13/2010 @ 0900 through 12/17/21 @ 1700.
OUTAGE UPDATE
Updated at 12/5/2021 12:18:26 AM – The MILES CITY DC Tie has been returned to normal operation.


Miles City DC tie will be limited to 120 from west to east and 170 from east to west through 12/5/2021 @ 1700
OUTAGE UPDATE
Updated at 12/3/2021 9:51:19 AM – The MILES CITY DC Tie has been returned to normal operation.


Miles City DC tie will be limited to 120 from west to east and 170 from east to west on 11/29/2021 @ 0600 through 12/03/21 1800
OUTAGE UPDATE
Updated at 11/29/2021 5:08:08 AM (CS) - The MILES CITY DC Tie from west to east will be limited to 120 as a result of a planned maintenance outage from 11/29/2021 6:00:00 AM (CS) to 12/3/2021 6:00:00 PM (CS).


Miles City DC tie will be limited to 120 from west to east and 170 from east to west on 11/29/2021 @ 0600 through 12/03/21 1800
OUTAGE UPDATE
Updated at 11/24/2021 3:01:45 PM – The MILES CITY DC Tie has been returned to normal operation.


Miles City DC tie will be limited to 60 MW from East to West from 12/13/2021 at 9:00 AM until 12/17/2021 at 5:00 PM.
OUTAGE UPDATE
Updated at 11/22/2021 5:52:35 PM – The MILES CITY DC Tie has been returned to normal operation.


Miles City DC tie is limited to 140 MW from West to East and 170 East to West from 11/18/2021 at 1:00 PM until 11/24/2021 at midnight. Miles City DC tie will be limited to 60 MW from East to West from 12/13/2021 at 9:00 AM until 12/17/2021 at 5:00 PM.
OUTAGE UPDATE
Updated at 11/22/2021 5:52:24 PM – The MILES CITY DC Tie has been returned to normal operation.


Miles City DC tie is limited to 140 MW from West to East and 170 East to West from 11/18/2021 at 1:00 PM until 11/24/2021 at midnight. Miles City DC tie will be limited to 60 MW from East to West from 12/13/2021 at 9:00 AM until 12/17/2021 at 5:00 PM.
OUTAGE UPDATE
Updated at 11/20/2021 4:38:01 AM – The MILES CITY DC Tie has been returned to normal operation.


Miles City DC tie is limited to 140 MW from West to East from 11/18/2021 at 1:00 PM until 11/24/2021 at midnight. Miles City DC tie will be limited to 60 MW from East to West from 12/13/2021 at 9:00 AM until 12/17/2021 at 5:00 PM.
OUTAGE UPDATE
Updated at 11/20/2021 4:23:17 AM – The MILES CITY DC Tie has been returned to normal operation.


Miles City DC tie is limited to 140 MW from West to East from 11/18/2021 at 1:00 PM until 11/24/2021 at midnight. Miles City DC tie will be limited to 60 MW from East to West from 12/13/2021 at 9:00 AM until 12/17/2021 at 5:00 PM.
OUTAGE UPDATE
Updated at 11/19/2021 4:28:47 PM (CS) - The MILES CITY DC Tie from north to south will be limited to 120 as a result of a planned maintenance outage from 11/20/2021 4:28:47 PM (CS) to 11/20/2021 4:28:47 PM (CS).


Miles City DC tie is limited to 120 MW from West to East from 11/18/2021 at 1:00 PM until 11/24/2021 at midnight. Miles City DC tie will be limited to 60 MW from East to West from 12/13/2021 at 9:00 AM until 12/17/2021 at 5:00 PM.
OUTAGE UPDATE
Updated at 10/19/2021 10:43:00 AM (CS) - The MILES CITY DC Tie from east to west will be limited to 170 as a result of a planned maintenance outage from 11/17/2021 7:00:00 PM (CS) to 11/24/2021 12:00:00 AM (CS).


OUTAGE UPDATE
Updated at 11/16/2021 11:47:33 AM (CS) - The MILES CITY DC Tie from east to west will be limited to 0 as a result of an unplanned maintenance outage from 11/15/2021 11:47:00 AM (CS) to 11/16/2021 1:00:00 PM (CS).


OUTAGE UPDATE
Updated at 11/15/2021 11:34:39 PM (CS) - The MILES CITY DC Tie from east to west will be limited to 0 as a result of an unplanned maintenance outage from 11/15/2021 11:31:00 PM (CS) to 11/16/2021 4:00:00 PM (CS).


OUTAGE UPDATE
Updated at 11/15/2021 10:55:14 PM (CS) - The MILES CITY DC Tie in both directions will be limited to 0 as a result of an unplanned maintenance outage from 11/15/2021 10:23:00 PM (CS) to 11/16/2021 4:00:00 PM (CS).


OUTAGE UPDATE
Updated at 11/15/2021 9:02:45 AM – The MILES CITY DC Tie has been returned to normal operation.


MCWEST_EXP to 60 MW on 11/15/2021 @ 0900 through 11/19/2021 @ 1800
OUTAGE UPDATE
Updated at 11/3/2021 2:44:14 AM – The MILES CITY DC Tie has been returned to normal operation.


MCWEST_EXP to 60 MW on 11/15/2021 @ 0900 through 11/19/2021 @ 1800
OUTAGE UPDATE
Updated at 11/3/2021 12:36:36 AM – The MILES CITY DC Tie has been returned to normal operation.


MCWEST_EXP to 60 MW on 11/15/2021 @ 0900 through 11/19/2021 @ 1800
OUTAGE UPDATE
Updated at 11/3/2021 12:35:12 AM (CD) - The MILES CITY DC Tie in both directions will be limited to 0 as a result of an unplanned maintenance outage from 11/3/2021 12:35:00 AM (CD) to 11/3/2021 3:00:00 AM (CD).


MCWEST_EXP to 60 MW on 11/15/2021 @ 0900 through 11/19/2021 @ 1800
OUTAGE UPDATE
Updated at 10/28/2021 11:06:30 AM – The MILES CITY DC Tie has been returned to normal operation.


OUTAGE UPDATE
Updated at 9/16/2021 1:45:53 PM – The MILES CITY DC Tie has been returned to normal operation.


MCWEST_EXP will be limited to 60 MW on 9/28/2021 @ 0800 through 9/30/2021 @ 1400.
OUTAGE UPDATE
Updated at 8/4/2021 1:48:38 PM – The MILES CITY DC Tie has been returned to normal operation.


MCWEST_EXP will be limited to 60 MW on 8/9/2021 @ 0800 through 8/12/2021 @ 1500.
OUTAGE UPDATE
Updated at 7/9/2021 10:04:40 AM – The MILES CITY DC Tie has been returned to normal operation.


MCWEST_EXP will be limited to 60 MW on 7/13/2021 @ 0800 through 7/14/2021 @ 1500. MCWEST_EXP and MCWEST_IMP will be limited to 0 on 7/07/2021 from 0700-0900
OUTAGE UPDATE
Updated at 7/6/2021 2:46:53 PM – The MILES CITY DC Tie has been returned to normal operation.


MCWEST_EXP will be limited to 60 MW on 7/13/2021 @ 0800 through 7/14/2021 @ 1500. MCWEST_EXP and MCWEST_IMP will be limited to 0 on 7/07/2021 from 0700-0900
OUTAGE UPDATE
Updated at 7/6/2021 2:42:59 PM – The MILES CITY DC Tie has been returned to normal operation.


MCWEST_EXP will be limited to 60 MW on 7/13/2021 @ 0800 through 7/14/2021 @ 1500.
OUTAGE UPDATE
Updated at 5/14/2021 1:10:20 PM – The MILES CITY DC Tie has been returned to normal operation.


MCWEST_EXP will be limited to 60 MW on 7/13/2021 @ 0800 through 7/14/2021 @ 1500.
OUTAGE UPDATE
Updated at 5/10/2021 7:45:00 PM (CD) - The MILES CITY DC Tie in both directions will be limited to 0 as a result of a planned maintenance outage from 4/26/2021 9:00:00 AM (CD) to 5/14/2021 7:00:00 PM (CD).


OUTAGE UPDATE
Updated at 5/10/2021 7:45:00 PM (CD) - The MILES CITY DC Tie in both directions will be limited to 0 as a result of a planned maintenance outage from 4/26/2021 9:00:00 AM (CD) to 5/14/2021 7:00:00 PM (CD).


OUTAGE UPDATE
Updated at 5/10/2021 7:45:24 PM – The MILES CITY DC Tie has been returned to normal operation.


OUTAGE UPDATE
Updated at 5/10/2021 7:41:00 PM (CD) - The MILES CITY DC Tie in both directions will be limited to 0 as a result of a planned maintenance outage from 4/26/2021 9:00:00 AM (CD) to 5/14/2021 7:00:00 PM (CD).


Annual maintenance outage scheduled for 4/26/2021 – 5/14/2021. The tie will be limited to 0 in both directions. 5/17/21, 5/18/21, 5/19/21 MCWest_EXP will be limited to 60 MW from 0800-1800.
OUTAGE UPDATE
Updated at 4/19/2021 2:28:30 PM (CD) - The MILES CITY DC Tie from east to west will be limited to 60 as a result of a planned maintenance outage from 5/17/2021 8:00:00 AM (CD) to 5/17/2021 6:00:00 PM (CD).


Annual maintenance outage scheduled for 4/26/2021 – 5/14/2021. The tie will be limited to 0 in both directions. 5/17/21, 5/18/21, 5/19/21 MCWest_EXP will be limited to 60 MW from 0800-1800.
OUTAGE UPDATE
Updated at 4/19/2021 2:26:34 PM – The MILES CITY DC Tie has been returned to normal operation.


Annual maintenance outage scheduled for 4/26/2021 – 5/14/2021. The tie will be limited to 0 in both directions.
OUTAGE UPDATE
Updated at 4/19/2021 2:18:52 PM (CD) - The MILES CITY DC Tie from east to west will be limited to 60 as a result of a planned maintenance outage from 5/17/2021 8:00:00 AM (CD) to 5/17/2021 6:00:00 PM (CD).


Annual maintenance outage scheduled for 4/26/2021 – 5/14/2021. The tie will be limited to 0 in both directions.
OUTAGE UPDATE
Updated at 4/9/2021 3:04:00 PM – The MILES CITY DC Tie has been returned to normal operation.


Annual maintenance outage scheduled for 4/26/2021 – 5/14/2021. The tie will be limited to 0 in both directions.
OUTAGE UPDATE
Updated at 4/9/2021 12:49:18 AM (CD) - The MILES CITY DC Tie from east to west will be limited to 60 as a result of an unplanned maintenance outage from 4/8/2021 3:45:00 PM (CD) to 4/9/2021 4:00:00 PM (CD).


Annual maintenance outage scheduled for 4/26/2021 – 5/14/2021. The tie will be limited to 0 in both directions.
OUTAGE UPDATE
Updated at 2/22/2021 9:27:27 AM – The MILES CITY DC Tie has been returned to normal operation.


Annual maintenance outage scheduled for 8/9/2021 – 8/27/2021. The tie will be limited to 0 in both directions.
OUTAGE UPDATE
Updated at 1/13/2021 7:59:03 PM – The MILES CITY DC Tie has been returned to normal operation.


Annual maintenance outage scheduled for 8/9/2021 – 8/27/2021. The tie will be limited to 0 in both directions.
OUTAGE UPDATE
Updated at 1/13/2021 6:41:49 PM (CS) - The MILES CITY DC Tie in both directions will be limited to 0 as a result of an unplanned maintenance outage from 1/13/2021 5:00:00 PM (CS) to 1/14/2021 12:00:00 AM (CS).


Annual maintenance outage scheduled for 8/9/2021 – 8/27/2021. The tie will be limited to 0 in both directions.
OUTAGE UPDATE
Updated at 1/13/2021 5:09:30 PM – The MILES CITY DC Tie has been returned to normal operation.


Annual maintenance outage scheduled for 8/9/2021 – 8/27/2021. The tie will be limited to 0 in both directions.
OUTAGE UPDATE
Updated at 1/13/2021 5:08:35 PM (CS) - The MILES CITY DC Tie in both directions will be limited to 0 as a result of an unplanned maintenance outage from 1/13/2021 5:00:00 PM (CS) to 1/13/2021 7:00:00 PM (CS).


Annual maintenance outage scheduled for 8/9/2021 – 8/27/2021. The tie will be limited to 0 in both directions.
OUTAGE UPDATE
Updated at 12/16/2020 2:39:19 AM – The MILES CITY DC Tie has been returned to normal operation.


Annual maintenance outage scheduled for 8/9/2021 – 8/27/2021. The tie will be limited to 0 in both directions.
OUTAGE UPDATE
Updated at 12/9/2020 8:31:35 AM (CS) - The MILES CITY DC Tie from east to west will be limited to 0 as a result of a planned maintenance outage from 12/13/2020 9:00:00 AM (CS) to 12/16/2020 6:00:00 PM (CS).


Annual maintenance outage scheduled for 8/9/2021 – 8/27/2021. The tie will be limited to 0 in both directions.
OUTAGE UPDATE
Updated at 12/8/2020 9:40:28 AM (CS) - The MILES CITY DC Tie from east to west will be limited to 0 as a result of a planned maintenance outage from 12/14/2020 10:00:00 AM (CS) to 12/17/2020 5:00:00 PM (CS).


OUTAGE UPDATE
Updated at 12/1/2020 5:03:37 PM (CS) - The MILES CITY DC Tie from north to south will be limited to 60 as a result of a planned maintenance outage from 12/14/2020 10:00:00 AM (CS) to 12/17/2020 5:00:00 PM (CS).


OUTAGE UPDATE
Updated at 10/10/2020 8:47:12 PM – The MILES CITY DC Tie has been returned to normal operation.


The Miles City DC Tie has a problem currently that is limiting the East-West flow to 60MW
OUTAGE UPDATE
Updated at 10/10/2020 8:46:33 PM – The MILES CITY DC Tie has been returned to normal operation.


The Miles City DC Tie has a problem currently that is limiting the East-West flow to 60MW
OUTAGE UPDATE
Updated at 10/10/2020 8:41:11 PM (CD) - The MILES CITY DC Tie from west to east will be limited to 60 as a result of an unplanned maintenance outage from 10/11/2020 8:41:11 PM (CD) to 10/12/2020 12:00:00 AM (CD).


The Miles City DC Tie has a problem currently that is limiting the East-West flow to 60MW
OUTAGE UPDATE
Updated at 10/10/2020 8:39:18 PM (CD) - The MILES CITY DC Tie from east to west will be limited to 60 as a result of a planned maintenance outage from 10/11/2020 8:39:18 PM (CD) to 10/12/2020 12:00:00 AM (CD).


The Miles City DC Tie has a problem currently that is limiting the East-West flow to 60MW
OUTAGE UPDATE
Updated at 10/10/2020 8:38:37 PM – The MILES CITY DC Tie has been returned to normal operation.


The Miles City DC Tie has a problem currently that is limiting the East-West flow to 60MW
OUTAGE UPDATE
Updated at 10/10/2020 8:35:42 PM (CD) - The MILES CITY DC Tie from east to west will be limited to 60 as a result of a planned maintenance outage from 10/11/2020 8:35:42 PM (CD) to 10/12/2020 12:00:00 AM (CD).


OUTAGE UPDATE
Updated at 10/9/2020 4:47:33 PM – The MILES CITY DC Tie has been returned to normal operation.


OUTAGE UPDATE
Updated at 9/18/2020 9:44:14 AM (CD) - The MILES CITY DC Tie in both directions will be limited to 0 as a result of a planned maintenance outage from 9/18/2020 1:00:00 AM (CD) to 10/9/2020 5:00:00 PM (CD).


MCWEST EXPORT and MCWEST IMPORT will be limited to 0 MW on 09/18/20 @ 0100 - 09/19/20 @ 2400; MCWEST EXPORT and MCWEST IMPORT will be limited to 0 MW on 09/21/20 @ 0800 - 10/9/20 @ 1700 MCWEST_EXP to 60 MW on 8/10/2020 @ 0800 through 8/20/2020 @ 1700 MCWEST_EXP to ZERO from 9/21/2020 @ 0700 through 10/9/2020 @ 1900
OUTAGE UPDATE
Updated at 9/18/2020 7:44:16 AM (CD) - The MILES CITY DC Tie from north to south will be limited to 0 as a result of a planned maintenance outage from 9/18/2020 1:00:00 AM (CD) to 9/19/2020 12:00:00 AM (CD).


MCWEST EXPORT and MCWEST IMPORT will be limited to 0 MW on 09/18/20 @ 0100 - 09/19/20 @ 2400; MCWEST EXPORT and MCWEST IMPORT will be limited to 0 MW on 09/21/20 @ 0800 - 10/9/20 @ 1700 MCWEST_EXP to 60 MW on 8/10/2020 @ 0800 through 8/20/2020 @ 1700 MCWEST_EXP to ZERO from 9/21/2020 @ 0700 through 10/9/2020 @ 1900
OUTAGE UPDATE
Updated at 9/18/2020 7:43:01 AM – The MILES CITY DC Tie has been returned to normal operation.


MCWEST EXPORT and MCWEST IMPORT will be limited to 0 MW on 09/18/20 @ 0100 - 09/19/20 @ 2400 MCWEST EXPORT and MCWEST IMPORT will be limited to 0 MW on 09/21/20 @ 0800 - 10/9/20 @ 1700 MCWEST_EXP to 60 MW on 8/10/2020 @ 0800 through 8/20/2020 @ 1700 MCWEST_EXP to ZERO from 9/21/2020 @ 0700 through 10/9/2020 @ 1900
OUTAGE UPDATE
Updated at 9/18/2020 7:40:04 AM (CD) - The MILES CITY DC Tie from north to south will be limited to 0 as a result of a planned maintenance outage from 9/18/2020 1:00:00 AM (CD) to 9/19/2020 12:00:00 AM (CD).


MCWEST EXPORT and MCWEST IMPORT will be limited to 0 MW on 09/21/20 @ 0800 - 10/9/20 @ 1700 MCWEST_EXP to 60 MW on 8/10/2020 @ 0800 through 8/20/2020 @ 1700 MCWEST_EXP to ZERO from 9/21/2020 @ 0700 through 10/9/2020 @ 1900
OUTAGE UPDATE
Updated at 8/10/2020 5:03:54 PM – The MILES CITY DC Tie has been returned to normal operation.


MCWEST EXPORT and MCWEST IMPORT will be limited to 0 MW on 09/21/20 @ 0800 - 10/9/20 @ 1700
OUTAGE UPDATE
Updated at 4/17/2020 9:39:53 AM (CD) - The MILES CITY DC Tie in both directions will be limited to 0 as a result of a planned maintenance outage from 9/21/2020 8:00:00 AM (CD) to 10/9/2020 5:00:00 PM (CD).


Per the tie operator, Miles City DC Tie minimum flow is 20 MW (deadband). WAUW BA Curtailment procedures when the minimum flow is not met may be found in this Business Practice .

Effective 11/5/2018 at 09:30 MIS service is allowed.



MCWEST EXPORT and MCWEST IMPORT will be limited to 0 MW on 04/20/2020 @ 08:00 - 05/08/2020 @ 18:00



OUTAGE UPDATE
Updated at 3/23/2020 9:40:11 AM – The MILES CITY DC Tie has been returned to normal operation.


Per the tie operator, Miles City DC Tie minimum flow is 20 MW (deadband). WAUW BA Curtailment procedures when the minimum flow is not met may be found in this Business Practice .

Effective 11/5/2018 at 09:30 MIS service is allowed.





MCWEST EXPORT and MCWEST IMPORT will be limited to 0 MW on 04/20/2020 @ 08:00 - 05/08/2020 @ 18:00



OUTAGE UPDATE
Updated at 3/23/2020 9:37:27 AM – The MILES CITY DC Tie has been returned to normal operation.


Per the tie operator, Miles City DC Tie minimum flow is 20 MW (deadband). WAUW BA Curtailment procedures when the minimum flow is not met may be found in this Business Practice .

Effective 11/5/2018 at 09:30 MIS service is allowed.

MCWEST EXPORT 60 MW on 3/24/2020 @ 0800 through 3/27/2020@ 1800 and



MCWEST EXPORT and MCWEST IMPORT will be limited to 0 MW on 04/20/2020 @ 08:00 - 05/08/2020 @ 18:00



OUTAGE UPDATE
Updated at 2/14/2020 10:45:21 AM – The MILES CITY DC Tie has been returned to normal operation.


Per the tie operator, Miles City DC Tie minimum flow is 20 MW (deadband). WAUW BA Curtailment procedures when the minimum flow is not met may be found in this Business Practice .

Effective 11/5/2018 at 09:30 MIS service is allowed.

MCWEST EXPORT 60 MW on 3/24/2020 @ 0800 through 3/27/2020@ 1800 and



MCWEST EXPORT and MCWEST IMPORT will be limited to 0 MW on 04/20/2020 @ 08:00 - 05/08/2020 @ 18:00



OUTAGE UPDATE
Updated at 2/14/2020 10:43:30 AM – The MILES CITY DC Tie has been returned to normal operation.


Per the tie operator, Miles City DC Tie minimum flow is 20 MW (deadband). WAUW BA Curtailment procedures when the minimum flow is not met may be found in this Business Practice .

Effective 11/5/2018 at 09:30 MIS service is allowed.

MCWEST EXPORT 100 MW on 12/17/2019 @ 1100 through 12/18/2019 @ 1800 and

MCWEST EXPORT will be limited to 60 MW on 12/20/2019 @ 1100 through 12/20/2019 @ 1600

MCWEST EXPORT and MCWEST IMPORT will be limited to 0 MW on 04/20/2020 @ 08:00 - 05/08/2020 @ 18:00



MCWEST EXPORT will be limited to 60mw on 12/19/2019 from 1100 to 1800
OUTAGE UPDATE
Updated at 12/18/2019 3:28:19 PM – The MILES CITY DC Tie has been returned to normal operation.


Per the tie operator, Miles City DC Tie minimum flow is 20 MW (deadband). WAUW BA Curtailment procedures when the minimum flow is not met may be found in this Business Practice .

Effective 11/5/2018 at 09:30 MIS service is allowed.

MCWEST EXPORT 100 MW on 12/17/2019 @ 1100 through 12/18/2019 @ 1800 and

MCWEST EXPORT will be limited to 60 MW on 12/20/2019 @ 1100 through 12/20/2019 @ 1600

MCWEST EXPORT and MCWEST IMPORT will be limited to 0 MW on 04/20/2020 @ 08:00 - 05/08/2020 @ 18:00

MCWEST_EXP will be limited to 60MW on 12/16/2019 from 1100 until 1600 12/16/2019

MCWEST EXPORT will be limited to 60mw on 12/19/2019 from 1100 to 1800
OUTAGE UPDATE
Updated at 12/18/2019 3:25:26 PM – The MILES CITY DC Tie has been returned to normal operation.


Per the tie operator, Miles City DC Tie minimum flow is 20 MW (deadband). WAUW BA Curtailment procedures when the minimum flow is not met may be found in this Business Practice .

Effective 11/5/2018 at 09:30 MIS service is allowed.

MCWEST EXPORT 100 MW on 12/17/2019 @ 1100 through 12/18/2019 @ 1800 and

MCWEST EXPORT will be limited to 60 MW on 12/20/2019 @ 1100 through 12/20/2019 @ 1600

MCWEST EXPORT and MCWEST IMPORT will be limited to 0 MW on 04/20/2020 @ 08:00 - 05/08/2020 @ 18:00

MCWEST_EXP will be limited to 60MW on 12/16/2019 from 1100 until 1600 12/16/2019
OUTAGE UPDATE
Updated at 12/13/2019 11:05:23 AM – The MILES CITY DC Tie has been returned to normal operation.


Per the tie operator, Miles City DC Tie minimum flow is 20 MW (deadband). WAUW BA Curtailment procedures when the minimum flow is not met may be found in this Business Practice .

Effective 11/5/2018 at 09:30 MIS service is allowed.

MCWEST EXPORT 100 MW on 12/17/2019 @ 1100 through 12/18/2019 @ 1800 and

MCWEST EXPORT will be limited to 60 MW on 12/20/2019 @ 1100 through 12/20/2019 @ 1600 MCWEST EXPORT and MCWEST IMPORT will be limited to 0 MW on 04/20/2020 @ 08:00 - 05/08/2020 @ 18:00

MCWEST_EXP will be limited to 60MW on 12/16/2019 from 1100 until 1600 12/16/2019
OUTAGE UPDATE
Updated at 12/13/2019 11:01:27 AM – The MILES CITY DC Tie has been returned to normal operation.


Per the tie operator, Miles City DC Tie minimum flow is 20 MW (deadband). WAUW BA Curtailment procedures when the minimum flow is not met may be found in this Business Practice .

Effective 11/5/2018 at 09:30 MIS service is allowed.

MCWEST EXPORT 100 MW on 12/17/2019 @ 1100 through 12/18/2019 @ 1800 and

MCWEST EXPORT 60 MW on 12/19/2019 @ 1100 through 12/19/2019 @ 1800 MCWEST EXPORT and MCWEST IMPORT will be limited to 0 MW on 04/20/2020 @ 08:00 - 05/08/2020 @ 18:00

MCWEST_EXP will be limited to 60MW on 12/16/2019 from 1100 until 1600 12/16/2019
OUTAGE UPDATE
Updated at 12/12/2019 1:55:06 PM – The MILES CITY DC Tie has been returned to normal operation.


Per the tie operator, Miles City DC Tie minimum flow is 20 MW (deadband). WAUW BA Curtailment procedures when the minimum flow is not met may be found in this Business Practice .

Effective 11/5/2018 at 09:30 MIS service is allowed.

MCWEST EXPORT 100 MW on 12/17/2019 @ 1100 through 12/18/2019 @ 1800 and

MCWEST EXPORT 60 MW on 12/19/2019 @ 1100 through 12/19/2019 @ 1800 MCWEST EXPORT and MCWEST IMPORT will be limited to 0 MW on 04/20/2020 @ 08:00 - 05/08/2020 @ 18:00 MCWEST_EXP will be limited to 60MW on 12/16/2019 from 1100 until 1600 12/16/2019
OUTAGE UPDATE
Updated at 12/12/2019 1:53:48 PM – The MILES CITY DC Tie has been returned to normal operation.


Per the tie operator, Miles City DC Tie minimum flow is 20 MW (deadband). WAUW BA Curtailment procedures when the minimum flow is not met may be found in this Business Practice .

Effective 11/5/2018 at 09:30 MIS service is allowed.

MCWEST EXPORT 100 MW on 12/17/2019 @ 1100 through 12/18/2019 @ 1800 and

MCWEST EXPORT 60 MW on 12/19/2019 @ 1100 through 12/19/2019 @ 1800 MCWEST EXPORT and MCWEST IMPORT will be limited to 0 MW on 04/20/2020 @ 08:00 - 05/08/2020 @ 18:00 MCWEST_EXP will be limited to 60MW on 12/16/2019 from 1100 until 1600 12/16/2019
OUTAGE UPDATE
Updated at 12/12/2019 1:51:56 PM – The MILES CITY DC Tie has been returned to normal operation.


Per the tie operator, Miles City DC Tie minimum flow is 20 MW (deadband). WAUW BA Curtailment procedures when the minimum flow is not met may be found in this Business Practice .

Effective 11/5/2018 at 09:30 MIS service is allowed.

MCWEST EXPORT 100 MW on 12/17/2019 @ 1100 through 12/18/2019 @ 1800 and MCWEST EXPORT 60 MW on 12/19/2019 @ 1100 through 12/19/2019 @ 1800 MCWEST EXPORT and MCWEST IMPORT will be limited to 0 MW on 04/20/2020 @ 08:00 - 05/08/2020 @ 18:00 MCWEST_EXP will be limited to 60MW on 12/16/2019 from 1100 until 1600 12/16/2019
OUTAGE UPDATE
Updated at 12/12/2019 1:41:53 PM – The MILES CITY DC Tie has been returned to normal operation.


Per the tie operator, Miles City DC Tie minimum flow is 20 MW (deadband). WAUW BA Curtailment procedures when the minimum flow is not met may be found in this Business Practice .

Effective 11/5/2018 at 09:30 MIS service is allowed.

MCWEST EXPORT 100 MW on 12/17/2019 @ 1100 through 12/18/2019 @ 1800 and MCWEST EXPORT 60 MW on 12/19/2019 @ 1100 through 12/19/2019 @ 1800 MCWEST EXPORT and MCWEST IMPORT will be limited to 0 MW on 04/20/2020 @ 08:00 - 05/08/2020 @ 18:00
OUTAGE UPDATE
Updated at 12/10/2019 1:06:12 PM – The MILES CITY DC Tie has been returned to normal operation.


Per the tie operator, Miles City DC Tie minimum flow is 20 MW (deadband). WAUW BA Curtailment procedures when the minimum flow is not met may be found in this Business Practice .

Effective 11/5/2018 at 09:30 MIS service is allowed.

MCWEST EXPORT 100 MW on 12/17/2019 @ 1100 through 12/18/2019 @ 1800 and MCWEST EXPORT 60 MW on 12/19/2019 @ 1100 through 12/19/2019 @ 1800 MCWEST EXPORT and MCWEST IMPORT will be limited to 0 MW on 04/20/2020 @ 08:00 - 05/08/2020 @ 18:00
OUTAGE UPDATE
Updated at 12/10/2019 1:06:02 PM – The MILES CITY DC Tie has been returned to normal operation.


Per the tie operator, Miles City DC Tie minimum flow is 20 MW (deadband). WAUW BA Curtailment procedures when the minimum flow is not met may be found in this Business Practice .

Effective 11/5/2018 at 09:30 MIS service is allowed.

MCWEST EXPORT 100 MW on 12/17/2019 @ 1100 through 12/18/2019 @ 1800 and MCWEST EXPORT 60 MW on 12/19/2019 @ 1100 through 12/19/2019 @ 1800 MCWEST EXPORT and MCWEST IMPORT will be limited to 0 MW on 04/20/2020 @ 08:00 - 05/08/2020 @ 18:00
OUTAGE UPDATE
Updated at 12/10/2019 1:01:55 PM – The MILES CITY DC Tie has been returned to normal operation.


