2018 Affected Systems
The following Generator Interconnection Studies have been requested.

Study Number Date Requested Purpose of Study Remarks Report
ASGI-2018-001 November 01, 2018 Generation Interconnection Affected System Interconnection Facilities Study Report Posted 4/8/2019 Download
ASGI-2018-001 February 02, 2018 Affected System Impact Study Posted 3/21/2019 Download
ASGI-2018-001 February 02, 2018 Limited Operation Impact Study Report of Affected System ASGI-2018-001 Reposted 8/7/2019 Download

Please send your requests to GIStudies@spp.org