Per the tie operator, Miles City DC Tie minimum flow is 20 MW (deadband). WAUW BA Curtailment procedures when the minimum flow is not met may be found in this Business Practice .

Effective 11/5/2018 at 09:30 MIS service is allowed.

MCWEST EXPORT 100 MW on 12/17/2019 @ 1100 through 12/18/2019 @ 1800 and MCWEST EXPORT 60 MW on 12/19/2019 @ 1100 through 12/19/2019 @ 1800
OUTAGE UPDATE
Updated at 12/9/2019 4:06:10 PM – The MILES CITY DC Tie has been returned to normal operation.


Per the tie operator, Miles City DC Tie minimum flow is 20 MW (deadband). WAUW BA Curtailment procedures when the minimum flow is not met may be found in this Business Practice .

Effective 11/5/2018 at 09:30 MIS service is allowed.

MCWEST EXPORT 100 MW on 12/17/2019 @ 1100 through 12/18/2019 @ 1800 and MCWEST EXPORT 60 MW on 12/19/2019 @ 1100 through 12/19/2019 @ 1800
OUTAGE UPDATE
Updated at 12/9/2019 12:52:00 PM (CS) - The MILES CITY DC Tie from east to west will be limited to 100 as a result of an unplanned maintenance outage from 12/9/2019 12:52:00 PM (CS) to 12/10/2019 12:00:00 AM (CS).


Per the tie operator, Miles City DC Tie minimum flow is 20 MW (deadband). WAUW BA Curtailment procedures when the minimum flow is not met may be found in this Business Practice .

Effective 11/5/2018 at 09:30 MIS service is allowed.

OUTAGE UPDATE
Updated at 12/9/2019 12:52:42 PM (CS) - The MILES CITY DC Tie from east to west will be limited to 100 as a result of an unplanned maintenance outage from 12/10/2019 12:52:42 PM (CS) to 12/10/2019 12:00:00 AM (CS).


Per the tie operator, Miles City DC Tie minimum flow is 20 MW (deadband). WAUW BA Curtailment procedures when the minimum flow is not met may be found in this Business Practice .

Effective 11/5/2018 at 09:30 MIS service is allowed.

OUTAGE UPDATE
Updated at 11/30/2019 1:57:00 PM – The MILES CITY DC Tie has been returned to normal operation.


Per the tie operator, Miles City DC Tie minimum flow is 20 MW (deadband). WAUW BA Curtailment procedures when the minimum flow is not met may be found in this Business Practice .

Effective 11/5/2018 at 09:30 MIS service is allowed.

OUTAGE UPDATE
Updated at 11/30/2019 8:05:43 AM (CS) - The MILES CITY DC Tie from east to west will be limited to 60 as a result of a planned maintenance outage from 11/30/2019 4:00:00 AM (CS) to 12/1/2019 12:00:00 AM (CS).


Per the tie operator, Miles City DC Tie minimum flow is 20 MW (deadband). WAUW BA Curtailment procedures when the minimum flow is not met may be found in this Business Practice .

Effective 11/5/2018 at 09:30 MIS service is allowed.

OUTAGE UPDATE
Updated at 11/30/2019 12:14:37 AM (CS) - The MILES CITY DC Tie from east to west will be limited to 60 as a result of an unplanned maintenance outage from 11/30/2019 12:00:00 AM (CS) to 11/30/2019 4:00:00 AM (CS).


Per the tie operator, Miles City DC Tie minimum flow is 20 MW (deadband). WAUW BA Curtailment procedures when the minimum flow is not met may be found in this Business Practice .

Effective 11/5/2018 at 09:30 MIS service is allowed.

OUTAGE UPDATE
Updated at 11/14/2019 9:48:41 AM – The MILES CITY DC Tie has been returned to normal operation.


Per the tie operator, Miles City DC Tie minimum flow is 20 MW (deadband). WAUW BA Curtailment procedures when the minimum flow is not met may be found in this Business Practice .

Effective 11/5/2018 at 09:30 MIS service is allowed.

OUTAGE UPDATE
Updated at 10/9/2019 10:40:40 AM (CD) - The MILES CITY DC Tie from east to west will be limited to 60 as a result of a planned maintenance outage from 9/30/2019 9:00:00 AM (CD) to 10/12/2019 6:00:00 PM (CD).


Per the tie operator, Miles City DC Tie minimum flow is 20 MW (deadband). WAUW BA Curtailment procedures when the minimum flow is not met may be found in this Business Practice .

Effective 11/5/2018 at 09:30 MIS service is allowed.

9/30/2019 @ 0900 through 10/12/2019 @ 1800 MCWEST_EXP 60 MW; MCWEST_IMP no change 10/15/2019 @ 0900 through 10/17/2019 @ 1800 MCWEST_EXP 60 MW; MCWEST_IMP no change
OUTAGE UPDATE
Updated at 9/30/2019 1:30:47 PM (CD) - The MILES CITY DC Tie from east to west will be limited to 60 as a result of a planned maintenance outage from 10/1/2019 9:00:00 AM (CD) to 10/17/2019 6:00:00 PM (CD).


Per the tie operator, Miles City DC Tie minimum flow is 20 MW (deadband). WAUW BA Curtailment procedures when the minimum flow is not met may be found in this Business Practice .

Effective 11/5/2018 at 09:30 MIS service is allowed.

9/30/2019 @ 0900 through 10/12/2019 @ 1800 MCWEST_EXP 60 MW; MCWEST_IMP no change 10/15/2019 @ 0900 through 10/17/2019 @ 1800 MCWEST_EXP 60 MW; MCWEST_IMP no change
OUTAGE UPDATE
Updated at 9/30/2019 1:27:22 PM – The MILES CITY DC Tie has been returned to normal operation.


Per the tie operator, Miles City DC Tie minimum flow is 20 MW (deadband). WAUW BA Curtailment procedures when the minimum flow is not met may be found in this Business Practice .

Effective 11/5/2018 at 09:30 MIS service is allowed.

OUTAGE UPDATE
Updated at 9/19/2019 9:35:07 PM – The MILES CITY DC Tie has been returned to normal operation.


Per the tie operator, Miles City DC Tie minimum flow is 20 MW (deadband). WAUW BA Curtailment procedures when the minimum flow is not met may be found in this Business Practice .

Effective 11/5/2018 at 09:30 MIS service is allowed.

OUTAGE UPDATE
Updated at 9/19/2019 8:37:56 PM (CD) - The MILES CITY DC Tie in both directions will be limited to 0 as a result of an unplanned maintenance outage from 9/19/2019 8:37:00 PM (CD) to 9/20/2019 12:00:00 AM (CD).


Per the tie operator, Miles City DC Tie minimum flow is 20 MW (deadband). WAUW BA Curtailment procedures when the minimum flow is not met may be found in this Business Practice .

Effective 11/5/2018 at 09:30 MIS service is allowed.

OUTAGE UPDATE
Updated at 9/13/2019 12:35:00 PM (CD) - The MILES CITY DC Tie from east to west will be limited to 60 as a result of a planned maintenance outage from 9/30/2019 9:00:00 AM (CD) to 10/12/2019 6:00:00 PM (CD).


Per the tie operator, Miles City DC Tie minimum flow is 20 MW (deadband). WAUW BA Curtailment procedures when the minimum flow is not met may be found in this Business Practice .

Effective 11/5/2018 at 09:30 MIS service is allowed.

OUTAGE UPDATE
Updated at 8/6/2019 5:49:00 AM – The MILES CITY DC Tie has been returned to normal operation.


Per the tie operator, Miles City DC Tie minimum flow is 20 MW (deadband). WAUW BA Curtailment procedures when the minimum flow is not met may be found in this Business Practice .

Effective 11/5/2018 at 09:30 MIS service is allowed.

OUTAGE UPDATE
Updated at 8/6/2019 1:14:18 AM (CD) - The MILES CITY DC Tie in both directions will be limited to 0 as a result of a planned maintenance outage from 8/6/2019 8:00:00 AM (CD) to 8/6/2019 12:00:00 PM (CD).


Per the tie operator, Miles City DC Tie minimum flow is 20 MW (deadband). WAUW BA Curtailment procedures when the minimum flow is not met may be found in this Business Practice .

Effective 11/5/2018 at 09:30 MIS service is allowed. Mile City West will be limited to 0 MWs from 8/6/2019 @ 0900 through 8/6/2019 @ 1800.

OUTAGE UPDATE
Updated at 7/8/2019 12:48:53 AM – The MILES CITY DC Tie has been returned to normal operation.


Per the tie operator, Miles City DC Tie minimum flow is 20 MW (deadband). WAUW BA Curtailment procedures when the minimum flow is not met may be found in this Business Practice .

Effective 11/5/2018 at 09:30 MIS service is allowed. Mile City West will be limited to 0 MWs from 8/6/2019 @ 0900 through 8/6/2019 @ 1800.

OUTAGE UPDATE
Updated at 7/4/2019 7:32:08 PM (CD) - The MILES CITY DC Tie in both directions will be limited to 0 as a result of an unplanned maintenance outage from 7/4/2019 7:32:00 PM (CD) to 7/6/2019 12:00:00 AM (CD).


Per the tie operator, Miles City DC Tie minimum flow is 20 MW (deadband). WAUW BA Curtailment procedures when the minimum flow is not met may be found in this Business Practice .

Effective 11/5/2018 at 09:30 MIS service is allowed. Mile City West will be limited to 0 MWs from 8/6/2019 @ 0900 through 8/6/2019 @ 1800.

OUTAGE UPDATE
Updated at 7/4/2019 7:31:59 PM – The MILES CITY DC Tie has been returned to normal operation.


Per the tie operator, Miles City DC Tie minimum flow is 20 MW (deadband). WAUW BA Curtailment procedures when the minimum flow is not met may be found in this Business Practice .

Effective 11/5/2018 at 09:30 MIS service is allowed. Mile City West will be limited to 0 MWs from 8/6/2019 @ 0900 through 8/6/2019 @ 1800.

OUTAGE UPDATE
Updated at 7/4/2019 7:30:01 PM (CD) - The MILES CITY DC Tie in both directions will be limited to 0 as a result of an unplanned maintenance outage from 7/4/2019 7:30:00 PM (CD) to 7/6/2019 12:00:00 AM (CD).


Per the tie operator, Miles City DC Tie minimum flow is 20 MW (deadband). WAUW BA Curtailment procedures when the minimum flow is not met may be found in this Business Practice .

Effective 11/5/2018 at 09:30 MIS service is allowed. Mile City West will be limited to 0 MWs from 8/6/2019 @ 0900 through 8/6/2019 @ 1800.

OUTAGE UPDATE
Updated at 7/4/2019 4:55:00 AM (CD) - The MILES CITY DC Tie in both directions will be limited to 0 as a result of an unplanned maintenance outage from 7/4/2019 4:55:00 AM (CD) to 7/5/2019 12:00:00 AM (CD).


Per the tie operator, Miles City DC Tie minimum flow is 20 MW (deadband). WAUW BA Curtailment procedures when the minimum flow is not met may be found in this Business Practice .

Effective 11/5/2018 at 09:30 MIS service is allowed. Mile City West will be limited to 0 MWs from 8/6/2019 @ 0900 through 8/6/2019 @ 1800.

OUTAGE UPDATE
Updated at 6/2/2019 1:32:00 PM – The MILES CITY DC Tie has been returned to normal operation.


Per the tie operator, Miles City DC Tie minimum flow is 20 MW (deadband). WAUW BA Curtailment procedures when the minimum flow is not met may be found in this Business Practice .

Effective 11/5/2018 at 09:30 MIS service is allowed. Mile City West will be limited to 0 MWs from 8/6/2019 @ 0900 through 8/6/2019 @ 1800.

OUTAGE UPDATE
Updated at 7/2/2019 1:31:41 PM – The MILES CITY DC Tie has been returned to normal operation.


Per the tie operator, Miles City DC Tie minimum flow is 20 MW (deadband). WAUW BA Curtailment procedures when the minimum flow is not met may be found in this Business Practice .

Effective 11/5/2018 at 09:30 MIS service is allowed. Mile City West will be limited to 0 MWs from 8/6/2019 @ 0900 through 8/6/2019 @ 1800.

OUTAGE UPDATE
Updated at 7/2/2019 1:30:34 PM – The MILES CITY DC Tie has been returned to normal operation.


Per the tie operator, Miles City DC Tie minimum flow is 20 MW (deadband). WAUW BA Curtailment procedures when the minimum flow is not met may be found in this Business Practice .

Effective 11/5/2018 at 09:30 MIS service is allowed.

OUTAGE UPDATE
Updated at 5/20/2019 6:35:26 AM – The MILES CITY DC Tie has been returned to normal operation.


Per the tie operator, Miles City DC Tie minimum flow is 20 MW (deadband). WAUW BA Curtailment procedures when the minimum flow is not met may be found in this Business Practice .

Effective 11/5/2018 at 09:30 MIS service is allowed.

OUTAGE UPDATE
Updated at 5/10/2019 5:10:18 PM (CD) - The MILES CITY DC Tie in both directions will be limited to 0 as a result of an unplanned maintenance outage from 5/10/2019 5:00:00 PM (CD) to 5/10/2019 6:00:00 PM (CD).


Per the tie operator, Miles City DC Tie minimum flow is 20 MW (deadband). WAUW BA Curtailment procedures when the minimum flow is not met may be found in this Business Practice .

Effective 11/5/2018 at 09:30 MIS service is allowed.

OUTAGE UPDATE
Updated at 5/10/2019 2:30:09 PM – The MILES CITY DC Tie has been returned to normal operation.


Per the tie operator, Miles City DC Tie minimum flow is 20 MW (deadband). WAUW BA Curtailment procedures when the minimum flow is not met may be found in this Business Practice .

Effective 11/5/2018 at 09:30 MIS service is allowed.

OUTAGE UPDATE
Updated at 4/22/2019 7:41:47 AM (CD) - The MILES CITY DC Tie in both directions will be limited to 0 as a result of a planned maintenance outage from 4/22/2019 8:00:00 AM (CD) to 5/10/2019 7:00:00 PM (CD).


Per the tie operator, Miles City DC Tie minimum flow is 20 MW (deadband). WAUW BA Curtailment procedures when the minimum flow is not met may be found in this Business Practice .

Effective 11/5/2018 at 09:30 MIS service is allowed.

OUTAGE UPDATE
Updated at 3/12/2019 8:03:37 AM – The MILES CITY DC Tie has been returned to normal operation.


Per the tie operator, Miles City DC Tie minimum flow is 20 MW (deadband). WAUW BA Curtailment procedures when the minimum flow is not met may be found in this Business Practice .

Effective 11/5/2018 at 09:30 MIS service is allowed.

OUTAGE UPDATE
Updated at 3/11/2019 12:00:00 PM (CD) - The MILES CITY DC Tie from east to west will be limited to 20 as a result of an unplanned maintenance outage from 3/11/2019 12:00:00 PM (CD) to 3/14/2019 5:00:00 PM (CD).


Per the tie operator, Miles City DC Tie minimum flow is 20 MW (deadband). WAUW BA Curtailment procedures when the minimum flow is not met may be found in this Business Practice .

Effective 11/5/2018 at 09:30 MIS service is allowed.

OUTAGE UPDATE
Updated at 3/1/2019 4:23:25 PM – The MILES CITY DC Tie has been returned to normal operation.


Per the tie operator, Miles City DC Tie minimum flow is 20 MW (deadband). WAUW BA Curtailment procedures when the minimum flow is not met may be found in this Business Practice .

Effective 11/5/2018 at 09:30 MIS service is allowed.

OUTAGE UPDATE
Updated at 2/28/2019 4:29:11 PM (CS) - The MILES CITY DC Tie from north to south will be limited to 0 as a result of a planned maintenance outage from 2/28/2019 3:30:00 PM (CS) to 3/28/2019 6:00:00 PM (CS).


Per the tie operator, Miles City DC Tie minimum flow is 20 MW (deadband). WAUW BA Curtailment procedures when the minimum flow is not met may be found in this Business Practice .

Effective 11/5/2018 at 09:30 MIS service is allowed.

OUTAGE UPDATE
Updated at 2/28/2019 3:22:11 PM (CS) - The MILES CITY DC Tie in both directions will be limited to 0 as a result of an unplanned maintenance outage from 3/1/2019 3:30:00 PM (CS) to 3/1/2019 5:00:00 PM (CS).


Per the tie operator, Miles City DC Tie minimum flow is 20 MW (deadband). WAUW BA Curtailment procedures when the minimum flow is not met may be found in this Business Practice .

Effective 11/5/2018 at 09:30 MIS service is allowed.

OUTAGE UPDATE
Updated at 1/17/2019 7:10:31 PM – The MILES CITY DC Tie has been returned to normal operation.


Per the tie operator, Miles City DC Tie minimum flow is 20 MW (deadband). WAUW BA Curtailment procedures when the minimum flow is not met may be found in this Business Practice .

Effective 11/5/2018 at 09:30 MIS service is allowed.

OUTAGE UPDATE
Updated at 1/17/2019 7:09:36 PM – The MILES CITY DC Tie has been returned to normal operation.


Per the tie operator, Miles City DC Tie minimum flow is 20 MW (deadband). WAUW BA Curtailment procedures when the minimum flow is not met may be found in this Business Practice .

Effective 11/5/2018 at 09:30 MIS service is allowed.

OUTAGE UPDATE
Updated at 1/15/2019 4:35:32 AM (CS) - The MILES CITY DC Tie in both directions will be limited to 0 as a result of an unplanned maintenance outage from 1/6/2019 6:00:00 PM (CS) to 1/23/2019 12:00:00 AM (CS).


Per the tie operator, Miles City DC Tie minimum flow is 20 MW (deadband). WAUW BA Curtailment procedures when the minimum flow is not met may be found in this Business Practice .

Effective 11/5/2018 at 09:30 MIS service is allowed.

OUTAGE UPDATE
Updated at 1/14/2019 5:00:08 PM (CS) - The MILES CITY DC Tie in both directions will be limited to 0 as a result of a planned maintenance outage from 1/14/2019 5:00:00 PM (CS) to 1/22/2019 5:00:00 PM (CS).


Per the tie operator, Miles City DC Tie minimum flow is 20 MW (deadband). WAUW BA Curtailment procedures when the minimum flow is not met may be found in this Business Practice .

Effective 11/5/2018 at 09:30 MIS service is allowed.

OUTAGE UPDATE
Updated at 1/14/2019 4:48:06 AM (CS) - The MILES CITY DC Tie in both directions will be limited to 0 as a result of an unplanned maintenance outage from 1/6/2019 12:00:00 AM (CS) to 1/16/2019 12:00:00 AM (CS).


Per the tie operator, Miles City DC Tie minimum flow is 20 MW (deadband). WAUW BA Curtailment procedures when the minimum flow is not met may be found in this Business Practice .

Effective 11/5/2018 at 09:30 MIS service is allowed.

OUTAGE UPDATE
Updated at 1/11/2019 9:35:09 AM (CS) - The MILES CITY DC Tie in both directions will be limited to 0 as a result of an unplanned maintenance outage from 1/6/2019 12:00:00 AM (CS) to 1/15/2019 12:00:00 AM (CS).


Per the tie operator, Miles City DC Tie minimum flow is 20 MW (deadband). WAUW BA Curtailment procedures when the minimum flow is not met may be found in this Business Practice .

Effective 11/5/2018 at 09:30 MIS service is allowed.

OUTAGE UPDATE
Updated at 1/9/2019 3:44:03 PM (CS) - The MILES CITY DC Tie in both directions will be limited to 0 as a result of an unplanned maintenance outage from 1/6/2019 12:00:00 AM (CS) to 1/12/2019 12:00:00 AM (CS).


Per the tie operator, Miles City DC Tie minimum flow is 20 MW (deadband). WAUW BA Curtailment procedures when the minimum flow is not met may be found in this Business Practice .

Effective 11/5/2018 at 09:30 MIS service is allowed.

OUTAGE UPDATE
Updated at 1/9/2019 3:37:43 PM – The MILES CITY DC Tie has been returned to normal operation.


Per the tie operator, Miles City DC Tie minimum flow is 20 MW (deadband). WAUW BA Curtailment procedures when the minimum flow is not met may be found in this Business Practice .

Effective 11/5/2018 at 09:30 MIS service is allowed.

OUTAGE UPDATE
Updated at 1/9/2019 3:36:44 PM (CS) - The MILES CITY DC Tie in both directions will be limited to 0 as a result of an unplanned maintenance outage from 1/6/2019 12:00:00 AM (CS) to 1/12/2019 12:00:00 AM (CS).


Per the tie operator, Miles City DC Tie minimum flow is 20 MW (deadband). WAUW BA Curtailment procedures when the minimum flow is not met may be found in this Business Practice .

Effective 11/5/2018 at 09:30 MIS service is allowed.

OUTAGE UPDATE
Updated at 1/8/2019 4:09:47 PM (CS) - The MILES CITY DC Tie in both directions will be limited to 0 as a result of an unplanned maintenance outage from 1/6/2019 12:00:00 AM (CS) to 1/11/2019 12:00:00 AM (CS).


Per the tie operator, Miles City DC Tie minimum flow is 20 MW (deadband). WAUW BA Curtailment procedures when the minimum flow is not met may be found in this Business Practice .

Effective 11/5/2018 at 09:30 MIS service is allowed.

OUTAGE UPDATE
Updated at 1/8/2019 4:09:34 PM – The MILES CITY DC Tie has been returned to normal operation.


Per the tie operator, Miles City DC Tie minimum flow is 20 MW (deadband). WAUW BA Curtailment procedures when the minimum flow is not met may be found in this Business Practice .

Effective 11/5/2018 at 09:30 MIS service is allowed.

OUTAGE UPDATE
Updated at 1/8/2019 4:08:44 PM (CS) - The MILES CITY DC Tie in both directions will be limited to 0 as a result of an unplanned maintenance outage from 1/6/2019 8:00:00 PM (CS) to 1/11/2019 12:00:00 AM (CS).


Per the tie operator, Miles City DC Tie minimum flow is 20 MW (deadband). WAUW BA Curtailment procedures when the minimum flow is not met may be found in this Business Practice .

Effective 11/5/2018 at 09:30 MIS service is allowed.

OUTAGE UPDATE
Updated at 1/7/2019 4:55:43 PM (CS) - The MILES CITY DC Tie in both directions will be limited to 0 as a result of an unplanned maintenance outage from 1/6/2019 8:00:00 PM (CS) to 1/9/2019 12:00:00 AM (CS).


Per the tie operator, Miles City DC Tie minimum flow is 20 MW (deadband). WAUW BA Curtailment procedures when the minimum flow is not met may be found in this Business Practice .

Effective 11/5/2018 at 09:30 MIS service is allowed.

OUTAGE UPDATE
Updated at 1/6/2019 8:25:21 PM (CS) - The MILES CITY DC Tie in both directions will be limited to 0 as a result of an unplanned maintenance outage from 1/6/2019 8:00:00 PM (CS) to 1/8/2019 12:00:00 AM (CS).


Per the tie operator, Miles City DC Tie minimum flow is 20 MW (deadband). WAUW BA Curtailment procedures when the minimum flow is not met may be found in this Business Practice .

Effective 11/5/2018 at 09:30 MIS service is allowed.

OUTAGE UPDATE
Updated at 1/6/2019 6:51:31 PM – The MILES CITY DC Tie has been returned to normal operation.


Per the tie operator, Miles City DC Tie minimum flow is 20 MW (deadband). WAUW BA Curtailment procedures when the minimum flow is not met may be found in this Business Practice .

Effective 11/5/2018 at 09:30 MIS service is allowed.

OUTAGE UPDATE
Updated at 1/5/2019 3:21:21 PM (CS) - The MILES CITY DC Tie in both directions will be limited to 0 as a result of an unplanned maintenance outage from 1/5/2019 1:15:00 AM (CS) to 1/7/2019 12:00:00 AM (CS).


Per the tie operator, Miles City DC Tie minimum flow is 20 MW (deadband). WAUW BA Curtailment procedures when the minimum flow is not met may be found in this Business Practice .

Effective 11/5/2018 at 09:30 MIS service is allowed.

OUTAGE UPDATE
Updated at 1/5/2019 12:53:09 AM (CS) - The MILES CITY DC Tie in both directions will be limited to 0 as a result of an unplanned maintenance outage from 1/4/2019 5:45:00 PM (CS) to 1/6/2019 12:00:00 AM (CS).


Per the tie operator, Miles City DC Tie minimum flow is 20 MW (deadband). WAUW BA Curtailment procedures when the minimum flow is not met may be found in this Business Practice .

Effective 11/5/2018 at 09:30 MIS service is allowed.

OUTAGE UPDATE
Updated at 1/4/2019 5:56:52 PM (CS) - The MILES CITY DC Tie in both directions will be limited to 0 as a result of an unplanned maintenance outage from 1/4/2019 5:56:00 PM (CS) to 1/5/2019 5:56:52 PM (CS).


Per the tie operator, Miles City DC Tie minimum flow is 20 MW (deadband). WAUW BA Curtailment procedures when the minimum flow is not met may be found in this Business Practice .

Effective 11/5/2018 at 09:30 MIS service is allowed.

OUTAGE UPDATE
Updated at 12/27/2018 5:48:40 PM – The MILES CITY DC Tie has been returned to normal operation.


Per the tie operator, Miles City DC Tie minimum flow is 20 MW (deadband). WAUW BA Curtailment procedures when the minimum flow is not met may be found in this Business Practice .

Effective 11/5/2018 at 09:30 MIS service is allowed.

OUTAGE UPDATE
Updated at 12/26/2018 11:16:30 AM (CS) - The MILES CITY DC Tie in both directions will be limited to 0 as a result of a planned maintenance outage from 12/19/2018 11:16:00 AM (CS) to 1/3/2019 12:00:00 AM (CS).


Per the tie operator, Miles City DC Tie minimum flow is 20 MW (deadband). WAUW BA Curtailment procedures when the minimum flow is not met may be found in this Business Practice .

Effective 11/5/2018 at 09:30 MIS service is allowed.

OUTAGE UPDATE
Updated at 12/19/2018 10:04:21 PM (CS) - The MILES CITY DC Tie in both directions will be limited to 0 as a result of a planned maintenance outage from 12/20/2018 10:04:21 PM (CS) to 12/27/2018 12:00:00 AM (CS).


Per the tie operator, Miles City DC Tie minimum flow is 20 MW (deadband). WAUW BA Curtailment procedures when the minimum flow is not met may be found in this Business Practice .

Effective 11/5/2018 at 09:30 MIS service is allowed.

OUTAGE UPDATE
Updated at 12/19/2018 5:31:02 PM (CS) - The MILES CITY DC Tie from north to south will be limited to 0 as a result of a planned maintenance outage from 12/20/2018 5:31:02 PM (CS) to 12/27/2018 12:00:00 AM (CS).


Per the tie operator, Miles City DC Tie minimum flow is 20 MW (deadband). WAUW BA Curtailment procedures when the minimum flow is not met may be found in this Business Practice .

Effective 11/5/2018 at 09:30 MIS service is allowed.

OUTAGE UPDATE
Updated at 12/19/2018 12:24:05 AM (CS) - The MILES CITY DC Tie in both directions will be limited to 0 as a result of an unplanned maintenance outage from 12/18/2018 4:30:00 PM (CS) to 12/20/2018 12:00:00 AM (CS).


Per the tie operator, Miles City DC Tie minimum flow is 20 MW (deadband). WAUW BA Curtailment procedures when the minimum flow is not met may be found in this Business Practice .

Effective 11/5/2018 at 09:30 MIS service is allowed.

OUTAGE UPDATE
Updated at 12/18/2018 5:56:40 PM (CS) - The MILES CITY DC Tie in both directions will be limited to 0 as a result of a planned maintenance outage from 12/18/2018 5:56:00 PM (CS) to 12/19/2018 12:00:00 AM (CS).


Per the tie operator, Miles City DC Tie minimum flow is 20 MW (deadband). WAUW BA Curtailment procedures when the minimum flow is not met may be found in this Business Practice .

Effective 11/5/2018 at 09:30 MIS service is allowed.

OUTAGE UPDATE
Updated at 12/18/2018 5:56:14 PM – The MILES CITY DC Tie has been returned to normal operation.


Per the tie operator, Miles City DC Tie minimum flow is 20 MW (deadband). WAUW BA Curtailment procedures when the minimum flow is not met may be found in this Business Practice .

Effective 11/5/2018 at 09:30 MIS service is allowed.

OUTAGE UPDATE
Updated at 12/18/2018 5:54:47 PM (CS) - The MILES CITY DC Tie in both directions will be limited to 0 as a result of a planned maintenance outage from 12/18/2018 5:54:00 PM (CS) to 12/19/2018 12:00:00 AM (CS).


Per the tie operator, Miles City DC Tie minimum flow is 20 MW (deadband). WAUW BA Curtailment procedures when the minimum flow is not met may be found in this Business Practice .

Effective 11/5/2018 at 09:30 MIS service is allowed.

OUTAGE UPDATE
Updated at 12/18/2018 5:05:01 PM (CS) - The MILES CITY DC Tie in both directions will be limited to 0 as a result of a planned maintenance outage from 12/19/2018 5:05:01 PM (CS) to 12/20/2018 12:00:00 AM (CS).


Per the tie operator, Miles City DC Tie minimum flow is 20 MW (deadband). WAUW BA Curtailment procedures when the minimum flow is not met may be found in this Business Practice .

Effective 11/5/2018 at 09:30 MIS service is allowed.

OUTAGE UPDATE
Updated at 12/18/2018 5:03:45 PM (CS) - The MILES CITY DC Tie in both directions will be limited to 0 as a result of a planned maintenance outage from 12/18/2018 5:00:00 PM (CS) to 12/20/2018 12:00:00 AM (CS).


Per the tie operator, Miles City DC Tie minimum flow is 20 MW (deadband). WAUW BA Curtailment procedures when the minimum flow is not met may be found in this Business Practice .

Effective 11/5/2018 at 09:30 MIS service is allowed.

OUTAGE UPDATE
Updated at 12/18/2018 4:16:47 PM (CS) - The MILES CITY DC Tie in both directions will be limited to 0 as a result of an unplanned maintenance outage from 12/18/2018 4:00:00 AM (CS) to 12/20/2018 12:00:00 AM (CS).


Per the tie operator, Miles City DC Tie minimum flow is 20 MW (deadband). WAUW BA Curtailment procedures when the minimum flow is not met may be found in this Business Practice .

Effective 11/5/2018 at 09:30 MIS service is allowed.

OUTAGE UPDATE
Updated at 12/18/2018 3:50:00 PM – The MILES CITY DC Tie has been returned to normal operation.


Per the tie operator, Miles City DC Tie minimum flow is 20 MW (deadband). WAUW BA Curtailment procedures when the minimum flow is not met may be found in this Business Practice .

Effective 11/5/2018 at 09:30 MIS service is allowed.

OUTAGE UPDATE
Updated at 12/12/2018 11:30:00 AM (CS) - The MILES CITY DC Tie in both directions will be limited to 0 as a result of an unplanned maintenance outage from 12/12/2018 11:30:00 AM (CS) to 12/19/2018 12:00:00 AM (CS).


Per the tie operator, Miles City DC Tie minimum flow is 20 MW (deadband). WAUW BA Curtailment procedures when the minimum flow is not met may be found in this Business Practice .

Effective 11/5/2018 at 09:30 MIS service is allowed.

OUTAGE UPDATE
Updated at 12/17/2018 1:52:53 PM – The MILES CITY DC Tie has been returned to normal operation.


Per the tie operator, Miles City DC Tie minimum flow is 20 MW (deadband). WAUW BA Curtailment procedures when the minimum flow is not met may be found in this Business Practice .

Effective 11/5/2018 at 09:30 MIS service is allowed.

OUTAGE UPDATE
Updated at 12/12/2018 11:30:00 AM (CS) - The MILES CITY DC Tie in both directions will be limited to 0 as a result of an unplanned maintenance outage from 12/12/2018 11:30:00 AM (CS) to 12/19/2018 12:00:00 AM (CS).


Per the tie operator, Miles City DC Tie minimum flow is 20 MW (deadband). WAUW BA Curtailment procedures when the minimum flow is not met may be found in this Business Practice .

Effective 11/5/2018 at 09:30 MIS service is allowed.

OUTAGE UPDATE
Updated at 12/17/2018 1:50:49 PM – The MILES CITY DC Tie has been returned to normal operation.


Per the tie operator, Miles City DC Tie minimum flow is 20 MW (deadband). WAUW BA Curtailment procedures when the minimum flow is not met may be found in this Business Practice .

Effective 11/5/2018 at 09:30 MIS service is allowed.

OUTAGE UPDATE
Updated at 12/12/2018 11:30:00 AM (CS) - The MILES CITY DC Tie in both directions will be limited to 0 as a result of an unplanned maintenance outage from 12/12/2018 11:30:00 AM (CS) to 12/19/2018 12:00:00 AM (CS).


Per the tie operator, Miles City DC Tie minimum flow is 20 MW (deadband). WAUW BA Curtailment procedures when the minimum flow is not met may be found in this Business Practice .

Effective 11/5/2018 at 09:30 MIS service is allowed.

OUTAGE UPDATE
Updated at 12/14/2018 1:27:36 PM (CS) - The MILES CITY DC Tie in both directions will be limited to 0 as a result of an emergency outage from 12/12/2018 11:30:00 AM (CS) to 12/18/2018 12:00:00 AM (CS).


Per the tie operator, Miles City DC Tie minimum flow is 20 MW (deadband). WAUW BA Curtailment procedures when the minimum flow is not met may be found in this Business Practice .

Effective 11/5/2018 at 09:30 MIS service is allowed.

OUTAGE UPDATE
Updated at 12/13/2018 3:35:17 PM (CS) - The MILES CITY DC Tie in both directions will be limited to 0 as a result of an emergency outage from 12/12/2018 11:30:00 PM (CS) to 12/15/2018 12:00:00 AM (CS).


Per the tie operator, Miles City DC Tie minimum flow is 20 MW (deadband). WAUW BA Curtailment procedures when the minimum flow is not met may be found in this Business Practice .

Effective 11/5/2018 at 09:30 MIS service is allowed.

OUTAGE UPDATE
Updated at 12/12/2018 11:30:00 PM (CS) - The MILES CITY DC Tie in both directions will be limited to 0 as a result of an emergency outage from 12/12/2018 11:30:00 PM (CS) to 12/14/2018 12:00:00 AM (CS).


Per the tie operator, Miles City DC Tie minimum flow is 20 MW (deadband). WAUW BA Curtailment procedures when the minimum flow is not met may be found in this Business Practice .

Effective 11/5/2018 at 09:30 MIS service is allowed.

OUTAGE UPDATE
Updated at 12/12/2018 11:13:00 PM – The MILES CITY DC Tie has been returned to normal operation.


Per the tie operator, Miles City DC Tie minimum flow is 20 MW (deadband). WAUW BA Curtailment procedures when the minimum flow is not met may be found in this Business Practice .

Effective 11/5/2018 at 09:30 MIS service is allowed.

OUTAGE UPDATE
Updated at 12/11/2018 4:35:55 PM (CS) - The MILES CITY DC Tie in both directions will be limited to 0 as a result of an unplanned maintenance outage from 12/10/2018 7:00:00 AM (CS) to 12/13/2018 12:00:00 AM (CS).


Per the tie operator, Miles City DC Tie minimum flow is 20 MW (deadband). WAUW BA Curtailment procedures when the minimum flow is not met may be found in this Business Practice .

Effective 11/5/2018 at 09:30 MIS service is allowed.

OUTAGE UPDATE
Updated at 12/10/2018 6:05:32 PM (CS) - The MILES CITY DC Tie in both directions will be limited to 0 as a result of an unplanned maintenance outage from 12/10/2018 7:00:00 AM (CS) to 12/12/2018 12:00:00 AM (CS).


Per the tie operator, Miles City DC Tie minimum flow is 20 MW (deadband). WAUW BA Curtailment procedures when the minimum flow is not met may be found in this Business Practice .

Effective 11/5/2018 at 09:30 MIS service is allowed.

OUTAGE UPDATE
Updated at 12/11/2018 7:00:00 AM (CS) - The MILES CITY DC Tie in both directions will be limited to 0 as a result of an unplanned maintenance outage from 12/11/2018 7:00:00 AM (CS) to 12/12/2018 12:00:00 AM (CS).


Per the tie operator, Miles City DC Tie minimum flow is 20 MW (deadband). WAUW BA Curtailment procedures when the minimum flow is not met may be found in this Business Practice .

Effective 11/5/2018 at 09:30 MIS service is allowed.

OUTAGE UPDATE
Updated at 12/10/2018 11:03:56 AM (CS) - The MILES CITY DC Tie in both directions will be limited to 0 as a result of an unplanned maintenance outage from 12/11/2018 11:00:00 AM (CS) to 12/12/2018 7:00:00 AM (CS).


Per the tie operator, Miles City DC Tie minimum flow is 20 MW (deadband). WAUW BA Curtailment procedures when the minimum flow is not met may be found in this Business Practice .

Effective 11/5/2018 at 09:30 MIS service is allowed.

OUTAGE UPDATE
Updated at 12/10/2018 10:50:26 AM – The MILES CITY DC Tie has been returned to normal operation.


Per the tie operator, Miles City DC Tie minimum flow is 20 MW (deadband). WAUW BA Curtailment procedures when the minimum flow is not met may be found in this Business Practice .

Effective 11/5/2018 at 09:30 MIS service is allowed.

OUTAGE UPDATE
Updated at 12/7/2018 9:45:33 PM (CS) - The MILES CITY DC Tie in both directions will be limited to 0 as a result of an unplanned maintenance outage from 12/7/2018 9:19:00 PM (CS) to 12/11/2018 12:00:00 AM (CS).


Per the tie operator, Miles City DC Tie minimum flow is 20 MW (deadband). WAUW BA Curtailment procedures when the minimum flow is not met may be found in this Business Practice .

Effective 11/5/2018 at 09:30 MIS service is allowed.

OUTAGE UPDATE
Updated at 12/7/2018 9:42:35 PM (CS) - The MILES CITY DC Tie in both directions will be limited to 0 as a result of an unplanned maintenance outage from 12/7/2018 9:19:00 PM (CS) to 12/10/2018 6:00:00 PM (CS).


Per the tie operator, Miles City DC Tie minimum flow is 20 MW (deadband). WAUW BA Curtailment procedures when the minimum flow is not met may be found in this Business Practice .

Effective 11/5/2018 at 09:30 MIS service is allowed.

OUTAGE UPDATE
Updated at 12/7/2018 9:41:26 PM (CS) - The MILES CITY DC Tie in both directions will be limited to 0 as a result of an unplanned maintenance outage from 12/7/2018 9:19:00 PM (CS) to 12/10/2018 7:00:00 PM (CS).


Per the tie operator, Miles City DC Tie minimum flow is 20 MW (deadband). WAUW BA Curtailment procedures when the minimum flow is not met may be found in this Business Practice .

Effective 11/5/2018 at 09:30 MIS service is allowed.

OUTAGE UPDATE
Updated at 12/7/2018 6:29:39 PM – The MILES CITY DC Tie has been returned to normal operation.


Per the tie operator, Miles City DC Tie minimum flow is 20 MW (deadband). WAUW BA Curtailment procedures when the minimum flow is not met may be found in this Business Practice .

Effective 11/5/2018 at 09:30 MIS service is allowed.

OUTAGE UPDATE
Updated at 12/6/2018 6:04:26 PM (CS) - The MILES CITY DC Tie in both directions will be limited to 0 as a result of an unplanned maintenance outage from 12/3/2018 3:00:00 PM (CS) to 12/8/2018 12:00:00 AM (CS).


Per the tie operator, Miles City DC Tie minimum flow is 20 MW (deadband). WAUW BA Curtailment procedures when the minimum flow is not met may be found in this Business Practice .

Effective 11/5/2018 at 09:30 MIS service is allowed.

OUTAGE UPDATE
Updated at 12/5/2018 2:22:42 PM (CS) - The MILES CITY DC Tie in both directions will be limited to 0 as a result of an unplanned maintenance outage from 12/3/2018 3:00:00 PM (CS) to 12/7/2018 12:00:00 AM (CS).


Per the tie operator, Miles City DC Tie minimum flow is 20 MW (deadband). WAUW BA Curtailment procedures when the minimum flow is not met may be found in this Business Practice .

Effective 11/5/2018 at 09:30 MIS service is allowed.

OUTAGE UPDATE
Updated at 12/5/2018 4:48:24 AM (CS) - The MILES CITY DC Tie in both directions will be limited to 0 as a result of an unplanned maintenance outage from 12/3/2018 3:00:00 PM (CS) to 12/6/2018 12:00:00 PM (CS).


Per the tie operator, Miles City DC Tie minimum flow is 20 MW (deadband). WAUW BA Curtailment procedures when the minimum flow is not met may be found in this Business Practice .

Effective 11/5/2018 at 09:30 MIS service is allowed.

OUTAGE UPDATE
Updated at 12/4/2018 4:59:56 AM (CS) - The MILES CITY DC Tie in both directions will be limited to 0 as a result of an unplanned maintenance outage from 12/3/2018 3:00:00 PM (CS) to 12/5/2018 12:00:00 AM (CS).


Per the tie operator, Miles City DC Tie minimum flow is 20 MW (deadband). WAUW BA Curtailment procedures when the minimum flow is not met may be found in this Business Practice .

Effective 11/5/2018 at 09:30 MIS service is allowed.

OUTAGE UPDATE
Updated at 12/3/2018 3:15:16 PM (CS) - The MILES CITY DC Tie in both directions will be limited to 0 as a result of an unplanned maintenance outage from 12/3/2018 3:10:00 PM (CS) to 12/4/2018 12:00:00 AM (CS).


Per the tie operator, Miles City DC Tie minimum flow is 20 MW (deadband). WAUW BA Curtailment procedures when the minimum flow is not met may be found in this Business Practice .

Effective 11/5/2018 at 09:30 MIS service is allowed.

OUTAGE UPDATE
Updated at 12/3/2018 3:00:00 PM – The MILES CITY DC Tie has been returned to normal operation.


Per the tie operator, Miles City DC Tie minimum flow is 20 MW (deadband). WAUW BA Curtailment procedures when the minimum flow is not met may be found in this Business Practice .

Effective 11/5/2018 at 09:30 MIS service is allowed.

OUTAGE UPDATE
Updated at 12/3/2018 11:48:02 AM (CS) - The MILES CITY DC Tie in both directions will be limited to 0 as a result of an unplanned maintenance outage from 12/2/2018 8:22:00 AM (CS) to 12/4/2018 12:00:00 AM (CS).


Per the tie operator, Miles City DC Tie minimum flow is 20 MW (deadband). WAUW BA Curtailment procedures when the minimum flow is not met may be found in this Business Practice .

Effective 11/5/2018 at 09:30 MIS service is allowed.

OUTAGE UPDATE
Updated at 12/3/2018 11:45:29 AM – The MILES CITY DC Tie has been returned to normal operation.


Per the tie operator, Miles City DC Tie minimum flow is 20 MW From East to West (deadband). WAUW BA Curtailment procedures when the minimum flow is not met may be found in this Business Practice .

Effective 11/5/2018 at 09:30 MIS service is allowed.

OUTAGE UPDATE
Updated at 12/3/2018 10:21:30 AM (CS) - The MILES CITY DC Tie in both directions will be limited to 0 as a result of an unplanned maintenance outage from 12/2/2018 8:21:00 AM (CS) to 12/4/2018 12:00:00 AM (CS).


Per the tie operator, Miles City DC Tie minimum flow is 20 MW From East to West (deadband). WAUW BA Curtailment procedures when the minimum flow is not met may be found in this Business Practice .

Effective 11/5/2018 at 09:30 MIS service is allowed.

OUTAGE UPDATE
Updated at 12/3/2018 10:21:06 AM – The MILES CITY DC Tie has been returned to normal operation.


Per the tie operator, Miles City DC Tie minimum flow is 60 MW From East to West (deadband). WAUW BA Curtailment procedures when the minimum flow is not met may be found in this Business Practice .

Effective 11/5/2018 at 09:30 MIS service is allowed.

OUTAGE UPDATE
Updated at 12/2/2018 8:22:15 PM (CS) - The MILES CITY DC Tie in both directions will be limited to 0 as a result of an unplanned maintenance outage from 12/2/2018 10:00:00 AM (CS) to 12/4/2018 12:00:00 AM (CS).


Per the tie operator, Miles City DC Tie minimum flow is 60 MW From East to West (deadband). WAUW BA Curtailment procedures when the minimum flow is not met may be found in this Business Practice .

Effective 11/5/2018 at 09:30 MIS service is allowed.

OUTAGE UPDATE
Updated at 12/2/2018 8:21:14 PM (CS) - The MILES CITY DC Tie in both directions will be limited to 0 as a result of an unplanned maintenance outage from 12/3/2018 11:00:00 AM (CS) to 12/4/2018 12:00:00 AM (CS).


Per the tie operator, Miles City DC Tie minimum flow is 60 MW From East to West (deadband). WAUW BA Curtailment procedures when the minimum flow is not met may be found in this Business Practice .

Effective 11/5/2018 at 09:30 MIS service is allowed.

OUTAGE UPDATE
Updated at 12/2/2018 5:52:25 PM (CS) - The MILES CITY DC Tie in both directions will be limited to 0 as a result of an unplanned maintenance outage from 12/2/2018 12:00:00 PM (CS) to 12/3/2018 12:00:00 AM (CS).


Per the tie operator, Miles City DC Tie minimum flow is 60 MW From East to West (deadband). WAUW BA Curtailment procedures when the minimum flow is not met may be found in this Business Practice .

Effective 11/5/2018 at 09:30 MIS service is allowed.

OUTAGE UPDATE
Updated at 12/2/2018 10:40:32 AM (CS) - The MILES CITY DC Tie in both directions will be limited to 0 as a result of an unplanned maintenance outage from 12/2/2018 10:40:00 AM (CS) to 12/3/2018 12:00:00 AM (CS).


Per the tie operator, Miles City DC Tie minimum flow is 60 MW From East to West (deadband). WAUW BA Curtailment procedures when the minimum flow is not met may be found in this Business Practice .

Effective 11/5/2018 at 09:30 MIS service is allowed.

OUTAGE UPDATE
Updated at 12/2/2018 10:40:21 AM – The MILES CITY DC Tie has been returned to normal operation.


Per the tie operator, Miles City DC Tie minimum flow is 60 MW From East to West (deadband). WAUW BA Curtailment procedures when the minimum flow is not met may be found in this Business Practice .

Effective 11/5/2018 at 09:30 MIS service is allowed.

OUTAGE UPDATE
Updated at 12/2/2018 10:39:30 AM (CS) - The MILES CITY DC Tie in both directions will be limited to 0 as a result of an unplanned maintenance outage from 12/2/2018 10:15:00 AM (CS) to 12/3/2018 12:00:00 AM (CS).


Per the tie operator, Miles City DC Tie minimum flow is 60 MW From East to West (deadband). WAUW BA Curtailment procedures when the minimum flow is not met may be found in this Business Practice .

Effective 11/5/2018 at 09:30 MIS service is allowed.

OUTAGE UPDATE
Updated at 12/1/2018 8:45:00 PM – The MILES CITY DC Tie has been returned to normal operation.


Per the tie operator, Miles City DC Tie minimum flow is 60 MW From East to West (deadband). WAUW BA Curtailment procedures when the minimum flow is not met may be found in this Business Practice .

Effective 11/5/2018 at 09:30 MIS service is allowed.

OUTAGE UPDATE
Updated at 12/1/2018 6:23:39 PM (CS) - The MILES CITY DC Tie in both directions will be limited to 0 as a result of an unplanned maintenance outage from 12/1/2018 5:14:00 PM (CS) to 12/2/2018 12:00:00 AM (CS).


Per the tie operator, Miles City DC Tie minimum flow is 60 MW From East to West (deadband). WAUW BA Curtailment procedures when the minimum flow is not met may be found in this Business Practice .

Effective 11/5/2018 at 09:30 MIS service is allowed.

OUTAGE UPDATE
Updated at 12/1/2018 5:55:29 PM (CS) - The MILES CITY DC Tie in both directions will be limited to 0 as a result of an unplanned maintenance outage from 12/1/2018 5:14:00 PM (CS) to 12/2/2018 6:00:00 PM (CS).


Per the tie operator, Miles City DC Tie minimum flow is 60 MW From East to West (deadband). WAUW BA Curtailment procedures when the minimum flow is not met may be found in this Business Practice .

Effective 11/5/2018 at 09:30 MIS service is allowed.

OUTAGE UPDATE
Updated at 11/23/2018 5:22:31 PM – The MILES CITY DC Tie has been returned to normal operation.


Per the tie operator, Miles City DC Tie minimum flow is 60 MW From East to West (deadband). WAUW BA Curtailment procedures when the minimum flow is not met may be found in this Business Practice .

Effective 11/5/2018 at 09:30 MIS service is allowed.

OUTAGE UPDATE
Updated at 11/23/2018 6:11:53 AM (CS) - The MILES CITY DC Tie from east to west will be limited to 60 as a result of a planned maintenance outage from 11/24/2018 6:11:53 AM (CS) to 11/24/2018 2:00:00 PM (CS).


Per the tie operator, Miles City DC Tie minimum flow is 60 MW From East to West (deadband). WAUW BA Curtailment procedures when the minimum flow is not met may be found in this Business Practice .

Effective 11/5/2018 at 09:30 MIS service is allowed.

OUTAGE UPDATE
Updated at 11/23/2018 6:11:46 AM – The MILES CITY DC Tie has been returned to normal operation.


Per the tie operator, Miles City DC Tie minimum flow is 60 MW From East to West (deadband). WAUW BA Curtailment procedures when the minimum flow is not met may be found in this Business Practice .

Effective 11/5/2018 at 09:30 MIS service is allowed.

OUTAGE UPDATE
Updated at 11/23/2018 6:09:11 AM (CS) - The MILES CITY DC Tie from east to west will be limited to 60 as a result of a planned maintenance outage from 11/24/2018 6:09:00 AM (CS) to 11/24/2018 2:00:00 PM (CS).


Per the tie operator, Miles City DC Tie minimum flow is 20 MW (deadband). WAUW BA Curtailment procedures when the minimum flow is not met may be found in this Business Practice .

Effective 11/5/2018 at 09:30 MIS service is allowed.

OUTAGE UPDATE
Updated at 11/22/2018 10:38:25 PM – The MILES CITY DC Tie has been returned to normal operation.


Per the tie operator, Miles City DC Tie minimum flow is 20 MW (deadband). WAUW BA Curtailment procedures when the minimum flow is not met may be found in this Business Practice .

Effective 11/5/2018 at 09:30 MIS service is allowed.

OUTAGE UPDATE
Updated at 11/22/2018 10:03:14 PM (CS) - The MILES CITY DC Tie in both directions will be limited to 0 as a result of an unplanned maintenance outage from 11/23/2018 9:33:00 PM (CS) to 11/23/2018 10:33:00 PM (CS).


Per the tie operator, Miles City DC Tie minimum flow is 20 MW (deadband). WAUW BA Curtailment procedures when the minimum flow is not met may be found in this Business Practice .

Effective 11/5/2018 at 09:30 MIS service is allowed.

OUTAGE UPDATE
Updated at 11/22/2018 10:01:44 PM (CS) - The MILES CITY DC Tie in both directions will be limited to 0 as a result of an unplanned maintenance outage from 11/23/2018 9:33:00 PM (CS) to 11/23/2018 10:33:00 PM (CS).


Per the tie operator, Miles City DC Tie minimum flow is 20 MW (deadband). WAUW BA Curtailment procedures when the minimum flow is not met may be found in this Business Practice .

Effective 11/5/2018 at 09:30 MIS service is allowed.

OUTAGE UPDATE
Updated at 11/20/2018 2:07:27 PM – The MILES CITY DC Tie has been returned to normal operation.


Per the tie operator, Miles City DC Tie minimum flow is 20 MW (deadband). WAUW BA Curtailment procedures when the minimum flow is not met may be found in this Business Practice .

Effective 11/5/2018 at 09:30 MIS service is allowed.

OUTAGE UPDATE
Updated at 11/20/2018 2:07:07 PM – The MILES CITY DC Tie has been returned to normal operation.


Per the tie operator, Miles City DC Tie minimum flow is 20 MW (deadband). WAUW BA Curtailment procedures when the minimum flow is not met may be found in this Business Practice .

Effective 11/5/2018 at 09:30 MIS service is allowed.

OUTAGE UPDATE
Updated at 11/20/2018 12:58:57 PM (CS) - The MILES CITY DC Tie in both directions will be limited to 0 as a result of an unplanned maintenance outage from 11/20/2018 12:30:00 PM (CS) to 11/20/2018 2:00:00 PM (CS).


Per the tie operator, Miles City DC Tie minimum flow is 20 MW (deadband). WAUW BA Curtailment procedures when the minimum flow is not met may be found in this Business Practice .

Effective 11/5/2018 at 09:30 MIS service is allowed.

OUTAGE UPDATE
Updated at 11/19/2018 4:48:02 PM (CS) - The MILES CITY DC Tie from east to west will be limited to 60 as a result of a planned maintenance outage from 11/27/2018 9:00:00 AM (CS) to 11/29/2018 4:00:00 PM (CS).


Per the tie operator, Miles City DC Tie minimum flow is 20 MW (deadband). WAUW BA Curtailment procedures when the minimum flow is not met may be found in this Business Practice .

Effective 11/5/2018 at 09:30 MIS service is allowed.

OUTAGE UPDATE
Updated at 11/19/2018 4:46:34 PM – The MILES CITY DC Tie has been returned to normal operation.


Per the tie operator, Miles City DC Tie minimum flow is 20 MW (deadband). WAUW BA Curtailment procedures when the minimum flow is not met may be found in this Business Practice .

Effective 11/5/2018 at 09:30 MIS service is allowed.

OUTAGE UPDATE
Updated at 11/19/2018 4:36:23 PM (CS) - The MILES CITY DC Tie from east to west will be limited to 60 as a result of a planned maintenance outage from 11/27/2018 9:00:00 AM (CS) to 11/29/2018 4:00:00 PM (CS).


Per the tie operator, Miles City DC Tie minimum flow is 20 MW (deadband). WAUW BA Curtailment procedures when the minimum flow is not met may be found in this Business Practice .

Effective 11/5/2018 at 09:30 MIS service is allowed.

OUTAGE UPDATE
Updated at 11/15/2018 6:17:39 AM – The MILES CITY DC Tie has been returned to normal operation.


Per the tie operator, Miles City DC Tie minimum flow is 20 MW (deadband). WAUW BA Curtailment procedures when the minimum flow is not met may be found in this Business Practice .

Effective 11/5/2018 at 09:30 MIS service is allowed.

OUTAGE UPDATE
Updated at 11/7/2018 8:43:36 AM (CS) - The MILES CITY DC Tie from east to west will be limited to 60 as a result of an emergency outage from 11/7/2018 8:15:00 AM (CS) to 11/9/2018 5:00:00 PM (CS).


Per the tie operator, Miles City DC Tie minimum flow is 20 MW (deadband). WAUW BA Curtailment procedures when the minimum flow is not met may be found in this Business Practice .

Effective 11/5/2018 at 09:30 MIS service is allowed.

OUTAGE UPDATE
Updated at 11/7/2018 8:15:00 AM (CS) - The MILES CITY DC Tie from east to west will be limited to 0 as a result of an emergency outage from 11/7/2018 8:15:00 AM (CS) to 11/9/2018 5:00:00 PM (CS).


Per the tie operator, Miles City DC Tie minimum flow is 20 MW (deadband). WAUW BA Curtailment procedures when the minimum flow is not met may be found in this Business Practice .

Effective 11/5/2018 at 09:30 MIS service is allowed.

OUTAGE UPDATE
Updated at 11/5/2018 9:34:07 AM – The MILES CITY DC Tie has been returned to normal operation.


Per the tie operator, Miles City DC Tie minimum flow is 20 MW (deadband). WAUW BA Curtailment procedures when the minimum flow is not met may be found in this Business Practice .

Until further notice, Market Import Service(MIS) will not be allowed over the Miles City DC Tie

OUTAGE UPDATE
Updated at 10/17/2018 7:33:00 AM – The MILES CITY DC Tie has been returned to normal operation.


Per the tie operator, Miles City DC Tie minimum flow is 20 MW (deadband). WAUW BA Curtailment procedures when the minimum flow is not met may be found in this Business Practice .

Until further notice, Market Import Service(MIS) will not be allowed over the Miles City DC Tie

OUTAGE UPDATE
Updated at 10/17/2018 7:58:42 AM – The MILES CITY DC Tie has been returned to normal operation.


Per the tie operator, Miles City DC Tie minimum flow is 20 MW (deadband). WAUW BA Curtailment procedures when the minimum flow is not met may be found in this Business Practice .

Until further notice, Market Import Service(MIS) will not be allowed over the Miles City DC Tie

OUTAGE UPDATE
Updated at 10/17/2018 6:54:00 AM (CD) - The MILES CITY DC Tie in both directions will be limited to 0 as a result of an unplanned maintenance outage from 10/17/2018 6:54:00 AM (CD) to 10/17/2018 8:00:00 AM (CD).


Per the tie operator, Miles City DC Tie minimum flow is 20 MW (deadband). WAUW BA Curtailment procedures when the minimum flow is not met may be found in this Business Practice .

Until further notice, Market Import Service(MIS) will not be allowed over the Miles City DC Tie

OUTAGE UPDATE
Updated at 10/10/2018 8:50:00 AM – The MILES CITY DC Tie has been returned to normal operation.


Per the tie operator, Miles City DC Tie minimum flow is 20 MW (deadband). WAUW BA Curtailment procedures when the minimum flow is not met may be found in this Business Practice .

Until further notice, Market Import Service(MIS) will not be allowed over the Miles City DC Tie

OUTAGE UPDATE
Updated at 10/10/2018 8:01:00 AM (CD) - The MILES CITY DC Tie in both directions will be limited to 0 as a result of an unplanned maintenance outage from 10/10/2018 8:01:00 AM (CD) to 10/11/2018 8:00:00 AM (CD).


Per the tie operator, Miles City DC Tie minimum flow is 20 MW (deadband). WAUW BA Curtailment procedures when the minimum flow is not met may be found in this Business Practice .

Until further notice, Market Import Service(MIS) will not be allowed over the Miles City DC Tie

OUTAGE UPDATE
Updated at 10/10/2018 8:10:17 AM – The MILES CITY DC Tie has been returned to normal operation.


Per the tie operator, Miles City DC Tie minimum flow is 20 MW (deadband). WAUW BA Curtailment procedures when the minimum flow is not met may be found in this Business Practice .

Until further notice, Market Import Service(MIS) will not be allowed over the Miles City DC Tie

OUTAGE UPDATE
Updated at 10/10/2018 8:01:00 AM (CD) - The MILES CITY DC Tie in both directions will be limited to 0 as a result of an unplanned maintenance outage from 10/10/2018 8:01:00 AM (CD) to 10/11/2018 8:00:00 AM (CD).


Per the tie operator, Miles City DC Tie minimum flow is 20 MW (deadband). WAUW BA Curtailment procedures when the minimum flow is not met may be found in this Business Practice .

Until further notice, Market Import Service(MIS) will not be allowed over the Miles City DC Tie

OUTAGE UPDATE
Updated at 9/26/2018 8:51:07 AM – The MILES CITY DC Tie has been returned to normal operation.


Per the tie operator, Miles City DC Tie minimum flow is 30 MW (deadband). WAUW BA Curtailment procedures when the minimum flow is not met may be found in this Business Practice .

Until further notice, Market Import Service(MIS) will not be allowed over the Miles City DC Tie

OUTAGE UPDATE
Updated at 8/14/2018 9:04:00 AM – The MILES CITY DC Tie has been returned to normal operation.


Per the tie operator, Miles City DC Tie minimum flow is 30 MW (deadband). WAUW BA Curtailment procedures when the minimum flow is not met may be found in this Business Practice .

Until further notice, Market Import Service(MIS) will not be allowed over the Miles City DC Tie

OUTAGE UPDATE
Updated at 8/14/2018 3:58:42 AM (CD) - The MILES CITY DC Tie in both directions will be limited to 0 as a result of an unplanned maintenance outage from 8/14/2018 3:58:00 AM (CD) to 8/14/2018 4:00:00 PM (CD).


Per the tie operator, Miles City DC Tie minimum flow is 30 MW (deadband). WAUW BA Curtailment procedures when the minimum flow is not met may be found in this Business Practice .

Until further notice, Market Import Service(MIS) will not be allowed over the Miles City DC Tie

OUTAGE UPDATE
Updated at 8/10/2018 9:11:09 AM – The MILES CITY DC Tie has been returned to normal operation.


Per the tie operator, Miles City DC Tie minimum flow is 30 MW (deadband). WAUW BA Curtailment procedures when the minimum flow is not met may be found in this Business Practice .

Until further notice, Market Import Service(MIS) will not be allowed over the Miles City DC Tie

OUTAGE UPDATE
Updated at 8/9/2018 9:58:03 AM (CD) - The MILES CITY DC Tie in both directions will be limited to 0 as a result of a planned maintenance outage from 8/10/2018 5:00:00 AM (CD) to 8/10/2018 6:00:00 AM (CD).


Per the tie operator, Miles City DC Tie minimum flow is 30 MW (deadband). WAUW BA Curtailment procedures when the minimum flow is not met may be found in this Business Practice .

Until further notice, Market Import Service(MIS) will not be allowed over the Miles City DC Tie

OUTAGE UPDATE
Updated at 8/7/2018 11:56:00 PM – The MILES CITY DC Tie has been returned to normal operation.


Per the tie operator, Miles City DC Tie minimum flow is 30 MW (deadband). WAUW BA Curtailment procedures when the minimum flow is not met may be found in this Business Practice .

Until further notice, Market Import Service(MIS) will not be allowed over the Miles City DC Tie

OUTAGE UPDATE
Updated at 8/7/2018 11:15:00 PM (CD) - The MILES CITY DC Tie in both directions will be limited to 0 as a result of an emergency outage from 8/7/2018 10:48:00 PM (CD) to 8/9/2018 12:00:00 AM (CD).


Per the tie operator, Miles City DC Tie minimum flow is 30 MW (deadband). WAUW BA Curtailment procedures when the minimum flow is not met may be found in this Business Practice .

Until further notice, Market Import Service(MIS) will not be allowed over the Miles City DC Tie

OUTAGE UPDATE
Updated at 8/6/2018 2:01:08 PM – The MILES CITY DC Tie has been returned to normal operation.


Per the tie operator, Miles City DC Tie minimum flow is 30 MW (deadband). WAUW BA Curtailment procedures when the minimum flow is not met may be found in this Business Practice .

Until further notice, Market Import Service(MIS) will not be allowed over the Miles City DC Tie

OUTAGE UPDATE
Updated at 8/6/2018 10:08:31 AM (CD) - The MILES CITY DC Tie in both directions will be limited to 0 as a result of an unplanned maintenance outage from 8/6/2018 10:08:00 AM (CD) to 8/7/2018 12:00:00 AM (CD).


Per the tie operator, Miles City DC Tie minimum flow is 30 MW (deadband). WAUW BA Curtailment procedures when the minimum flow is not met may be found in this Business Practice .

Until further notice, Market Import Service(MIS) will not be allowed over the Miles City DC Tie

OUTAGE UPDATE
Updated at 8/6/2018 10:03:44 AM – The MILES CITY DC Tie has been returned to normal operation.


Per the tie operator, Miles City DC Tie minimum flow is 30 MW (deadband). WAUW BA Curtailment procedures when the minimum flow is not met may be found in this Business Practice .

Until further notice, Market Import Service(MIS) will not be allowed over the Miles City DC Tie

OUTAGE UPDATE
Updated at 8/6/2018 9:35:44 AM (CD) - The MILES CITY DC Tie in both directions will be limited to 0 as a result of an unplanned maintenance outage from 8/7/2018 9:35:44 AM (CD) to 8/7/2018 10:00:00 PM (CD).


Per the tie operator, Miles City DC Tie minimum flow is 30 MW (deadband). WAUW BA Curtailment procedures when the minimum flow is not met may be found in this Business Practice .

Until further notice, Market Import Service(MIS) will not be allowed over the Miles City DC Tie

OUTAGE UPDATE
Updated at 8/6/2018 5:58:00 AM – The MILES CITY DC Tie has been returned to normal operation.


Per the tie operator, Miles City DC Tie minimum flow is 30 MW (deadband). WAUW BA Curtailment procedures when the minimum flow is not met may be found in this Business Practice .

Until further notice, Market Import Service(MIS) will not be allowed over the Miles City DC Tie

OUTAGE UPDATE
Updated at 8/6/2018 5:23:47 AM (CD) - The MILES CITY DC Tie in both directions will be limited to 0 as a result of an unplanned maintenance outage from 8/6/2018 5:23:00 AM (CD) to 8/7/2018 8:00:00 PM (CD).


Per the tie operator, Miles City DC Tie minimum flow is 30 MW (deadband). WAUW BA Curtailment procedures when the minimum flow is not met may be found in this Business Practice .

Until further notice, Market Import Service(MIS) will not be allowed over the Miles City DC Tie

OUTAGE UPDATE
Updated at 7/16/2018 12:15:09 PM – The MILES CITY DC Tie has been returned to normal operation.


Per the tie operator, Miles City DC Tie minimum flow is 30 MW (deadband). WAUW BA Curtailment procedures when the minimum flow is not met may be found in this Business Practice .

Until further notice, Market Import Service(MIS) will not be allowed over the Miles City DC Tie

OUTAGE UPDATE
Updated at 7/16/2018 9:52:28 AM (CD) - The MILES CITY DC Tie in both directions will be limited to 0 as a result of a planned maintenance outage from 7/16/2018 9:52:00 AM (CD) to 7/16/2018 12:00:00 PM (CD).


Per the tie operator, Miles City DC Tie minimum flow is 30 MW (deadband). WAUW BA Curtailment procedures when the minimum flow is not met may be found in this Business Practice .

Until further notice, Market Import Service(MIS) will not be allowed over the Miles City DC Tie

OUTAGE UPDATE
Updated at 7/16/2018 9:49:43 AM (CD) - The MILES CITY DC Tie in both directions will be limited to 0 as a result of a planned maintenance outage from 7/17/2018 9:49:43 AM (CD) to 7/17/2018 12:00:00 PM (CD).


Per the tie operator, Miles City DC Tie minimum flow is 20 MW (deadband). WAUW BA Curtailment procedures when the minimum flow is not met may be found in this Business Practice .

Until further notice, Market Import Service(MIS) will not be allowed over the Miles City DC Tie

OUTAGE UPDATE
Updated at 7/12/2018 8:58:53 AM (CD) - The MILES CITY DC Tie in both directions will be limited to 0 as a result of a planned maintenance outage from 7/12/2018 1:00:00 PM (CD) to 7/16/2018 12:00:00 PM (CD).


Per the tie operator, Miles City DC Tie minimum flow is 20 MW (deadband). WAUW BA Curtailment procedures when the minimum flow is not met may be found in this Business Practice .

Until further notice, Market Import Service(MIS) will not be allowed over the Miles City DC Tie

OUTAGE UPDATE
Updated at 7/10/2018 3:52:23 PM (CD) - The MILES CITY DC Tie in both directions will be limited to 0 as a result of a planned maintenance outage from 7/10/2018 3:52:00 PM (CD) to 7/12/2018 1:00:00 PM (CD).


Per the tie operator, Miles City DC Tie minimum flow is 20 MW (deadband). WAUW BA Curtailment procedures when the minimum flow is not met may be found in this Business Practice .

Until further notice, Market Import Service(MIS) will not be allowed over the Miles City DC Tie

OUTAGE UPDATE
Updated at 7/10/2018 8:51:40 AM (CD) - The MILES CITY DC Tie in both directions will be limited to 0 as a result of a planned maintenance outage from 7/10/2018 12:00:00 AM (CD) to 7/11/2018 12:00:00 PM (CD).


Per the tie operator, Miles City DC Tie minimum flow is 20 MW (deadband). WAUW BA Curtailment procedures when the minimum flow is not met may be found in this Business Practice .

Until further notice, Market Import Service(MIS) will not be allowed over the Miles City DC Tie

OUTAGE UPDATE
Updated at 7/9/2018 10:04:42 PM – The MILES CITY DC Tie has been returned to normal operation.


Per the tie operator, Miles City DC Tie minimum flow is 20 MW (deadband). WAUW BA Curtailment procedures when the minimum flow is not met may be found in this Business Practice .

Until further notice, Market Import Service(MIS) will not be allowed over the Miles City DC Tie

OUTAGE UPDATE
Updated at 7/9/2018 3:16:04 PM (CD) - The MILES CITY DC Tie in both directions will be limited to 0 as a result of a planned maintenance outage from 7/9/2018 4:00:00 PM (CD) to 7/9/2018 10:00:00 PM (CD).


Per the tie operator, Miles City DC Tie minimum flow is 20 MW (deadband). WAUW BA Curtailment procedures when the minimum flow is not met may be found in this Business Practice .

Until further notice, Market Import Service(MIS) will not be allowed over the Miles City DC Tie

OUTAGE UPDATE
Updated at 7/9/2018 3:05:29 PM (CD) - The MILES CITY DC Tie in both directions will be limited to 0 as a result of a planned maintenance outage from 7/9/2018 4:00:00 PM (CD) to 7/9/2018 9:00:00 PM (CD).


Per the tie operator, Miles City DC Tie minimum flow is 20 MW (deadband). WAUW BA Curtailment procedures when the minimum flow is not met may be found in this Business Practice .

Until further notice, Market Import Service(MIS) will not be allowed over the Miles City DC Tie

OUTAGE UPDATE
Updated at 7/8/2018 4:36:00 PM – The MILES CITY DC Tie has been returned to normal operation.


Per the tie operator, Miles City DC Tie minimum flow is 20 MW (deadband). WAUW BA Curtailment procedures when the minimum flow is not met may be found in this Business Practice .

Until further notice, Market Import Service(MIS) will not be allowed over the Miles City DC Tie

OUTAGE UPDATE
Updated at 7/8/2018 4:10:00 PM (CD) - The MILES CITY DC Tie in both directions will be limited to 0 as a result of an unplanned maintenance outage from 7/8/2018 4:10:00 PM (CD) to 7/10/2018 4:00:00 PM (CD).


Per the tie operator, Miles City DC Tie minimum flow is 20 MW (deadband). WAUW BA Curtailment procedures when the minimum flow is not met may be found in this Business Practice .

Until further notice, Market Import Service(MIS) will not be allowed over the Miles City DC Tie

OUTAGE UPDATE
Updated at 6/29/2018 11:00:00 PM – The MILES CITY DC Tie has been returned to normal operation.


Per the tie operator, Miles City DC Tie minimum flow is 20 MW (deadband). WAUW BA Curtailment procedures when the minimum flow is not met may be found in this Business Practice .

Until further notice, Market Import Service(MIS) will not be allowed over the Miles City DC Tie

OUTAGE UPDATE
Updated at 6/29/2018 4:33:57 PM (CD) - The MILES CITY DC Tie in both directions will be limited to 0 as a result of an emergency outage from 6/29/2018 4:33:00 PM (CD) to 6/29/2018 8:00:00 PM (CD).


Per the tie operator, Miles City DC Tie minimum flow is 20 MW (deadband). WAUW BA Curtailment procedures when the minimum flow is not met may be found in this Business Practice .

Until further notice, Market Import Service(MIS) will not be allowed over the Miles City DC Tie

OUTAGE UPDATE
Updated at 6/29/2018 4:32:20 PM (CD) - The MILES CITY DC Tie in both directions will be limited to 0 as a result of an unplanned maintenance outage from 6/29/2018 4:32:00 PM (CD) to 6/29/2018 8:00:00 PM (CD).


Per the tie operator, Miles City DC Tie minimum flow is 20 MW (deadband). WAUW BA Curtailment procedures when the minimum flow is not met may be found in this Business Practice .

Until further notice, Market Import Service(MIS) will not be allowed over the Miles City DC Tie

OUTAGE UPDATE
Updated at 6/20/2018 11:35:39 AM – The MILES CITY DC Tie has been returned to normal operation.


Per the tie operator, Miles City DC Tie minimum flow is 20 MW (deadband). WAUW BA Curtailment procedures when the minimum flow is not met may be found in this Business Practice .

Until further notice, Market Import Service(MIS) will not be allowed over the Miles City DC Tie

OUTAGE UPDATE
Updated at 6/19/2018 3:39:39 PM (CD) - The MILES CITY DC Tie in both directions will be limited to 115 as a result of an emergency outage from 6/19/2018 3:39:00 PM (CD) to 6/22/2018 6:00:00 PM (CD).


Per the tie operator, Miles City DC Tie minimum flow is 20 MW (deadband). WAUW BA Curtailment procedures when the minimum flow is not met may be found in this Business Practice .

Until further notice, Market Import Service(MIS) will not be allowed over the Miles City DC Tie

OUTAGE UPDATE
Updated at 6/18/2018 6:34:07 PM – The MILES CITY DC Tie has been returned to normal operation.


Per the tie operator, Miles City DC Tie minimum flow is 20 MW (deadband). WAUW BA Curtailment procedures when the minimum flow is not met may be found in this Business Practice .

Until further notice, Market Import Service(MIS) will not be allowed over the Miles City DC Tie

OUTAGE UPDATE
Updated at 6/7/2018 9:50:02 AM (CD) - The MILES CITY DC Tie from east to west will be limited to 20 as a result of a planned maintenance outage from 6/11/2018 10:00:00 AM (CD) to 6/14/2018 6:00:00 PM (CD).


Per the tie operator, Miles City DC Tie minimum flow is 20 MW (deadband). WAUW BA Curtailment procedures when the minimum flow is not met may be found in this Business Practice .

Until further notice, Market Import Service(MIS) will not be allowed over the Miles City DC Tie

OUTAGE UPDATE
Updated at 5/28/2018 12:29:55 PM – The MILES CITY DC Tie has been returned to normal operation.


Per the tie operator, Miles City DC Tie minimum flow is 20 MW (deadband). WAUW BA Curtailment procedures when the minimum flow is not met may be found in this Business Practice .

Until further notice, Market Import Service(MIS) will not be allowed over the Miles City DC Tie

OUTAGE UPDATE
Updated at 5/28/2018 9:54:11 AM (CD) - The MILES CITY DC Tie in both directions will be limited to 0 as a result of an unplanned maintenance outage from 5/28/2018 1:00:00 AM (CD) to 5/29/2018 12:00:00 AM (CD).


Per the tie operator, Miles City DC Tie minimum flow is 20 MW (deadband). WAUW BA Curtailment procedures when the minimum flow is not met may be found in this Business Practice .

Until further notice, Market Import Service(MIS) will not be allowed over the Miles City DC Tie

OUTAGE UPDATE
Updated at 5/28/2018 9:50:53 AM – The MILES CITY DC Tie has been returned to normal operation.


Per the tie operator, Miles City DC Tie minimum flow is 20 MW (deadband). WAUW BA Curtailment procedures when the minimum flow is not met may be found in this Business Practice .

Until further notice, Market Import Service(MIS) will not be allowed over the Miles City DC Tie

OUTAGE UPDATE
Updated at 5/28/2018 1:22:00 AM (CD) - The MILES CITY DC Tie in both directions will be limited to 0 as a result of an emergency outage from 5/28/2018 1:22:00 AM (CD) to 5/29/2018 12:00:00 AM (CD).


Per the tie operator, Miles City DC Tie minimum flow is 20 MW (deadband). WAUW BA Curtailment procedures when the minimum flow is not met may be found in this Business Practice .

Until further notice, Market Import Service(MIS) will not be allowed over the Miles City DC Tie

OUTAGE UPDATE
Updated at 5/22/2018 9:22:29 AM – The MILES CITY DC Tie has been returned to normal operation.


Per the tie operator, Miles City DC Tie minimum flow is 20 MW (deadband). WAUW BA Curtailment procedures when the minimum flow is not met may be found in this Business Practice .

Until further notice, Market Import Service(MIS) will not be allowed over the Miles City DC Tie

OUTAGE UPDATE
Updated at 5/11/2018 6:10:29 PM – The MILES CITY DC Tie has been returned to normal operation.


Per the tie operator, Miles City DC Tie minimum flow is 20 MW (deadband). WAUW BA Curtailment procedures when the minimum flow is not met may be found in this Business Practice .

Until further notice, Market Import Service(MIS) will not be allowed over the Miles City DC Tie

OUTAGE UPDATE
Updated at 5/11/2018 6:04:00 PM – The MILES CITY DC Tie has been returned to normal operation.


Per the tie operator, Miles City DC Tie minimum flow is 20 MW (deadband). WAUW BA Curtailment procedures when the minimum flow is not met may be found in this Business Practice .

Until further notice, Market Import Service(MIS) will not be allowed over the Miles City DC Tie

OUTAGE UPDATE
Updated at 5/11/2018 3:42:20 PM (CD) - The MILES CITY DC Tie in both directions will be limited to 0 as a result of a planned maintenance outage from 4/23/2018 8:00:00 AM (CD) to 5/11/2018 8:00:00 PM (CD).


Per the tie operator, Miles City DC Tie minimum flow is 20 MW (deadband). WAUW BA Curtailment procedures when the minimum flow is not met may be found in this Business Practice .

Until further notice, Market Import Service(MIS) will not be allowed over the Miles City DC Tie

OUTAGE UPDATE
Updated at 4/18/2018 9:04:52 AM (CD) - The MILES CITY DC Tie in both directions will be limited to 0 as a result of a planned maintenance outage from 4/23/2018 8:00:00 AM (CD) to 5/11/2018 6:00:00 PM (CD).


Per the tie operator, Miles City DC Tie minimum flow is 20 MW (deadband). WAUW BA Curtailment procedures when the minimum flow is not met may be found in this Business Practice .

Until further notice, Market Import Service(MIS) will not be allowed over the Miles City DC Tie

The MILES CITY DC Tie will be will be limited to 20 MW east to west from 5//7/2018 at 10:00 CDT until 5/10/2018 at 1500 CDT.
OUTAGE UPDATE
Updated at 4/18/2018 5:57:05 AM (CD) - The MILES CITY DC Tie in both directions will be limited to 0 as a result of a planned maintenance outage from 4/23/2018 8:00:00 AM (CD) to 5/11/2018 6:00:00 PM (CD).


Per the tie operator, Miles City DC Tie minimum flow is 20 MW (deadband). WAUW BA Curtailment procedures when the minimum flow is not met may be found in this Business Practice .

Until further notice, Market Import Service(MIS) will not be allowed over the Miles City DC Tie

The MILES CITY DC Tie in both directions will be limited to 0 as a result of a planned maintenance outage from 4/23/2018 8:00 AM CDT until 5/11/2018 6:00 PM CDT.
OUTAGE UPDATE
Updated at 4/9/2018 12:22:00 PM – The MILES CITY DC Tie has been returned to normal operation.


Per the tie operator, Miles City DC Tie minimum flow is 20 MW (deadband). WAUW BA Curtailment procedures when the minimum flow is not met may be found in this Business Practice .

Until further notice, Market Import Service(MIS) will not be allowed over the Miles City DC Tie

The MILES CITY DC Tie in both directions will be limited to 0 as a result of a planned maintenance outage from 4/23/2018 8:00 AM CDT until 5/11/2018 6:00 PM CDT.
OUTAGE UPDATE
Updated at 4/6/2018 1:00:00 PM (CD) - The MILES CITY DC Tie from east to west will be limited to 20 as a result of an emergency outage from 4/6/2018 1:00:00 PM (CD) to 4/9/2018 5:00:00 PM (CD).


Per the tie operator, Miles City DC Tie minimum flow is 20 MW (deadband). WAUW BA Curtailment procedures when the minimum flow is not met may be found in this Business Practice .

Until further notice, Market Import Service(MIS) will not be allowed over the Miles City DC Tie

The MILES CITY DC Tie in both directions will be limited to 0 as a result of a planned maintenance outage from 4/23/2018 8:00 AM CDT until 5/11/2018 6:00 PM CDT.
OUTAGE UPDATE
Updated at 4/6/2018 1:05:34 PM (CD) - The MILES CITY DC Tie from west to east will be limited to 150 as a result of an emergency outage from 4/7/2018 1:00:00 PM (CD) to 4/9/2018 5:00:00 PM (CD).


Per the tie operator, Miles City DC Tie minimum flow is 20 MW (deadband). WAUW BA Curtailment procedures when the minimum flow is not met may be found in this Business Practice .

Until further notice, Market Import Service(MIS) will not be allowed over the Miles City DC Tie

The MILES CITY DC Tie in both directions will be limited to 0 as a result of a planned maintenance outage from 4/23/2018 8:00 AM CDT until 5/11/2018 6:00 PM CDT.
OUTAGE UPDATE
Updated at 4/6/2018 12:56:18 PM (CD) - The MILES CITY DC Tie from west to east will be limited to 20 as a result of an emergency outage from 4/7/2018 12:56:18 PM (CD) to 4/9/2018 5:00:00 PM (CD).


Per the tie operator, Miles City DC Tie minimum flow is 20 MW (deadband). WAUW BA Curtailment procedures when the minimum flow is not met may be found in this Business Practice .

Until further notice, Market Import Service(MIS) will not be allowed over the Miles City DC Tie

The MILES CITY DC Tie in both directions will be limited to 0 as a result of a planned maintenance outage from 4/23/2018 8:00 AM CDT until 5/11/2018 6:00 PM CDT.
OUTAGE UPDATE
Updated at 4/3/2018 4:26:04 PM – The MILES CITY DC Tie has been returned to normal operation.


Per the tie operator, Miles City DC Tie minimum flow is 20 MW (deadband). WAUW BA Curtailment procedures when the minimum flow is not met may be found in this Business Practice .

Until further notice, Market Import Service(MIS) will not be allowed over the Miles City DC Tie

The MILES CITY DC Tie in both directions will be limited to 0 as a result of a planned maintenance outage from 4/23/2018 8:00 AM CDT until 5/11/2018 6:00 PM CDT.
OUTAGE UPDATE
Updated at 4/3/2018 2:31:08 AM (CD) - The MILES CITY DC Tie from east to west will be limited to 60 as a result of an emergency outage from 4/3/2018 2:31:00 AM (CD) to 4/4/2018 12:00:00 AM (CD).


Per the tie operator, Miles City DC Tie minimum flow is 20 MW (deadband). WAUW BA Curtailment procedures when the minimum flow is not met may be found in this Business Practice .

Until further notice, Market Import Service(MIS) will not be allowed over the Miles City DC Tie

The MILES CITY DC Tie in both directions will be limited to 0 as a result of a planned maintenance outage from 4/23/2018 8:00 AM CDT until 5/11/2018 6:00 PM CDT.
OUTAGE UPDATE
Updated at 1/26/2018 7:35:31 PM – The MILES CITY DC Tie has been returned to normal operation.


Per the tie operator, Miles City DC Tie minimum flow is 20 MW (deadband). WAUW BA Curtailment procedures when the minimum flow is not met may be found in this Business Practice .

Until further notice, Market Import Service(MIS) will not be allowed over the Miles City DC Tie

OUTAGE UPDATE
Updated at 1/23/2018 12:38:28 PM (CS) - The MILES CITY DC Tie in both directions will be limited to 0 as a result of a planned maintenance outage from 4/23/2018 8:00:00 AM (CD) to 5/11/2018 6:00:00 PM (CD).


Per the tie operator, Miles City DC Tie minimum flow is 20 MW (deadband). WAUW BA Curtailment procedures when the minimum flow is not met may be found in this Business Practice .

Until further notice, Market Import Service(MIS) will not be allowed over the Miles City DC Tie

OUTAGE UPDATE
Updated at 12/12/2017 4:52:00 PM – The MILES CITY DC Tie has been returned to normal operation.


Per the tie operator, Miles City DC Tie minimum flow is 20 MW (deadband). WAUW BA Curtailment procedures when the minimum flow is not met may be found in this Business Practice .

Until further notice, Market Import Service(MIS) will not be allowed over the Miles City DC Tie

The Miles City DC Tie will be limited to 60 MW in the Export Direction on 12/12/2017 @ 0800 to 12/12/2017 @ 1700
OUTAGE UPDATE
Updated at 12/8/2017 2:30:05 PM – The MILES CITY DC Tie has been returned to normal operation.


Per the tie operator, Miles City DC Tie minimum flow is 20 MW (deadband). WAUW BA Curtailment procedures when the minimum flow is not met may be found in this Business Practice .

Until further notice, Market Import Service(MIS) will not be allowed over the Miles City DC Tie

OUTAGE UPDATE
Updated at 11/12/2017 3:31:15 PM – The MILES CITY DC Tie has been returned to normal operation.


Per the tie operator, Miles City DC Tie minimum flow is 20 MW (deadband). WAUW BA Curtailment procedures when the minimum flow is not met may be found in this Business Practice .

Until further notice, Market Import Service(MIS) will not be allowed over the Miles City DC Tie

OUTAGE UPDATE
Updated at 11/12/2017 11:44:08 AM (CS) - The MILES CITY DC Tie from south to north will be limited to 60 as a result of a planned maintenance outage from 11/7/2017 7:00:00 AM (CS) to 11/12/2017 3:00:00 PM (CS).


Per the tie operator, Miles City DC Tie minimum flow is 20 MW (deadband). WAUW BA Curtailment procedures when the minimum flow is not met may be found in this Business Practice .

Until further notice, Market Import Service(MIS) will not be allowed over the Miles City DC Tie

OUTAGE UPDATE
Updated at 11/11/2017 2:00:35 PM (CS) - The MILES CITY DC Tie from east to west will be limited to 60 as a result of a planned maintenance outage from 11/11/2017 1:15:00 AM (CS) to 11/12/2017 12:00:00 PM (CS).


Per the tie operator, Miles City DC Tie minimum flow is 20 MW (deadband). WAUW BA Curtailment procedures when the minimum flow is not met may be found in this Business Practice .

Until further notice, Market Import Service(MIS) will not be allowed over the Miles City DC Tie

OUTAGE UPDATE
Updated at 11/11/2017 1:10:02 PM (CS) - The MILES CITY DC Tie from east to west will be limited to 60 as a result of a planned maintenance outage from 11/11/2017 1:10:00 PM (CS) to 11/12/2017 6:00:00 PM (CS).


Per the tie operator, Miles City DC Tie minimum flow is 20 MW (deadband). WAUW BA Curtailment procedures when the minimum flow is not met may be found in this Business Practice .

Until further notice, Market Import Service(MIS) will not be allowed over the Miles City DC Tie

OUTAGE UPDATE
Updated at 11/7/2017 3:52:00 PM – The MILES CITY DC Tie has been returned to normal operation.


Per the tie operator, Miles City DC Tie minimum flow is 20 MW (deadband). WAUW BA Curtailment procedures when the minimum flow is not met may be found in this Business Practice .

Until further notice, Market Import Service(MIS) will not be allowed over the Miles City DC Tie

OUTAGE UPDATE
Updated at 11/7/2017 3:41:45 PM (CS) - The MILES CITY DC Tie in both directions will be limited to 0 as a result of an emergency outage from 11/8/2017 3:35:00 PM (CS) to 11/9/2017 12:00:00 AM (CS).


Per the tie operator, Miles City DC Tie minimum flow is 20 MW (deadband). WAUW BA Curtailment procedures when the minimum flow is not met may be found in this Business Practice .

Until further notice, Market Import Service(MIS) will not be allowed over the Miles City DC Tie

OUTAGE UPDATE
Updated at 11/5/2017 5:25:44 AM (CS) - The MILES CITY DC Tie from east to west will be limited to 60 as a result of an emergency outage from 11/4/2017 7:36:00 AM (CS) to 11/7/2017 12:00:00 AM (CS).


Per the tie operator, Miles City DC Tie minimum flow is 20 MW (deadband). WAUW BA Curtailment procedures when the minimum flow is not met may be found in this Business Practice .

Until further notice, Market Import Service(MIS) will not be allowed over the Miles City DC Tie

OUTAGE UPDATE
Updated at 11/4/2017 7:49:42 AM (CD) - The MILES CITY DC Tie from east to west will be limited to 60 as a result of an emergency outage from 11/4/2017 7:36:00 AM (CD) to 11/5/2017 12:00:00 AM (CD).


Per the tie operator, Miles City DC Tie minimum flow is 20 MW (deadband). WAUW BA Curtailment procedures when the minimum flow is not met may be found in this Business Practice .

Until further notice, Market Import Service(MIS) will not be allowed over the Miles City DC Tie

OUTAGE UPDATE
Updated at 10/26/2017 10:32:56 AM – The MILES CITY DC Tie has been returned to normal operation.


Per the tie operator, Miles City DC Tie minimum flow is 20 MW (deadband). WAUW BA Curtailment procedures when the minimum flow is not met may be found in this Business Practice .

Until further notice, Market Import Service(MIS) will not be allowed over the Miles City DC Tie

OUTAGE UPDATE
Updated at 10/19/2017 5:00:00 PM (CD) - The MILES CITY DC Tie from east to west will be limited to 60 as a result of a planned maintenance outage from 10/24/2017 9:00:00 AM (CD) to 10/26/2017 4:00:00 PM (CD).


Per the tie operator, Miles City DC Tie minimum flow is 20 MW (deadband). WAUW BA Curtailment procedures when the minimum flow is not met may be found in this Business Practice .

Until further notice, Market Import Service(MIS) will not be allowed over the Miles City DC Tie

OUTAGE UPDATE
Updated at 10/17/2017 11:19:00 AM – The MILES CITY DC Tie has been returned to normal operation.


Per the tie operator, Miles City DC Tie minimum flow is 20 MW (deadband). WAUW BA Curtailment procedures when the minimum flow is not met may be found in this Business Practice .

Until further notice, Market Import Service(MIS) will not be allowed over the Miles City DC Tie

OUTAGE UPDATE
Updated at 10/17/2017 10:24:00 AM (CD) - The MILES CITY DC Tie from east to west will be limited to 20 as a result of a planned maintenance outage from 10/17/2017 10:24:00 AM (CD) to 10/18/2017 12:00:00 AM (CD).


Per the tie operator, Miles City DC Tie minimum flow is 20 MW (deadband). WAUW BA Curtailment procedures when the minimum flow is not met may be found in this Business Practice .

Until further notice, Market Import Service(MIS) will not be allowed over the Miles City DC Tie

The Mile City DC Tie will be limited until further notice:
150 MW West to East
20 MW East to West

OUTAGE UPDATE
Updated at 10/17/2017 10:29:01 AM – The MILES CITY DC Tie has been returned to normal operation.


Per the tie operator, Miles City DC Tie minimum flow is 20 MW (deadband). WAUW BA Curtailment procedures when the minimum flow is not met may be found in this Business Practice .

Until further notice, Market Import Service(MIS) will not be allowed over the Miles City DC Tie

The Mile City DC Tie will be limited until further notice to 150 MW West to East And 20 MW East to West

OUTAGE UPDATE
Updated at 10/17/2017 10:27:28 AM – The MILES CITY DC Tie has been returned to normal operation.


Per the tie operator, Miles City DC Tie minimum flow is 20 MW (deadband). WAUW BA Curtailment procedures when the minimum flow is not met may be found in this Business Practice .

Until further notice, Market Import Service(MIS) will not be allowed over the Miles City DC Tie

OUTAGE UPDATE
Updated at 10/6/2017 3:58:33 PM – The MILES CITY DC Tie has been returned to normal operation.


Per the tie operator, Miles City DC Tie minimum flow is 20 MW (deadband). WAUW BA Curtailment procedures when the minimum flow is not met may be found in this Business Practice .

Until further notice, Market Import Service(MIS) will not be allowed over the Miles City DC Tie

OUTAGE UPDATE
Updated at 9/20/2017 10:25:50 AM (CD) - The MILES CITY DC Tie from east to west will be limited to 60 as a result of a planned maintenance outage from 8/9/2017 6:00:00 PM (CD) to 10/6/2017 4:00:00 PM (CD).


Per the tie operator, Miles City DC Tie minimum flow is 20 MW (deadband). WAUW BA Curtailment procedures when the minimum flow is not met may be found in this Business Practice .

Until further notice, Market Import Service(MIS) will not be allowed over the Miles City DC Tie

OUTAGE UPDATE
Updated at 8/22/2017 6:20:54 PM (CD) - The MILES CITY DC Tie from east to west will be limited to 60 as a result of a planned maintenance outage from 8/9/2017 6:00:00 PM (CD) to 9/22/2017 6:00:00 PM (CD).


Per the tie operator, Miles City DC Tie minimum flow is 20 MW (deadband). WAUW BA Curtailment procedures when the minimum flow is not met may be found in this Business Practice .

Until further notice, Market Import Service(MIS) will not be allowed over the Miles City DC Tie

OUTAGE UPDATE
Updated at 8/22/2017 6:20:33 PM – The MILES CITY DC Tie has been returned to normal operation.


Per the tie operator, Miles City DC Tie minimum flow is 20 MW (deadband). WAUW BA Curtailment procedures when the minimum flow is not met may be found in this Business Practice .

Until further notice, Market Import Service(MIS) will not be allowed over the Miles City DC Tie

OUTAGE UPDATE
Updated at 8/22/2017 6:17:07 PM (CD) - The MILES CITY DC Tie from east to west will be limited to 60 as a result of a planned maintenance outage from 8/9/2017 6:00:00 PM (CD) to 9/22/2017 6:00:00 PM (CD).


Per the tie operator, Miles City DC Tie minimum flow is 20 MW (deadband). WAUW BA Curtailment procedures when the minimum flow is not met may be found in this Business Practice .

Until further notice, Market Import Service(MIS) will not be allowed over the Miles City DC Tie

Miles City DC Tie limited to 100 MW West to East on 08/22/2017 from 0900 to 1600.
OUTAGE UPDATE
Updated at 8/22/2017 6:15:29 PM (CD) - The MILES CITY DC Tie from east to west will be limited to 60 as a result of a planned maintenance outage from 8/9/2017 6:00:00 PM (CD) to 9/22/2017 6:00:00 PM (CD).


Per the tie operator, Miles City DC Tie minimum flow is 20 MW (deadband). WAUW BA Curtailment procedures when the minimum flow is not met may be found in this Business Practice .

Until further notice, Market Import Service(MIS) will not be allowed over the Miles City DC Tie

Miles City DC Tie limited to 100 MW West to East on 08/22/2017 from 0900 to 1600.
OUTAGE UPDATE
Updated at 8/22/2017 6:13:28 PM – The MILES CITY DC Tie has been returned to normal operation.


Per the tie operator, Miles City DC Tie minimum flow is 20 MW (deadband). WAUW BA Curtailment procedures when the minimum flow is not met may be found in this Business Practice .

Until further notice, Market Import Service(MIS) will not be allowed over the Miles City DC Tie

Miles City DC Tie limited to 100 MW West to East on 08/22/2017 from 0900 to 1600.
OUTAGE UPDATE
Updated at 8/22/2017 6:07:01 PM (CD) - The MILES CITY DC Tie from east to west will be limited to 60 as a result of a planned maintenance outage from 8/9/2017 6:07:00 PM (CD) to 9/22/2017 6:07:00 PM (CD).


Per the tie operator, Miles City DC Tie minimum flow is 20 MW (deadband). WAUW BA Curtailment procedures when the minimum flow is not met may be found in this Business Practice .

Until further notice, Market Import Service(MIS) will not be allowed over the Miles City DC Tie

Miles City DC Tie limited to 100 MW West to East on 08/22/2017 from 0900 to 1600.
OUTAGE UPDATE
Updated at 8/17/2017 1:33:51 PM (CD) - The MILES CITY DC Tie from east to west will be limited to 20 as a result of a planned maintenance outage from 8/22/2017 9:00:00 AM (CD) to 8/22/2017 4:00:00 PM (CD).


Per the tie operator, Miles City DC Tie minimum flow is 20 MW (deadband). WAUW BA Curtailment procedures when the minimum flow is not met may be found in this Business Practice .

Until further notice, Market Import Service(MIS) will not be allowed over the Miles City DC Tie

OUTAGE UPDATE
Updated at 8/15/2017 12:09:36 PM (CD) - The MILES CITY DC Tie from east to west will be limited to 60 as a result of a planned maintenance outage from 8/10/2017 3:00:00 PM (CD) to 9/22/2017 4:00:00 PM (CD).


Per the tie operator, Miles City DC Tie minimum flow is 20 MW (deadband). WAUW BA Curtailment procedures when the minimum flow is not met may be found in this Business Practice .

Until further notice, Market Import Service(MIS) will not be allowed over the Miles City DC Tie

OUTAGE UPDATE
Updated at 8/15/2017 12:03:02 PM (CD) - The MILES CITY DC Tie from east to west will be limited to 60 as a result of a planned maintenance outage from 8/10/2017 3:00:00 PM (CD) to 9/5/2017 8:00:00 AM (CD).


Per the tie operator, Miles City DC Tie minimum flow is 20 MW (deadband). WAUW BA Curtailment procedures when the minimum flow is not met may be found in this Business Practice .

Until further notice, Market Import Service(MIS) will not be allowed over the Miles City DC Tie

OUTAGE UPDATE
Updated at 8/9/2017 3:24:53 PM (CD) - The MILES CITY DC Tie from east to west will be limited to 60 as a result of a planned maintenance outage from 8/10/2017 3:00:00 PM (CD) to 9/22/2017 4:00:00 PM (CD).


Per the tie operator, Miles City DC Tie minimum flow is 20 MW (deadband). WAUW BA Curtailment procedures when the minimum flow is not met may be found in this Business Practice .

Until further notice, Market Import Service(MIS) will not be allowed over the Miles City DC Tie

MCWEST_IMP limited to 100MW from 8/07/2017 at 00:00 thru 8/09/17 at 18:00

MCWEST_EXP will be limited to 60 MW from 08/09/2017 at 1800 until 09/22/2017 at 1600.
OUTAGE UPDATE
Updated at 8/7/2017 11:13:49 AM (CD) - The MILES CITY DC Tie from east to west will be limited to 20 as a result of a planned maintenance outage from 8/7/2017 12:00:00 AM (CD) to 8/9/2017 6:00:00 PM (CD).


Per the tie operator, Miles City DC Tie minimum flow is 20 MW (deadband). WAUW BA Curtailment procedures when the minimum flow is not met may be found in this Business Practice .

Until further notice, Market Import Service(MIS) will not be allowed over the Miles City DC Tie

MCWEST_IMP limited to 100MW from 8/07/2017 at 00:00 thru 8/09/17 at 18:00

MCWEST_EXP will be limited to 60 MW from 08/09/2017 until 09/22/2017 at 1600.
OUTAGE UPDATE
Updated at 8/7/2017 11:05:03 AM (CD) - The MILES CITY DC Tie from east to west will be limited to 20 as a result of a planned maintenance outage from 8/7/2017 12:00:00 AM (CD) to 8/9/2017 6:00:00 PM (CD).


Per the tie operator, Miles City DC Tie minimum flow is 20 MW (deadband). WAUW BA Curtailment procedures when the minimum flow is not met may be found in this Business Practice .

Until further notice, Market Import Service(MIS) will not be allowed over the Miles City DC Tie

MCWEST_IMP limited to 100MW from 8/07/2017 at 00:00 thru 8/23/17 at 00:00
OUTAGE UPDATE
Updated at 8/6/2017 10:00:16 AM (CD) - The MILES CITY DC Tie from east to west will be limited to 20 as a result of a planned maintenance outage from 8/7/2017 12:00:00 AM (CD) to 8/23/2017 12:00:00 AM (CD).


Per the tie operator, Miles City DC Tie minimum flow is 20 MW (deadband). WAUW BA Curtailment procedures when the minimum flow is not met may be found in this Business Practice .

Until further notice, Market Import Service(MIS) will not be allowed over the Miles City DC Tie

MCWEST_IMP limited to 100MW from 8/07/2017 at 00:00 thru 8/23/17 at 00:00
OUTAGE UPDATE
Updated at 8/6/2017 9:58:09 AM (CD) - The MILES CITY DC Tie from west to east will be limited to 100 as a result of a planned maintenance outage from 8/7/2017 12:00:00 AM (CD) to 8/23/2017 12:00:00 AM (CD).


Per the tie operator, Miles City DC Tie minimum flow is 20 MW (deadband). WAUW BA Curtailment procedures when the minimum flow is not met may be found in this Business Practice .

Until further notice, Market Import Service(MIS) will not be allowed over the Miles City DC Tie

MCWEST_IMP limited to 100MW from 8/07/2017 at 00:00 thru 8/23/17 at 00:00
OUTAGE UPDATE
Updated at 8/6/2017 9:47:48 AM (CD) - The MILES CITY DC Tie from east to west will be limited to 20 as a result of a planned maintenance outage from 8/7/2017 12:00:00 AM (CD) to 8/23/2017 12:00:00 AM (CD).


Per the tie operator, Miles City DC Tie minimum flow is 20 MW (deadband). WAUW BA Curtailment procedures when the minimum flow is not met may be found in this Business Practice .

Until further notice, Market Import Service(MIS) will not be allowed over the Miles City DC Tie

OUTAGE UPDATE
Updated at 7/26/2017 11:07:00 AM – The MILES CITY DC Tie has been returned to normal operation.


Per the tie operator, Miles City DC Tie minimum flow is 20 MW (deadband). WAUW BA Curtailment procedures when the minimum flow is not met may be found in this Business Practice .

Until further notice, Market Import Service(MIS) will not be allowed over the Miles City DC Tie

Until Further notice the Miles City DC Tie is limited in both directions. In the West to East direction (MCWEST_IMP) to 60 MW, and 20 MW in the East to West direction (MCWEST_EXP)
OUTAGE UPDATE
Updated at 7/26/2017 7:14:16 AM – The MILES CITY DC Tie has been returned to normal operation.


Per the tie operator, Miles City DC Tie minimum flow is 20 MW (deadband). WAUW BA Curtailment procedures when the minimum flow is not met may be found in this Business Practice .

Until further notice, Market Import Service(MIS) will not be allowed over the Miles City DC Tie

OUTAGE UPDATE
Updated at 7/25/2017 10:06:58 AM (CD) - The MILES CITY DC Tie from east to west will be limited to 60 as a result of a planned maintenance outage from 7/25/2017 10:00:00 AM (CD) to 7/25/2017 5:00:00 PM (CD).


Per the tie operator, Miles City DC Tie minimum flow is 20 MW (deadband). WAUW BA Curtailment procedures when the minimum flow is not met may be found in this Business Practice .

Until further notice, Market Import Service(MIS) will not be allowed over the Miles City DC Tie

OUTAGE UPDATE
Updated at 7/21/2017 8:10:50 PM – The MILES CITY DC Tie has been returned to normal operation.


Per the tie operator, Miles City DC Tie minimum flow is 20 MW (deadband). WAUW BA Curtailment procedures when the minimum flow is not met may be found in this Business Practice .

Until further notice, Market Import Service(MIS) will not be allowed over the Miles City DC Tie

Tuesday July 25, MCWEST_EXP will be limited to 60 mw from 1000 through 1700.
OUTAGE UPDATE
Updated at 7/20/2017 5:07:16 PM (CD) - The MILES CITY DC Tie from east to west will be limited to 60 as a result of a planned maintenance outage from 6/23/2017 9:00:00 AM (CD) to 7/22/2017 6:00:00 PM (CD).


Per the tie operator, Miles City DC Tie minimum flow is 20 MW (deadband). WAUW BA Curtailment procedures when the minimum flow is not met may be found in this Business Practice .

Until further notice, Market Import Service(MIS) will not be allowed over the Miles City DC Tie

OUTAGE UPDATE
Updated at 7/20/2017 5:02:36 PM (CD) - The MILES CITY DC Tie from north to south will be limited to 60 as a result of a planned maintenance outage from 6/23/2017 9:00:00 AM (CD) to 7/22/2017 6:00:00 PM (CD).


Per the tie operator, Miles City DC Tie minimum flow is 20 MW (deadband). WAUW BA Curtailment procedures when the minimum flow is not met may be found in this Business Practice .

Until further notice, Market Import Service(MIS) will not be allowed over the Miles City DC Tie

OUTAGE UPDATE
Updated at 7/11/2017 5:40:48 PM (CD) - The MILES CITY DC Tie from east to west will be limited to 50 as a result of a planned maintenance outage from 6/23/2017 9:00:00 AM (CD) to 7/25/2017 5:40:00 PM (CD).


Per the tie operator, Miles City DC Tie minimum flow is 20 MW (deadband). WAUW BA Curtailment procedures when the minimum flow is not met may be found in this Business Practice .

Until further notice, Market Import Service(MIS) will not be allowed over the Miles City DC Tie

OUTAGE UPDATE
Updated at 6/5/2017 8:03:21 AM – The MILES CITY DC Tie has been returned to normal operation.


Per the tie operator, Miles City DC Tie minimum flow is 20 MW.

Per the tie operator, Miles City DC Tie minimum flow is 20 MW (deadband). WAUW BA Curtailment procedures when the minimum flow is not met may be found in this Business Practice .

Until further notice, Market Import Service(MIS) will not be allowed over the Miles City DC Tie

MCWEST_EXP Limitations: Limited to 60 MW until further notice.
OUTAGE UPDATE
Updated at 5/30/2017 10:10:00 AM – The MILES CITY DC Tie has been returned to normal operation.


Per the tie operator, Miles City DC Tie minimum flow is 20 MW.

Per the tie operator, Miles City DC Tie minimum flow is 20 MW (deadband). WAUW BA Curtailment procedures when the minimum flow is not met may be found in this Business Practice .

Until further notice, Market Import Service(MIS) will not be allowed over the Miles City DC Tie

MCWEST_EXP Limitations: Limited to 60 MW until further notice.
OUTAGE UPDATE
Updated at 5/30/2017 9:50:00 AM (CD) - The MILES CITY DC Tie in both directions will be limited to 0 as a result of an emergency outage from 5/31/2017 10:02:42 AM (CD) to 5/31/2017 10:02:42 AM (CD).


Per the tie operator, Miles City DC Tie minimum flow is 20 MW.

Per the tie operator, Miles City DC Tie minimum flow is 20 MW (deadband). WAUW BA Curtailment procedures when the minimum flow is not met may be found in this Business Practice .

Until further notice, Market Import Service(MIS) will not be allowed over the Miles City DC Tie

MCWEST_EXP Limitations: Limited to 60 MW until further notice.
OUTAGE UPDATE
Updated at 5/12/2017 2:04:00 PM – The MILES CITY DC Tie has been returned to normal operation.


Per the tie operator, Miles City DC Tie minimum flow is 20 MW.

Per the tie operator, Miles City DC Tie minimum flow is 20 MW (deadband). WAUW BA Curtailment procedures when the minimum flow is not met may be found in this Business Practice .

Until further notice, Market Import Service(MIS) will not be allowed over the Miles City DC Tie

MCWEST_EXP Limitations:

MCWEST has returned to service, but will be limited to 60 MW in the MCWEST_EXP direction.
OUTAGE UPDATE
Updated at 5/12/2017 2:04:16 PM – The MILES CITY DC Tie has been returned to normal operation.


Per the tie operator, Miles City DC Tie minimum flow is 20 MW.

Per the tie operator, Miles City DC Tie minimum flow is 20 MW (deadband). WAUW BA Curtailment procedures when the minimum flow is not met may be found in this Business Practice .

Until further notice, Market Import Service(MIS) will not be allowed over the Miles City DC Tie

MCWEST_EXP Limitations:
OUTAGE UPDATE
Updated at 5/12/2017 2:04:01 PM – The MILES CITY DC Tie has been returned to normal operation.


Per the tie operator, Miles City DC Tie minimum flow is 20 MW.

Per the tie operator, Miles City DC Tie minimum flow is 20 MW (deadband). WAUW BA Curtailment procedures when the minimum flow is not met may be found in this Business Practice .

Until further notice, Market Import Service(MIS) will not be allowed over the Miles City DC Tie

MCWEST_EXP Limitations:
OUTAGE UPDATE
Updated at 4/24/2017 9:12:06 AM (CD) - The MILES CITY DC Tie in both directions will be limited to 0 as a result of a planned maintenance outage from 4/24/2017 9:00:00 AM (CD) to 5/12/2017 5:00:00 PM (CD).


Per the tie operator, Miles City DC Tie minimum flow is 20 MW.

Per the tie operator, Miles City DC Tie minimum flow is 20 MW (deadband). WAUW BA Curtailment procedures when the minimum flow is not met may be found in this Business Practice .

Until further notice, Market Import Service(MIS) will not be allowed over the Miles City DC Tie

MCWEST_EXP Limitations:
OUTAGE UPDATE
Updated at 4/24/2017 9:09:13 AM – The MILES CITY DC Tie has been returned to normal operation.


Per the tie operator, Miles City DC Tie minimum flow is 20 MW.

Per the tie operator, Miles City DC Tie minimum flow is 20 MW (deadband). WAUW BA Curtailment procedures when the minimum flow is not met may be found in this Business Practice .

Until further notice, Market Import Service(MIS) will not be allowed over the Miles City DC Tie

MCWEST_EXP Limitations:
20 MW @ 4/18/2017 11:00 - 4/18/2017 14:00
20 MW @ 4/19/2017 11:00 - 4/19/2017 14:00
60 MW @ 4/10/2017 13:00 - 7/25/2017 16:00
OUTAGE UPDATE
Updated at 4/24/2017 9:08:05 AM (CD) - The MILES CITY DC Tie in both directions will be limited to 0 as a result of a planned maintenance outage from 4/24/2017 9:00:00 AM (CD) to 5/12/2017 5:00:00 PM (CD).


Per the tie operator, Miles City DC Tie minimum flow is 20 MW.

Per the tie operator, Miles City DC Tie minimum flow is 20 MW (deadband). WAUW BA Curtailment procedures when the minimum flow is not met may be found in this Business Practice .

Until further notice, Market Import Service(MIS) will not be allowed over the Miles City DC Tie

MCWEST_EXP Limitations:
20 MW @ 4/18/2017 11:00 - 4/18/2017 14:00
20 MW @ 4/19/2017 11:00 - 4/19/2017 14:00
60 MW @ 4/10/2017 13:00 - 7/25/2017 16:00
OUTAGE UPDATE
Updated at 4/17/2017 4:03:34 PM (CD) - The MILES CITY DC Tie from east to west will be limited to 30 as a result of an unplanned maintenance outage from 4/17/2017 4:03:00 PM (CD) to 4/26/2017 4:00:00 PM (CD).


Per the tie operator, Miles City DC Tie minimum flow is 20 MW.

Per the tie operator, Miles City DC Tie minimum flow is 20 MW (deadband). WAUW BA Curtailment procedures when the minimum flow is not met may be found in this Business Practice .

Until further notice, Market Import Service(MIS) will not be allowed over the Miles City DC Tie

MCWEST_EXP Limitations:
20 MW @ 4/18/2017 11:00 - 4/18/2017 14:00
20 MW @ 4/19/2017 11:00 - 4/19/2017 14:00
60 MW @ 4/10/2017 13:00 - 7/25/2017 16:00
OUTAGE UPDATE
Updated at 4/17/2017 3:33:48 PM (CD) - The MILES CITY DC Tie from east to west will be limited to 20 as a result of an unplanned maintenance outage from 4/18/2017 3:33:48 PM (CD) to 4/26/2017 4:00:00 PM (CD).


Per the tie operator, Miles City DC Tie minimum flow is 20 MW.

Per the tie operator, Miles City DC Tie minimum flow is 20 MW (deadband). WAUW BA Curtailment procedures when the minimum flow is not met may be found in this Business Practice .

Until further notice, Market Import Service(MIS) will not be allowed over the Miles City DC Tie

MCWEST_EXP Limitations:
20 MW @ 4/18/2017 11:00 - 4/18/2017 14:00
20 MW @ 4/19/2017 11:00 - 4/19/2017 14:00
60 MW @ 4/10/2017 13:00 - 7/25/2017 16:00
OUTAGE UPDATE
Updated at 4/17/2017 12:44:50 PM (CD) - The MILES CITY DC Tie from east to west will be limited to 30 as a result of an unplanned maintenance outage from 4/17/2017 12:30:00 PM (CD) to 4/26/2017 4:00:00 PM (CD).


Per the tie operator, Miles City DC Tie minimum flow is 20 MW.

Per the tie operator, Miles City DC Tie minimum flow is 20 MW (deadband). WAUW BA Curtailment procedures when the minimum flow is not met may be found in this Business Practice .

Until further notice, Market Import Service(MIS) will not be allowed over the Miles City DC Tie

MCWEST_EXP Limitations:
20 MW @ 4/18/2017 11:00 - 4/18/2017 14:00
20 MW @ 4/19/2017 11:00 - 4/19/2017 14:00
60 MW @ 4/10/2017 13:00 - 7/25/2017 16:00
OUTAGE UPDATE
Updated at 4/17/2017 9:32:45 AM (CD) - The MILES CITY DC Tie from east to west will be limited to 20 as a result of an unplanned maintenance outage from 4/17/2017 6:30:00 AM (CD) to 4/26/2017 4:00:00 PM (CD).


Per the tie operator, Miles City DC Tie minimum flow is 20 MW.

Per the tie operator, Miles City DC Tie minimum flow is 20 MW (deadband). WAUW BA Curtailment procedures when the minimum flow is not met may be found in this Business Practice .

Until further notice, Market Import Service(MIS) will not be allowed over the Miles City DC Tie

MCWEST_EXP Limitations:
20 MW @ 4/18/2017 11:00 - 4/18/2017 14:00
20 MW @ 4/19/2017 11:00 - 4/19/2017 14:00
60 MW @ 4/10/2017 13:00 - 7/25/2017 16:00
OUTAGE UPDATE
Updated at 4/17/2017 6:38:31 AM (CD) - The MILES CITY DC Tie from east to west will be limited to 20 as a result of an emergency outage from 4/17/2017 6:38:00 AM (CD) to 4/18/2017 11:00:00 AM (CD).


Per the tie operator, Miles City DC Tie minimum flow is 20 MW.

Per the tie operator, Miles City DC Tie minimum flow is 20 MW (deadband). WAUW BA Curtailment procedures when the minimum flow is not met may be found in this Business Practice .

Until further notice, Market Import Service(MIS) will not be allowed over the Miles City DC Tie

MCWEST_EXP Limitations:
20 MW @ 4/18/2017 11:00 - 4/18/2017 14:00
20 MW @ 4/19/2017 11:00 - 4/19/2017 14:00
60 MW @ 4/10/2017 13:00 - 7/25/2017 16:00
OUTAGE UPDATE
Updated at 4/12/2017 9:15:07 PM (CD) - The MILES CITY DC Tie from east to west will be limited to 60 as a result of a planned maintenance outage from 4/10/2017 1:00:00 AM (CD) to 7/25/2017 4:00:00 PM (CD).


Per the tie operator, Miles City DC Tie minimum flow is 20 MW.

Per the tie operator, Miles City DC Tie minimum flow is 20 MW (deadband). WAUW BA Curtailment procedures when the minimum flow is not met may be found in this Business Practice .

Until further notice, Market Import Service(MIS) will not be allowed over the Miles City DC Tie

MCWEST_EXP Limitations:
20 MW @ 4/18/2017 11:00 - 4/18/2017 14:00
20 MW @ 4/19/2017 11:00 - 4/19/2017 14:00
60 MW @ 4/10/2017 13:00 - 7/25/2017 16:00
OUTAGE UPDATE
Updated at 4/12/2017 7:32:19 PM (CD) - The MILES CITY DC Tie in both directions will be limited to 0 as a result of an emergency outage from 4/13/2017 7:14:00 PM (CD) to 4/13/2017 8:30:00 PM (CD).


Per the tie operator, Miles City DC Tie minimum flow is 20 MW.

Per the tie operator, Miles City DC Tie minimum flow is 20 MW (deadband). WAUW BA Curtailment procedures when the minimum flow is not met may be found in this Business Practice .

Until further notice, Market Import Service(MIS) will not be allowed over the Miles City DC Tie

MCWEST_EXP Limitations:
20 MW @ 4/18/2017 11:00 - 4/18/2017 14:00
20 MW @ 4/19/2017 11:00 - 4/19/2017 14:00
60 MW @ 4/10/2017 13:00 - 7/25/2017 16:00
OUTAGE UPDATE
Updated at 4/12/2017 2:40:42 PM (CD) - The MILES CITY DC Tie from east to west will be limited to 60 as a result of a planned maintenance outage from 4/10/2017 1:00:00 PM (CD) to 7/25/2017 4:00:00 PM (CD).


Per the tie operator, Miles City DC Tie minimum flow is 20 MW.

Per the tie operator, Miles City DC Tie minimum flow is 20 MW (deadband). WAUW BA Curtailment procedures when the minimum flow is not met may be found in this Business Practice .

Until further notice, Market Import Service(MIS) will not be allowed over the Miles City DC Tie

MCWEST_EXP Limitations:
20 MW @ 4/10/2017 08:00 - 4/10/2017 13:00
60 MW @ 4/10/2017 13:00 - 7/25/2017 16:00
OUTAGE UPDATE
Updated at 4/6/2017 12:38:00 PM (CD) - The MILES CITY DC Tie from east to west will be limited to 60 as a result of a planned maintenance outage from 4/3/2017 8:00:00 AM (CD) to 4/10/2017 8:00:00 AM (CD).


Per the tie operator, Miles City DC Tie minimum flow is 20 MW.

Per the tie operator, Miles City DC Tie minimum flow is 20 MW (deadband). WAUW BA Curtailment procedures when the minimum flow is not met may be found in this Business Practice .

Until further notice, Market Import Service(MIS) will not be allowed over the Miles City DC Tie

MCWEST_EXP Limitations:
20 MW @ 4/10/2017 08:00 - 4/10/2017 13:00
60 MW @ 4/10/2017 13:00 - 7/25/2017 16:00
OUTAGE UPDATE
Updated at 4/6/2017 12:38:50 PM (CD) - The MILES CITY DC Tie from west to east will be limited to 60 as a result of a planned maintenance outage from 4/3/2017 8:00:00 AM (CD) to 4/10/2017 8:00:00 AM (CD).


Per the tie operator, Miles City DC Tie minimum flow is 20 MW.

Per the tie operator, Miles City DC Tie minimum flow is 20 MW (deadband). WAUW BA Curtailment procedures when the minimum flow is not met may be found in this Business Practice .

Until further notice, Market Import Service(MIS) will not be allowed over the Miles City DC Tie

MCWEST_EXP Limitations:
20 MW on 4/10/2017 @ 09:00 till 14:00 on 4/13/2017
60 MW on 4/13/2017 @ 14:00 till 15:00 on 7/25/2017
OUTAGE UPDATE
Updated at 4/6/2017 8:10:00 AM (CD) - The MILES CITY DC Tie from west to east will be limited to 60 as a result of a planned maintenance outage from 4/3/2017 8:00:00 AM (CD) to 4/10/2017 9:00:00 AM (CD).


Per the tie operator, Miles City DC Tie minimum flow is 20 MW.

Per the tie operator, Miles City DC Tie minimum flow is 20 MW (deadband). WAUW BA Curtailment procedures when the minimum flow is not met may be found in this Business Practice .

Until further notice, Market Import Service(MIS) will not be allowed over the Miles City DC Tie

MCWEST_EXP Limitations:
60 MW on 4/3/2017 @ 08:00 till 09:00 on 4/10/2017
20 MW on 4/10/2017 @ 09:00 till 14:00 on 4/13/2017
60 MW on 4/13/2017 @ 14:00 till 15:00 on 7/25/2017
OUTAGE UPDATE
Updated at 4/3/2017 9:33:01 AM – The MILES CITY DC Tie has been returned to normal operation.


Per the tie operator, Miles City DC Tie minimum flow is 20 MW.

Per the tie operator, Miles City DC Tie minimum flow is 20 MW (deadband). WAUW BA Curtailment procedures when the minimum flow is not met may be found in this Business Practice .

Until further notice, Market Import Service(MIS) will not be allowed over the Miles City DC Tie

MCWEST_EXP Limitations:
60 MW on 4/3/2017 @ 08:00 till 09:00 on 4/10/2017
20 MW on 4/10/2017 @ 09:00 till 14:00 on 4/13/2017
60 MW on 4/13/2017 @ 14:00 till 00:00 on 7/25/2017
OUTAGE UPDATE
Updated at 4/3/2017 8:58:52 AM – The MILES CITY DC Tie has been returned to normal operation.


Per the tie operator, Miles City DC Tie minimum flow is 20 MW.

Per the tie operator, Miles City DC Tie minimum flow is 20 MW (deadband). WAUW BA Curtailment procedures when the minimum flow is not met may be found in this Business Practice .

Until further notice, Market Import Service(MIS) will not be allowed over the Miles City DC Tie

MCWEST_EXP Limitations:
60 MW on 4/3/2017 @ 08:00 till 10:00 on 4/3/2017
20 MW on 4/3/2017 @ 10:00 till 14:00 on 4/13/2017
60 MW on 4/13/2017 @ 14:00 till 00:00 on 7/25/2017
OUTAGE UPDATE
Updated at 3/30/2017 3:23:52 PM – The MILES CITY DC Tie has been returned to normal operation.


Per the tie operator, Miles City DC Tie minimum flow is 20 MW.

Per the tie operator, Miles City DC Tie minimum flow is 20 MW (deadband). WAUW BA Curtailment procedures when the minimum flow is not met may be found in this Business Practice .

Until further notice, Market Import Service(MIS) will not be allowed over the Miles City DC Tie

MCWEST_EXP Limitations:
60 MW From 08:00 to 10:00 on 4/3/2017
20 MW on 4/3/2017 @ 10:00 till 14:00 on 4/13/2017
60 MW on 4/13/2017 @ 14:00 till 00:00 on 7/25/2017
OUTAGE UPDATE
Updated at 3/30/2017 3:01:06 PM – The MILES CITY DC Tie has been returned to normal operation.


Per the tie operator, Miles City DC Tie minimum flow is 20 MW.

Per the tie operator, Miles City DC Tie minimum flow is 20 MW (deadband). WAUW BA Curtailment procedures when the minimum flow is not met may be found in this Business Practice .

Until further notice, Market Import Service(MIS) will not be allowed over the Miles City DC Tie

The Miles City DC Tie will be Limited to 20 MW East to West And 0 MW in the West to East Direction Today from 11:00 through 14:00 on 3/30/2017

OUTAGE UPDATE
Updated at 3/30/2017 9:18:41 AM – The MILES CITY DC Tie has been returned to normal operation.


Per the tie operator, Miles City DC Tie minimum flow is 20 MW.

Per the tie operator, Miles City DC Tie minimum flow is 20 MW (deadband). WAUW BA Curtailment procedures when the minimum flow is not met may be found in this Business Practice .

Until further notice, Market Import Service(MIS) will not be allowed over the Miles City DC Tie

OUTAGE UPDATE
Updated at 3/30/2017 9:01:04 AM – The MILES CITY DC Tie has been returned to normal operation.


Per the tie operator, Miles City DC Tie minimum flow is 20 MW.

Per the tie operator, Miles City DC Tie minimum flow is 20 MW (deadband). WAUW BA Curtailment procedures when the minimum flow is not met may be found in this Business Practice .

Until further notice, Market Import Service(MIS) will not be allowed over the Miles City DC Tie

MCWEST_EXP will be limited to 60 MW from 03/29/2017 @ 0800 TO 7/25/2017 @ 1600.

MCWEST_EXP will be limited to 0 MW from 03/20/2017 @ 10:00 TO @ 12:00.

MCWEST_IMP will be limited to 30 MW from 03/20/2017 @ 10:00 TO @ 12:00.

MCWEST_EXP will be limited to 0 MW from 03/24/2017 @ 10:00 TO @ 12:00.

MCWEST_IMP will be limited to 30 MW from 03/24/2017 @ 10:00 TO @ 12:00.

MCWEST_EXP will be limited to 0 MW from 03/28/2017 @ 09:00 TO @ 11:00.

MCWEST_IMP will be limited to 30 MW from 03/28/2017 @ 09:00 TO @ 11:00.
OUTAGE UPDATE
Updated at 3/24/2017 9:19:23 AM (CD) - The MILES CITY DC Tie from east to west will be limited to 0 as a result of a planned maintenance outage from 3/24/2017 10:00:00 AM (CD) to 3/24/2017 12:00:00 PM (CD).


Per the tie operator, Miles City DC Tie minimum flow is 20 MW.

Per the tie operator, Miles City DC Tie minimum flow is 20 MW (deadband). WAUW BA Curtailment procedures when the minimum flow is not met may be found in this Business Practice .

Until further notice, Market Import Service(MIS) will not be allowed over the Miles City DC Tie

MCWEST_EXP will be limited to 60 MW from 03/29/2017 @ 0800 TO 7/25/2017 @ 1600.

MCWEST_EXP will be limited to 0 MW from 03/20/2017 @ 10:00 TO @ 12:00.

MCWEST_IMP will be limited to 30 MW from 03/20/2017 @ 10:00 TO @ 12:00.

MCWEST_EXP will be limited to 0 MW from 03/24/2017 @ 09:00 TO @ 11:00.

MCWEST_IMP will be limited to 30 MW from 03/24/2017 @ 09:00 TO @ 11:00.

MCWEST_EXP will be limited to 0 MW from 03/28/2017 @ 09:00 TO @ 11:00.

MCWEST_IMP will be limited to 30 MW from 03/28/2017 @ 09:00 TO @ 11:00.
OUTAGE UPDATE
Updated at 3/19/2017 3:44:39 PM – The MILES CITY DC Tie has been returned to normal operation.


Per the tie operator, Miles City DC Tie minimum flow is 20 MW.

Per the tie operator, Miles City DC Tie minimum flow is 20 MW (deadband). WAUW BA Curtailment procedures when the minimum flow is not met may be found in this Business Practice .

Until further notice, Market Import Service(MIS) will not be allowed over the Miles City DC Tie

MCWEST_EXP will be limited to 60 MW from 03/29/2017 @ 0800 TO 7/25/2017 @ 1600.

MCWEST_EXP will be limited to 0 MW from 03/20/2017 @ 10:00 TO @ 12:00.

MCWEST_IMP will be limited to 30 MW from 03/20/2017 @ 10:00 TO @ 12:00.

MCWEST_EXP will be limited to 0 MW from 03/24/2017 @ 09:00 TO @ 11:00.

MCWEST_IMP will be limited to 30 MW from 03/24/2017 @ 09:00 TO @ 11:00.

MCWEST_EXP will be limited to 0 MW from 03/28/2017 @ 09:00 TO @ 11:00.

MCWEST_IMP will be limited to 30 MW from 03/28/2017 @ 09:00 TO @ 11:00.
OUTAGE UPDATE
Updated at 3/19/2017 2:48:09 PM (CD) - The MILES CITY DC Tie in both directions will be limited to 0 as a result of an emergency outage from 3/20/2017 2:48:09 PM (CD) to 3/20/2017 8:00:00 PM (CD).


Per the tie operator, Miles City DC Tie minimum flow is 20 MW.

Per the tie operator, Miles City DC Tie minimum flow is 20 MW (deadband). WAUW BA Curtailment procedures when the minimum flow is not met may be found in this Business Practice .

Until further notice, Market Import Service(MIS) will not be allowed over the Miles City DC Tie

MCWEST_EXP will be limited to 60 MW from 03/29/2017 @ 0800 TO 7/25/2017 @ 1600.

MCWEST_EXP will be limited to 0 MW from 03/20/2017 @ 10:00 TO @ 12:00.

MCWEST_IMP will be limited to 30 MW from 03/20/2017 @ 10:00 TO @ 12:00.

MCWEST_EXP will be limited to 0 MW from 03/24/2017 @ 09:00 TO @ 11:00.

MCWEST_IMP will be limited to 30 MW from 03/24/2017 @ 09:00 TO @ 11:00.

MCWEST_EXP will be limited to 0 MW from 03/28/2017 @ 09:00 TO @ 11:00.

MCWEST_IMP will be limited to 30 MW from 03/28/2017 @ 09:00 TO @ 11:00.
OUTAGE UPDATE
Updated at 3/19/2017 2:48:02 PM – The MILES CITY DC Tie has been returned to normal operation.


Per the tie operator, Miles City DC Tie minimum flow is 20 MW.

Per the tie operator, Miles City DC Tie minimum flow is 20 MW (deadband). WAUW BA Curtailment procedures when the minimum flow is not met may be found in this Business Practice .

Until further notice, Market Import Service(MIS) will not be allowed over the Miles City DC Tie

MCWEST_EXP will be limited to 60 MW from 03/29/2017 @ 0800 TO 7/25/2017 @ 1600.

MCWEST_EXP will be limited to 0 MW from 03/20/2017 @ 10:00 TO @ 12:00.

MCWEST_IMP will be limited to 30 MW from 03/20/2017 @ 10:00 TO @ 12:00.

MCWEST_EXP will be limited to 0 MW from 03/24/2017 @ 09:00 TO @ 11:00.

MCWEST_IMP will be limited to 30 MW from 03/24/2017 @ 09:00 TO @ 11:00.

MCWEST_EXP will be limited to 0 MW from 03/28/2017 @ 09:00 TO @ 11:00.

MCWEST_IMP will be limited to 30 MW from 03/28/2017 @ 09:00 TO @ 11:00.
OUTAGE UPDATE
Updated at 3/19/2017 2:47:02 PM (CD) - The MILES CITY DC Tie in both directions will be limited to 0 as a result of an emergency outage from 3/20/2017 2:47:02 PM (CD) to 3/20/2017 8:00:00 PM (CD).


Per the tie operator, Miles City DC Tie minimum flow is 20 MW.

Per the tie operator, Miles City DC Tie minimum flow is 20 MW (deadband). WAUW BA Curtailment procedures when the minimum flow is not met may be found in this Business Practice .

Until further notice, Market Import Service(MIS) will not be allowed over the Miles City DC Tie

MCWEST_EXP will be limited to 60 MW from 03/29/2017 @ 0800 TO 7/25/2017 @ 1600.

MCWEST_EXP will be limited to 0 MW from 03/20/2017 @ 10:00 TO @ 12:00.

MCWEST_IMP will be limited to 30 MW from 03/20/2017 @ 10:00 TO @ 12:00.

MCWEST_EXP will be limited to 0 MW from 03/24/2017 @ 09:00 TO @ 11:00.

MCWEST_IMP will be limited to 30 MW from 03/24/2017 @ 09:00 TO @ 11:00.

MCWEST_EXP will be limited to 0 MW from 03/28/2017 @ 09:00 TO @ 11:00.

MCWEST_IMP will be limited to 30 MW from 03/28/2017 @ 09:00 TO @ 11:00.
OUTAGE UPDATE
Updated at 3/17/2017 9:19:47 AM – The MILES CITY DC Tie has been returned to normal operation.


Per the tie operator, Miles City DC Tie minimum flow is 20 MW.

Per the tie operator, Miles City DC Tie minimum flow is 20 MW (deadband). WAUW BA Curtailment procedures when the minimum flow is not met may be found in this Business Practice .

Until further notice, Market Import Service(MIS) will not be allowed over the Miles City DC Tie

MCWEST_EXP will be limited to 60 MW from 03/15/2017 @ 0800 TO 7/25/2017 @ 1600.

MCWEST_EXP will be limited to 0 MW from 03/20/2017 @ 10:00 TO @ 12:00.

MCWEST_IMP will be limited to 30 MW from 03/20/2017 @ 10:00 TO @ 12:00.

MCWEST_EXP will be limited to 0 MW from 03/24/2017 @ 09:00 TO @ 11:00.

MCWEST_IMP will be limited to 30 MW from 03/24/2017 @ 09:00 TO @ 11:00.

MCWEST_EXP will be limited to 0 MW from 03/28/2017 @ 09:00 TO @ 11:00.

MCWEST_IMP will be limited to 30 MW from 03/28/2017 @ 09:00 TO @ 11:00.
OUTAGE UPDATE
Updated at 3/16/2017 4:03:49 PM – The MILES CITY DC Tie has been returned to normal operation.


Per the tie operator, Miles City DC Tie minimum flow is 20 MW.

Per the tie operator, Miles City DC Tie minimum flow is 20 MW (deadband). WAUW BA Curtailment procedures when the minimum flow is not met may be found in this Business Practice .

Until further notice, Market Import Service(MIS) will not be allowed over the Miles City DC Tie

MCWEST_EXP will be limited to 60 MW from 03/15/2017 @ 0800 TO 7/25/2017 @ 1600.
OUTAGE UPDATE
Updated at 3/1/2017 4:11:48 PM – The MILES CITY DC Tie has been returned to normal operation.


Per the tie operator, Miles City DC Tie minimum flow is 20 MW.

Per the tie operator, Miles City DC Tie minimum flow is 20 MW (deadband). WAUW BA Curtailment procedures when the minimum flow is not met may be found in this Business Practice .

Until further notice, Market Import Service(MIS) will not be allowed over the Miles City DC Tie

MCWEST_EXP will be limited to 60 MW from 03/15/2017 @ 0800 TO 7/25/2017 @ 1600.
OUTAGE UPDATE
Updated at 3/1/2017 7:30:00 AM (CS) - The MILES CITY DC Tie from east to west will be limited to 20 as a result of a planned maintenance outage from 3/1/2017 11:00:00 AM (CS) to 3/2/2017 12:00:00 AM (CS).


Per the tie operator, Miles City DC Tie minimum flow is 20 MW.

Per the tie operator, Miles City DC Tie minimum flow is 20 MW (deadband). WAUW BA Curtailment procedures when the minimum flow is not met may be found in this Business Practice .

Until further notice, Market Import Service(MIS) will not be allowed over the Miles City DC Tie

MCWEST_EXP will be limited to 60 MW from 03/15/2017 @ 0800 TO 7/25/2017 @ 1600.
OUTAGE UPDATE
Updated at 3/1/2017 10:56:22 AM – The MILES CITY DC Tie has been returned to normal operation.


Per the tie operator, Miles City DC Tie minimum flow is 20 MW.

Per the tie operator, Miles City DC Tie minimum flow is 20 MW (deadband). WAUW BA Curtailment procedures when the minimum flow is not met may be found in this Business Practice .

Until further notice, Market Import Service(MIS) will not be allowed over the Miles City DC Tie

MCWEST_EXP will be limited to 60 MW from 03/08/2017 @ 0800 TO 7/25/2017 @ 1600.
OUTAGE UPDATE
Updated at 3/1/2017 10:25:20 AM (CS) - The MILES CITY DC Tie from east to west will be limited to 20 as a result of a planned maintenance outage from 3/1/2017 11:00:00 AM (CS) to 3/2/2017 12:00:00 AM (CS).


Per the tie operator, Miles City DC Tie minimum flow is 20 MW.

Per the tie operator, Miles City DC Tie minimum flow is 20 MW (deadband). WAUW BA Curtailment procedures when the minimum flow is not met may be found in this Business Practice .

Until further notice, Market Import Service(MIS) will not be allowed over the Miles City DC Tie

MCWEST_EXP will be limited to 60 MW from 03/08/2017 @ 0800 TO 7/25/2017 @ 1600.
OUTAGE UPDATE
Updated at 2/27/2017 10:28:31 PM – The MILES CITY DC Tie has been returned to normal operation.


Per the tie operator, Miles City DC Tie minimum flow is 20 MW.

Per the tie operator, Miles City DC Tie minimum flow is 20 MW (deadband). WAUW BA Curtailment procedures when the minimum flow is not met may be found in this Business Practice .

Until further notice, Market Import Service(MIS) will not be allowed over the Miles City DC Tie

MCWEST_EXP will be limited to 60 MW from 03/08/2017 @ 0800 TO 7/25/2017 @ 1600.
OUTAGE UPDATE
Updated at 2/27/2017 9:53:27 PM (CS) - The MILES CITY DC Tie in both directions will be limited to 0 as a result of an emergency outage from 2/28/2017 9:26:00 PM (CS) to 2/28/2017 11:00:00 PM (CS).


Per the tie operator, Miles City DC Tie minimum flow is 20 MW.

Per the tie operator, Miles City DC Tie minimum flow is 20 MW (deadband). WAUW BA Curtailment procedures when the minimum flow is not met may be found in this Business Practice .

Until further notice, Market Import Service(MIS) will not be allowed over the Miles City DC Tie

MCWEST_EXP will be limited to 60 MW from 03/08/2017 @ 0800 TO 7/25/2017 @ 1600.
OUTAGE UPDATE
Updated at 2/24/2017 5:16:48 PM – The MILES CITY DC Tie has been returned to normal operation.


Per the tie operator, Miles City DC Tie minimum flow is 20 MW.

Per the tie operator, Miles City DC Tie minimum flow is 20 MW (deadband). WAUW BA Curtailment procedures when the minimum flow is not met may be found in this Business Practice .

Until further notice, Market Import Service(MIS) will not be allowed over the Miles City DC Tie

MCWEST_EXP will be limited to 60 MW from 03/08/2017 @ 0800 TO 7/25/2017 @ 1600.
OUTAGE UPDATE
Updated at 2/24/2017 5:11:00 PM (CS) - The MILES CITY DC Tie from east to west will be limited to 60 as a result of a planned maintenance outage from 2/21/2017 8:00:00 AM (CS) to 2/25/2017 4:00:00 PM (CS).


Per the tie operator, Miles City DC Tie minimum flow is 20 MW.

Per the tie operator, Miles City DC Tie minimum flow is 20 MW (deadband). WAUW BA Curtailment procedures when the minimum flow is not met may be found in this Business Practice .

Until further notice, Market Import Service(MIS) will not be allowed over the Miles City DC Tie

MCWEST_EXP will be limited to 60 MW from 03/08/2017 @ 0800 TO 7/25/2017 @ 1600.
OUTAGE UPDATE
Updated at 2/24/2017 5:09:40 PM (CS) - The MILES CITY DC Tie from east to west will be limited to 60 as a result of a planned maintenance outage from 2/25/2017 5:09:40 PM (CS) to 2/25/2017 5:09:40 PM (CS).


Per the tie operator, Miles City DC Tie minimum flow is 20 MW.

Per the tie operator, Miles City DC Tie minimum flow is 20 MW (deadband). WAUW BA Curtailment procedures when the minimum flow is not met may be found in this Business Practice .

Until further notice, Market Import Service(MIS) will not be allowed over the Miles City DC Tie

MCWEST_EXP will be limited to 60 MW from 03/08/2017 @ 0800 TO 7/25/2017 @ 1600.
OUTAGE UPDATE
Updated at 2/21/2017 4:38:00 PM (CS) - The MILES CITY DC Tie from north to south will be limited to 60 as a result of a planned maintenance outage from 2/21/2017 8:00:00 AM (CS) to 2/25/2017 4:00:00 PM (CS).


Per the tie operator, Miles City DC Tie minimum flow is 20 MW.

Per the tie operator, Miles City DC Tie minimum flow is 20 MW (deadband). WAUW BA Curtailment procedures when the minimum flow is not met may be found in this Business Practice .

Until further notice, Market Import Service(MIS) will not be allowed over the Miles City DC Tie

MCWEST_EXP will be limited to 60 MW from 03/08/2017 @ 0800 TO 7/25/2017 @ 1600.
OUTAGE UPDATE
Updated at 2/24/2017 10:19:38 AM – The MILES CITY DC Tie has been returned to normal operation.


Per the tie operator, Miles City DC Tie minimum flow is 20 MW.

Per the tie operator, Miles City DC Tie minimum flow is 20 MW (deadband). WAUW BA Curtailment procedures when the minimum flow is not met may be found in this Business Practice .

Until further notice, Market Import Service(MIS) will not be allowed over the Miles City DC Tie

MCWEST_EXP will be limited to 60 MW from 2/21/2017 @ 0800 TO 2/24/2017 @ 1600.
OUTAGE UPDATE
Updated at 2/15/2017 4:47:19 PM – The MILES CITY DC Tie has been returned to normal operation.


Per the tie operator, Miles City DC Tie minimum flow is 20 MW.

Per the tie operator, Miles City DC Tie minimum flow is 20 MW (deadband). WAUW BA Curtailment procedures when the minimum flow is not met may be found in this Business Practice .

Until further notice, Market Import Service(MIS) will not be allowed over the Miles City DC Tie

MCWEST_EXP will be limited to 60 MW from 1/23/2017 @ 0900 until 1/27/2017 @ 1600.
OUTAGE UPDATE
Updated at 1/26/2017 5:46:40 PM – The MILES CITY DC Tie has been returned to normal operation.


Per the tie operator, Miles City DC Tie minimum flow is 20 MW.

Per the tie operator, Miles City DC Tie minimum flow is 20 MW (deadband). WAUW BA Curtailment procedures when the minimum flow is not met may be found in this Business Practice .

Until further notice, Market Import Service(MIS) will not be allowed over the Miles City DC Tie

MCWEST_EXP will be limited to 60 MW from 1/23/2017 @ 0900 until 1/27/2017 @ 1600.
OUTAGE UPDATE
Updated at 1/26/2017 5:24:18 PM (CS) - The MILES CITY DC Tie from east to west will be limited to 60 as a result of a planned maintenance outage from 1/23/2017 9:00:00 AM (CS) to 1/27/2017 4:00:00 PM (CS).


Per the tie operator, Miles City DC Tie minimum flow is 20 MW.

Per the tie operator, Miles City DC Tie minimum flow is 20 MW (deadband). WAUW BA Curtailment procedures when the minimum flow is not met may be found in this Business Practice .

Until further notice, Market Import Service(MIS) will not be allowed over the Miles City DC Tie

MCWEST_EXP will be limited to 60 MW from 1/23/2017 @ 0900 until 1/27/2017 @ 1600.
OUTAGE UPDATE
Updated at 1/26/2017 5:23:20 PM (CS) - The MILES CITY DC Tie in both directions will be limited to 40 as a result of a planned maintenance outage from 1/26/2017 8:00:00 AM (CS) to 1/26/2017 8:00:00 PM (CS).


Per the tie operator, Miles City DC Tie minimum flow is 20 MW.

Per the tie operator, Miles City DC Tie minimum flow is 20 MW (deadband). WAUW BA Curtailment procedures when the minimum flow is not met may be found in this Business Practice .

Until further notice, Market Import Service(MIS) will not be allowed over the Miles City DC Tie

MCWEST_EXP will be limited to 60 MW from 1/23/2017 @ 0900 until 1/27/2017 @ 1600.
OUTAGE UPDATE
Updated at 1/26/2017 8:05:00 AM (CS) - The MILES CITY DC Tie in both directions will be limited to 40 as a result of a planned maintenance outage from 1/26/2017 8:00:00 AM (CS) to 1/26/2017 6:00:00 PM (CS).


Per the tie operator, Miles City DC Tie minimum flow is 20 MW.

Per the tie operator, Miles City DC Tie minimum flow is 20 MW (deadband). WAUW BA Curtailment procedures when the minimum flow is not met may be found in this Business Practice .

Until further notice, Market Import Service(MIS) will not be allowed over the Miles City DC Tie

MCWEST_EXP will be limited to 60 MW from 1/23/2017 @ 0900 until 1/27/2017 @ 1600.
OUTAGE UPDATE
Updated at 1/19/2017 8:40:07 AM (CS) - The MILES CITY DC Tie from east to west will be limited to 40 as a result of a planned maintenance outage from 1/26/2017 8:00:00 AM (CS) to 1/26/2017 6:00:00 PM (CS).


Per the tie operator, Miles City DC Tie minimum flow is 20 MW.

Per the tie operator, Miles City DC Tie minimum flow is 20 MW (deadband). WAUW BA Curtailment procedures when the minimum flow is not met may be found in this Business Practice .

Until further notice, Market Import Service(MIS) will not be allowed over the Miles City DC Tie

MCWEST_EXP will be limited to 60 MW from 1/23/2017 @ 0900 until 1/27/2017 @ 1600.
OUTAGE UPDATE
Updated at 1/19/2017 8:36:32 AM – The MILES CITY DC Tie has been returned to normal operation.


Per the tie operator, Miles City DC Tie minimum flow is 20 MW.

Per the tie operator, Miles City DC Tie minimum flow is 20 MW (deadband). WAUW BA Curtailment procedures when the minimum flow is not met may be found in this Business Practice .

Until further notice, Market Import Service(MIS) will not be allowed over the Miles City DC Tie

MCWEST_EXP will be limited to 60 MW from 1/23/2017 @ 0900 until 1/27/2017 @ 1600.
OUTAGE UPDATE
Updated at 1/19/2017 6:33:19 AM (CS) - The MILES CITY DC Tie from east to west will be limited to 40 as a result of a planned maintenance outage from 1/19/2017 7:00:00 AM (CS) to 1/19/2017 5:00:00 PM (CS).


Per the tie operator, Miles City DC Tie minimum flow is 20 MW.

Per the tie operator, Miles City DC Tie minimum flow is 20 MW (deadband). WAUW BA Curtailment procedures when the minimum flow is not met may be found in this Business Practice .

Until further notice, Market Import Service(MIS) will not be allowed over the Miles City DC Tie

MCWEST_EXP will be limited to 60 MW from 1/23/2017 @ 0900 until 1/27/2017 @ 1600.
OUTAGE UPDATE
Updated at 1/19/2017 6:30:34 AM – The MILES CITY DC Tie has been returned to normal operation.


Per the tie operator, Miles City DC Tie minimum flow is 20 MW.

Per the tie operator, Miles City DC Tie minimum flow is 20 MW (deadband). WAUW BA Curtailment procedures when the minimum flow is not met may be found in this Business Practice .

Until further notice, Market Import Service(MIS) will not be allowed over the Miles City DC Tie

MCWEST_EXP will be limited to 60 MW from 1/23/2017 @ 0900 until 1/27/2017 @ 1600.
OUTAGE UPDATE
Updated at 1/9/2017 10:28:52 AM – The MILES CITY DC Tie has been returned to normal operation.


Per the tie operator, Miles City DC Tie minimum flow is 20 MW.

Per the tie operator, Miles City DC Tie minimum flow is 20 MW (deadband). WAUW BA Curtailment procedures when the minimum flow is not met may be found in this Business Practice .

Until further notice, Market Import Service(MIS) will not be allowed over the Miles City DC Tie

OUTAGE UPDATE
Updated at 1/9/2017 10:28:05 AM – The MILES CITY DC Tie has been returned to normal operation.


Per the tie operator, Miles City DC Tie minimum flow is 20 MW.

Per the tie operator, Miles City DC Tie minimum flow is 20 MW (deadband). WAUW BA Curtailment procedures when the minimum flow is not met may be found in this Business Practice .

Until further notice, Market Import Service(MIS) will not be allowed over the Miles City DC Tie

OUTAGE UPDATE
Updated at 1/4/2017 11:50:37 AM (CS) - The MILES CITY DC Tie from east to west will be limited to 150 as a result of a planned maintenance outage from 1/5/2017 10:00:00 AM (CS) to 1/5/2017 3:00:00 PM (CS).


Per the tie operator, Miles City DC Tie minimum flow is 20 MW.

Per the tie operator, Miles City DC Tie minimum flow is 20 MW (deadband). WAUW BA Curtailment procedures when the minimum flow is not met may be found in this Business Practice .

Until further notice, Market Import Service(MIS) will not be allowed over the Miles City DC Tie

OUTAGE UPDATE
Updated at 1/3/2017 10:15:00 AM (CS) - The MILES CITY DC Tie from east to west will be limited to 150 as a result of a planned maintenance outage from 1/4/2017 10:00:00 AM (CS) to 1/4/2017 3:00:00 PM (CS).


Per the tie operator, Miles City DC Tie minimum flow is 20 MW.

Per the tie operator, Miles City DC Tie minimum flow is 20 MW (deadband). WAUW BA Curtailment procedures when the minimum flow is not met may be found in this Business Practice .

Until further notice, Market Import Service(MIS) will not be allowed over the Miles City DC Tie

OUTAGE UPDATE
Updated at 12/19/2016 3:24:50 PM – The MILES CITY DC Tie has been returned to normal operation.


Per the tie operator, Miles City DC Tie minimum flow is 20 MW.

Per the tie operator, Miles City DC Tie minimum flow is 20 MW (deadband). WAUW BA Curtailment procedures when the minimum flow is not met may be found in this Business Practice .

Until further notice, Market Import Service(MIS) will not be allowed over the Miles City DC Tie

OUTAGE UPDATE
Updated at 12/19/2016 11:36:16 AM (CS) - The MILES CITY DC Tie from east to west will be limited to 100 as a result of an unplanned maintenance outage from 12/19/2016 11:36:00 AM (CS) to 12/20/2016 12:00:00 AM (CS).


Per the tie operator, Miles City DC Tie minimum flow is 20 MW.

Per the tie operator, Miles City DC Tie minimum flow is 20 MW (deadband). WAUW BA Curtailment procedures when the minimum flow is not met may be found in this Business Practice .

Until further notice, Market Import Service(MIS) will not be allowed over the Miles City DC Tie

OUTAGE UPDATE
Updated at 11/16/2016 5:20:00 PM – The MILES CITY DC Tie has been returned to normal operation.


Per the tie operator, Miles City DC Tie minimum flow is 20 MW.

Per the tie operator, Miles City DC Tie minimum flow is 20 MW (deadband). WAUW BA Curtailment procedures when the minimum flow is not met may be found in this Business Practice .
Until further notice, Market Import Service(MIS) will not be allowed over the Miles City DC Tie

OUTAGE UPDATE
Updated at 11/16/2016 5:20:46 PM – The MILES CITY DC Tie has been returned to normal operation.


Per the tie operator, Miles City DC Tie minimum flow is 20 MW.

Per the tie operator, Miles City DC Tie minimum flow is 20 MW (deadband). WAUW BA Curtailment procedures when the minimum flow is not met may be found in this Business Practice .

Until further notice, Market Import Service(MIS) will not be allowed over the Miles City DC Tie

Limited to 30 MW East to West from 10/17 @ 0800 until 10/20 @ 1700.
Limited to 60 MW East to West from 10/20 @ 1700 until 10/24 @ 0900.
Limited to 30 MW East to West from 10/24 @ 0900 until 11/04 @ 1000.
OUTAGE UPDATE
Updated at 10/12/2016 12:13:00 PM (CD) - The MILES CITY DC Tie from east to west will be limited to 60 as a result of a planned maintenance outage from 9/8/2016 11:00:00 AM (CD) to 10/17/2016 8:00:00 AM (CD).


Per the tie operator, Miles City DC Tie minimum flow is 20 MW.

Per the tie operator, Miles City DC Tie minimum flow is 20 MW (deadband). WAUW BA Curtailment procedures when the minimum flow is not met may be found in this Business Practice .

Until further notice, Market Import Service(MIS) will not be allowed over the Miles City DC Tie

Limited to 30 MW East to West from 10/17 @ 0800 until 10/20 @ 1700.
Limited to 60 MW East to West from 10/20 @ 1700 until 10/24 @ 0900.
Limited to 30 MW East to West from 10/24 @ 0900 until 11/04 @ 1000.
OUTAGE UPDATE
Updated at 10/12/2016 4:53:01 AM – The MILES CITY DC Tie has been returned to normal operation.


Per the tie operator, Miles City DC Tie minimum flow is 20 MW.

Per the tie operator, Miles City DC Tie minimum flow is 20 MW (deadband). WAUW BA Curtailment procedures when the minimum flow is not met may be found in this Business Practice .

Until further notice, Market Import Service(MIS) will not be allowed over the Miles City DC Tie

Limited to 30 MW East to West from 10/17 @ 0800 until 10/20 @ 1700. Limited to 60 MW East to West from 10/20 @ 1700 until 10/24 @ 0900. Limited to 30 MW East to West from 10/24 @ 0900 until 11/04 @ 1000.
OUTAGE UPDATE
Updated at 10/12/2016 12:13:00 AM (CD) - The MILES CITY DC Tie from east to west will be limited to 60 as a result of a planned maintenance outage from 10/13/2016 12:13:53 AM (CD) to 10/17/2016 8:00:00 AM (CD).


Per the tie operator, Miles City DC Tie minimum flow is 20 MW.

Per the tie operator, Miles City DC Tie minimum flow is 20 MW (deadband). WAUW BA Curtailment procedures when the minimum flow is not met may be found in this Business Practice .

Until further notice, Market Import Service(MIS) will not be allowed over the Miles City DC Tie

OUTAGE UPDATE
Updated at 10/12/2016 12:11:35 AM (CD) - The MILES CITY DC Tie from east to west will be limited to 60 as a result of a planned maintenance outage from 10/12/2016 12:11:00 AM (CD) to 10/17/2016 8:00:00 AM (CD).


Per the tie operator, Miles City DC Tie minimum flow is 20 MW.

Per the tie operator, Miles City DC Tie minimum flow is 20 MW (deadband). WAUW BA Curtailment procedures when the minimum flow is not met may be found in this Business Practice .

Until further notice, Market Import Service(MIS) will not be allowed over the Miles City DC Tie

OUTAGE UPDATE
Updated at 9/8/2016 11:00:00 AM (CD) - The MILES CITY DC Tie from east to west will be limited to 60 as a result of a planned maintenance outage from 9/8/2016 11:00:00 AM (CD) to 10/28/2016 4:00:00 PM (CD).


Per the tie operator, Miles City DC Tie minimum flow is 20 MW.

Per the tie operator, Miles City DC Tie minimum flow is 20 MW (deadband). WAUW BA Curtailment procedures when the minimum flow is not met may be found in this Business Practice .

Until further notice, Market Import Service(MIS) will not be allowed over the Miles City DC Tie

OUTAGE UPDATE
Updated at 9/7/2016 7:30:14 AM (CD) - The MILES CITY DC Tie from east to west will be limited to 30 as a result of a planned maintenance outage from 9/7/2016 8:00:00 AM (CD) to 9/9/2016 4:00:00 PM (CD).


Per the tie operator, Miles City DC Tie minimum flow is 20 MW.

Per the tie operator, Miles City DC Tie minimum flow is 20 MW (deadband). WAUW BA Curtailment procedures when the minimum flow is not met may be found in this Business Practice .

Until further notice, Market Import Service(MIS) will not be allowed over the Miles City DC Tie

OUTAGE UPDATE
Updated at 9/6/2016 5:30:00 PM (CD) - The MILES CITY DC Tie from east to west will be limited to 60 as a result of an unplanned maintenance outage from 9/6/2016 5:30:00 PM (CD) to 9/7/2016 8:00:00 AM (CD).


Per the tie operator, Miles City DC Tie minimum flow is 20 MW.

Per the tie operator, Miles City DC Tie minimum flow is 20 MW (deadband). WAUW BA Curtailment procedures when the minimum flow is not met may be found in this Business Practice .

Until further notice, Market Import Service(MIS) will not be allowed over the Miles City DC Tie

OUTAGE UPDATE
Updated at 9/6/2016 9:01:23 AM (CD) - The MILES CITY DC Tie from east to west will be limited to 30 as a result of an unplanned maintenance outage from 9/7/2016 9:01:23 AM (CD) to 9/9/2016 4:00:00 PM (CD).


Per the tie operator, Miles City DC Tie minimum flow is 20 MW.

Per the tie operator, Miles City DC Tie minimum flow is 20 MW (deadband). WAUW BA Curtailment procedures when the minimum flow is not met may be found in this Business Practice .

Until further notice, Market Import Service(MIS) will not be allowed over the Miles City DC Tie

OUTAGE UPDATE
Updated at 9/1/2016 1:08:46 PM (CD) - The MILES CITY DC Tie from east to west will be limited to 60 as a result of an unplanned maintenance outage from 9/1/2016 11:31:00 AM (CD) to 10/28/2016 4:00:00 PM (CD).


Per the tie operator, Miles City DC Tie minimum flow is 20 MW.

Per the tie operator, Miles City DC Tie minimum flow is 20 MW (deadband). WAUW BA Curtailment procedures when the minimum flow is not met may be found in this Business Practice .

Until further notice, Market Import Service(MIS) will not be allowed over the Miles City DC Tie

OUTAGE UPDATE
Updated at 8/18/2016 6:59:00 PM – The MILES CITY DC Tie has been returned to normal operation.


Per the tie operator, Miles City DC Tie minimum flow is 20 MW.

Per the tie operator, Miles City DC Tie minimum flow is 20 MW (deadband). WAUW BA Curtailment procedures when the minimum flow is not met may be found in this Business Practice .

Until further notice, Market Import Service(MIS) will not be allowed over the Miles City DC Tie

OUTAGE UPDATE
Updated at 8/18/2016 11:01:00 AM (CD) - The MILES CITY DC Tie from east to west will be limited to 60 as a result of a planned maintenance outage from 9/1/2016 7:00:00 AM (CD) to 10/28/2016 4:00:00 PM (CD).


Per the tie operator, Miles City DC Tie minimum flow is 20 MW.

Per the tie operator, Miles City DC Tie minimum flow is 20 MW (deadband). WAUW BA Curtailment procedures when the minimum flow is not met may be found in this Business Practice .

Until further notice, Market Import Service(MIS) will not be allowed over the Miles City DC Tie

OUTAGE UPDATE
Updated at 8/17/2016 9:05:42 AM (CD) - The MILES CITY DC Tie from east to west will be limited to 60 as a result of an emergency outage from 8/17/2016 9:00:00 AM (CD) to 8/18/2016 5:00:00 PM (CD).


Per the tie operator, Miles City DC Tie minimum flow is 20 MW.

Per the tie operator, Miles City DC Tie minimum flow is 20 MW (deadband). WAUW BA Curtailment procedures when the minimum flow is not met may be found in this Business Practice .

Until further notice, Market Import Service(MIS) will not be allowed over the Miles City DC Tie

OUTAGE UPDATE
Updated at 7/18/2016 6:19:53 PM – The MILES CITY DC Tie has been returned to normal operation.


Per the tie operator, Miles City DC Tie minimum flow is 20 MW.

Per the tie operator, Miles City DC Tie minimum flow is 20 MW (deadband). WAUW BA Curtailment procedures when the minimum flow is not met may be found in this Business Practice .

Until further notice, Market Import Service(MIS) will not be allowed over the Miles City DC Tie

OUTAGE UPDATE
Updated at 7/13/2016 4:07:57 PM (CD) - The MILES CITY DC Tie from east to west will be limited to 20 as a result of a planned maintenance outage from 7/12/2016 10:00:00 AM (CD) to 7/14/2016 2:00:00 PM (CD).


Per the tie operator, Miles City DC Tie minimum flow is 20 MW.

Per the tie operator, Miles City DC Tie minimum flow is 20 MW (deadband). WAUW BA Curtailment procedures when the minimum flow is not met may be found in this Business Practice .

Until further notice, Market Import Service(MIS) will not be allowed over the Miles City DC Tie

OUTAGE UPDATE
Updated at 7/13/2016 12:28:53 PM (CD) - The MILES CITY DC Tie from east to west will be limited to 20 as a result of a planned maintenance outage from 7/12/2016 10:00:00 AM (CD) to 7/13/2016 7:00:00 PM (CD).


Per the tie operator, Miles City DC Tie minimum flow is 20 MW.

Per the tie operator, Miles City DC Tie minimum flow is 20 MW (deadband). WAUW BA Curtailment procedures when the minimum flow is not met may be found in this Business Practice .

Until further notice, Market Import Service(MIS) will not be allowed over the Miles City DC Tie

OUTAGE UPDATE
Updated at 7/12/2016 9:57:00 AM (CD) - The MILES CITY DC Tie from east to west will be limited to 20 as a result of a planned maintenance outage from 7/12/2016 10:00:00 AM (CD) to 7/13/2016 4:00:00 PM (CD).


Per the tie operator, Miles City DC Tie minimum flow is 20 MW.

Per the tie operator, Miles City DC Tie minimum flow is 20 MW (deadband). WAUW BA Curtailment procedures when the minimum flow is not met may be found in this Business Practice .

Until further notice, Market Import Service(MIS) will not be allowed over the Miles City DC Tie

OUTAGE UPDATE
Updated at 7/12/2016 9:57:54 AM (CD) - The MILES CITY DC Tie from east to west will be limited to 20 as a result of a planned maintenance outage from 7/12/2016 10:00:00 AM (CD) to 7/13/2016 10:00:00 AM (CD).


Per the tie operator, Miles City DC Tie minimum flow is 20 MW.

Per the tie operator, Miles City DC Tie minimum flow is 20 MW (deadband). WAUW BA Curtailment procedures when the minimum flow is not met may be found in this Business Practice .

Until further notice, Market Import Service(MIS) will not be allowed over the Miles City DC Tie

The Miles City DC Tie will be limited to 20 MW E to W from 7/12/2016 at 1000 till 7/13/2016 at 1600(CD)

OUTAGE UPDATE
Updated at 7/11/2016 3:04:00 PM (CD) - The MILES CITY DC Tie from east to west will be limited to 100 as a result of a planned maintenance outage from 7/11/2016 10:00:00 AM (CD) to 7/12/2016 10:00:00 AM (CD).


Per the tie operator, Miles City DC Tie minimum flow is 20 MW.

Per the tie operator, Miles City DC Tie minimum flow is 20 MW (deadband). WAUW BA Curtailment procedures when the minimum flow is not met may be found in this Business Practice .

Until further notice, Market Import Service(MIS) will not be allowed over the Miles City DC Tie

OUTAGE UPDATE
Updated at 7/11/2016 11:06:21 AM (CD) - The MILES CITY DC Tie from east to west will be limited to 100 as a result of a planned maintenance outage from 7/11/2016 10:00:00 AM (CD) to 7/15/2016 5:00:00 PM (CD).


Per the tie operator, Miles City DC Tie minimum flow is 20 MW.

Per the tie operator, Miles City DC Tie minimum flow is 20 MW (deadband). WAUW BA Curtailment procedures when the minimum flow is not met may be found in this Business Practice .

Until further notice, Market Import Service(MIS) will not be allowed over the Miles City DC Tie

OUTAGE UPDATE
Updated at 7/11/2016 9:48:00 AM (CD) - The MILES CITY DC Tie from east to west will be limited to 100 as a result of a planned maintenance outage from 7/11/2016 10:00:00 AM (CD) to 7/15/2016 4:00:00 PM (CD).


Per the tie operator, Miles City DC Tie minimum flow is 20 MW.

Per the tie operator, Miles City DC Tie minimum flow is 20 MW (deadband). WAUW BA Curtailment procedures when the minimum flow is not met may be found in this Business Practice .

Until further notice, Market Import Service(MIS) will not be allowed over the Miles City DC Tie

OUTAGE UPDATE
Updated at 7/6/2016 9:27:00 AM – The MILES CITY DC Tie has been returned to normal operation.


Per the tie operator, Miles City DC Tie minimum flow is 20 MW.

Per the tie operator, Miles City DC Tie minimum flow is 20 MW (deadband). WAUW BA Curtailment procedures when the minimum flow is not met may be found in this Business Practice .

Until further notice, Market Import Service(MIS) will not be allowed over the Miles City DC Tie

OUTAGE UPDATE
Updated at 7/6/2016 1:58:00 AM (CD) - The MILES CITY DC Tie from east to west will be limited to 60 as a result of an unplanned maintenance outage from 7/6/2016 1:40:00 AM (CD) to 7/8/2016 3:00:00 PM (CD).


Per the tie operator, Miles City DC Tie minimum flow is 20 MW.

Per the tie operator, Miles City DC Tie minimum flow is 20 MW (deadband). WAUW BA Curtailment procedures when the minimum flow is not met may be found in this Business Practice .

Until further notice, Market Import Service(MIS) will not be allowed over the Miles City DC Tie

OUTAGE UPDATE
Updated at 7/6/2016 1:58:00 AM (CD) - The MILES CITY DC Tie from east to west will be limited to 60 as a result of an unplanned maintenance outage from 7/7/2016 1:40:00 AM (CD) to 7/8/2016 3:00:00 PM (CD).


Per the tie operator, Miles City DC Tie minimum flow is 20 MW.

Per the tie operator, Miles City DC Tie minimum flow is 20 MW (deadband). WAUW BA Curtailment procedures when the minimum flow is not met may be found in this Business Practice .

Until further notice, Market Import Service(MIS) will not be allowed over the Miles City DC Tie

OUTAGE UPDATE
Updated at 6/20/2016 10:30:51 AM – The MILES CITY DC Tie has been returned to normal operation.


Per the tie operator, Miles City DC Tie minimum flow is 20 MW.

Per the tie operator, Miles City DC Tie minimum flow is 20 MW (deadband). WAUW BA Curtailment procedures when the minimum flow is not met may be found in this Business Practice .

Until further notice, Market Import Service(MIS) will not be allowed over the Miles City DC Tie

The Miles City DC Tie will be limited to 60 MW East to West on 06/07/2016 from 10:00 to 14:00

The Miles City DC Tie will be limited to 60 MW East to West on 06/15/2016 from 11:00 to 15:00.
OUTAGE UPDATE
Updated at 6/19/2016 6:48:00 PM – The MILES CITY DC Tie has been returned to normal operation.


Per the tie operator, Miles City DC Tie minimum flow is 20 MW.

Per the tie operator, Miles City DC Tie minimum flow is 20 MW (deadband). WAUW BA Curtailment procedures when the minimum flow is not met may be found in this Business Practice .

Until further notice, Market Import Service(MIS) will not be allowed over the Miles City DC Tie

The Miles City DC Tie will be limited to 60 MW East to West on 06/07/2016 from 10:00 to 14:00

The Miles City DC Tie will be limited to 60 MW East to West on 06/15/2016 from 11:00 to 15:00.
OUTAGE UPDATE
Updated at 6/19/2016 6:48:00 PM – The MILES CITY DC Tie has been returned to normal operation.


Per the tie operator, Miles City DC Tie minimum flow is 20 MW.

Per the tie operator, Miles City DC Tie minimum flow is 20 MW (deadband). WAUW BA Curtailment procedures when the minimum flow is not met may be found in this Business Practice .

Until further notice, Market Import Service(MIS) will not be allowed over the Miles City DC Tie

The Miles City DC Tie will be limited to 60 MW East to West on 06/07/2016 from 10:00 to 14:00

The Miles City DC Tie will be limited to 60 MW East to West on 06/15/2016 from 11:00 to 15:00.
OUTAGE UPDATE
Updated at 6/17/2016 12:35:00 PM (CD) - The MILES CITY DC Tie from east to west will be limited to 60 as a result of an unplanned maintenance outage from 6/17/2016 3:53:00 AM (CD) to 6/20/2016 4:00:00 PM (CD).


Per the tie operator, Miles City DC Tie minimum flow is 20 MW.

Per the tie operator, Miles City DC Tie minimum flow is 20 MW (deadband). WAUW BA Curtailment procedures when the minimum flow is not met may be found in this Business Practice .

Until further notice, Market Import Service(MIS) will not be allowed over the Miles City DC Tie

The Miles City DC Tie will be limited to 60 MW East to West on 06/07/2016 from 10:00 to 14:00

The Miles City DC Tie will be limited to 60 MW East to West on 06/15/2016 from 11:00 to 15:00.
OUTAGE UPDATE
Updated at 6/17/2016 8:53:00 AM (CD) - The MILES CITY DC Tie from east to west will be limited to 60 as a result of an unplanned maintenance outage from 6/17/2016 3:53:00 AM (CD) to 6/18/2016 12:00:00 AM (CD).


Per the tie operator, Miles City DC Tie minimum flow is 20 MW.

Per the tie operator, Miles City DC Tie minimum flow is 20 MW (deadband). WAUW BA Curtailment procedures when the minimum flow is not met may be found in this Business Practice .

Until further notice, Market Import Service(MIS) will not be allowed over the Miles City DC Tie

The Miles City DC Tie will be limited to 60 MW East to West on 06/07/2016 from 10:00 to 14:00

The Miles City DC Tie will be limited to 60 MW East to West on 06/15/2016 from 11:00 to 15:00.
OUTAGE UPDATE
Updated at 6/17/2016 10:11:33 AM – The MILES CITY DC Tie has been returned to normal operation.


Per the tie operator, Miles City DC Tie minimum flow is 20 MW.

Per the tie operator, Miles City DC Tie minimum flow is 20 MW (deadband). WAUW BA Curtailment procedures when the minimum flow is not met may be found in this Business Practice .

Until further notice, Market Import Service(MIS) will not be allowed over the Miles City DC Tie

The Miles City DC Tie will be limited to 60 MW East to West on 06/07/2016 from 10:00 to 14:00

The Miles City DC Tie will be limited to 60 MW East to West on 06/15/2016 from 11:00 to 15:00.
OUTAGE UPDATE
Updated at 6/17/2016 8:53:00 AM (CD) - The MILES CITY DC Tie from east to west will be limited to 60 as a result of an unplanned maintenance outage from 6/17/2016 3:54:00 AM (CD) to 6/18/2016 12:00:00 AM (CD).


Per the tie operator, Miles City DC Tie minimum flow is 20 MW.

Per the tie operator, Miles City DC Tie minimum flow is 20 MW (deadband). WAUW BA Curtailment procedures when the minimum flow is not met may be found in this Business Practice .

Until further notice, Market Import Service(MIS) will not be allowed over the Miles City DC Tie

The Miles City DC Tie will be limited to 60 MW East to West on 06/07/2016 from 10:00 to 14:00

The Miles City DC Tie will be limited to 60 MW East to West on 06/15/2016 from 11:00 to 15:00.
OUTAGE UPDATE
Updated at 6/2/2016 11:17:30 AM – The MILES CITY DC Tie has been returned to normal operation.


Per the tie operator, Miles City DC Tie minimum flow is 20 MW.

Per the tie operator, Miles City DC Tie minimum flow is 20 MW (deadband). WAUW BA Curtailment procedures when the minimum flow is not met may be found in this Business Practice .

Until further notice, Market Import Service(MIS) will not be allowed over the Miles City DC Tie

The Miles City DC Tie will be limited to 60 MW East to West on 06/07/2016 from 10:00 to 14:00

The Miles City DC Tie will be limited to 60 MW East to West on 06/15/2016 from 11:00 to 15:00.
OUTAGE UPDATE
Updated at 6/2/2016 11:18:00 AM – The MILES CITY DC Tie has been returned to normal operation.


Per the tie operator, Miles City DC Tie minimum flow is 20 MW.

Per the tie operator, Miles City DC Tie minimum flow is 20 MW (deadband). WAUW BA Curtailment procedures when the minimum flow is not met may be found in this Business Practice .

Until further notice, Market Import Service(MIS) will not be allowed over the Miles City DC Tie

The Miles City DC Tie will be limited to 60 MW East to West on 06/07/2016 from 10:00 to 14:00

The Miles City DC Tie will be limited to 60 MW East to West on 06/15/2016 from 11:30 to 15:00.
OUTAGE UPDATE
Updated at 6/2/2016 10:49:49 AM – The MILES CITY DC Tie has been returned to normal operation.


Per the tie operator, Miles City DC Tie minimum flow is 20 MW.

Per the tie operator, Miles City DC Tie minimum flow is 20 MW (deadband). WAUW BA Curtailment procedures when the minimum flow is not met may be found in this Business Practice .

Until further notice, Market Import Service(MIS) will not be allowed over the Miles City DC Tie

The Miles City DC Tie will be limited to 0 MW in both directions at 08:00 on 4/25/2016 to 18:00 on 5/06/2016

The Miles City DC Tie will be limited to 60 MW East to West on 06/07/2016 from 10:00 to 14:00.
OUTAGE UPDATE
Updated at 5/16/2016 1:41:21 PM – The MILES CITY DC Tie has been returned to normal operation.


Per the tie operator, Miles City DC Tie minimum flow is 20 MW.

Per the tie operator, Miles City DC Tie minimum flow is 20 MW (deadband). WAUW BA Curtailment procedures when the minimum flow is not met may be found in this Business Practice .

Until further notice, Market Import Service(MIS) will not be allowed over the Miles City DC Tie

The Miles City DC Tie will be limited to 0 MW in both directions at 08:00 on 4/25/2016 to 18:00 on 5/06/2016
OUTAGE UPDATE
Updated at 5/6/2016 7:42:35 PM – The MILES CITY DC Tie has been returned to normal operation.


Per the tie operator, Miles City DC Tie minimum flow is 20 MW.

Per the tie operator, Miles City DC Tie minimum flow is 20 MW (deadband). WAUW BA Curtailment procedures when the minimum flow is not met may be found in this Business Practice .

Until further notice, Market Import Service(MIS) will not be allowed over the Miles City DC Tie

The Miles City DC Tie will be limited to 0 MW in both directions at 08:00 on 4/25/2016 to 18:00 on 5/06/2016
OUTAGE UPDATE
Updated at 04/25/2016 06:45 (CD) – The Miles City DC Tie in both directions will be limited to 0 MW as a result of a planned maintenance outage from 04/25/2016 08:00 (CD) to 05/06/2016 18:00 (CD).


Per the tie operator, Miles City DC Tie minimum flow is 20 MW.

Per the tie operator, Miles City DC Tie minimum flow is 20 MW (deadband). WAUW BA Curtailment procedures when the minimum flow is not met may be found in this Business Practice .

Until further notice, Market Import Service(MIS) will not be allowed over the Miles City DC Tie

The Miles City DC Tie will be limited to 0 MW in both directions at 08:00 on 4/25/2016 to 18:00 on 5/06/2016
OUTAGE UPDATE
Updated at 04/25/2016 06:45 (CD) – The Miles City DC Tie in both directions will be limited to 0 MW as a result of a planned maintenance outage from 04/25/2016 08:00 (CD) to 05/06/2016 18:00 (CD).


Per the tie operator, Miles City DC Tie minimum flow is 20 MW.

Per the tie operator, Miles City DC Tie minimum flow is 20 MW (deadband). WAUW BA Curtailment procedures when the minimum flow is not met may be found in this Business Practice .

Until further notice, Market Import Service(MIS) will not be allowed over the Miles City DC Tie

The Miles City DC Tie will be limited to 0 MW in both directions at 08:00 on 4/25/2016 to 18:00 on 5/06/2016
OUTAGE UPDATE
Updated at 04/19/2016 10:36 (CD) – The Miles City DC Tie has been returned to normal operation.


Per the tie operator, Miles City DC Tie minimum flow is 20 MW.

Per the tie operator, Miles City DC Tie minimum flow is 20 MW (deadband). WAUW BA Curtailment procedures when the minimum flow is not met may be found in this Business Practice .

Until further notice, Market Import Service(MIS) will not be allowed over the Miles City DC Tie

The Miles City DC Tie will be limited to 0 MW in both directions at 14:00 on 4/25/2016 to 23:00 on 5/13/2016
OUTAGE UPDATE
Updated at 04/07/2016 13:50 (CD) – The Miles City DC Tie has been returned to normal operation.


Per the tie operator, Miles City DC Tie minimum flow is 20 MW.

Per the tie operator, Miles City DC Tie minimum flow is 20 MW (deadband). WAUW BA Curtailment procedures when the minimum flow is not met may be found in this Business Practice .

Until further notice, Market Import Service(MIS) will not be allowed over the Miles City DC Tie

The Miles City DC Tie will be derated to 60MW in the East to West Direction from April 6th 0800 until April 7th at 1700

The Miles City DC Tie will be limited to 0 MW in both directions at 14:00 on 4/25/2016 to 23:00 on 5/13/2016
OUTAGE UPDATE
Updated at 03/28/2016 18:00 (CD) – The Miles City DC Tie has been returned to normal operation.


Per the tie operator, Miles City DC Tie minimum flow is 20 MW.

Per the tie operator, Miles City DC Tie minimum flow is 20 MW (deadband). WAUW BA Curtailment procedures when the minimum flow is not met may be found in this Business Practice .

Until further notice, Market Import Service(MIS) will not be allowed over the Miles City DC Tie

The Miles City DC Tie will be derated to 60MW in the East to West Direction from April 6th 0800 until April 7th at 1700

The Miles City DC Tie will be limited to 0 MW in both directions at 14:00 on 4/25/2016 to 23:00 on 5/13/2016
OUTAGE UPDATE
Updated at 03/28/2016 13:27 (CD) – The Miles City DC Tie from east to west will be limited to 60 MW as a result of a planned maintenance outage from 03/24/2016 08:00 (CD) to 03/28/2016 16:30 (CD).


Per the tie operator, Miles City DC Tie minimum flow is 20 MW.

Per the tie operator, Miles City DC Tie minimum flow is 20 MW (deadband). WAUW BA Curtailment procedures when the minimum flow is not met may be found in this Business Practice .

Until further notice, Market Import Service(MIS) will not be allowed over the Miles City DC Tie

The Miles City DC Tie will be derated to 60MW in the East to West Direction from April 6th 0800 until April 7th at 1700

The Miles City DC Tie will be limited to 0 MW in both directions at 14:00 on 4/25/2016 to 23:00 on 5/13/2016
OUTAGE UPDATE
Updated at 03/28/2016 13:27 (CD) – The Miles City DC Tie from north to south will be limited to MW as a result of a planned maintenance outage from 03/29/2016 00:00 (CD) to 03/29/2016 00:00 (CD).


Per the tie operator, Miles City DC Tie minimum flow is 20 MW.

Per the tie operator, Miles City DC Tie minimum flow is 20 MW (deadband). WAUW BA Curtailment procedures when the minimum flow is not met may be found in this Business Practice .

Until further notice, Market Import Service(MIS) will not be allowed over the Miles City DC Tie

The Miles City DC Tie will be limited to 0 MW in both directions at 14:00 on 4/25/2016 to 23:00 on 5/13/2016
OUTAGE UPDATE
Updated at 03/25/2016 11:25 (CD) – The Miles City DC Tie from east to west will be limited to 60 MW as a result of a planned maintenance outage from 03/24/2016 08:00 (CD) to 03/28/2016 16:30 (CD).


Per the tie operator, Miles City DC Tie minimum flow is 20 MW.

Per the tie operator, Miles City DC Tie minimum flow is 20 MW (deadband). WAUW BA Curtailment procedures when the minimum flow is not met may be found in this Business Practice .

Until further notice, Market Import Service(MIS) will not be allowed over the Miles City DC Tie

The Miles City DC Tie will be limited to 0 MW in both directions at 14:00 on 4/25/2016 to 23:00 on 5/13/2016
OUTAGE UPDATE
Updated at 03/25/2016 11:25 (CD) – The Miles City DC Tie in both directions will be limited to 0 MW as a result of a planned maintenance outage from 03/24/2016 08:00 (CD) to 03/28/2016 16:30 (CD).


Per the tie operator, Miles City DC Tie minimum flow is 20 MW.

Per the tie operator, Miles City DC Tie minimum flow is 20 MW (deadband). WAUW BA Curtailment procedures when the minimum flow is not met may be found in this Business Practice .

Until further notice, Market Import Service(MIS) will not be allowed over the Miles City DC Tie

The Miles City DC Tie will be limited to 0 MW in both directions at 14:00 on 4/25/2016 to 23:00 on 5/13/2016
OUTAGE UPDATE
Updated at 03/25/2016 11:25 (CD) – The Miles City DC Tie in both directions will be limited to 0 MW as a result of a planned maintenance outage from 03/24/2016 08:00 (CD) to 03/28/2016 16:30 (CD).


Per the tie operator, Miles City DC Tie minimum flow is 20 MW.

Per the tie operator, Miles City DC Tie minimum flow is 20 MW (deadband). WAUW BA Curtailment procedures when the minimum flow is not met may be found in this Business Practice .

Until further notice, Market Import Service(MIS) will not be allowed over the Miles City DC Tie

The Miles City DC Tie will be limited to 0 MW in both directions at 14:00 on 4/25/2016 to 23:00 on 5/13/2016
OUTAGE UPDATE
Updated at 03/24/2016 00:00 (CD) – The Miles City DC Tie from north to south will be limited to MW as a result of a planned maintenance outage from 03/25/2016 00:00 (CD) to 03/25/2016 00:00 (CD).


Per the tie operator, Miles City DC Tie minimum flow is 20 MW.

Per the tie operator, Miles City DC Tie minimum flow is 20 MW (deadband). WAUW BA Curtailment procedures when the minimum flow is not met may be found in this Business Practice .

Until further notice, Market Import Service(MIS) will not be allowed over the Miles City DC Tie

3/24/2016 08:00 to 3/25/2016 at 16:00(CS) The Miles City DC Tie will be derated to 60MW E-W and 150MW W-E.

The Miles City DC Tie will be limited to 0 MW in both directions at 14:00 on 4/25/2016 to 23:00 on 5/13/2016
OUTAGE UPDATE
Updated at 03/24/2016 06:35 (CD) – The Miles City DC Tie from east to west will be limited to 60 MW as a result of a planned maintenance outage from 03/24/2016 07:00 (CD) to 03/25/2016 16:00 (CD).


Per the tie operator, Miles City DC Tie minimum flow is 20 MW.

Per the tie operator, Miles City DC Tie minimum flow is 20 MW (deadband). WAUW BA Curtailment procedures when the minimum flow is not met may be found in this Business Practice .

Until further notice, Market Import Service(MIS) will not be allowed over the Miles City DC Tie

3/24/2016 08:00 to 3/25/2016 at 16:00(CS) The Miles City DC Tie will be derated to 60MW E-W and 150MW W-E.

The Miles City DC Tie will be limited to 0 MW in both directions at 14:00 on 4/25/2016 to 23:00 on 5/13/2016
OUTAGE UPDATE
Updated at 03/24/2016 06:25 (CD) – The Miles City DC Tie from east to west will be limited to 60 MW as a result of a planned maintenance outage from 03/24/2016 08:00 (CD) to 03/25/2016 16:00 (CD).


Per the tie operator, Miles City DC Tie minimum flow is 20 MW.

Per the tie operator, Miles City DC Tie minimum flow is 20 MW (deadband). WAUW BA Curtailment procedures when the minimum flow is not met may be found in this Business Practice .

Until further notice, Market Import Service(MIS) will not be allowed over the Miles City DC Tie

3/24/2016 08:00 to 3/25/2016 at 16:00(CS) The Miles City DC Tie will be derated to 60MW E-W and 150MW W-E.

The Miles City DC Tie will be limited to 0 MW in both directions at 14:00 on 4/25/2016 to 23:00 on 5/13/2016
OUTAGE UPDATE
Updated at 03/18/2016 16:13 (CD) – The Miles City DC Tie has been returned to normal operation.


Per the tie operator, Miles City DC Tie minimum flow is 20 MW.

Per the tie operator, Miles City DC Tie minimum flow is 20 MW (deadband). WAUW BA Curtailment procedures when the minimum flow is not met may be found in this Business Practice .

Until further notice, Market Import Service(MIS) will not be allowed over the Miles City DC Tie

3/24/2016 08:00 to 3/25/2016 at 16:00(CS) The Miles City DC Tie will be derated to 60MW E-W and 150MW W-E.

OUTAGE UPDATE
Updated at 03/14/2016 05:00 (CD) – The Miles City DC Tie has been returned to normal operation.


Per the tie operator, Miles City DC Tie minimum flow is 20 MW.

Per the tie operator, Miles City DC Tie minimum flow is 20 MW (deadband). WAUW BA Curtailment procedures when the minimum flow is not met may be found in this Business Practice .

Until further notice, Market Import Service(MIS) will not be allowed over the Miles City DC Tie

3/24/2016 08:00 to 3/25/2016 at 16:00(CS) The Miles City DC Tie will be derated to 60MW E-W and 150MW W-E.

OUTAGE UPDATE
Updated at 03/14/2016 00:00 (CD) – The Miles City DC Tie has been returned to normal operation.


Per the tie operator, Miles City DC Tie minimum flow is 20 MW.

Per the tie operator, Miles City DC Tie minimum flow is 20 MW (deadband). WAUW BA Curtailment procedures when the minimum flow is not met may be found in this Business Practice .

Until further notice, Market Import Service(MIS) will not be allowed over the Miles City DC Tie.

3/09/2016 09:00 to 17:00(CS) The Miles City DC Tie will be derated to 60MW E-W and 150MW W-E.

3/24/2016 08:00 to 3/25/2016 at 16:00(CS) The Miles City DC Tie will be derated to 60MW E-W and 150MW W-E.

OUTAGE UPDATE
Updated at 03/07/2016 13:48 (CS) – The Miles City DC Tie has been returned to normal operation.


Per the tie operator, Miles City DC Tie minimum flow is 20 MW.

Per the tie operator, Miles City DC Tie minimum flow is 20 MW (deadband). WAUW BA Curtailment procedures when the minimum flow is not met may be found in this Business Practice .

Until further notice, Market Import Service(MIS) will not be allowed over the Miles City DC Tie.

3/09/2016 09:00 to 17:00(CS) The Miles City DC Tie will be derated to 60MW E-W and 150MW W-E.

3/24/2016 08:00 to 3/25/2016 at 16:00(CS) The Miles City DC Tie will be derated to 60MW E-W and 150MW W-E.

OUTAGE UPDATE
Updated at 03/07/2016 00:00 (CS) – The Miles City DC Tie has been returned to normal operation.


Per the tie operator, Miles City DC Tie minimum flow is 20 MW.

Per the tie operator, Miles City DC Tie minimum flow is 20 MW (deadband). WAUW BA Curtailment procedures when the minimum flow is not met may be found in this Business Practice .

Until further notice, Market Import Service(MIS) will not be allowed over the Miles City DC Tie.

3/09/2016 09:00 to 17:00(CS) The Miles City DC Tie will be derated to 60MW E-W and 150MW W-E.

3/24/2016 08:00 to 17:00(CS) The Miles City DC Tie will be derated to 60MW E-W and 150MW W-E.

OUTAGE UPDATE
Updated at 03/02/2016 00:00 (CS) – The Miles City DC Tie has been returned to normal operation.


Per the tie operator, Miles City DC Tie minimum flow is 20 MW.

Per the tie operator, Miles City DC Tie minimum flow is 20 MW (deadband). WAUW BA Curtailment procedures when the minimum flow is not met may be found in this Business Practice .

Until further notice, Market Import Service(MIS) will not be allowed over the Miles City DC Tie.

2/24/2016 09:00 to 17:00(CS) The Miles City DC Tie will be derated to 60MW E-W and 150MW W-E.

2/25/2016 10:00 to 16:00(CS) The Miles City DC Tie will be derated to 60MW E-W and 150MW W-E.

3/09/2016 09:00 to 17:00(CS) The Miles City DC Tie will be derated to 60MW E-W and 150MW W-E.

3/24/2016 08:00 to 17:00(CS) The Miles City DC Tie will be derated to 60MW E-W and 150MW W-E.

OUTAGE UPDATE
Updated at 02/24/2016 00:00 (CS) – The Miles City DC Tie has been returned to normal operation.


Per the tie operator, Miles City DC Tie minimum flow is 20 MW.

Per the tie operator, Miles City DC Tie minimum flow is 20 MW (deadband). WAUW BA Curtailment procedures when the minimum flow is not met may be found in this Business Practice .

Until further notice, Market Import Service(MIS) will not be allowed over the Miles City DC Tie.

2/24/2016 09:00 to 17:00(CS) The Miles City DC Tie will be derated to 60MW E-W and 150MW W-E.

2/25/2016 10:00 to 16:00(CS) The Miles City DC Tie will be derated to 60MW E-W and 150MW W-E.

3/09/2016 09:00 to 17:00(CS) The Miles City DC Tie will be derated to 60MW E-W and 150MW W-E.

3/24/2016 08:00 to 17:00(CS) The Miles City DC Tie will be derated to 60MW E-W and 150MW W-E.

3/23/2016 08:00 to 17:00(CS) The Miles City DC Tie will be derated to 60MW E-W.

OUTAGE UPDATE
Updated at 02/23/2016 00:00 (CS) – The Miles City DC Tie has been returned to normal operation.


Per the tie operator, Miles City DC Tie minimum flow is 20 MW.

Per the tie operator, Miles City DC Tie minimum flow is 20 MW (deadband). WAUW BA Curtailment procedures when the minimum flow is not met may be found in this Business Practice .

Until further notice, Market Import Service(MIS) will not be allowed over the Miles City DC Tie.

2/24/2016 09:00 to 17:00(CS) The Miles City DC Tie will be derated to 60MW E-W and 150MW W-E.

2/25/2016 10:00 to 16:00(CS) The Miles City DC Tie will be derated to 60MW E-W and 150MW W-E.

3/09/2016 09:00 to 17:00(CS) The Miles City DC Tie will be derated to 60MW E-W and 150MW W-E.

3/24/2016 08:00 to 17:00(CS) The Miles City DC Tie will be derated to 60MW E-W and 150MW W-E.

OUTAGE UPDATE
Updated at 02/22/2016 00:00 (CS) – The Miles City DC Tie has been returned to normal operation.


Per the tie operator, Miles City DC Tie minimum flow is 20 MW.

Per the tie operator, Miles City DC Tie minimum flow is 20 MW (deadband). WAUW BA Curtailment procedures when the minimum flow is not met may be found in this Business Practice .

Until further notice, Market Import Service(MIS) will not be allowed over the Miles City DC Tie.

2/24/2016 09:00 to 17:00(CS) The Miles City DC Tie will be derated to 60MW E-W and 150MW W-E.

2/25/2016 10:00 to 16:00(CS) The Miles City DC Tie will be derated to 60MW E-W and 150MW W-E.

3/09/2016 09:00 to 17:00(CS) The Miles City DC Tie will be derated to 60MW E-W and 150MW W-E.

OUTAGE UPDATE
Updated at 02/13/2016 16:35 (CS) – The Miles City DC Tie has been returned to normal operation.


Per the tie operator, Miles City DC Tie minimum flow is 20 MW.

Per the tie operator, Miles City DC Tie minimum flow is 20 MW (deadband). WAUW BA Curtailment procedures when the minimum flow is not met may be found in this Business Practice .

Until further notice, Market Import Service(MIS) will not be allowed over the Miles City DC Tie.

2/24/2016 09:00 to 17:00(CS) The Miles City DC Tie will be derated to 60MW E-W and 150MW W-E.

2/25/2016 10:00 to 16:00(CS) The Miles City DC Tie will be derated to 60MW E-W and 150MW W-E.

3/09/2016 09:00 to 17:00(CS) The Miles City DC Tie will be derated to 60MW E-W and 150MW W-E.

OUTAGE UPDATE
Updated at 02/13/2016 00:00 (CS) – The Miles City DC Tie has been returned to normal operation.


Per the tie operator, Miles City DC Tie minimum flow is 20 MW.

Per the tie operator, Miles City DC Tie minimum flow is 20 MW (deadband). WAUW BA Curtailment procedures when the minimum flow is not met may be found in this Business Practice .

Until further notice, Market Import Service(MIS) will not be allowed over the Miles City DC Tie.

2/24/2016 09:00 to 17:00(CS) The Miles City DC Tie will be derated to 60MW E-W and 150MW W-E.

2/25/2016 10:00 to 16:00(CS) The Miles City DC Tie will be derated to 60MW E-W and 150MW W-E.

3/09/2016 09:00 to 17:00(CS) The Miles City DC Tie will be derated to 60MW E-W and 150MW W-E.

OUTAGE UPDATE
Updated at 02/13/2016 00:00 (CS) – The Miles City DC Tie has been returned to normal operation.


Per the tie operator, Miles City DC Tie minimum flow is 20 MW.

Per the tie operator, Miles City DC Tie minimum flow is 20 MW (deadband). WAUW BA Curtailment procedures when the minimum flow is not met may be found in this Business Practice .

Until further notice, Market Import Service(MIS) will not be allowed over the Miles City DC Tie.

2/24/2016 09:00 to 17:00(CS) The Miles City DC Tie will be derated to 60MW E-W and 150MW W-E.

2/25/2016 10:00 to 16:00(CS) The Miles City DC Tie will be derated to 60MW E-W and 150MW W-E.

3/09/2016 09:00 to 17:00(CS) The Miles City DC Tie will be derated to 60MW E-W and 150MW W-E.

OUTAGE UPDATE
Updated at 02/13/2016 12:40 (CS) – The Miles City DC Tie in both directions will be limited to 0 MW as a result of a planned maintenance outage from 02/13/2016 18:00 (CS) to 02/13/2016 20:00 (CS).


Per the tie operator, Miles City DC Tie minimum flow is 20 MW.

Per the tie operator, Miles City DC Tie minimum flow is 20 MW (deadband). WAUW BA Curtailment procedures when the minimum flow is not met may be found in this Business Practice .

Until further notice, Market Import Service(MIS) will not be allowed over the Miles City DC Tie.

2/24/2016 09:00 to 17:00(CS) The Miles City DC Tie will be derated to 60MW E-W and 150MW W-E.

2/25/2016 10:00 to 16:00(CS) The Miles City DC Tie will be derated to 60MW E-W and 150MW W-E.

3/09/2016 09:00 to 17:00(CS) The Miles City DC Tie will be derated to 60MW E-W and 150MW W-E.

OUTAGE UPDATE
Updated at 02/13/2016 00:00 (CS) – The Miles City DC Tie from north to south will be limited to MW as a result of a planned maintenance outage from 02/14/2016 00:00 (CS) to 02/14/2016 00:00 (CS).


Per the tie operator, Miles City DC Tie minimum flow is 20 MW.

Per the tie operator, Miles City DC Tie minimum flow is 20 MW (deadband). WAUW BA Curtailment procedures when the minimum flow is not met may be found in this Business Practice .

Until further notice, Market Import Service(MIS) will not be allowed over the Miles City DC Tie.

2/25/2016 10:00 to 16:00(CS) The Miles City DC Tie will be derated to 60MW E-W and 150MW W-E.
OUTAGE UPDATE
Updated at 02/12/2016 00:00 (CS) – The Miles City DC Tie in both directions will be limited to 0 MW as a result of a planned maintenance outage from 02/13/2016 18:00 (CS) to 02/13/2016 20:00 (CS).


Per the tie operator, Miles City DC Tie minimum flow is 20 MW.

Per the tie operator, Miles City DC Tie minimum flow is 20 MW (deadband). WAUW BA Curtailment procedures when the minimum flow is not met may be found in this Business Practice .

Until further notice, Market Import Service(MIS) will not be allowed over the Miles City DC Tie.

2/25/2016 10:00 to 16:00(CS) The Miles City DC Tie will be derated to 60MW E-W and 150MW W-E.
OUTAGE UPDATE
Updated at 02/12/2016 00:00 (CS) – The Miles City DC Tie from north to south will be limited to 0 MW as a result of a planned maintenance outage from 02/13/2016 18:00 (CS) to 02/13/2016 20:00 (CS).


Per the tie operator, Miles City DC Tie minimum flow is 20 MW.

Per the tie operator, Miles City DC Tie minimum flow is 20 MW (deadband). WAUW BA Curtailment procedures when the minimum flow is not met may be found in this Business Practice .

Until further notice, Market Import Service(MIS) will not be allowed over the Miles City DC Tie.

OUTAGE UPDATE
Updated at 02/07/2016 09:53 (CS) – The Miles City DC Tie has been returned to normal operation.


Per the tie operator, Miles City DC Tie minimum flow is 20 MW.

Per the tie operator, Miles City DC Tie minimum flow is 20 MW (deadband). WAUW BA Curtailment procedures when the minimum flow is not met may be found in this Business Practice .

Until further notice, Market Import Service(MIS) will not be allowed over the Miles City DC Tie.

OUTAGE UPDATE
Updated at 02/07/2016 09:53 (CS) – The Miles City DC Tie has been returned to normal operation.


Per the tie operator, Miles City DC Tie minimum flow is 20 MW.

Per the tie operator, Miles City DC Tie minimum flow is 20 MW (deadband). WAUW BA Curtailment procedures when the minimum flow is not met may be found in this Business Practice .

Until further notice, Market Import Service(MIS) will not be allowed over the Miles City DC Tie.

OUTAGE UPDATE
Updated at 02/07/2016 09:53 (CS) – The Miles City DC Tie has been returned to normal operation.


Per the tie operator, Miles City DC Tie minimum flow is 20 MW.

Per the tie operator, Miles City DC Tie minimum flow is 20 MW (deadband). WAUW BA Curtailment procedures when the minimum flow is not met may be found in this Business Practice .

Until further notice, Market Import Service(MIS) will not be allowed over the Miles City DC Tie.

OUTAGE UPDATE
Updated at 02/07/2016 05:01 (CS) – The Miles City DC Tie from east to west will be limited to 0 MW as a result of an unplanned maintenance outage from 02/07/2016 01:42 (CS) to 02/08/2016 00:00 (CS).


Per the tie operator, Miles City DC Tie minimum flow is 20 MW.

Per the tie operator, Miles City DC Tie minimum flow is 20 MW (deadband). WAUW BA Curtailment procedures when the minimum flow is not met may be found in this Business Practice .

Until further notice, Market Import Service(MIS) will not be allowed over the Miles City DC Tie.

OUTAGE UPDATE
Updated at 01/26/2016 20:00 (CS) – The Miles City DC Tie has been returned to normal operation.


Per the tie operator, Miles City DC Tie minimum flow is 20 MW.

Per the tie operator, Miles City DC Tie minimum flow is 20 MW (deadband). WAUW BA Curtailment procedures when the minimum flow is not met may be found in this Business Practice .

Until further notice, Market Import Service(MIS) will not be allowed over the Miles City DC Tie.

OUTAGE UPDATE
Updated at 01/08/2016 08:18 (CS) – The Miles City DC Tie from east to west will be limited to 50 MW as a result of a planned maintenance outage from 01/06/2016 00:00 (CS) to 01/26/2016 23:00 (CS).


Per the tie operator, Miles City DC Tie minimum flow is 20 MW.

Per the tie operator, Miles City DC Tie minimum flow is 20 MW (deadband). WAUW BA Curtailment procedures when the minimum flow is not met may be found in this Business Practice .

Until further notice, Market Import Service(MIS) will not be allowed over the Miles City DC Tie.

OUTAGE UPDATE
Updated at 01/07/2016 07:35 (CS) – The Miles City DC Tie from east to west will be limited to 60 MW as a result of a planned maintenance outage from 01/06/2016 00:00 (CS) to 01/26/2016 23:00 (CS).


Per the tie operator, Miles City DC Tie minimum flow is 20 MW.

Per the tie operator, Miles City DC Tie minimum flow is 20 MW (deadband). WAUW BA Curtailment procedures when the minimum flow is not met may be found in this Business Practice .

Until further notice, Market Import Service(MIS) will not be allowed over the Miles City DC Tie.

OUTAGE UPDATE
Updated at 01/06/2016 00:00 (CS) – The Miles City DC Tie from north to south will be limited to MW as a result of a planned maintenance outage from 01/07/2016 00:00 (CS) to 01/07/2016 00:00 (CS).


Per the tie operator, Miles City DC Tie minimum flow is 20 MW.

Per the tie operator, Miles City DC Tie minimum flow is 20 MW (deadband). WAUW BA Curtailment procedures when the minimum flow is not met may be found Business Practice HERE.

Until further notice, Market Import Service(MIS) will not be allowed over the Miles City DC Tie.

OUTAGE UPDATE
Updated at 01/06/2016 00:00 (CS) – The Miles City DC Tie from north to south will be limited to MW as a result of a planned maintenance outage from 01/07/2016 00:00 (CS) to 01/07/2016 00:00 (CS).


Per the tie operator, Miles City DC Tie minimum flow is 20 MW.

Per the tie operator, Miles City DC Tie minimum flow is 20 MW (deadband). WAUW BA Curtailment procedures when the minimum flow is not met may be found HERE.

Until further notice, Market Import Service(MIS) will not be allowed over the Miles City DC Tie.

OUTAGE UPDATE
Updated at 01/06/2016 00:00 (CS) – The Miles City DC Tie from north to south will be limited to MW as a result of a planned maintenance outage from 01/07/2016 00:00 (CS) to 01/07/2016 00:00 (CS).


Per the tie operator, Miles City DC Tie minimum flow is 20 MW.

Per the tie operator, Miles City DC Tie minimum flow is 20 MW (deadband). WAUW BA Curtailment procedures when the minimum flow is not met may be found HERE.

Until further notice, Market Import Service(MIS) will not be allowed over the Miles City DC Tie.

OUTAGE UPDATE
Updated at 01/06/2016 00:00 (CS) – The Miles City DC Tie from north to south will be limited to MW as a result of a planned maintenance outage from 01/07/2016 00:00 (CS) to 01/07/2016 00:00 (CS).


Per the tie operator, Miles City DC Tie minimum flow is 20 MW.

Per the tie operator, Miles City DC Tie minimum flow is 20 MW (deadband). WAUW BA Curtailment procedures when the minimum flow is not met may be found HERE.

Until further notice, Market Import Service(MIS) will not be allowed over the Miles City DC Tie.

OUTAGE UPDATE
Updated at 01/06/2016 00:00 (CS) – The Miles City DC Tie from north to south will be limited to MW as a result of a planned maintenance outage from 01/07/2016 00:00 (CS) to 01/07/2016 00:00 (CS).


Per the tie operator, Miles City DC Tie minimum flow is 20 MW.

Miles City DC Tie will be under the SWPP OATT beginning 10/01/2015.

Until further notice, Market Import Service(MIS) will not be allowed over the Miles City DC Tie.

OUTAGE UPDATE
Updated at 01/05/2016 08:00 (CS) – The Miles City DC Tie from east to west will be limited to 60 MW as a result of an unplanned maintenance outage from 01/05/2016 08:00 (CS) to 01/26/2016 16:00 (CS).


Per the tie operator, Miles City DC Tie minimum flow is 20 MW.

Miles City DC Tie will be under the SWPP OATT beginning 10/01/2015.

Until further notice, Market Import Service(MIS) will not be allowed over the Miles City DC Tie.

OUTAGE UPDATE
Updated at 12/08/2015 10:12 (CS) – The Miles City DC Tie has been returned to normal operation.


Per the tie operator, Miles City DC Tie minimum flow is 20 MW.

Miles City DC Tie will be under the SWPP OATT beginning 10/01/2015.

Until further notice, Market Import Service(MIS) will not be allowed over the Miles City DC Tie.

OUTAGE UPDATE
Updated at 12/06/2015 11:16 (CS) – The Miles City DC Tie from east to west will be limited to 20 MW as a result of a planned maintenance outage from 12/10/2015 08:00 (CS) to 12/10/2015 12:00 (CS).


Per the tie operator, Miles City DC Tie minimum flow is 20 MW.

Miles City DC Tie will be under the SWPP OATT beginning 10/01/2015.

Until further notice, Market Import Service(MIS) will not be allowed over the Miles City DC Tie.

OUTAGE UPDATE
Updated at 11/10/2015 00:00 (CS) – The Miles City DC Tie has been returned to normal operation.


Per the tie operator, Miles City DC Tie minimum flow is 20 MW.

Miles City DC Tie will be under the SWPP OATT beginning 10/01/2015.


OUTAGE UPDATE
Updated at 10/30/2015 00:00 (CD) – The Miles City DC Tie has been returned to normal operation.


Per the tie operator, Miles City DC Tie minimum flow is 20 MW.

Miles City DC Tie will be under the SWPP OATT beginning 10/01/2015.

The Miles City DC Tie from east to west will be limited to 90 MW as a result of a planned maintenance outage from 10/13/2015 00:00 (CD) to 10/29/2015 00:00 (CD)..

OUTAGE UPDATE
Updated at 10/08/2015 18:22 (CD) – The Miles City DC Tie has been returned to normal operation.


Per the tie operator, Miles City DC Tie minimum flow is 20 MW.

Miles City DC Tie will be under the SWPP OATT beginning 10/01/2015.

The Miles City DC Tie from east to west will be limited to 90 MW as a result of a planned maintenance outage from 10/13/2015 00:00 (CD) to 10/29/2015 00:00 (CD)..

OUTAGE UPDATE
Updated at 10/01/2015 11:25 (CD) – The Miles City DC Tie from east to west will be limited to 50 MW as a result of a planned maintenance outage from 10/01/2015 00:00 (CD) to 10/09/2015 16:00 (CD).


Per the tie operator, Miles City DC Tie minimum flow is 20 MW.

Miles City DC Tie will be under the SWPP OATT beginning 10/01/2015.

The Miles City DC Tie from east to west will be limited to 90 MW as a result of a planned maintenance outage from 10/13/2015 00:00 (CD) to 10/29/2015 00:00 (CD)..

OUTAGE UPDATE
Updated at 10/03/2015 00:00 (CD) – The Miles City DC Tie from north to south will be limited to MW as a result of a planned maintenance outage from 10/04/2015 00:00 (CD) to 10/04/2015 00:00 (CD).


Per the tie operator, Miles City DC Tie minimum flow is 20 MW.

Miles City DC Tie will be under the SWPP OATT beginning 10/01/2015.

OUTAGE UPDATE
Updated at 10/01/2015 11:25 (CD) – The Miles City DC Tie from east to west will be limited to 50 MW as a result of a planned maintenance outage from 10/01/2015 00:00 (CD) to 10/09/2015 16:00 (CD).


Per the tie operator, Miles City DC Tie minimum flow is 20 MW.

Miles City DC Tie will be under the SWPP OATT beginning 10/01/2015.

OUTAGE UPDATE
Updated at 10/01/2015 11:25 (CD) – The Miles City DC Tie from east to west will be limited to 50 MW as a result of a planned maintenance outage from 10/01/2015 00:00 (CD) to 10/09/2015 16:00 (CD).


Per the tie operator, Miles City DC Tie minimum flow is 20 MW.

Miles City DC Tie will be under the SWPP OATT beginning 10/01/2015.

OUTAGE UPDATE
Updated at 10/01/2015 11:25 (CD) – The Miles City DC Tie from east to west will be limited to 50 MW as a result of a planned maintenance outage from 10/01/2015 00:00 (CD) to 10/09/2015 16:00 (CD).


Per the tie operator, Miles City DC Tie minimum flow is 20 MW.

Miles City DC Tie will be under the SWPP OATT beginning 10/01/2015.

OUTAGE UPDATE
Updated at 10/01/2015 11:25 (CD) – The Miles City DC Tie from east to west will be limited to 50 MW as a result of a planned maintenance outage from 10/01/2015 00:00 (CD) to 10/09/2015 16:00 (CD).


Per the tie operator, Miles City DC Tie minimum flow is 15 MW.>

Miles City DC Tie will be under the SWPP OATT beginning 10/01/2015.

OUTAGE UPDATE
Updated at 10/01/2015 09:34 (CD) – The Miles City DC Tie from east to west will be limited to 50 MW as a result of a planned maintenance outage from 10/01/2015 00:00 (CD) to 10/09/2015 01:00 (CD).


Per the tie operator, Miles City DC Tie minimum flow is 15 MW.>

Miles City DC Tie will be under the SWPP OATT beginning 10/01/2015.

OUTAGE UPDATE
Updated at 10/01/2015 19:16 (CD) – The Miles City DC Tie from east to west will be limited to 50 MW as a result of a planned maintenance outage from 10/01/2015 00:00 (CD) to 10/09/2015 00:00 (CD).


Per the tie operator, Miles City DC Tie minimum flow is 15 MW.>

Miles City DC Tie will be under the SWPP OATT beginning 10/01/2015.

OUTAGE UPDATE
Updated at 10/01/2015 00:00 (CD) – The Miles City DC Tie from east to west will be limited to 50 MW as a result of a planned maintenance outage from 10/01/2015 00:00 (CD) to 10/09/2015 12:00 (CD).


Per the tie operator, Miles City DC Tie minimum flow is 15 MW.>

Miles City DC Tie will be under the SWPP OATT beginning 10/01/2015.

OUTAGE UPDATE
Updated at 10/01/2015 07:44 (CD) – The Miles City DC Tie has been returned to normal operation.


Per the tie operator, Miles City DC Tie minimum flow is 15 MW.>

Miles City DC Tie will be under the SWPP OATT beginning 10/01/2015.

OUTAGE UPDATE
Updated at 09/30/2015 13:16 (CD) – The Miles City DC Tie from east to west will be limited to 50 MW as a result of a planned maintenance outage from 09/28/2015 09:00 (CD) to 10/09/2015 16:00 (CD).


Per the tie operator, Miles City DC Tie minimum flow is 15 MW.>

Miles City DC Tie will be under the SWPP OATT beginning 10/01/2015.

OUTAGE UPDATE
Updated at 09/30/2015 13:16 (CD) – The Miles City DC Tie from east to west will be limited to 50 MW as a result of a planned maintenance outage from 09/28/2015 09:00 (CD) to 10/09/2015 16:00 (CD).


Per the tie operator, Miles City DC Tie minimum flow is 15 MW.>

Miles City DC Tie will be under the SWPP OATT beginning 10/01/2015.

OUTAGE UPDATE
Updated at 09/24/2015 05:39 (CD) – The Miles City DC Tie has been returned to normal operation.


Per the tie operator, Miles City DC Tie minimum flow is 15 MW.>

Miles City DC Tie will be under the SWPP OATT beginning 10/01/2015.

OUTAGE UPDATE
Updated at 09/21/2015 08:53 (CD) – The Miles City DC Tie in both directions will be limited to 0 MW as a result of an unplanned maintenance outage from 09/21/2015 08:53 (CD) to 10/05/2015 00:00 (CD).


Per the tie operator, Miles City DC Tie minimum flow is 15 MW.>

Miles City DC Tie will be under the SWPP OATT beginning 10/01/2015.

OUTAGE UPDATE
Updated at 09/21/2015 09:30 (CD) – The Miles City DC Tie has been returned to normal operation.


Per the tie operator, Miles City DC Tie minimum flow is 15 MW.>

OUTAGE UPDATE
Updated at 09/17/2015 09:30(CD) – The Miles City DC Tie has been returned to normal operation.